Analisa Harga Satuan Pekerjaan

Kota Palu

T. ANG. : 2018

1. ANL. PRAKTIS 1 M3 BONGKARAN PONDASI


Tenaga
5.000 Oh Pekerja Rp. 70,000.00 = Rp. 350,017.50
0.250 Oh Mandor Rp. 120,000.00 = Rp. 29,970.00
Jumlah Rp. 379,987.50

2. ANL. PRAKTIS 1 M3 BONGKARAN BETON LANTAI


Tenaga
3.334 Oh Pekerja Rp. 70,000.00 = Rp. 233,345.00
0.167 Oh Mandor Rp. 120,000.00 = Rp. 19,980.00
Jumlah Rp. 253,325.00

3. ANL. PRAKTIS 1 M3 BONGKARAN DINDING TEMBOK BATA + KUSEN


Tenaga
4.334 Oh Pekerja Rp. 70,000.00 = Rp. 303,348.50
0.033 Oh Mandor Rp. 120,000.00 = Rp. 3,900.00
Jumlah Rp. 307,248.50
~ Untuk 1 M2 Bongkaran Dinding Tembok Bata ( Anl.Bongkaran Dinding Tembok Bata / 15 ) = Rp. 20,483.23

4. SNI 6.13. 1 M3 BONGKARAN BETON BERTULANG


Tenaga
6.667 Oh Pekerja Rp. 70,000.00 = Rp. 466,690.00
0.333 Oh Mandor Rp. 120,000.00 = Rp. 39,960.00
Jumlah Rp. 506,650.00

5. SNI 6.1. 1 M2 MENGUPAS / MENGEROK PERMUKAAN CAT TEMBOK LAMA


Bahan
0.050 Kg Soda Api Rp. 27,500.00 = Rp. 1,375.00

Tenaga
0.150 Oh Pekerja Rp. 70,000.00 = Rp. 10,500.00
0.0025 Oh Mandor Rp. 120,000.00 = Rp. 300.00
Jumlah Rp. 12,175.00

6. ANL. PRAKTIS 10 M2 BONGKARAN ATAP SENG GELOMBANG (ATAP TIDAK DIPAKAI LAGI)
Tenaga
0.500 Oh Pekerja Rp. 70,000.00 = Rp. 35,000.00
0.250 Oh Tukang Rp. 95,000.00 = Rp. 23,750.00
Jumlah Rp. 58,750.00
• Untuk 1 M2 Bongkaran Rangka Atap Kayu (Anl.Bongkaran Atap Seng Gelombang / 10) = Rp. 5,875.00

7. ANL. PRAKTIS 10 M2 BONGKARAN RANGKA ATAP KAYU (KAYU SEBAGIAN DIPAKAI KEMBALI)
Tenaga
1.000 Oh Pekerja Rp. 70,000.00 = Rp. 70,000.00
0.050 Oh Mandor Rp. 120,000.00 = Rp. 6,000.00
Jumlah Rp. 76,000.00
• Untuk 1 M2 Bongkaran Rangka Atap Kayu ( Anl.Bongkaran Rangka Atap Kayu / 10 ) = Rp. 7,600.00
8. SNI 6.8. 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
Tenaga
0.100 Oh Pekerja Rp. 70,000.00 = Rp. 7,000.00
0.050 Oh Mandor Rp. 120,000.00 = Rp. 6,000.00
1.000 Oh Operator Rp. 150,000.00 = Rp. 150,000.00
Peralatan
0.0075 Jam Excavator Rp. 350,000.00 = Rp. 2,625.00
Harga Satuan Pekerjaan = Rp. 165,625.00

9. SNI 6.4. 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


Bahan
0.012 M3 Kayu 5/7 Rp. 1,700,000.00 = Rp. 20,400.00
0.020 Kg Paku 2" - 5" Rp. 20,800.00 = Rp. 416.00
0.007 M3 Papan 3/20 Rp. 1,700,000.00 = Rp. 11,900.00
Tenaga
0.100 Oh Pekerja Rp. 70,000.00 = Rp. 7,000.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.005 Oh Mandor Rp. 120,000.00 = Rp. 600.00
Harga Satuan Pekerjaan = Rp. 51,016.00

10. ANL. PRAKTIS 1 M2 PEMBUATAN KANTOR SEMENTARA


Bahan
1.250 Btg Dolken Kayu Galam Ø 8 - 10 P = 4 m Rp. 11,000.00 = Rp. 13,750.00
0.180 M3 Kayu Terentang / Mall Rp. 1,700,000.00 = Rp. 306,000.00
0.850 Kg Paku 2" - 5" Rp. 20,800.00 = Rp. 17,680.00
35.000 Kg Semen Portland (50 Kg) Rp. 1,300.00 = Rp. 45,500.00
0.150 M3 Pasir Pasang Rp. 160,000.00 = Rp. 24,000.00
0.100 M3 Pasir Beton Rp. 160,000.00 = Rp. 16,000.00
0.150 M3 Kerikil Sungai Ayakan Rp. 190,000.00 = Rp. 28,500.00
30.000 Bh Batu Bata Ukuran 5 x 11 x 22 Rp. 1,150.00 = Rp. 34,500.00
0.250 M1 Seng Gelombang BJLS 20 Rp. 47,300.00 = Rp. 11,825.00
0.080 M2 Kaca 5 mm Buram Rp. 200,000.00 = Rp. 16,000.00
0.060 Lbr Tripleks Ukuran 120 x 240cm T=3mm Rp. 55,000.00 = Rp. 3,300.00
Tenaga
1.000 Oh Pekerja Rp. 70,000.00 = Rp. 70,000.00
2.000 Oh Tukang Rp. 95,000.00 = Rp. 190,000.00
0.300 Oh Kepala Tukang Rp. 120,000.00 = Rp. 36,000.00
0.050 Oh Mandor Rp. 120,000.00 = Rp. 6,000.00
Harga Satuan Pekerjaan = Rp. 819,055.00

11. SNI 6.6. 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


Bahan
1.700 Btg Dolken Kayu Galam Ø 8 - 10 P = 4 m Rp. 11,000.00 = Rp. 18,700.00
0.210 M3 Kayu Terentang / Mall Rp. 1,700,000.00 = Rp. 357,000.00
0.300 Kg Paku 2" - 5" Rp. 20,800.00 = Rp. 6,240.00
10.500 Kg Semen Portland (50 Kg) Rp. 1,300.00 = Rp. 13,650.00
0.030 M3 Pasir Beton Rp. 160,000.00 = Rp. 4,800.00
0.050 M3 Kerikil Sungai Ayakan Rp. 190,000.00 = Rp. 9,500.00
1.500 Lbr Seng Gelombang BJLS 20 Rp. 47,300.00 = Rp. 70,950.00
Tenaga
1.000 Oh Pekerja Rp. 70,000.00 = Rp. 70,000.00
2.000 Oh Tukang Rp. 95,000.00 = Rp. 190,000.00
0.200 Oh Kepala Tukang Rp. 120,000.00 = Rp. 24,000.00
0.050 Oh Mandor Rp. 120,000.00 = Rp. 6,000.00
Harga Satuan Pekerjaan = Rp. 770,840.00
12. SNI 6.2. 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
Bahan
1.250 Btg Dolken Kayu Galam Ø 8 - 10 P = 4 m Rp. 11,000.00 = Rp. 13,750.00
2.500 Kg Semen Portland (50 Kg) Rp. 1,300.00 = Rp. 3,250.00
1.200 Lbr Seng Gelombang BJLS 20 Rp. 47,300.00 = Rp. 56,760.00
0.005 M3 Pasir Beton Rp. 160,000.00 = Rp. 800.00
0.009 M3 Kerikil Sungai Ayakan Rp. 190,000.00 = Rp. 1,710.00
0.072 M3 Kayu Terentang / Mall Rp. 1,700,000.00 = Rp. 122,400.00
0.060 Kg Paku 2" - 5" Rp. 20,800.00 = Rp. 1,248.00
0.450 LTR Cat Meny Rp. 25,750 = Rp. 11,587.50
Tenaga
0.400 Oh Pekerja Rp. 70,000.00 = Rp. 28,000.00
0.200 Oh Tukang Rp. 95,000.00 = Rp. 19,000.00
0.020 Oh Kepala Tukang Rp. 120,000.00 = Rp. 2,400.00
0.020 Oh Mandor Rp. 120,000.00 = Rp. 2,400.00
Harga Satuan Pekerjaan = Rp. 263,305.50

13. SNI 8.11. 1 M2 PEMBUATAN STEGGER


Bahan
1.000 Btg Bambu Ø 6 - 10 P = 6 m Rp. 13,000.00 = Rp. 13,000.00
0.250 Kg Tali Ijuk Rp. 12,500.00 = Rp. 3,125.00
Tenaga
0.250 Oh Pekerja Rp. 70,000.00 = Rp. 17,500.00
0.017 Oh Tukang Rp. 95,000.00 = Rp. 1,615.00
0.002 Oh Kepala Tukang Rp. 120,000.00 = Rp. 240.00
0.013 Oh Mandor Rp. 120,000.00 = Rp. 1,560.00
Harga Satuan Pekerjaan = Rp. 37,040.00

14. SNI 6.1. 1M3 GALIAN TANAH BIASA SEDALAM 1 METER


Tenaga
0.750 Oh Pekerja Rp. 70,000.00 = Rp. 52,500.00
0.025 Oh Mandor Rp. 120,000.00 = Rp. 3,000.00
Harga Satuan Pekerjaan = Rp. 55,500.00

15. SNI 6.2. 1M3 GALIAN TANAH BIASA SEDALAM 2 METER


Tenaga
0.900 Oh Pekerja Rp. 70,000.00 = Rp. 63,000.00
0.045 Oh Mandor Rp. 120,000.00 = Rp. 5,400.00
Harga Satuan Pekerjaan = Rp. 68,400.00

16. SNI 6.9. 1 M3 URUGAN KEMBALI


Tenaga
0.192 Oh Pekerja Rp. 70,000.00 = Rp. 13,440.00
0.019 Oh Mandor Rp. 120,000.00 = Rp. 2,280.00
Harga Satuan Pekerjaan = Rp. 15,720.00

17. SNI 6.11. 1 M3 URUGAN PASIR


Bahan
1.200 M3 Pasir Urug Rp. 140,000.00 = Rp. 168,000.00
Tenaga
0.300 Oh Pekerja Rp. 70,000.00 = Rp. 21,000.00
0.010 Oh Mandor Rp. 120,000.00 = Rp. 1,200.00
Harga Satuan Pekerjaan = Rp. 190,200.00
18. SNI 1 M3 URUGAN SIRTU
Bahan
1.200 M3 Tasirtu Rp. 100,000.00 = Rp. 120,000.00
Tenaga
0.300 Oh Pekerja Rp. 70,000.00 = Rp. 21,000.00
0.010 Oh Mandor Rp. 120,000.00 = Rp. 1,200.00
Harga Satuan Pekerjaan = Rp. 142,200.00

19. ANL. TERAPAN 1 M3 URUGAN KERIKIL


Bahan
1.200 M3 Kerikil Sungai Ayakan Rp. 190,000.00 = Rp. 228,000.00
Tenaga
0.250 Oh Pekerja Rp. 70,000.00 = Rp. 17,500.00
0.025 Oh Mandor Rp. 120,000.00 = Rp. 3,000.00
Harga Satuan Pekerjaan = Rp. 248,500.00

20. SNI 6.10. 1 M3 PEMADATAN URUGAN


Tenaga
0.500 Oh Pekerja Rp. 70,000.00 = Rp. 35,000.00
0.050 Oh Mandor Rp. 120,000.00 = Rp. 6,000.00
Jumlah Rp. 41,000.00

21. SNI 6.15. 1 M3 PEMASANGAN LAPISAN IJUK


Bahan
1.200 M3 Ijuk Rp. 42,100.00 = Rp. 50,520.00
Tenaga
0.150 Oh Pekerja Rp. 70,000.00 = Rp. 10,500.00
0.015 Oh Mandor Rp. 120,000.00 = Rp. 1,800.00
Harga Satuan Pekerjaan = Rp. 62,820.00

22. ANL. TERAPAN 1 M3 LAPISAN BATU KARANG


Bahan
1.200 M3 Batu Karang Rp. 1,650.00 = Rp. 1,980.00
Tenaga
0.780 Oh Pekerja Rp. 70,000.00 = Rp. 54,600.00
0.390 Oh Tukang Rp. 95,000.00 = Rp. 37,050.00
0.039 Oh Kepala Tukang Rp. 120,000.00 = Rp. 4,680.00
0.039 Oh Mandor Rp. 120,000.00 = Rp. 4,680.00
Harga Satuan Pekerjaan = Rp. 102,990.00

23. SNI 6.14 1 M3 PASANGAN BATU KOSONG


Bahan
1.200 M3 Batu Kali Rp. 220,000.00 = Rp. 264,000.00
0.300 M3 Pasir Urug Rp. 100,000.00 = Rp. 30,000.00
Tenaga
0.780 Oh Pekerja Rp. 70,000.00 = Rp. 54,600.00
0.390 Oh Tukang Rp. 95,000.00 = Rp. 37,050.00
0.039 Oh Kepala Tukang Rp. 120,000.00 = Rp. 4,680.00
0.039 Oh Mandor Rp. 120,000.00 = Rp. 4,680.00
Harga Satuan Pekerjaan = Rp. 395,010.00
24. SNI 6.5 1 M3 PASANGAN PONDASI BATU KALI 1 PC : 5 PSR
Bahan
1.100 M3 Batu Kali Rp. 220,000.00 = Rp. 242,000.00
136.000 Kg Semen Portland Rp. 1,300.00 = Rp. 176,800.00
0.544 M3 Pasir Pasang Rp. 160,000.00 = Rp. 87,040.00
Tenaga
1.500 Oh Pekerja Rp. 70,000.00 = Rp. 105,000.00
0.600 Oh Tukang Rp. 95,000.00 = Rp. 57,000.00
0.060 Oh Kepala Tukang Rp. 120,000.00 = Rp. 7,200.00
0.075 Oh Mandor Rp. 120,000.00 = Rp. 9,000.00
Harga Satuan Pekerjaan = Rp. 684,040.00

25. SNI 6.8 1 M2 PASANGAN BATU BATA TEBAL 1/2 BATA 1 PC : 3 PSR
Bahan
70.000 Buah Batu Bata Ukuran 5 x 11 x 22 Rp. 1,150.00 = Rp. 80,500.00
14.370 Kg Semen Portland Rp. 1,300.00 = Rp. 18,681.00
0.040 M3 Pasir Pasang Rp. 160,000.00 = Rp. 6,400.00
Tenaga
0.300 Oh Pekerja Rp. 70,000.00 = Rp. 21,000.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.015 Oh Mandor Rp. 120,000.00 = Rp. 1,800.00
Harga Satuan Pekerjaan = Rp. 139,081.00

26. SNI 6.10 1 M2 PASANGAN BATU BATA TEBAL 1/2 BATA 1 PC : 5 PSR
Bahan
70.000 Buah Batu Bata Ukuran 5 x 11 x 22 Rp. 1,150.00 = Rp. 80,500.00
9.680 Kg Semen Portland Rp. 1,300.00 = Rp. 12,584.00
0.045 M3 Pasir Pasang Rp. 160,000.00 = Rp. 7,200.00
Tenaga
0.300 Oh Pekerja Rp. 70,000.00 = Rp. 21,000.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.015 Oh Mandor Rp. 120,000.00 = Rp. 1,800.00
Harga Satuan Pekerjaan = Rp. 133,784.00

27. SNI 6.2 1 M2 PEKERJAAN PLESTERAN 1 PC : 2 PSR TEBAL 15 MM


Bahan
10.224 Kg Semen Portland Rp. 1,300.00 = Rp. 13,291.20
0.020 M3 Pasir Pasang Rp. 160,000.00 = Rp. 3,200.00
Tenaga
0.300 Oh Pekerja Rp. 70,000.00 = Rp. 21,000.00
0.150 Oh Tukang Rp. 95,000.00 = Rp. 14,250.00
0.015 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,800.00
0.015 Oh Mandor Rp. 120,000.00 = Rp. 1,800.00
Harga Satuan Pekerjaan = Rp. 55,341.20

28. SNI 6.3 1 M2 PEKERJAAN PLESTERAN 1 PC : 3 PSR TEBAL 15 MM


Bahan
7.776 Kg Semen Portland Rp. 1,300.00 = Rp. 10,108.80
0.023 M3 Pasir Pasang Rp. 160,000.00 = Rp. 3,680.00
Tenaga
0.300 Oh Pekerja Rp. 70,000.00 = Rp. 21,000.00
0.150 Oh Tukang Rp. 95,000.00 = Rp. 14,250.00
0.015 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,800.00
0.015 Oh Mandor Rp. 120,000.00 = Rp. 1,800.00
Harga Satuan Pekerjaan = Rp. 52,638.80
29. SNI 6.5 1 M2 PEKERJAAN PLESTERAN 1 PC : 5 PSR TEBAL 15 MM
Bahan
5.184 Kg Semen Portland Rp. 1,300.00 = Rp. 6,739.20
0.026 M3 Pasir Pasang Rp. 160,000.00 = Rp. 4,160.00
Tenaga
0.300 Oh Pekerja Rp. 70,000.00 = Rp. 21,000.00
0.150 Oh Tukang Rp. 95,000.00 = Rp. 14,250.00
0.015 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,800.00
0.015 Oh Mandor Rp. 120,000.00 = Rp. 1,800.00
Harga Satuan Pekerjaan = Rp. 49,749.20

30. ANL. PRAKTIS 1 M2 PEKERJAAN BATU ALAM


Bahan
12.960 Kg Semen Portland Rp. 1,300.00 = Rp. 16,848.00
0.065 M3 Pasir Pasang Rp. 160,000.00 = Rp. 10,400.00
1.000 M2 Batu Alam Rp. 120,000.00 = Rp. 120,000.00
Tenaga
0.800 Oh Pekerja Rp. 70,000.00 = Rp. 55,986.00
0.600 Oh Tukang Rp. 95,000.00 = Rp. 57,000.00
0.060 Oh Kepala Tukang Rp. 120,000.00 = Rp. 7,200.00
0.040 Oh Mandor Rp. 120,000.00 = Rp. 4,798.80
Harga Satuan Pekerjaan = Rp. 272,232.80

31. SNI 6.27 1 M2 ACIAN


Bahan
3.250 Kg Semen Portland Rp. 1,300.00 = Rp. 4,225.00
Tenaga
0.200 Oh Pekerja Rp. 70,000.00 = Rp. 14,000.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.010 Oh Mandor Rp. 120,000.00 = Rp. 1,200.00
Harga Satuan Pekerjaan = Rp. 30,125.00

32. SNI 6.4 1 M3 MEMBUAT BETON TUMBUK 1 PC : 3 PSR : 5 KRK


Bahan
247.000 Kg Semen Portland Rp. 1,300.00 = Rp. 321,100.00
0.621 M3 Pasir Beton Rp. 160,000.00 = Rp. 99,314.29
0.740 M3 Kerikil Sungai Ayakan Rp. 190,000.00 = Rp. 140,600.00
215.000 Ltr Air Rp. 100.00 = Rp. 21,500.00
Tenaga
1.650 Oh Pekerja Rp. 70,000.00 = Rp. 115,500.00
0.275 Oh Tukang Rp. 95,000.00 = Rp. 26,125.00
0.028 Oh Kepala Tukang Rp. 120,000.00 = Rp. 3,360.00
0.083 Oh Mandor Rp. 120,000.00 = Rp. 9,960.00
Harga Satuan Pekerjaan = Rp. 737,459.29

33. Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 175), slump (12 ± 2) cm
Bahan
326.000 Kg Semen Portland Rp. 1,300.00 = Rp. 423,800.00
0.543 M3 Pasir Beton Rp. 160,000.00 = Rp. 86,880.00
0.762 M3 Kerikil Rp. 168,000.00 = Rp. 128,016.00
215.000 Ltr Air Rp. 100.00 = Rp. 21,500.00
Tenaga
1.650 Oh Pekerja Rp. 70,000.00 = Rp. 115,500.00
0.275 Oh Tukang Rp. 95,000.00 = Rp. 26,125.00
0.028 Oh Kepala Tukang Rp. 120,000.00 = Rp. 3,360.00
0.083 Oh Mandor Rp. 120,000.00 = Rp. 9,960.00
Harga Satuan Pekerjaan = Rp. 815,141.00
34. 1 KG PEMBESIAN DENGAN BESI POLOS / ULIR
Bahan
1.050 Kg Besi Beton Polos Rp. 13,000.00 = Rp. 13,650.00
0.015 Kg Kawat Ikat Beton / Bendrat Rp. 22,400.00 = Rp. 336.00
Tenaga
0.007 Oh Pekerja Rp. 70,000.00 = Rp. 490.00
0.007 Oh Tukang Rp. 95,000.00 = Rp. 665.00
0.0007 Oh Kepala Tukang Rp. 120,000.00 = Rp. 84.00
0.0003 Oh Mandor Rp. 120,000.00 = Rp. 36.00
Harga Satuan Pekerjaan = Rp. 15,261.00

35. SNI 6.28 1 M2 PASANG BEKISTING UNTUK PONDASI


Bahan
0.040 M3 Kayu Terentang / Mall Rp. 1,700,000.00 = Rp. 68,000.00
0.300 Kg Paku 2" - 5" Rp. 20,800.00 = Rp. 6,240.00
0.100 Liter Minyak Bekisting Rp. 34,500.00 = Rp. 3,450.00
Tenaga
0.300 Oh Pekerja Rp. 70,000.00 = Rp. 21,000.00
0.260 Oh Tukang Rp. 95,000.00 = Rp. 24,700.00
0.026 Oh Kepala Tukang Rp. 120,000.00 = Rp. 3,120.00
0.026 Oh Mandor Rp. 120,000.00 = Rp. 3,120.00
Harga Satuan Pekerjaan = Rp. 129,630.00

36. SNI 6.21 1 M2 PASANG BEKISTING UNTUK SLOOF


Bahan
0.045 M3 Kayu Terentang / Mall Rp. 1,700,000.00 = Rp. 76,500.00
0.300 Kg Paku 2" - 5" Rp. 20,800.00 = Rp. 6,240.00
0.100 Liter Minyak Bekisting Rp. 34,500.00 = Rp. 3,450.00
Tenaga
0.520 Oh Pekerja Rp. 70,000.00 = Rp. 36,400.00
0.260 Oh Tukang Rp. 95,000.00 = Rp. 24,700.00
0.026 Oh Kepala Tukang Rp. 120,000.00 = Rp. 3,120.00
0.026 Oh Mandor Rp. 120,000.00 = Rp. 3,120.00
Harga Satuan Pekerjaan = Rp. 153,530.00

37. SNI 6.22 1 M2 PASANG BEKISTING UNTUK KOLOM


Bahan
0.040 M3 Kayu Terentang / Mall Rp. 1,700,000.00 = Rp. 68,000.00
0.400 Kg Paku 2" - 5" Rp. 20,800.00 = Rp. 8,320.00
0.200 Liter Minyak Bekisting Rp. 34,500.00 = Rp. 6,900.00
0.015 M3 Balok Kayu Rp. 1,700,000.00 = Rp. 25,500.00
0.350 Lbr Playwood 120 x 140cm T = 9mm Rp. 120,000.00 = Rp. 42,000.00
2.000 Btg Dolken Kayu Galam Ø 8 - 10 P = 4 m Rp. 11,000.00 = Rp. 22,000.00
Tenaga
0.660 Oh Pekerja Rp. 70,000.00 = Rp. 46,200.00
0.330 Oh Tukang Rp. 95,000.00 = Rp. 31,350.00
0.033 Oh Kepala Tukang Rp. 120,000.00 = Rp. 3,960.00
0.033 Oh Mandor Rp. 120,000.00 = Rp. 3,960.00
Harga Satuan Pekerjaan = Rp. 258,190.00

38. SNI 6.23 1 M2 PASANG BEKISTING UNTUK BALOK


Bahan
0.040 M3 Kayu Terentang / Mall Rp. 1,700,000.00 = Rp. 68,000.00
0.400 Kg Paku 2" - 5" Rp. 20,800.00 = Rp. 8,320.00
0.200 Liter Minyak Bekisting Rp. 34,500.00 = Rp. 6,900.00
0.018 M3 Balok Kayu Rp. 1,700,000.00 = Rp. 30,600.00
0.350 Lbr Playwood 120 x 140cm T = 9mm Rp. 120,000.00 = Rp. 42,000.00
2.000 Btg Dolken Kayu Galam Ø 8 - 10 P = 4 m Rp. 11,000.00 = Rp. 22,000.00
Tenaga
0.660 Oh Pekerja Rp. 70,000.00 = Rp. 46,200.00
0.330 Oh Tukang Rp. 95,000.00 = Rp. 31,350.00
0.033 Oh Kepala Tukang Rp. 120,000.00 = Rp. 3,960.00
0.033 Oh Mandor Rp. 120,000.00 = Rp. 3,960.00
Harga Satuan Pekerjaan = Rp. 263,290.00
39. SNI 6.24 1 M2 PASANG BEKISTING UNTUK LANTAI
Bahan
0.040 M3 Kayu Terentang / Mall Rp. 1,700,000.00 = Rp. 68,000.00
0.400 Kg Paku 2" - 5" Rp. 20,800.00 = Rp. 8,320.00
0.200 Liter Minyak Bekisting Rp. 34,500.00 = Rp. 6,900.00
0.015 M3 Balok Kayu Rp. 1,700,000.00 = Rp. 25,500.00
0.350 Lbr Playwood 120 x 140cm T = 9mm Rp. 120,000.00 = Rp. 42,000.00
6.000 Btg Dolken Kayu Galam Ø 8 - 10 P = 4 m Rp. 11,000.00 = Rp. 66,000.00
Tenaga
0.660 Oh Pekerja Rp. 70,000.00 = Rp. 46,200.00
0.330 Oh Tukang Rp. 95,000.00 = Rp. 31,350.00
0.033 Oh Kepala Tukang Rp. 120,000.00 = Rp. 3,960.00
0.033 Oh Mandor Rp. 120,000.00 = Rp. 3,960.00
Harga Satuan Pekerjaan = Rp. 302,190.00

40. 1 M3 PEKERJAAN SLOOF PRAKTIS K175


1.000 M3 Beton 1 : 2 : 3 K175 Rp. 815,141.00 = Rp. 815,141.00
165.109 Kg Besi Beton Rp. 15,261.00 = Rp. 2,519,728.45
3.000 M2 Bekisting Sloof Rp. 153,530.00 = Rp. 460,590.00
Jumlah Rp. 3,795,459.45

41. 1 M3 PEKERJAAN KOLOM PRAKTIS K175


1.000 M3 Beton 1 : 2 : 3 K175 Rp. 815,141.00 = Rp. 815,141.00
153.372 Kg Besi Beton Rp. 15,261.00 = Rp. 2,340,610.09
3.000 M2 Bekisting Kolom Rp. 258,190.00 = Rp. 774,570.00
Jumlah Rp. 3,930,321.09

42. 1 M3 PEKERJAAN RINGBALK PRAKTIS K175


1.000 M3 Beton 1 : 2 : 3 K175 Rp. 815,141.00 = Rp. 815,141.00
165.109 Kg Besi Beton Rp. 15,261.00 = Rp. 2,519,728.45
3.000 M2 Bekisting Balok Rp. 263,290.00 = Rp. 789,870.00
Jumlah Rp. 4,124,739.45

43. 1 M3 PEKERJAAN PLAT LANTAI, LEUFEL, MEJA BETON DLL K175


1.000 M3 Beton 1 : 2 : 3 K175 Rp. 815,141.00 = Rp. 815,141.00
110.000 Kg Besi Beton Rp. 15,261.00 = Rp. 1,678,710.00
2.500 M2 Bekisting Lantai Rp. 302,190.00 = Rp. 755,475.00
Jumlah Rp. 3,249,326.00

44. 1 M3 PEKERJAAN RING BALOK 25 / 35 K225


1.000 M3 Beton 1 : 2 : 3 K225 Rp. = Rp. 0.00
134.750 Kg Besi Beton Rp. 15,261.00 = Rp. 2,056,419.75
11.667 M2 Bekisting Balok Rp. 263,290.00 = Rp. 3,071,804.43
Jumlah Rp. 5,128,224.18

45. 1 M3 PEKERJAAN RING BALOK 16 / 25 K200


1.000 M3 Beton 1 : 2 : 3 K200 Rp. 0.00 = Rp. 0.00
8.010 Kg Besi Beton Rp. 15,261.00 = Rp. 122,240.61
11.667 M2 Bekisting Balok Rp. 263,290.00 = Rp. 3,071,804.43
Jumlah Rp. 3,194,045.04

46. 1 M3 PEKERJAAN BETON PLAT BETON T= 10 Cm


1.000 M3 Beton 1 : 2 : 3 K200 Rp. 0.00 = Rp. 0.00
102.080 Kg Besi Beton Rp. 15,261.00 = Rp. 1,557,842.88
2.400 M2 Bekisting Lantai Rp. 302,190.00 = Rp. 725,256.00
Jumlah Rp. 2,283,098.88
47. SNI 6.36 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM
Bahan
26.500 Bh Tegel Keramik ( Permukaan Kasar ) 20 x 20 cm Rp. 3,076.92 = Rp. 81,538.46
10.400 Kg Semen Portland Rp. 1,300.00 = Rp. 13,520.00
0.0450 M3 Pasir Pasang Rp. 160,000.00 = Rp. 7,200.00
1.620 Kg Nat / Mortar Flex Rp. 13,850.00 = Rp. 22,437.00
Tenaga
0.700 Oh Pekerja Rp. 70,000.00 = Rp. 49,000.00
0.350 Oh Tukang Rp. 95,000.00 = Rp. 33,250.00
0.035 Oh Kepala Tukang Rp. 120,000.00 = Rp. 4,200.00
0.035 Oh Mandor Rp. 120,000.00 = Rp. 4,200.00
Harga Satuan Pekerjaan = Rp. 215,345.46

48. SNI 6.13 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM


Bahan
6.250 Bh Tegel Keramik 40 x 40 cm Rp. 17,500.00 = Rp. 109,375.00
9.800 Kg Semen Portland Rp. 1,300.00 = Rp. 12,740.00
0.0215 M3 Pasir Pasang Rp. 160,000.00 = Rp. 3,440.00
1.300 Kg Nat / Mortar Flex Rp. 13,850.00 = Rp. 18,005.00
Tenaga
0.250 Oh Pekerja Rp. 70,000.00 = Rp. 17,500.00
0.120 Oh Tukang Rp. 95,000.00 = Rp. 11,400.00
0.012 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,440.00
0.013 Oh Mandor Rp. 120,000.00 = Rp. 1,560.00
Harga Satuan Pekerjaan = Rp. 175,460.00

49. SNI 6.54 1 M2 PASANG DINDING KERAMIK 20 X 30 CM


Bahan
16.667 Bh Keramik Dinding 20 x 30 cm Rp. 4,799.04 = Rp. 79,984.00
9.300 Kg Semen Portland Rp. 1,300.00 = Rp. 12,090.00
0.0180 M3 Pasir Pasang Rp. 160,000.00 = Rp. 2,880.00
1.940 Kg Nat / Mortar Flex Rp. 13,850.00 = Rp. 26,869.00
Tenaga
0.900 Oh Pekerja Rp. 70,000.00 = Rp. 63,000.00
0.450 Oh Tukang Rp. 95,000.00 = Rp. 42,750.00
0.045 Oh Kepala Tukang Rp. 120,000.00 = Rp. 5,400.00
0.045 Oh Mandor Rp. 120,000.00 = Rp. 5,400.00
Harga Satuan Pekerjaan = Rp. 238,373.00

50. SNI 6.55 1 M2 PASANG DINDING KERAMIK 60 X 30 CM


Bahan
5.556 Bh Keramik Dinding 60 x 30 cm Rp. 16,906.47 = Rp. 93,924.86
9.300 Kg Semen Portland Rp. 1,300.00 = Rp. 12,090.00
0.0180 M3 Pasir Pasang Rp. 160,000.00 = Rp. 2,880.00
1.940 Kg Nat / Mortar Flex Rp. 13,850.00 = Rp. 26,869.00
Tenaga
0.900 Oh Pekerja Rp. 70,000.00 = Rp. 63,000.00
0.450 Oh Tukang Rp. 95,000.00 = Rp. 42,750.00
0.045 Oh Kepala Tukang Rp. 120,000.00 = Rp. 5,400.00
0.045 Oh Mandor Rp. 120,000.00 = Rp. 5,400.00
Harga Satuan Pekerjaan = Rp. 252,313.86
51. ANALISA PRAKTIS 1 M2 PASANG ATAP BAJA RINGAN
Bahan
2.800 M' Profil Baja Ringan TS 75.75 Rp. 11,666.67 = Rp. 32,666.67
5.100 M' Roof Bottom R 32.0.45 Rp. 7,166.67 = Rp. 36,550.00
15.000 Bh Self Drilling Scew dia-6x20mm (Truss Screw) Rp. 1,800.00 = Rp. 27,000.00
20.000 Bh Self Drilling Scew dia-6x16mm (Roof Batten Screw) Rp. 2,000.00 = Rp. 40,000.00
2.000 Bh Dynabol Rp. 5,000.00 = Rp. 10,000.00
1.000 Ls Alat Bantu (Mesin Bor) Rp. 10,000.00 = Rp. 10,000.00
Tenaga
0.200 Oh Pekerja Rp. 70,000.00 = Rp. 14,000.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.001 Oh Mandor Rp. 120,000.00 = Rp. 120.00
Harga Satuan Pekerjaan = Rp. 181,036.67

52. ANL. TERAPAN 1 M2 PASANG ATAP GENTENG METAL


Bahan
0.833 Lbr Genteng Metal Spandek Rp. 45,500.00 = Rp. 37,901.50
0.200 Kg Paku Genteng Metal Rp. 27,450.00 = Rp. 5,490.00
Tenaga
0.200 Oh Pekerja Rp. 70,000.00 = Rp. 14,000.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.001 Oh Mandor Rp. 120,000.00 = Rp. 120.00
Harga Satuan Pekerjaan = Rp. 68,211.50

53. ANL. 1 M2 PASANG KUDA-KUDA BAJA RINGAN + ATAP GENTENG METAL = Rp. 249,248.17

54. ANL. TERAPAN 1 M1 PASANG NOK ATAP GENTENG METAL


Bahan
1.100 M1 Nok Genteng Metal P= 30 cm (Model C) Rp. 23,900.00 = Rp. 26,290.00
0.050 Kg Paku Genteng Metal Rp. 27,450.00 = Rp. 1,372.50
Tenaga
0.250 Oh Pekerja Rp. 70,000.00 = Rp. 17,500.00
0.150 Oh Tukang Rp. 95,000.00 = Rp. 14,250.00
0.015 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,800.00
0.013 Oh Mandor Rp. 120,000.00 = Rp. 1,560.00
Harga Satuan Pekerjaan = Rp. 62,772.50

55. ANL. PRAKTIS 1 M1 PASANG LISPLANK GALSIBOARD UKURAN 20 CM


Bahan
0.250 M' Wood Plank Elephant Rp. 240,000.00 = Rp. 60,000.00
0.050 Kg Paku Sekrup / Paku Gypsum Rp. 20,800.00 = Rp. 1,040.00
Tenaga
0.200 Oh Pekerja Rp. 70,000.00 = Rp. 14,000.00
0.400 Oh Tukang Rp. 95,000.00 = Rp. 38,000.00
0.025 Oh Kepala Tukang Rp. 120,000.00 = Rp. 3,000.00
0.005 Oh Mandor Rp. 120,000.00 = Rp. 600.00
Harga Satuan Pekerjaan = Rp. 116,640.00
56. 1 UNIT PASANG PINTU DAN KUSEN ALUMINIUM TIPE P4
Bahan
5.740 M' Profil Almunium 4" x 1,3/4" ( YKK ) Rp. 70,000.00 = Rp. 401,800.00
8.000 Bh Sekrup Fixer Rp. 2,500.00 = Rp. 20,000.00
3.000 Bh Engsel Pintu Rp. 11,050.00 = Rp. 33,150.00
1.000 Bh Kunci Pintu Rp. 115,000.00 = Rp. 115,000.00
1.000 Set Pintu Panil Lapis Aluminium Rp. 750,000.00 = Rp. 750,000.00
0.700 M2 Kaca Bening 6 mm Rp. 200,000.00 = Rp. 140,000.00
Tenaga
5.0000 % Alat Bantu Rp. 1,459,950.00 = Rp. 72,997.50
15.0000 % Ongkos Kerja Rp. 1,459,950.00 = Rp. 218,992.50
Harga Satuan Pekerjaan = Rp. 1,751,940.00

57. 1 UNIT PASANG JENDELA DAN KUSEN ALUMINIUM KACA TIPE J1


Bahan
5.0600 M' Profil Almunium 4" x 1,3/4" ( YKK ) Rp. 70,000.00 = Rp. 354,200.00
2.6700 M' Kusen Jendela Cassement Rp. 55,000.00 = Rp. 146,850.00
0.1750 Tube Karet Sealent/Silikon Rp. 150,000.00 = Rp. 26,250.00
10.0000 Bh Sekrup Fixer Rp. 2,500.00 = Rp. 25,000.00
1.0000 Bh Kunci/Pengunci Rambuncis Rp. 35,000.00 = Rp. 35,000.00
0.6080 M2 Kaca Ryben 5 mm Rp. 162,500.00 = Rp. 98,800.00
Tenaga
5.0000 % Alat Bantu Rp. 686,100.00 = Rp. 34,305.00
15.0000 % Ongkos Kerja Rp. 686,100.00 = Rp. 102,915.00
Harga Satuan Pekerjaan = Rp. 823,320.00

58. 1 UNIT PASANG JENDELA DAN KUSEN ALUMINIUM KACA TIPE J2


Bahan
4.360 M' Profil Almunium 4" x 1,3/4" ( YKK ) Rp. 70,000.00 = Rp. 305,200.00
3.020 M' Kusen Jendela Cassement Rp. 55,000.00 = Rp. 166,100.00
0.151 Tube Karet Sealent/Silikon Rp. 150,000.00 = Rp. 22,650.00
6.000 Bh Sekrup Fixer Rp. 2,500.00 = Rp. 15,000.00
1.000 Bh Kunci/Pengunci Rambuncis Rp. 35,000.00 = Rp. 35,000.00
0.522 M2 Kaca Ryben 5 mm Rp. 162,500.00 = Rp. 84,825.00
Tenaga
5.0000 Oh Alat Bantu Rp. 628,775.00 = Rp. 31,438.75
15.0000 Oh Ongkos Kerja Rp. 628,775.00 = Rp. 94,316.25
Harga Satuan Pekerjaan = Rp. 754,530.00

59. 1 UNIT PASANG VENTILASI KUSEN ALUMINIUM KACA TIPE V2


Bahan
2.1800 M' Profil Almunium 4" x 1,3/4" ( YKK ) Rp. 70,000.00 = Rp. 152,600.00
2.8800 M' Kusen Jendela Cassement Rp. 55,000.00 = Rp. 158,400.00
0.2890 Tube Karet Sealent/Silikon Rp. 150,000.00 = Rp. 43,350.00
8.0000 Bh Sekrup Fixer Rp. 2,500.00 = Rp. 20,000.00
1.0000 Bh Kunci/Pengunci Rambuncis Rp. 35,000.00 = Rp. 35,000.00
1.3900 M2 Kaca Ryben 5 mm Rp. 162,500.00 = Rp. 225,875.00
Tenaga
5.0000 Oh Alat Bantu Rp. 635,225.00 = Rp. 31,761.25
15.0000 Oh Ongkos Kerja Rp. 635,225.00 = Rp. 95,283.75
Harga Satuan Pekerjaan = Rp. 762,270.00
60. 1 UNIT PASANG VENTILASI KUSEN ALUMINIUM KACA TIPE V3
Bahan
2.720 M' Profil Almunium 4" x 1,3/4" ( YKK ) Rp. 70,000.00 = Rp. 190,400.00
0.136 Tube Karet Sealent/Silikon Rp. 150,000.00 = Rp. 20,400.00
8.000 Bh Sekrup Fixer Rp. 2,500.00 = Rp. 20,000.00
0.189 M2 Kaca Ryben 5 mm Rp. 162,500.00 = Rp. 30,712.50
Tenaga
5.000 % Alat Bantu Rp. 261,512.50 = Rp. 13,075.63
15.000 % Ongkos Kerja Rp. 261,512.50 = Rp. 39,226.88
Harga Satuan Pekerjaan = Rp. 313,815.00

61. 1 UNIT PASANG PINTU DAN KUSEN ALUMINIUM KACA TIPE P1


Bahan
9.900 M' Profil Almunium 4" x 1,3/4" ( YKK ) Rp. 70,000.00 = Rp. 693,000.00
0.188 Tube Karet Sealent/Silikon Rp. 150,000.00 = Rp. 28,200.00
21.000 Bh Sekrup Fixer Rp. 2,500.00 = Rp. 52,500.00
6.000 Bh Engsel Pintu Rp. 35,000.00 = Rp. 210,000.00
1.000 Bh Kunci/Pengunci Rp. 115,000.00 = Rp. 115,000.00
2.000 Psg Handel Pintu Rp. 230,000.00 = Rp. 460,000.00
2.000 Set Pintu Panil Rp. 750,000.00 = Rp. 1,500,000.00
0.225 M2 Kaca 5 mm Buram Rp. 200,000.00 = Rp. 45,000.00
Tenaga
5.000 % Alat Bantu Rp. 3,103,700.00 = Rp. 155,185.00
15.000 % Ongkos Kerja Rp. 3,103,700.00 = Rp. 465,555.00
Harga Satuan Pekerjaan = Rp. 3,724,440.00

62. 1 UNIT PASANG PINTU KUSEN ALUMINIUM KACA TIPE P2


Bahan
8.600 M' Profil Almunium 4" x 1,3/4" ( YKK ) Rp. 70,000.00 = Rp. 602,000.00
0.138 Tube Karet Sealent/Silikon Rp. 150,000.00 = Rp. 20,700.00
8.000 Bh Sekrup Fixer Rp. 2,500.00 = Rp. 20,000.00
3.000 Bh Engsel Pintu Rp. 35,000.00 = Rp. 105,000.00
1.000 Bh Kunci/Pengunci Rp. 115,000.00 = Rp. 115,000.00
1.000 Set Pintu Panil Rp. 750,000.00 = Rp. 750,000.00
0.150 M2 Kaca 5 mm Buram Rp. 200,000.00 = Rp. 30,000.00
Tenaga
5.000 % Alat Bantu Rp. 1,642,700.00 = Rp. 82,135.00
15.000 % Ongkos Kerja Rp. 1,642,700.00 = Rp. 246,405.00
Harga Satuan Pekerjaan = Rp. 1,971,240.00

63. 1 UNIT PASANG PINTU KUSEN ALUMINIUM KACA TIPE P3


Bahan
8.400 M' Profil Almunium 4" x 1,3/4" ( YKK ) Rp. 70,000.00 = Rp. 588,000.00
0.136 Tube Karet Sealent/Silikon Rp. 150,000.00 = Rp. 20,400.00
8.000 Bh Sekrup Fixer Rp. 2,500.00 = Rp. 20,000.00
3.000 Bh Engsel Pintu Rp. 35,000.00 = Rp. 105,000.00
1.000 Bh Kunci/Pengunci Rp. 115,000.00 = Rp. 115,000.00
1.000 Set Pintu Panil Rp. 750,000.00 = Rp. 750,000.00
0.150 M2 Kaca 5 mm Buram Rp. 200,000.00 = Rp. 30,000.00
Tenaga
5.000 % Alat Bantu Rp. 1,628,400.00 = Rp. 81,420.00
15.000 % Ongkos Kerja Rp. 1,628,400.00 = Rp. 244,260.00
Harga Satuan Pekerjaan = Rp. 1,954,080.00
64 ANALISA PRAKTIS 1 M2 RANGKA PLAFON ZINGKALUM
Bahan
3.600 M' Besi Holo 2/4 P= 4m Rp. 19,500.00 = Rp. 70,200.00
0.150 Kg Kawat Rp. 19,000.00 = Rp. 2,850.00
12.000 bh Paku Sekrup / Paku Gypsum Rp. 500.00 = Rp. 6,000.00
Tenaga
0.120 Oh Pekerja Rp. 70,000.00 = Rp. 8,400.00
0.150 Oh Tukang Rp. 95,000.00 = Rp. 14,250.00
0.040 Oh Kepala Tukang Rp. 120,000.00 = Rp. 4,800.00
0.050 Oh Mandor Rp. 120,000.00 = Rp. 6,000.00
Harga Satuan Pekerjaan = Rp. 112,500.00

65 SNI 6.24 1 M2 PASANG PLAFON GYPSUMBOARD TEBAL 9 MM


Bahan
0.357 M2 Gypsumboard 120 x 240 x 9 mm Rp. 130,000.00 = Rp. 46,410.00
0.110 Kg Paku Sekrup / Paku Gypsum Rp. 500.00 = Rp. 55.00
Tenaga
0.100 Oh Pekerja Rp. 70,000.00 = Rp. 7,000.00
0.050 Oh Tukang Rp. 95,000.00 = Rp. 4,750.00
0.005 Oh Kepala Tukang Rp. 120,000.00 = Rp. 600.00
0.005 Oh Mandor Rp. 120,000.00 = Rp. 600.00
Harga Satuan Pekerjaan = Rp. 59,415.00

65 1 M2 PASANG LIST PROFIL GYPSUM


Bahan
1.050 M' List Profil Gypsum 9 - 11cm Rp. 20,000.00 = Rp. 21,000.00
0.150 Kg Cornice Adhesive Rp. 7,750.00 = Rp. 1,162.50
Tenaga
0.600 Oh Cat Kayu (Penutup 2 x) Rp. 51,950.00 = Rp. 31,170.00
0.060 Oh Tenaga Rp. 0.00 = Rp. 0.00
0.006 Oh Pekerja Rp. 70,000.00 = Rp. 420.00
0.003 Oh Tukang Rp. 95,000.00 = Rp. 285.00
Harga Satuan Pekerjaan = Rp. 54,037.50

66 SNI 6.14 1 M2 CAT TEMBOK


Bahan
0.100 Kg Plamur Tembok Rp. 21,350.00 = Rp. 2,135.00
0.100 Kg Cat Tembok ( Dasar ) Rp. 25,000.00 = Rp. 2,500.00
0.260 Kg Cat Tembok ( Penutup 2 x ) Rp. 25,000.00 = Rp. 6,500.00
Tenaga
0.020 Oh Pekerja Rp. 70,000.00 = Rp. 1,400.00
0.063 Oh Tukang Rp. 95,000.00 = Rp. 5,985.00
0.0063 Oh Kepala Tukang Rp. 120,000.00 = Rp. 756.00
0.0025 Oh Mandor Rp. 120,000.00 = Rp. 300.00
Harga Satuan Pekerjaan = Rp. 19,576.00

67 SNI 6.14 1 M2 CAT KAYU


Bahan
0.200 Kg Cat Meni Rp. 25,750.00 = Rp. 5,150.00
0.150 Kg Plamir Rp. 11,550.00 = Rp. 1,732.50
0.170 Kg Cat Kayu (Dasar) Rp. 51,950.00 = Rp. 8,831.50
0.200 Kg Cat Kayu (Penutup 2 x) Rp. 51,950.00 = Rp. 10,390.00
Tenaga
0.070 Oh Pekerja Rp. 70,000.00 = Rp. 4,900.00
0.009 Oh Tukang Rp. 95,000.00 = Rp. 855.00
0.0060 Oh Kepala Tukang Rp. 120,000.00 = Rp. 720.00
0.0030 Oh Mandor Rp. 120,000.00 = Rp. 360.00
Harga Satuan Pekerjaan = Rp. 32,939.00

68 LAMPU LED 18 - 20 WATT


Bahan
1.000 Bh Lampu Led 18 - 20 Watt Rp. 75,000.00 = Rp. 75,000.00
Tenaga
0.010 Oh Pekerja Rp. = Rp. 0.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. = Rp. 0.00
0.001 Oh Mandor Rp. = Rp. 0.00
Harga Satuan Pekerjaan = Rp. 84,500.00
69 LAMPU PIJAR 15 - 30 WATT
Bahan
1.000 Bh Lampu Pijar 15 - 30 watt Rp. 8,000.00 = Rp. 8,000.00
Tenaga
0.010 Oh Pekerja Rp. 0.00 = Rp. 0.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 0.00 = Rp. 0.00
0.001 Oh Mandor Rp. = Rp. 0.00
Harga Satuan Pekerjaan = Rp. 17,500.00

70 STOP KONTAK DAYA 10 A, 200 WATT 3 PHASE


Bahan
1.000 Bh Stop Kontak Rp. 22,000.00 = Rp. 22,000.00
Tenaga
0.010 Oh Pekerja Rp. = Rp. 0.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. = Rp. 0.00
0.001 Oh Mandor Rp. = Rp. 0.00
Harga Satuan Pekerjaan = Rp. 31,500.00

71 SAKLAR TUNGGAL
Bahan
1.000 Bh Saklar Tunggal Rp. 7,000.00 = Rp. 7,000.00
Tenaga
0.010 Oh Pekerja Rp. = Rp.
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. = Rp.
0.001 Oh Mandor Rp. = Rp.
Harga Satuan Pekerjaan = Rp. 16,500.00

72 SAKLAR GANDA
Bahan
1.000 Bh Saklar Ganda Rp. 15,000.00 = Rp. 15,000.00
Tenaga
0.010 Oh Pekerja Rp. = Rp.
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. = Rp.
0.001 Oh Mandor Rp. = Rp.
Harga Satuan Pekerjaan = Rp. 24,500.00

73 PEMASANGAN PANEL BOX


Bahan
1.000 Bh Panel Box MCB Include Rp. 180,000.00 = Rp. 180,000.00
Tenaga
0.010 Oh Pekerja Rp. 0.00 = Rp. 0.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 0.00 = Rp. 0.00
0.001 Oh Mandor Rp. 0.00 = Rp. 0.00
Harga Satuan Pekerjaan = Rp. 189,500.00
74 INSTALASI STOP KONTAK KABEL NYA 2,5 MM DLM PCV Ø 20 MM KOMPLIT JUCTION BOX & PERLENGKAPANNYA
Bahan
1.000 Bh Instalasi Stop Kontak Kabel NYA 2,5 mm Rp. 60,000.00 = Rp. 60,000.00
Dlm PVC 20 mm Komplit Juction Box & Perlengkapan
Tenaga
0.010 Oh Pekerja Rp. 70,000.00 = Rp. 700.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.001 Oh Mandor Rp. 120,000.00 = Rp. 120.00
Harga Satuan Pekerjaan = Rp. 71,520.00

75 SNI 6.19 1 M1 PIPA GIP Ø 1/2"


Bahan
1.200 M1 GIP Ø 1/2" P = 6m Rp. 11,126.67 = Rp. 13,352.00
0.350 % Harga Pipa ( Perlengkapan ) Rp. 13,352.00 = Rp. 4,673.20
Tenaga
0.054 Oh Pekerja Rp. 70,000.00 = Rp. 3,780.00
0.090 Oh Tukang Rp. 95,000.00 = Rp. 8,550.00
0.009 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,080.00
0.027 Oh Mandor Rp. 120,000.00 = Rp. 3,240.00
Harga Satuan Pekerjaan = Rp. 34,675.20

76 SNI 6.20 1 M1 PIPA GIP Ø 3/4"


Bahan
1.200 M1 GIP Ø 3/4" P = 6m Rp. 13,950.00 = Rp. 16,740.00
0.350 % Harga Pipa ( Perlengkapan ) Rp. 16,740.00 = Rp. 5,859.00
Tenaga
0.054 Oh Pekerja Rp. 70,000.00 = Rp. 3,780.00
0.090 Oh Tukang Rp. 95,000.00 = Rp. 8,550.00
0.009 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,080.00
0.027 Oh Mandor Rp. 120,000.00 = Rp. 3,240.00
Harga Satuan Pekerjaan = Rp. 39,249.00

77 SNI 6.31 1 M1 PIPA PVC TYPE AW Ø 2 1/2"


Bahan
1.200 M1 PVC Ø 2 1/2" P = 4m Rp. 22,500.00 = Rp. 27,000.00
0.350 % Harga Pipa ( Perlengkapan ) Rp. 27,000.00 = Rp. 9,450.00
Tenaga
0.081 Oh Pekerja Rp. 70,000.00 = Rp. 5,670.00
0.135 Oh Tukang Rp. 95,000.00 = Rp. 12,825.00
0.135 Oh Kepala Tukang Rp. 120,000.00 = Rp. 16,200.00
0.0041 Oh Mandor Rp. 120,000.00 = Rp. 492.00
Harga Satuan Pekerjaan = Rp. 71,637.00
78 SNI 6.29 1 M1 PIPA PVC TYPE AW Ø 3"
Bahan
1.200 M1 PVC Ø 3" P = 4m Rp. 37,000.00 = Rp. 44,400.00
0.350 % Harga Pipa ( Perlengkapan ) Rp. 44,400.00 = Rp. 15,540.00
Tenaga
0.054 Oh Pekerja Rp. 70,000.00 = Rp. 3,780.00
0.090 Oh Tukang Rp. 95,000.00 = Rp. 8,550.00
0.009 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,080.00
0.027 Oh Mandor Rp. 120,000.00 = Rp. 3,240.00
Harga Satuan Pekerjaan = Rp. 76,590.00

79 SNI 6.31 1 M1 PIPA PVC TYPE AW Ø 4"


Bahan
1.200 M1 PVC Ø 4" P = 4m Rp. 68,565.00 = Rp. 82,278.00
0.350 % Harga Pipa ( Perlengkapan ) Rp. 82,278.00 = Rp. 28,797.30
Tenaga
0.081 Oh Pekerja Rp. 70,000.00 = Rp. 5,670.00
0.135 Oh Tukang Rp. 95,000.00 = Rp. 12,825.00
0.135 Oh Kepala Tukang Rp. 120,000.00 = Rp. 16,200.00
0.0041 Oh Mandor Rp. 120,000.00 = Rp. 492.00
Harga Satuan Pekerjaan = Rp. 146,262.30

80 SNI 6.1. 1 UNIT CLOSED JONGKOK


Bahan
1.000 Bh Closed Jongkok Rp. 150,000.00 = Rp. 150,000.00
6.000 Kg Semen Rp. 1,300.00 = Rp. 7,800.00
0.010 M3 Pasir Pasang Rp. 160,000.00 = Rp. 1,600.00
Tenaga
1.000 Oh Pekerja Rp. 70,000.00 = Rp. 70,000.00
1.500 Oh Tukang Rp. 95,000.00 = Rp. 142,500.00
1.500 Oh Kepala Tukang Rp. 120,000.00 = Rp. 180,000.00
0.160 Oh Mandor Rp. 120,000.00 = Rp. 19,200.00
Harga Satuan Pekerjaan = Rp. 571,100.00

81 SNI 6.5 MEMASANG 1 SET WASTAFEL


Bahan
1.000 Set Wastafel Rp. 70,000.00 = Rp. 70,000.00
0.120 % Perlengkapan Rp. 70,000.00 = Rp. 8,400.00
6.000 Kg Semen Portland Rp. 1,300.00 = Rp. 7,800.00
0.010 M3 Pasir Pasang Rp. 160,000.00 = Rp. 1,600.00
Tenaga
1.200 Oh Pekerja Rp. 70,000.00 = Rp. 84,000.00
1.450 Oh Tukang Rp. 95,000.00 = Rp. 137,750.00
0.150 Oh Kepala Tukang Rp. 120,000.00 = Rp. 18,000.00
0.100 Oh Mandor Rp. 120,000.00 = Rp. 12,000.00
Harga Satuan Pekerjaan = Rp. 339,550.00

82 ANL. PRAKTIS 1 BH PASANG FLOOR DRAIN


Bahan
1.000 Bh Flor Drain Rp. 15,000.00 = Rp. 15,000.00
Tenaga
0.010 Oh Pekerja Rp. 70,000.00 = Rp. 700.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.005 Oh Mandor Rp. 120,000.00 = Rp. 600.00
Harga Satuan Pekerjaan = Rp. 27,000.00

83 ANL. PRAKTIS 1 BH PASANG KRAN DINDING Ø 1/2" ATAU Ø 3/4"


Bahan
1.000 Bh Kran Dinding Ø 3/4 " (Stainless) Rp. 27,000.00 = Rp. 27,000.00
0.0250 Bh Seal Tape Rp. 7,500.00 = Rp. 187.50
Tenaga
0.010 Oh Pekerja Rp. 70,000.00 = Rp. 700.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.005 Oh Mandor Rp. 120,000.00 = Rp. 600.00
Harga Satuan Pekerjaan = Rp. 39,187.50
84 ANL. PRAKTIS 1 BH PASANG KRAN LEHER ANGSA
Bahan
1.000 Bh Kran Leher Angsa (Stainless) Rp. 92,250.00 = Rp. 92,250.00
0.0250 Bh Seal Tape Rp. 7,500.00 = Rp. 187.50
Tenaga
0.010 Oh Pekerja Rp. 70,000.00 = Rp. 700.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.005 Oh Mandor Rp. 120,000.00 = Rp. 600.00
Harga Satuan Pekerjaan = Rp. 104,437.50
Harga Satuan Dasar Upah Dan Bahan
#NAME? : #NAME?
#NAME? : #NAME?
T. ANG. : 2018

NO URAIAN SATUAN HARGA KET.

a b c d e

A. UPAH
1 Pekerja Org/Hari Rp 70,000.00
2 Tukang Batu / Kayu / Besi / Cat Org/Hari Rp 95,000.00
3 Kepala Tukang Org/Hari Rp 120,000.00
4 Mandor Org/Hari Rp 120,000.00
5 Operator Org/Hari Rp 150,000.00

B. BAHAN
1 Tasirtu M3 Rp. 100,000.00
2 Pasir Urug M3 Rp. 140,000.00
3 Pasir Pasang M3 Rp. 160,000.00
4 Pasir Beton M3 Rp. 160,000.00
5 Kerikil M3 Rp. 168,000.00
6 Kerikil Sungai Ayakan M3 Rp. 190,000.00
7 Batu Kali / Batu Gunung M3 Rp. 220,000.00
8 Batu Bata Ukuran 5 x 11 x 22 Bh Rp. 1,150.00
9 Batu Karang M3 Rp. 1,650.00
10 Semen Portland (50 Kg) Zak Rp. 65,000.00 1,300.00
11 Semen Putih 25 Kg Zak Rp. 65,600.00 2,624.00
12 Nat / Mortar Flex Kg Rp. 13,850.00
13 Genteng Metal Spandek Lbr Rp. 45,500.00
14 Nok Genteng Metal P= 30 cm (Model C) Lbr Rp. 23,900.00
15 Seng Plat BJLS 20 Uk. 40cm M1 Rp. 28,550.00
16 Seng Gelombang BJLS 20 Lbr Rp. 47,300.00
17 Kayu Kelas I M3 Rp. 6,050,000.00
18 Kayu Klas II M3 Rp. 4,400,000.00
19 Kayu Terentang / Mall M3 Rp. 1,700,000.00
20 Dolken Kayu Galam Ø 8 - 10 P = 4 m Btg Rp. 11,000.00
21 Bambu Ø 6 - 10 P = 6 m Btg Rp. 13,000.00
22 Tali Ijuk Kg Rp. 12,500.00
23 Ijuk M3 Rp. 42,100.00
24 Tegel Keramik ( Permukaan Kasar ) 20 x 20 cm Dos Rp. 80,000.00 3,076.92
25 Keramik Dinding 20 x 30 cm Dos Rp. 80,000.00 4,799.04
26 Keramik Dinding 60 x 30 cm Dos Rp. 94,000.00 16,906.47
27 Tegel Keramik 40 x 40 cm Dos Rp. 70,000.00 17,500.00
28 Tegel Plint 10 x 20 cm BH Rp. 2,000.00
29 Batu Alam M2 Rp. 120,000.00
30 Besi Beton Polos Kg Rp. 13,000.00
31 Kawat Ikat Beton / Bendrat Kg Rp. 22,400.00
32 Besi Strip Kg Rp. 17,500.00
33 Baja Profil WF Kg Rp. 21,000.00
34 Besi Holo 2/4 P= 4m Btg Rp. 78,000.00 /M' 19,500.00
35 Besi Holo 4/4 P= 4m Btg Rp. 95,000.00 /M' 23,750.00
36 Besi L 4/4 P= 3,8m Btg Rp. 37,000.00
37 Acessories Pintu Pagar Btg Rp. 150,000.00
38 Baja Ringan Main Truss 75.75 Btg Rp. 70,000.00 11,666.67
39 Kanal C 45 Btg Rp. 30,000.00 7,500.00
40 Reng TR 32 - 45 Btg Rp. 43,000.00 7,166.67
41 Screw 12 - 14 x 20 (Truss) Bh Rp. 1,800.00
42 Screw 10 - 14 x 20 (Reng) Bh Rp. 2,000.00
43 Dynabol Bh Rp. 5,000.00
44 Braket L Bh Rp. 2,000.00
45 Kaki Seribu M' Rp. 22,000.00
46 Profil L 45 M' Rp. 12,500.00
47 Braket T 20 Bh Rp. 1,700.00
48 Braket T 40 Bh Rp. 2,000.00
49 Kunci Penggantung Bh Rp. 3,000.00
50 Paku Tripleks Kg Rp. 24,200.00
51 Paku 2" - 5" Kg Rp. 20,800.00
52 Paku 0,5" - 1,5" Kg Rp. 19,700.00
53 Paku Genteng Metal Kg Rp. 27,450.00
54 Paku Seng Kg Rp. 27,200.00
55 Paku Sekrup / Paku Gypsum Bh Rp. 500.00
56 Sekrup Fixer Bh Rp. 2,500.00
57 Sealent Tube Rp. 125,000.00
58 Sealant (Karet Kaca) Tube Rp. 150,000.00
59 Profil Almunium 4" x 1,3/4" ( YKK ) M1 Rp. 70,000.00
60 Slimar Aluminium 3/8 cm M1 Rp. 79,000.00
61 Karet Sealent/Silikon M1 Rp. 35,500.00
62 Tripleks Ukuran 120 x 240cm T=3mm Lbr Rp. 55,000.00
63 Teakwood Ukuran 120 x 240 cm T=4mm Lbr Rp. 127,400.00
64 Kusen + Daun Pintu PVC Km/Wc (Include) Unit Rp. 1,850,000.00
65 Pas. ACP + Rangka Hollow M2 Rp. 1,100,000.00
66 Kusen Rangka Jendela M' Rp. 55,000.00
67 Kusen Rangka Pintu M' Rp. 65,000.00
68 Playwood 120 x 140cm T = 9mm Lbr Rp. 120,000.00
69 Gypsumboard 120 x 240 x 9 mm Lbr Rp. 130,000.00
70 Kalsiboard 120 x 120 T=5mm Lbr Rp. 53,000.00
71 Wood Plank Elephant M1 Rp. 240,000.00
72 List Profil Gypsum 9 - 11cm M1 Rp. 20,000.00
73 List Profil Beton 10 - 12cm M1 Rp. 30,000.00
74 Kitcen Zink 1 Lubang (Include) Bh Rp. 225,000.00
75 Wastafel (include) Bh Rp. 70,000.00
76 Wather Drain + Asesories Set Rp. 65,000.00
77 Closed Jongkok Bh Rp. 150,000.00
78 Shower Basuh Bh Rp. 65,000.00
79 Flor Drain Bh Rp. 15,000.00
80 Kran Dinding Ø 3/4 " (Stainless) Bh Rp. 27,000.00
81 Kran Leher Angsa (Stainless) Bh Rp. 92,250.00
82 Seal Tape Bh Rp. 7,500.00
83 PVC Ø 1" P = 4m Btg Rp. 36,400.00 9,100.00
84 PVC Ø 2" P = 4m Btg Rp. 87,000.00 21,750.00
85 PVC Ø 2 1/2" P = 4m Btg Rp. 90,000.00 22,500.00
86 PVC Ø 3" P = 4m Btg Rp. 148,000.00 37,000.00
87 PVC Ø 4" P = 4m Btg Rp. 274,260.00 68,565.00
88 GIP Ø 1/2" P = 6m Btg Rp. 66,760.00 11,126.67
89 GIP Ø 3/4" P = 6m Btg Rp. 83,700.00 13,950.00
90 Pipa Penguapan Septiktank Bh Rp. 27,500.00
91 Kaca 5 mm Bening M2 Rp. 197,610.00
92 Kaca 5 mm Ryben M2 Rp. 162,500.00
93 Kaca 6 mm Bening M2 Rp. 200,000.00
94 Kaca 5 mm Buram M2 Rp. 200,000.00
95 Kaca Temperet 12 mm M2 Rp. 1,750,000.00
96 Kaca Temperet 10 mm M2 Rp. 1,100,000.00
97 Cat Kayu Kg Rp. 51,950.00
98 Cat Tembok Kg Rp. 25,000.00
99 Cat Besi Kg Rp. 51,950.00
100 Cat Seng Kg Rp. 26,700.00
101 Cat Meny Kg Rp. 25,750.00
102 Soda Api Kg Rp. 27,500.00
103 Lem Kayu Klg Rp. 22,470.00
104 Cornice Adhesive Kg Rp. 7,750.00
105 Perban Gypsum Roll Rp. 15,000.00
106 Dempul Kayu Kg Rp. 20,160.00
107 Plamur Kayu Kg Rp. 11,550.00
108 Dempul Tembok Kg Rp. 8,200.00
109 Plamur Tembok Kg Rp. 21,350.00
110 Cat Meni Kg Rp. 7,600.00
111 Minyak Cat Kg Rp. 19,200.00
112 Minyak Bekisting Ltr Rp. 34,500.00
113 Residu / Ter Ltr Rp. 12,000.00
114 Kertas Pasir Lbr Rp. 11,500.00
115 Pintu Panel + Lapis Aliminium Unit/Set Rp. 750,000.00
116 Kunci Pintu 2 Slagg Set Rp. 115,000.00
117 Kunci Pintu Bulat ( Km/Wc ) Set Rp. 71,500.00
118 Kunci Lemari Set Rp. 7,500.00
119 Engsel Pintu Set Rp. 11,050.00
120 Engsel Jendela Set Rp. 6,500.00
121 Engsel X Key Jendela Psg Rp. 115,000.00
122 Grendel Pintu Bh Rp. 10,000.00
123 Engsel Tanam Psg Rp. 350,000.00
124 Grendel Jendela Bh Rp. 4,450.00
125 Grendel Lemari Bh Rp. 5,100.00
126 Handel Pintu Stanless Psg Rp. 341,550.00
127 Handel Pintu Psg Rp. 230,000.00
128 Hak Tarikan Pintu Lemari Bh Rp. 5,000.00
129 Floor Hings Set Rp. 410,000.00
130 Over Panel Set Rp. 140,000.00
131 Top Patch Fiting Set Rp. 150,000.00
132 Buttom Patch Lock Dorman + Cyling Set Rp. 1,250,000.00
133 Buttom Patch Fitting Set Rp. 350,000.00
134 Pull Handel Set Rp. 375,000.00
135 Tarikan Rambuncis Bh Rp. 35,000.00
136 Lampu Led 18 - 20 Watt Bh Rp. 75,000.00
137 Lampu Pijar 15 - 30 watt Bh Rp. 8,000.00
138 Stop Kontak Bh Rp. 22,000.00
139 Saklar Tunggal Bh Rp. 7,000.00
140 Saklar Ganda Bh Rp. 15,000.00
141 Panel Box MCB Include Unit Rp. 180,000.00
142 Instalasi Titik Lampu Ttk Rp. 190,000.00
143 Instalasi Stop Kontak Kabel NYA 2,5 mm
Dlm PVC 20 mm Komplit Juction Box & Perlengkapan Ttk Rp. 60,000.00
144 Alat Bantu Ls Rp. 12,000.00
145 Excavator /Jam Rp. 350,000.00
Lampiran Daftar Kuantitas dan Harga
Pekerjaan Pembongkaran dan Pembersihan
Err:509 : KEGIATAN LAIN YANG MENDUKUNG KELANCARAN PELAKSANAAN TUGAS
### DIREKTORAT JENDRAL PAJAK
Err:509 : RENOVASI RUMAH DINAS ESELON IV (3 UNIT)
Err:509 : KOMPLEKS KANTOR PAJAK PRATAMA
### 0
T. ANG. : 2010

Harga Sat. Jml. Harga


No Uraian Pekerjaan Vol Sat
(Rp) (Rp)
a b c d e f = (c x e)

DIVISI 0.0. PEMBONGKARAN DAN PEMBERSIHAN


Section 0.0.1 Pekerjaan Pembongkaran
1 Badan Bangunan
• Batu Bata + Kusen 121.957 M2 20,483.23 2,498,068.57
• Mengupas / Mengerok Permukaan Cat Tembok Lama 276.300 M2 12,175.00 3,363,952.50
• Beton Lantai 8.667 M3 253,325.00 2,195,567.78
• Beton ( Kolom, Sloof dan Ring Balk ) 1.309 M3 506,650.00 663,458.17
2 Kap dan Rangka Kap Bangunan
• Kap 234.765 M2 5,875.00 1,379,244.38
• Rangka Kap ( Kayu Sebagian Dipakai Kembali) 234.765 M2 7,600.00 1,784,214.00
Sub. Jumlah Section 0.0.1 11,884,505.39

Section 0.0.2 Pekerjaan Pembersihan


1 Pembersihan Bekas Bongkaran 144.450 M2 #NAME? #NAME?
Sub. Jumlah Section 0.0.2 #NAME?
Sub Total Pekerjaan Pembongkaran dan Pembersihan Bekas Bongkaran ( Sec. 0.0.1 + Sec. 0.0.2 ) #NAME?

Err:509
Err:509
Err:509

6000

Err:509
Err:509
LAMPIRAN ANGGARAN PEKERJAAN PEMBONGKARAN
PROGRAM : KEGIATAN LAIN YANG MENDUKUNG KELANCARAN PELAKSANAAN TUGAS
###DIREKTORAT JENDRAL PAJAK
PEKERJAAN : RENOVASI RUMAH DINAS KEPALA KANTOR (1 UNIT)
LOKASI : KOMPLEKS KANTOR PAJAK PRATAMA
###JL. ANOA 1 NO.
TH. ANGGARAN : 2010

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp) (Rp)
A B C D E F = (C x E)

DIVISI 0.0. PEMBONGKARAN DAN PEMBERSIHAN


Section 0.0.1 Pekerjaan Pembongkaran
1 Badan Bangunan
• Pondasi 2.190 M3 379,987.50 832,172.62
• Batu Bata 27.910 M3 20,483.23 571,687.04
• Roster 22.500 M3 20,483.23 460,872.75
• Mengupas / Mengerok Permukaan Cat Tembok Lama 54.750 M2 12,175.00 666,581.25
• Beton ( Kolom, dan Ring Balk ) 0.587 M3 506,650.00 297,403.55
2 Kap dan Rangka Kap Bangunan
• Kap 63.250 M2 5,875.00 371,593.75
• Rangka Kap ( Kayu Sebagian Dipakai Kembali) 63.250 M2 7,600.00 480,700.00
Sub. Jumlah Section 0.0.1 3,681,010.97

Section 0.0.2 Pekerjaan Pembersihan


1 Pembersihan Bekas Bongkaran 29.325 M2 #NAME? #NAME?
Sub. Jumlah Section 0.0.2 #NAME?
Sub Total Pekerjaan Pembongkaran dan Pembersihan Bekas Bongkaran ( Sec. 0.0.1 + Sec. 0.0.2 ) #NAME?

Palu, 12 Juni 2010


Dibuat :
Konsultan Perencana
CV. PARUJA

WAHYUDI M. SUUDI, ST
Direktur

LAMPIRAN RENCANA ANGGARAN BIAYA (EE)


PEKERJAAN PEMBONGKARAN DAN PEMBERSIHAN
PROGRAM : KEGIATAN LAIN YANG MENDUKUNG KELANCARAN PELAKSANAAN TUGAS
###DIREKTORAT JENDRAL PAJAK
PEKERJAAN : PEMBANGUNAN PAGAR RUMAH DINAS (210,60 M2)
LOKASI : KOMPLEKS KANTOR PAJAK PRATAMA
###JL. ANOA 1 KOTA PALU
TH. ANGGARAN : 2010

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp) (Rp)
A B C D E F = (C x E)

DIVISI 0.0. PEMBONGKARAN DAN PEMBERSIHAN


Section 0.0.1 Pekerjaan Pembongkaran
1 Pagar Lama
• Pondasi 7.897 M3 379,987.50 3,000,951.28
• Beton Kolom 8.400 M3 506,650.00 4,255,860.00
• Beton Sloof 4.928 M3 506,650.00 2,496,517.88
Sub. Jumlah Section 0.0.2 9,753,329.16
Section 0.0.2 Pekerjaan Pembersihan
1 Pembersihan Bekas Bongkaran 210.600 M2 #NAME? #NAME?
Sub. Jumlah Section 0.0.3 #NAME?
Sub Total Pekerjaan Pembongkaran dan Pembersihan Bekas Bongkaran (Sec. 0.0.1 + Sec. 0.0.2 + Sec. 0 #NAME?

Palu, 12 Juni 2010


Dibuat :
Konsultan Perencana
#REF!

#REF!
#REF!

LAMPIRAN RENCANA ANGGARAN BIAYA (EE)


PEKERJAAN PEMBONGKARAN DAN PEMBERSIHAN
PROGRAM : KEGIATAN LAIN YANG MENDUKUNG KELANCARAN PELAKSANAAN TUGAS
DIREKTORAT JENDRAL PAJAK
PEKERJAAN : RENOVASI RUMAH DINAS ESELON IV (4 KOPEL / 8 UNIT)
LOKASI : KOMPLEKS KANTOR PAJAK PRATAMA
JL. ANOA 1 KOTA PALU
TH. ANGGARAN : 2010

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp) (Rp)
A B C D E F = (C x E)

DIVISI 0.0. PEMBONGKARAN DAN PEMBERSIHAN


Section 0.0.1 Pekerjaan Pembongkaran
1 Badan Bangunan
• Batu Bata + Kusen 353.796 M2 20,483.23 7,246,886.02
• Mengupas / Mengerok Permukaan Cat Tembok Lama 862.400 M2 12,175.00 10,499,720.00
• Beton Lantai 28.416 M3 253,325.00 7,198,483.20
• Beton ( Kolom, Sloof dan Ring Balk ) 8.656 M3 506,650.00 4,385,562.40
2 Kap dan Rangka Kap Bangunan
• Kap 476.960 M2 5,875.00 2,802,140.00
• Rangka Kap ( Kayu Sebagian Dipakai Kembali) 476.960 M2 7,600.00 3,624,896.00
Sub. Jumlah Section 0.0.1 35,757,687.62

Section 0.0.2 Pekerjaan Pembersihan


1 Pembersihan Bekas Bongkaran 473.600 M2 #NAME? #NAME?
Sub. Jumlah Section 0.0.2 #NAME?
Sub Total Pekerjaan Pembongkaran dan Pembersihan Bekas Bongkaran ( Sec. 0.0.1 + Sec. 0.0.2 ) #NAME?

Palu, 12 Juni 2010


Dibuat :
Konsultan Perencana
CV. L O B O

EDY PURWANTO, A.Md


Direktur

2 Plat Pelintas Lama


• Beton Lantai - M3 - -
• Beton Lantai - M3 253,325.00 -
LAMPIRAN RENCANA ANGGARAN BIAYA (EE) PEKERJAAN PEMBONGKARAN
PROGRAM : KEGIATAN LAIN YANG MENDUKUNG KELANCARAN PELAKSANAAN TUGAS
###DIREKTORAT JENDRAL PAJAK
PEKERJAAN : RENOVASI PAGAR RUMAH DINAS
LOKASI : KOMPLEKS KANTOR PAJAK PRATAMA
###JL. ANOA 1 NO.
TH. ANGGARAN : 2010

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp) (Rp)
A B C D E F = (C x E)

DIVISI 0.0. PEMBONGKARAN DAN PEMBERSIHAN


Section 0.0.1 Pekerjaan Pembongkaran
1 Pagar
• Pondasi - M3 - -
• Pagar Besi - M3 - -
• Roster - M3 - -
• Beton ( Kolom, Sloof dan Ring Balk ) - M3 - -
Sub. Jumlah Section 0.0.1 -

Section 0.0.2 Pekerjaan Pembersihan


1 Pembersihan Bekas Bongkaran - M2 - -
Sub. Jumlah Section 0.0.2 -
Sub Total Pekerjaan Pembongkaran dan Pembersihan Bekas Bongkaran ( Section 0.0.1 + Se -

Palu, 12 Juni 2010


Dibuat :
Konsultan Perencana
CV. L O B O

EDY PURWANTO, A.Md


Direktur
• Pondasi - M3 379,987.50 -
• Pondasi - M3 379,987.50 -
40.652 3.000 54.203 6.775 13.551 4 2
92.100 3.000 122.800 15.350 30.700 4 2
2.889 3.000 3.852 0.482 0.963 4 2
0.437 3.000 0.582 0.073 0.146 4 2
4 2
78.255 3.000 104.340 13.043 26.085 4 2
78.255 3.000 104.340 13.043 26.085 4 2

48.150 3.000 64.200


Pagar Luar

Garasi Area Dpr Entrance


2.190
27.910
22.500 -
54.750 - - 4 2
0.587

63.250
63.250
27.375
0.150 210.600 4.000
0.240 35.000 Bh
0.030 164.250 M1

1.000 210.600
88.449 4.000
215.600 4.000
7.104 4.000 118.400 0.060
2.164 4.000

119.240 4.000
119.240 4.000

118.400 4.000

0.150 210.600 4.000


-
- 4.000
1.729 3.000 - - - 4 2