Professional Documents
Culture Documents
ANALISA SNI, SATUAN BAHAN KOTA PALU (KONSULTAN FREDDY)
ANALISA SNI, SATUAN BAHAN KOTA PALU (KONSULTAN FREDDY)
Kota Palu
T. ANG. : 2018
Tenaga
0.150 Oh Pekerja Rp. 70,000.00 = Rp. 10,500.00
0.0025 Oh Mandor Rp. 120,000.00 = Rp. 300.00
Jumlah Rp. 12,175.00
6. ANL. PRAKTIS 10 M2 BONGKARAN ATAP SENG GELOMBANG (ATAP TIDAK DIPAKAI LAGI)
Tenaga
0.500 Oh Pekerja Rp. 70,000.00 = Rp. 35,000.00
0.250 Oh Tukang Rp. 95,000.00 = Rp. 23,750.00
Jumlah Rp. 58,750.00
• Untuk 1 M2 Bongkaran Rangka Atap Kayu (Anl.Bongkaran Atap Seng Gelombang / 10) = Rp. 5,875.00
7. ANL. PRAKTIS 10 M2 BONGKARAN RANGKA ATAP KAYU (KAYU SEBAGIAN DIPAKAI KEMBALI)
Tenaga
1.000 Oh Pekerja Rp. 70,000.00 = Rp. 70,000.00
0.050 Oh Mandor Rp. 120,000.00 = Rp. 6,000.00
Jumlah Rp. 76,000.00
• Untuk 1 M2 Bongkaran Rangka Atap Kayu ( Anl.Bongkaran Rangka Atap Kayu / 10 ) = Rp. 7,600.00
8. SNI 6.8. 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
Tenaga
0.100 Oh Pekerja Rp. 70,000.00 = Rp. 7,000.00
0.050 Oh Mandor Rp. 120,000.00 = Rp. 6,000.00
1.000 Oh Operator Rp. 150,000.00 = Rp. 150,000.00
Peralatan
0.0075 Jam Excavator Rp. 350,000.00 = Rp. 2,625.00
Harga Satuan Pekerjaan = Rp. 165,625.00
25. SNI 6.8 1 M2 PASANGAN BATU BATA TEBAL 1/2 BATA 1 PC : 3 PSR
Bahan
70.000 Buah Batu Bata Ukuran 5 x 11 x 22 Rp. 1,150.00 = Rp. 80,500.00
14.370 Kg Semen Portland Rp. 1,300.00 = Rp. 18,681.00
0.040 M3 Pasir Pasang Rp. 160,000.00 = Rp. 6,400.00
Tenaga
0.300 Oh Pekerja Rp. 70,000.00 = Rp. 21,000.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.015 Oh Mandor Rp. 120,000.00 = Rp. 1,800.00
Harga Satuan Pekerjaan = Rp. 139,081.00
26. SNI 6.10 1 M2 PASANGAN BATU BATA TEBAL 1/2 BATA 1 PC : 5 PSR
Bahan
70.000 Buah Batu Bata Ukuran 5 x 11 x 22 Rp. 1,150.00 = Rp. 80,500.00
9.680 Kg Semen Portland Rp. 1,300.00 = Rp. 12,584.00
0.045 M3 Pasir Pasang Rp. 160,000.00 = Rp. 7,200.00
Tenaga
0.300 Oh Pekerja Rp. 70,000.00 = Rp. 21,000.00
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. 120,000.00 = Rp. 1,200.00
0.015 Oh Mandor Rp. 120,000.00 = Rp. 1,800.00
Harga Satuan Pekerjaan = Rp. 133,784.00
33. Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 175), slump (12 ± 2) cm
Bahan
326.000 Kg Semen Portland Rp. 1,300.00 = Rp. 423,800.00
0.543 M3 Pasir Beton Rp. 160,000.00 = Rp. 86,880.00
0.762 M3 Kerikil Rp. 168,000.00 = Rp. 128,016.00
215.000 Ltr Air Rp. 100.00 = Rp. 21,500.00
Tenaga
1.650 Oh Pekerja Rp. 70,000.00 = Rp. 115,500.00
0.275 Oh Tukang Rp. 95,000.00 = Rp. 26,125.00
0.028 Oh Kepala Tukang Rp. 120,000.00 = Rp. 3,360.00
0.083 Oh Mandor Rp. 120,000.00 = Rp. 9,960.00
Harga Satuan Pekerjaan = Rp. 815,141.00
34. 1 KG PEMBESIAN DENGAN BESI POLOS / ULIR
Bahan
1.050 Kg Besi Beton Polos Rp. 13,000.00 = Rp. 13,650.00
0.015 Kg Kawat Ikat Beton / Bendrat Rp. 22,400.00 = Rp. 336.00
Tenaga
0.007 Oh Pekerja Rp. 70,000.00 = Rp. 490.00
0.007 Oh Tukang Rp. 95,000.00 = Rp. 665.00
0.0007 Oh Kepala Tukang Rp. 120,000.00 = Rp. 84.00
0.0003 Oh Mandor Rp. 120,000.00 = Rp. 36.00
Harga Satuan Pekerjaan = Rp. 15,261.00
53. ANL. 1 M2 PASANG KUDA-KUDA BAJA RINGAN + ATAP GENTENG METAL = Rp. 249,248.17
71 SAKLAR TUNGGAL
Bahan
1.000 Bh Saklar Tunggal Rp. 7,000.00 = Rp. 7,000.00
Tenaga
0.010 Oh Pekerja Rp. = Rp.
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. = Rp.
0.001 Oh Mandor Rp. = Rp.
Harga Satuan Pekerjaan = Rp. 16,500.00
72 SAKLAR GANDA
Bahan
1.000 Bh Saklar Ganda Rp. 15,000.00 = Rp. 15,000.00
Tenaga
0.010 Oh Pekerja Rp. = Rp.
0.100 Oh Tukang Rp. 95,000.00 = Rp. 9,500.00
0.010 Oh Kepala Tukang Rp. = Rp.
0.001 Oh Mandor Rp. = Rp.
Harga Satuan Pekerjaan = Rp. 24,500.00
a b c d e
A. UPAH
1 Pekerja Org/Hari Rp 70,000.00
2 Tukang Batu / Kayu / Besi / Cat Org/Hari Rp 95,000.00
3 Kepala Tukang Org/Hari Rp 120,000.00
4 Mandor Org/Hari Rp 120,000.00
5 Operator Org/Hari Rp 150,000.00
B. BAHAN
1 Tasirtu M3 Rp. 100,000.00
2 Pasir Urug M3 Rp. 140,000.00
3 Pasir Pasang M3 Rp. 160,000.00
4 Pasir Beton M3 Rp. 160,000.00
5 Kerikil M3 Rp. 168,000.00
6 Kerikil Sungai Ayakan M3 Rp. 190,000.00
7 Batu Kali / Batu Gunung M3 Rp. 220,000.00
8 Batu Bata Ukuran 5 x 11 x 22 Bh Rp. 1,150.00
9 Batu Karang M3 Rp. 1,650.00
10 Semen Portland (50 Kg) Zak Rp. 65,000.00 1,300.00
11 Semen Putih 25 Kg Zak Rp. 65,600.00 2,624.00
12 Nat / Mortar Flex Kg Rp. 13,850.00
13 Genteng Metal Spandek Lbr Rp. 45,500.00
14 Nok Genteng Metal P= 30 cm (Model C) Lbr Rp. 23,900.00
15 Seng Plat BJLS 20 Uk. 40cm M1 Rp. 28,550.00
16 Seng Gelombang BJLS 20 Lbr Rp. 47,300.00
17 Kayu Kelas I M3 Rp. 6,050,000.00
18 Kayu Klas II M3 Rp. 4,400,000.00
19 Kayu Terentang / Mall M3 Rp. 1,700,000.00
20 Dolken Kayu Galam Ø 8 - 10 P = 4 m Btg Rp. 11,000.00
21 Bambu Ø 6 - 10 P = 6 m Btg Rp. 13,000.00
22 Tali Ijuk Kg Rp. 12,500.00
23 Ijuk M3 Rp. 42,100.00
24 Tegel Keramik ( Permukaan Kasar ) 20 x 20 cm Dos Rp. 80,000.00 3,076.92
25 Keramik Dinding 20 x 30 cm Dos Rp. 80,000.00 4,799.04
26 Keramik Dinding 60 x 30 cm Dos Rp. 94,000.00 16,906.47
27 Tegel Keramik 40 x 40 cm Dos Rp. 70,000.00 17,500.00
28 Tegel Plint 10 x 20 cm BH Rp. 2,000.00
29 Batu Alam M2 Rp. 120,000.00
30 Besi Beton Polos Kg Rp. 13,000.00
31 Kawat Ikat Beton / Bendrat Kg Rp. 22,400.00
32 Besi Strip Kg Rp. 17,500.00
33 Baja Profil WF Kg Rp. 21,000.00
34 Besi Holo 2/4 P= 4m Btg Rp. 78,000.00 /M' 19,500.00
35 Besi Holo 4/4 P= 4m Btg Rp. 95,000.00 /M' 23,750.00
36 Besi L 4/4 P= 3,8m Btg Rp. 37,000.00
37 Acessories Pintu Pagar Btg Rp. 150,000.00
38 Baja Ringan Main Truss 75.75 Btg Rp. 70,000.00 11,666.67
39 Kanal C 45 Btg Rp. 30,000.00 7,500.00
40 Reng TR 32 - 45 Btg Rp. 43,000.00 7,166.67
41 Screw 12 - 14 x 20 (Truss) Bh Rp. 1,800.00
42 Screw 10 - 14 x 20 (Reng) Bh Rp. 2,000.00
43 Dynabol Bh Rp. 5,000.00
44 Braket L Bh Rp. 2,000.00
45 Kaki Seribu M' Rp. 22,000.00
46 Profil L 45 M' Rp. 12,500.00
47 Braket T 20 Bh Rp. 1,700.00
48 Braket T 40 Bh Rp. 2,000.00
49 Kunci Penggantung Bh Rp. 3,000.00
50 Paku Tripleks Kg Rp. 24,200.00
51 Paku 2" - 5" Kg Rp. 20,800.00
52 Paku 0,5" - 1,5" Kg Rp. 19,700.00
53 Paku Genteng Metal Kg Rp. 27,450.00
54 Paku Seng Kg Rp. 27,200.00
55 Paku Sekrup / Paku Gypsum Bh Rp. 500.00
56 Sekrup Fixer Bh Rp. 2,500.00
57 Sealent Tube Rp. 125,000.00
58 Sealant (Karet Kaca) Tube Rp. 150,000.00
59 Profil Almunium 4" x 1,3/4" ( YKK ) M1 Rp. 70,000.00
60 Slimar Aluminium 3/8 cm M1 Rp. 79,000.00
61 Karet Sealent/Silikon M1 Rp. 35,500.00
62 Tripleks Ukuran 120 x 240cm T=3mm Lbr Rp. 55,000.00
63 Teakwood Ukuran 120 x 240 cm T=4mm Lbr Rp. 127,400.00
64 Kusen + Daun Pintu PVC Km/Wc (Include) Unit Rp. 1,850,000.00
65 Pas. ACP + Rangka Hollow M2 Rp. 1,100,000.00
66 Kusen Rangka Jendela M' Rp. 55,000.00
67 Kusen Rangka Pintu M' Rp. 65,000.00
68 Playwood 120 x 140cm T = 9mm Lbr Rp. 120,000.00
69 Gypsumboard 120 x 240 x 9 mm Lbr Rp. 130,000.00
70 Kalsiboard 120 x 120 T=5mm Lbr Rp. 53,000.00
71 Wood Plank Elephant M1 Rp. 240,000.00
72 List Profil Gypsum 9 - 11cm M1 Rp. 20,000.00
73 List Profil Beton 10 - 12cm M1 Rp. 30,000.00
74 Kitcen Zink 1 Lubang (Include) Bh Rp. 225,000.00
75 Wastafel (include) Bh Rp. 70,000.00
76 Wather Drain + Asesories Set Rp. 65,000.00
77 Closed Jongkok Bh Rp. 150,000.00
78 Shower Basuh Bh Rp. 65,000.00
79 Flor Drain Bh Rp. 15,000.00
80 Kran Dinding Ø 3/4 " (Stainless) Bh Rp. 27,000.00
81 Kran Leher Angsa (Stainless) Bh Rp. 92,250.00
82 Seal Tape Bh Rp. 7,500.00
83 PVC Ø 1" P = 4m Btg Rp. 36,400.00 9,100.00
84 PVC Ø 2" P = 4m Btg Rp. 87,000.00 21,750.00
85 PVC Ø 2 1/2" P = 4m Btg Rp. 90,000.00 22,500.00
86 PVC Ø 3" P = 4m Btg Rp. 148,000.00 37,000.00
87 PVC Ø 4" P = 4m Btg Rp. 274,260.00 68,565.00
88 GIP Ø 1/2" P = 6m Btg Rp. 66,760.00 11,126.67
89 GIP Ø 3/4" P = 6m Btg Rp. 83,700.00 13,950.00
90 Pipa Penguapan Septiktank Bh Rp. 27,500.00
91 Kaca 5 mm Bening M2 Rp. 197,610.00
92 Kaca 5 mm Ryben M2 Rp. 162,500.00
93 Kaca 6 mm Bening M2 Rp. 200,000.00
94 Kaca 5 mm Buram M2 Rp. 200,000.00
95 Kaca Temperet 12 mm M2 Rp. 1,750,000.00
96 Kaca Temperet 10 mm M2 Rp. 1,100,000.00
97 Cat Kayu Kg Rp. 51,950.00
98 Cat Tembok Kg Rp. 25,000.00
99 Cat Besi Kg Rp. 51,950.00
100 Cat Seng Kg Rp. 26,700.00
101 Cat Meny Kg Rp. 25,750.00
102 Soda Api Kg Rp. 27,500.00
103 Lem Kayu Klg Rp. 22,470.00
104 Cornice Adhesive Kg Rp. 7,750.00
105 Perban Gypsum Roll Rp. 15,000.00
106 Dempul Kayu Kg Rp. 20,160.00
107 Plamur Kayu Kg Rp. 11,550.00
108 Dempul Tembok Kg Rp. 8,200.00
109 Plamur Tembok Kg Rp. 21,350.00
110 Cat Meni Kg Rp. 7,600.00
111 Minyak Cat Kg Rp. 19,200.00
112 Minyak Bekisting Ltr Rp. 34,500.00
113 Residu / Ter Ltr Rp. 12,000.00
114 Kertas Pasir Lbr Rp. 11,500.00
115 Pintu Panel + Lapis Aliminium Unit/Set Rp. 750,000.00
116 Kunci Pintu 2 Slagg Set Rp. 115,000.00
117 Kunci Pintu Bulat ( Km/Wc ) Set Rp. 71,500.00
118 Kunci Lemari Set Rp. 7,500.00
119 Engsel Pintu Set Rp. 11,050.00
120 Engsel Jendela Set Rp. 6,500.00
121 Engsel X Key Jendela Psg Rp. 115,000.00
122 Grendel Pintu Bh Rp. 10,000.00
123 Engsel Tanam Psg Rp. 350,000.00
124 Grendel Jendela Bh Rp. 4,450.00
125 Grendel Lemari Bh Rp. 5,100.00
126 Handel Pintu Stanless Psg Rp. 341,550.00
127 Handel Pintu Psg Rp. 230,000.00
128 Hak Tarikan Pintu Lemari Bh Rp. 5,000.00
129 Floor Hings Set Rp. 410,000.00
130 Over Panel Set Rp. 140,000.00
131 Top Patch Fiting Set Rp. 150,000.00
132 Buttom Patch Lock Dorman + Cyling Set Rp. 1,250,000.00
133 Buttom Patch Fitting Set Rp. 350,000.00
134 Pull Handel Set Rp. 375,000.00
135 Tarikan Rambuncis Bh Rp. 35,000.00
136 Lampu Led 18 - 20 Watt Bh Rp. 75,000.00
137 Lampu Pijar 15 - 30 watt Bh Rp. 8,000.00
138 Stop Kontak Bh Rp. 22,000.00
139 Saklar Tunggal Bh Rp. 7,000.00
140 Saklar Ganda Bh Rp. 15,000.00
141 Panel Box MCB Include Unit Rp. 180,000.00
142 Instalasi Titik Lampu Ttk Rp. 190,000.00
143 Instalasi Stop Kontak Kabel NYA 2,5 mm
Dlm PVC 20 mm Komplit Juction Box & Perlengkapan Ttk Rp. 60,000.00
144 Alat Bantu Ls Rp. 12,000.00
145 Excavator /Jam Rp. 350,000.00
Lampiran Daftar Kuantitas dan Harga
Pekerjaan Pembongkaran dan Pembersihan
Err:509 : KEGIATAN LAIN YANG MENDUKUNG KELANCARAN PELAKSANAAN TUGAS
### DIREKTORAT JENDRAL PAJAK
Err:509 : RENOVASI RUMAH DINAS ESELON IV (3 UNIT)
Err:509 : KOMPLEKS KANTOR PAJAK PRATAMA
### 0
T. ANG. : 2010
Err:509
Err:509
Err:509
6000
Err:509
Err:509
LAMPIRAN ANGGARAN PEKERJAAN PEMBONGKARAN
PROGRAM : KEGIATAN LAIN YANG MENDUKUNG KELANCARAN PELAKSANAAN TUGAS
###DIREKTORAT JENDRAL PAJAK
PEKERJAAN : RENOVASI RUMAH DINAS KEPALA KANTOR (1 UNIT)
LOKASI : KOMPLEKS KANTOR PAJAK PRATAMA
###JL. ANOA 1 NO.
TH. ANGGARAN : 2010
WAHYUDI M. SUUDI, ST
Direktur
#REF!
#REF!
63.250
63.250
27.375
0.150 210.600 4.000
0.240 35.000 Bh
0.030 164.250 M1
1.000 210.600
88.449 4.000
215.600 4.000
7.104 4.000 118.400 0.060
2.164 4.000
119.240 4.000
119.240 4.000
118.400 4.000