CHEDULE – A
1. The Site
1.1 Site for construction of Four/Six lane Project Highway shall include the land,
buildings, structures and road works as described in Annex-I of this Schedule-A.
1.2 An inventory of the Site including the land, buildings, structures, road works trees and
any other immovable property on, or attached to, the Site shall be inspected and
prepared jointly by the Authority Representative and the Concessionaire, and such
inventory shall form part of the memorandum referred to in Clause 10.3.1 of the
Agreement.
1.3 Additional land required for construction of works specified in the Change of Scope
Order issued under Clause 16.2.3 of this Agreement shall be acquired in accordance
with the provisions of Clause 10.3.6 of this Agreement. Upon acquisition, such land
shall form part of the Site and vest in the Authority. The existing chainage wise detail
of highway is as detailed below:
There is Existing Bypass of 7m wide 2-Lane road with Earthen Shoulder on either
side for Chalisgaon Town for a length of 11.670 km which takes off at existing
National Highway at km 396+300 and takes into the existing National Highway at km
404+200. This bypass is being tolled and maintained by MSRDC Ltd. for which the
concessionaire period is up to year 2022.
1.4 The key Alignment plan of the project highway is as specified in Annex-II
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-1 of A-17
National Highways Authority of India
Annex – I
(Schedule – A)
1. Site
The site for construction of Four/Six Lane of the Project Highway comprises the
section of National Highway 211 commencing from km 390+000 to km 452+800 in
the state of Maharashtra. The land, carriageway and structures comprising the Site are
described below.
2. Land
The detail of the existing Right of Way (ROW) are as below:
3. Carriageway
Bodhre – Dhule section of NH-211 is having 2-Lane road standards with generally 7
m carriageway predominately without paved shoulder, except from km 390+000 to
km 396+000, where 1.5 m paved shoulder is also exists on either sides of the road.
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-2 of A-17
National Highways Authority of India
5. Service Roads
There is no existing service road along the project road.
7. Bypasses
There is an existing bypass at Chalisgaon Town as detail below:
Existing (km)
Name Existing Length (km)
From To
Existing Chalisgaon
0+000 11+670 11.670
Bypass
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-3 of A-17
National Highways Authority of India
8. Major Bridges
The Site includes the following Major Bridges for Project Road:
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-4 of A-17
National Highways Authority of India
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-6 of A-17
National Highways Authority of India
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-7 of A-17
National Highways Authority of India
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-8 of A-17
National Highways Authority of India
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-9 of A-17
National Highways Authority of India
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-10 of A-17
National Highways Authority of India
S. Existing
Length in (km) Crossing Remarks
No. (km)
Fro 400 132 66
To 220 kV 110 kV 66 kV 110 kV
m kV kV kV
1
Nil
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-13 of A-17
National Highways Authority of India
Water
Sewage line Water Supply line Sewage line
S Supply line
No
. From To With
With With With With With With
Gra With
Pump Pumpi Gravit Gravity Pumpi Gravity
vity Pumping
ing ng y Flow Flow ng Flow
Flow
1 408+000 415+600 7.60
3 427+000
4 432+400
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-14 of A-17
National Highways Authority of India
The Relationship between the “Existing km & Design Chainage” for the
project road is as below.
S. S.
Existing km Design Chainage Existing km Design Chainage
No. No.
1 390+000 390.000 39 425+000 429.020
2 391+000 391.000 40 426+000 429.921
3 392+000 391.995 41 427+000 430.918
4 393+000 392.992 42 428+000 431.944
43 429+000 432.928
5 394+000 393.998
44 430+000 433.933
6 395+000 395.995
45 431+000 434.934
7 396+000 396.993 46 432+000 435.942
8 1+000 397.244 47 433+000 436.979
9 2+000 398.244 48 434+000 437.967
10 3+000 399.244 49 435+000 438.977
11 4+000 400.244 50 436+000 440.006
12 5+000 401.236 51 437+000 440.990
13 6+000 402.205 52 438+000 441.994
14 7+000 403.205 53 439+000 442.997
15 8+000 404.205 54 440+000 444.000
16 9+000 405.205 55 441+000 445.004
56 442+000 446.003
17 10+000 406.205
57 443+000 447.003
18 11+000 407.205
58 444+000 447.979
19 405+000 408.833 59 445+000 448.982
20 406+000 409.832 60 446+000 449.982
21 407+000 410.831 61 447+000
22 408+000 411.835 62 448+000 Garthad Bypass
23 409+000 412.801 63 449+000
24 410+000 413.805 64 450+000 454.345
25 411+000 414.807 65 451+000 455.346
26 412+000 415.800 66 452+000 456.348
27 413+000
28 414+000 Mehunbare Bypass
29 415+000
30 416+000 420.101
31 417+000 421.104
32 418+000 422.115
33 419+000 423.143
34 420+000 424.108
35 421+000 425.110
36 422+000 426.114
37 423+000 427.134
38 424+000 428.117
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-15 of A-17
National Highways Authority of India
Annex - II
(Schedule-A)
Alignment Plans
Entire section of Project Highway is to be widened from two lane to four lane with paved
shoulder. The alignment of the project highway shall be followed as per the alignment plan
enclosed.
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-16 of A-17
National Highways Authority of India
Appendix-AI
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page A-17 of A-17
National Highways Authority of India
SCHEDULE - B
(See Clause 2.1)
DEVELOPMENT OF THE PROJECT HIGHWAY
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-1 of B-50
National Highways Authority of India
Annex - I
(Schedule-B)
1. Width of Carriageway
1.1 The width of Paved carriageway including Existing Chalisgaon Bypass shall be 9.00 meter
wide (including Kerb Shyness) in each side except the following stretches. The median
and carriageway for six lane structure approaches shall be as per TCS Type 3, 3A, 4 & 5.
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-2 of B-50
National Highways Authority of India
Service/slip road
Service/slip road shall be designed with minimum design traffic of 10 MSA.
Rigid Pavement
At toll plaza location, rigid pavement with minimum 280 mm PQC, 150 mm DLC with
150 mm GSB shall be provided.
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-4 of B-50
National Highways Authority of India
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-5 of B-50
National Highways Authority of India
Appendix BI
1. Cross Section Schedules
1.1 The Project Highway (design length=67.231 km) from Bodhre at Design Ch 390.000 to
Dhule at Design Ch 457.231 including existing Chalisgaon bypass shall be widened to
Four lane divided configuration with paved shoulder with or without Service Roads
excluding the provision of six lane approaches to six lane structures. Typical cross-
sections for widening and new construction of highway have been developed based on
site requirements and to meet design standards stated in the Manual of Specifications &
Standard for Four Laning of Highways through Public Private Partnership’ (IRC: SP: 84-
2019) subject to the specific provisions in Schedule D. Cross section schedule and the
details of typical cross section are presented below.
For Existing Chalisgaon Bypass of length of 11.670 km, which takes off at existing
National Highway at km 396+300 and takes into the existing National Highway at km
404+200. This bypass is being tolled and maintained by MSRDC Ltd. for which the
concessionaire period is up to 28th May 2022. After the completion of concession period
it will be handed over to the present concessionaires.
Till completion of concession period of concessionaire with MSRDC Ltd., appointed
concessionaire by NHAI may work eccentrically on the bypass stretch.
Cross Section Schedules along the Project
Ex. km Design Chainage Length Cross Section
From To From To (km) Type
390+000 396+243 390.000 396.235 6.235 Type-1C
Existing
396+243 Chalisgaon 396.235 396.600 0.365 Type-1
Bypass
396.600 397.640 1.040 Type-1B
397.640 398.380 0.740 Type-3
398.380 401.136 2.756 Type-1B
401.136 401.459 0.323 Type-1
401.459 402.500 1.041 Type-1B
Existing Chalisgaon Bypass
402.500 403.200 0.700 Type-5
additional 2L configuration
403.200 403.500 0.300 Type-1B
403.500 403.800 0.300 Type-1
403.800 405.350 1.550 Type-1B
405.350 406.585 1.235 Type-3
406.585 407.900 1.315 Type-1B
Existing
Chalisgaon 404+271 407.900 408.100 0.200 Type-1
Bypass
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-6 of B-50
National Highways Authority of India
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-7 of B-50
National Highways Authority of India
1 Type 7 Typical cross section for improvement in existing Chalisgaon town from 5.420
Existing Km. 396+300 to Existing Km. 397+800 and from Existing Km.
400+280 to Existing Km. 404+200
Raising / Reconstruction conforming to Specifications and Standards as per Schedule “D” and wherever
necessary as per site requirement, shall be carried out in following conditions wherever required.
Rising of embankment due to submergence.
Rising of embankment due to low embankment height.
Distressed/ Failed pavement & sub-grade sections.
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-8 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-9 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-10 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-11 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-12 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-13 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-14 of B-50
National Highways Authority of India
Appendix B II
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-15 of B-50
National Highways Authority of India
Appendix BIII
The indicative alignment Plan & Profile drawings are given in the soft copy as Annexure – B
However concessionaire will improve/upgrade the road profile as indicated in Annex II based
on site/design requirement and as per the Manual of specifications and Standards as given in
Schedule “D”.
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-16 of B-50
National Highways Authority of India
Appendix - B IV
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-17 of B-50
National Highways Authority of India
Appendix - B V
Minimum
Clear Span Total
S. Existing Design Vertical
Arrangement Width Location
No. Chainage Chainage Clearance
(Sq.) (m) (m)
(m)
1 Existing 397.985 1 x 12.0 4.5 2 x 14.5 LVUP on
Chalisgaon Patnadevi-
Bypass Chalisgaon
Road at
Existing
Chalisgaon
Bypass
2 438+390 442.390 1 x 12.0 4.5 2 x 14.5 LVUP on
Junawane
Village
3 Proposed 452.065 1 x 12.0 4.5 2 x 14.5 LVUP on
Garthad Proposed
Bypass Garthad
Bypass
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-18 of B-50
National Highways Authority of India
Appendix - B VI
I. Details of 7.5/5.5 m Service Road/ Slip Road for Proposed Road including Existing
Chalisgaon Bypass:
Note:
a) Slip road & service road length excluding Merging & Diverging length.
b) At VUP/Flyover & PUP location existing road need to be tie-in with Slip road
as per schedule D.
c) Any Junction with Slip/Service road and cross-road need to be properly
developed and carryout up- gradation of cross road in consultation with IE.
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-19 of B-50
National Highways Authority of India
Appendix - B VII
I. Repair/Rehabilitation/Widening/Reconstruction of Culverts for Proposed Road including Existing Chalisgaon Bypass:
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-20 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-21 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-22 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-23 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-26 of B-50
National Highways Authority of India
Note: - Cross drainage structures at cross roads as per site requirement are to be provided.
(a) Repairs/replacements of railing/parapets, flooring and protection works of the existing culverts shall be undertaken as
follows:
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-27 of B-50
National Highways Authority of India
Appendix B VIII
I. Minor bridges on Main Carriageway for Proposed Road including Existing Chalisgaon Bypass:
Configuration
New Carriage
Deck width of
Remarks
Location
S. Existing Design Type of Type of Total length of of widened
way(m)
Deck Existing New
Road
No. Chainage Chainage bridge super- Span length new /retained
width bridge bridge
structure in m carriage Carriage
way (m) way(m)
1 390+880 390.825 MNBR RCC Slab 1x6.50 6.5 13.4 Retain 1x6.50 6.5 13.4 1X12.5 New 2- Lane - -
(sk)
2 391+540 391.550 MNBR RCC Slab 1x6.50 6.5 12.0 Widen 1x6.50 6.5 13.5 1X12.5 New 2- Lane - -
3 392+510 392.534 MNBR RCC Slab 1x7.10 7.1 14.3 Retain 1x7.10 7.1 14.3 1X12.5 New 2- Lane - -
(sk)
4 395+425 395.590 MNBR RCC Slab 9x6.10 54.9 8.2 Widen 9x6.10 54.9 13.5 1X12.5 New 2- Lane - -
5 6+350 402.238 MNBR RCC Slab 1x8 8.0 11.8 Widen 1x8.0 8.0 - 1X12.5 New - Lane - -
6 10+050 405.453 MNBR RCC Slab 1x8 8.0 12.2 Re 1x8.0 8.0 12.2 2 x 14.5 New 4- Lane - -
construction
7 404+340 408.171 MNBR RCC Slab 2x7.10 14.2 12.0 Widen 2x7.1 14.2 13.5 1X12.5 New 2- Lane - -
8 407+675 411.513 MNBR RCC Slab 3x10.3 30.9 14.7 Retain 3x10.3 30.9 14.7 1X12.5 New 2- Lane - -
(sk)
9 408+350 412.183 MNBR CRM Arch 1x7.40 7.4 12.0 New 1x7.0 7 - 2x12.5 New 4- Lane - -
widened with construction
RCC Slab
10 417+226 421.335 MNBR RCC Slab 1x6.10 6.1 15.3 Retain 1x6.10 6.1 15.3 1X12.5 New 2- Lane - -
11 418+302 422.402 MNBR RCC Slab 3x7.10 21.3 12.6 Retain 3x7.10 21.3 12.6 1X12.5 New 2- Lane - -
12 419+237 423.375 MNBR RCC Slab 1x6.10 6.1 13.2 Retain 1x6.10 6.1 13.2 1X12.5 New 2- Lane - -
(sk)
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-28 of B-50
National Highways Authority of India
Details of existing bridge Improvement Proposal
Total Deck width
Configuration
Deck width of
New Carriage
Remarks
Location
S. Existing Design Type of Type of Total length of of widened
way(m)
Deck Existing New
Road
No. Chainage Chainage bridge super- Span length new /retained
width bridge bridge
structure in m carriage Carriage
way (m) way(m)
13 422+825 426.940 MNBR RCC Slab 1x6.10 6.1 10.8 Widen 1x6.10 6.1 13.5 1X12.5 New 2- Lane - -
14 423+031 427.168 MNBR RCC Slab 1x9.40 9.4 13.6 Retain 1x9.40 9.4 13.6 1X12.5 New 2- - -
(sk) Lane
15 427+605 431.540 MNBR RCC Slab 3x5.00 15 12.1 Retain & 3x5.00 15 11.6 2 x 10.5 - - -
both side -
widening
16 436+068 440.082 MNBR CRM Arch 2x9.30 18.6 16.9 Retain 2x9.30 16.9 16.9 1X12.5 New 2- Lane - -
(sk) widened with
RCC Slab -
17 438+671 442.665 MNBR RCC Slab 2x8.10 16.2 13.6 Retain & 2x8.10 16.2 15.1 2 x 14.5 - - -
both side -
widening
18 439+104 443.102 MNBR RCC Slab 1x8.00 8 11.8 Retain & 1x8.00 8 1 x 36.9 - - -
Widening (Toll plaza approach)
19 441+033 445.043 MNBR RCC Slab 1x6.80 6.8 11.9 Retain & 1x6.80 6.8 13.5 1X12.5 New 2- Lane - -
Widening
20 442+032 446.035 MNBR RCC Slab 1x6.10 6.1 12.2 Retain & 1x6.10 6.1 13.5 1X12.5 New 2- Lane - -
(sk) Widening
21 442+475 446.480 MNBR RCC Slab 1x7.40 7.4 11.6 Retain & 1x7.40 7.4 13.5 1X12.5 New 2- Lane - -
(sk) Widening
22 443+630 447.605 MNBR CRM Arch 3x7.20 21.6 7.0 Retain & 3x7.20 21.6 13.5 1X12.5 New 2- Lane - -
Widening
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-29 of B-50
National Highways Authority of India
Details of existing bridge Improvement Proposal
Total Deck width
Configuration
Deck width of
New Carriage
Remarks
Location
S. Existing Design Type of Type of Total length of of widened
way(m)
Deck Existing New
Road
No. Chainage Chainage bridge super- Span length new /retained
width bridge bridge
structure in m carriage Carriage
way (m) way(m)
23 - 452.815 MNBR Bypass 4x10.5 42 - 4x10.5 42.0 - 2x12.5 New 4-
Lane
24 - 454.230 MNBR Bypass 3x15.70 47.1 - 3x15.70 47.1 - 2x12.5 New 4-
Lane
25 451+200 455.550 MNBR RCC Slab 2x4.65 9.3 8.1 Retain and 2x4.65 9.3 11.6 1X10.5 New 2- Lane - -
both side
widening
26 451+750 456.088 MNBR RCC Slab 2x6.30 12.6 8.0 Retain and 2x6.30 12.6 11.6 1X10.5 New 2- Lane - -
both side
widening
- Note - The type of structure given above is indicative and the Concessionaire shall decide the type of structure based on the provisions
in the manual and site conditions.* (sk)- skew
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-31 of B-50
National Highways Authority of India
II. Minor Bridge on Service/Slip Road for Proposed Road via Existing Chalisgaon Bypass
S. Deck
Existing Chainage Design Chainage Type of Bridge Span Arrangement Road Configuration
No Width
Existing Chalishgaon
1 405.453 MNBR 1x8 New Both Side on Service Road/Slip Road 10.8m
bypass
2 427+605 431.540 MNBR 3x5 New Both Side on Service Road/Slip Road 10.8m
3 438+671 442.665 MNBR 2 X 8.1 New Both Side on Service Road/Slip Road 10.8m
4 451+200 455.550 MNBR 2x4.65 New Both Side on Service Road/Slip Road 10.8m
5 451+750 456.088 MNBR 2x6.30 New Both Side on Service Road/Slip Road 10.8m
Note - width of bridges in taper portion shall be proposed based on highway plan
High level Bridges are proposed on service road/Slip road with same span arrangement of main carriageway bridges. Width of the each side bridge will be
10.8m . Span arrangement and width of the bridge on service road/Slip road will be finalised in consultation with IE and approval from employer as per IRC
standard. This shall not be treated as change in the scope of services.
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-32 of B-50
National Highways Authority of India
Appendix B IX
I. Major bridges as listed below shall be provided, widened, reconstructed, or extended for Proposed Road including Existing
Chalisgaon Bypass:
2 7+950 402.142 MJBR RCC Slab 13x9.00 117 7.9 Retain 13x9.00 - 117 1 x 15.8 New 3 lane -
(skew)
3 411+720 415.710 MJBR RCC 9x27.4 246.6 7.7 Retain till 9x27.4 246.6 - 2x15.8 New 6- -
Balanced construction Lane with
Cantilever of new 6 lane Footpath
4 432+820 436.866 MJBR CRM 3x7.4+ 188.4 7.5 Retain till 2x22.5+ 189 - 2x15.8 New 6-
Arch 9x16+3x7.4 construction 9x16 Lane with -
of new 6 lane footpath
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-33 of B-50
National Highways Authority of India
Repairs and strengthening of Major bridges
The existing bridges and structures to be repaired/strengthened, and the nature and extent of repairs /strengthening required are given below:
S. No. Location of bridge (Ch.) Nature and extent of repairs/ strengthening to be carried out
All repairs in Substructure & Superstructure & bed protection, etc. shall be carried out.
1 Debris removal and cleaning along with the vegetation shall be done at the waterway.
Major Bridge at 399.038
Existing wearing coat to be removed and new bituminous WC shall be laid with the
interlocking with footpath as per the cross section specified in the manual of specification.
Existing pitching shall be removed and new pitching with in proper quadrant shall be
2 Major Bridge at402.142 constructed.
Crash barrier shall be repaired/re-casted, etc.
Note: - Repairs shall include but not limited to the points mentioned above but up to the complete satisfaction of Authority.
Note - The type of structure given above is indicative and the Concessionaire shall decide the type of structure based on the provisions in the
manual and site conditions.
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-34 of B-50
National Highways Authority of India
Appendix B X
I. Rail Over Bridges (ROBs) as listed below shall be provided, widened, reconstructed, or extended for Proposed Road including
Existing Chalisgaon Bypass:
S. Existing Design Type of Type of superstructure Span (m) Total Deck Remarks Area
No. Chainage Chainage structure length in m width (m)
1 Existing 402.870 ROB Composite steel structure 1x16+1x57.4+1x16 89.400 2 x 16 Existing 2lane ROB to Existing
Chalisgaon with RCC slab be dismantle for New 6 Chalisgaon
Bypass lane Bypass
2 *Garthad 451.590 ROB Composite steel structure 1X19.299(sk.)+ 1 X 101.998 2 x 16 New 6-Lane Garthad
Bypass with RCC slab 63.400(sk.) +1X Bypass
19.299(sk.) m
i. The proposed span arrangements of ROB & RUB are tentative and subject to change as per the availability of railway boundaries / requirement of the
railways.
ii. ROB & RUB (including approach road) shall be designed, constructed and maintained as per the requirements of Railway authorities. The construction
plans shall be prepared in consultation with the concerned railway authorities.
iii. The ROB’s & RUB shall be constructed and maintained by the concessionaire under supervision of Railways.
iv. All the expenditure related to construction, maintenance and supervision of ROB & RUB including approach road (except P&E charges) shall be borne
by the concessionaire.
* Box type RUB (10.5mX5.5m Size) is proposed at the existing level crossing on existing NH 211,(L.C-19, Railway Km. 376/8-9).
Note: The location and span arrangements of the structures in the project stretch are indicative. The exact location and span arrangements shall be decided as per site
requirements in consultation with IE. Any change in location and span arrangement, skew angle, change in centre line shall not be treated as change in scope.
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-35 of B-50
National Highways Authority of India
Appendix B XI
I. Details of Proposed ROW for Proposed Road including Existing Chalisgaon
Bypass:
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-36 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-37 of B-50
National Highways Authority of India
Appendix B XII
I. At Grade Major Junctions for Proposed Road including Existing Chalisgaon
Bypass:
II. Major Junctions below Grade separator structures for Proposed Road including
Existing Chalisgaon Bypass:
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-39 of B-50
National Highways Authority of India
Appendix B XIII
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-40 of B-50
National Highways Authority of India
Appendix B XIV
“Any reconstruction of existing pavement due to the presence of expansive soils shall not be
treated as change of scope”.
The below sections are indicative. Based on site conditions the sections may be identified and
improved.
From To Design
S. From To
Description (Design (Design Length
No. (Existing km) (Existing km)
Chainage) Chainage) (km)
1 Mehunbure 410+495 411+730 414.300 415.540 1.240
Village
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-41 of B-50
National Highways Authority of India
Appendix B XV
Longitudinal Drains shall be provided on both sides of carriageway as per cross section
schedule mentioned in schedule “B” and conforming to Schedule “D”. Concrete covered drains
are proposed in built up areas, along the slip roads and in Chalisgaon Town area as shown in
the typical cross sections.
I. Details of Concrete covered drains for Proposed Road including Existing
Chalisgaon Bypass:
Existing Existing
Chalisgaon Chalisgaon 397.640 398.380 0.740 Type-3
Bypass Bypass
Existing Existing
Chalisgaon Chalisgaon 405.350 406.585 1.235 Type-3
Bypass Bypass
Mehunbare Mehunbare
418.140 418.940 0.800 Type-3
Bypass Bypass
427+570 428+100 431.490 432.040 0.550 Type-2
434+512 435+238 438.480 439.216 0.736 Type-3
438+025 438+934 442.020 442.930 0.910 Type-3A
II. Details of Concrete covered drains for Existing road in Chalisgaon Town Area
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-42 of B-50
National Highways Authority of India
III. Details of Median drains for Proposed Road including Existing Chalisgaon
Bypass:
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-43 of B-50
National Highways Authority of India
5. Utility Shifting
Shifting of obstructing utilities to an appropriate location in accordance with the
standards and specifications of concern utility department is a part of scope of work for
the concessionaire. The Bidder may visit the site and assess the quantum of shifting of
utilities for the project before submission of their bid. Copy of Utility relocation plan is
enclosed. The specifications are to be as per the specification of concerned utility
owning department.
Brief details of shifting of utilities are as below.
Nil
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-44 of B-50
National Highways Authority of India
(b) High Tension and Low Tension Line (HT & LT Lines)
Design
Existing Km RSJ Pole Conductor Cable Crossings Transformer
Chainage
Type
152 116 116
Des of 125 Tota Ove
S X X X Le Sh
cri circuit X 70 Len l U/ r Ne To Capa
No 152 100 100 Size ngt Size ift
Fro pti (TC / 9 gth Leng G hea w tal city
. From To To 13 11 9 No. h ng
m on DC mtr. th d
mtr. mtr. mtr.
/SC)
Sq. Mt Sq. Nos No No No
Nos. Nos. Nos. Nos. Km. Km. Nos. Nos.
mm. r. mm. . s. s. s.
33 0.01 3c X
S/C 4 4 Nil Nil 3 0 100 194 1 Nil Nil Nil Nil Nil
KV 2 300
Ch 11 10.7 3c X 100
Km Km Ch S/C Nil 81 32 Nil 3 3.4 55 970 5 Nil 0 1 1
390 KV 1 300 KVA
1 390+ 391+ 391.6
.00 AAC
000 600 00
0 0.48 ANT
LT T/C Nil Nil Nil 2 4 0.12 Nil Nil Nil Nil Nil Nil Nil Nil
0 &
GANT
33 5.72
S/C 58 28 Nil Nil 3 1.8 100 Nil Nil Nil Nil Nil Nil Nil Nil
KV 4
Ch 11 18.5 174 3c X 100
Km Km Ch S/C Nil 164 63 Nil 3 5.88 55 9 Nil 3 4 7
391 KV 22 6 300 KVA
2 391+ 395+ 395.5
.60 AAC
600 600 95
0 13.3 ANT
LT T/C Nil Nil Nil 52 4 3.12 Nil Nil Nil Nil Nil Nil Nil Nil
12 &
GANT
33 5.60 3c X
Exist S/C 65 40 Nil Nil 3 1.86 100 582 3 Nil Nil Nil Nil Nil
KV 4 300
ing
Ch 11 3c X 100
Km Km Chali S/C Nil 31 10 Nil 3 1.14 3.42 55 194 1 Nil 3 0 3
395 KV 300 KVA
3 395+ 397+ sgao
.59 AAC
600 000 n
5 7.20 ANT
Bypa LT T/C Nil Nil Nil 24 5 1.4 Nil Nil Nil Nil Nil Nil Nil Nil
0 &
ss
GANT
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-45 of B-50
National Highways Authority of India
Design
Existing Km RSJ Pole Conductor Cable Crossings Transformer
Chainage
Type
152 116 116
Des of 125 Tota Ove
S X X X Le Sh
cri circuit X 70 Len l U/ r Ne To Capa
No 152 100 100 Size ngt Size ift
Fro pti (TC / 9 gth Leng G hea w tal city
. From To To 13 11 9 No. h ng
m on DC mtr. th d
mtr. mtr. mtr.
/SC)
Sq. Mt Sq. Nos No No No
Nos. Nos. Nos. Nos. Km. Km. Nos. Nos.
mm. r. mm. . s. s. s.
Exi 33 29.2 135 3c X
S/C 209 81 Nil Nil 3 9.72 100 7 Nil Nil Nil Nil Nil
stin KV 08 8 300
Exist
g 11 232 3c X 100
ing S/C Nil 148 76 Nil 3 4.2 12.6 55 12 Nil 2 6 8
Ch KV 8 300 KVA
Km Km Chali
alis
4 397+ 403+ sgao
gao AAC
000 200 n
n 9.10 ANT
Bypa LT T/C Nil Nil Nil 35 4 2.1 Nil Nil Nil Nil Nil Nil Nil Nil
By 8 &
ss
pas GANT
s
33 1.52 3c X
S/C 12 6 Nil Nil 3 0.48 100 194 1 Nil Nil Nil Nil Nil
KV 4 300
100
Exi KVA
stin 11 26.0 349 3c X 5 nos.
S/C Nil 231 106 Nil 3 8.28 55 18 Nil 5 1 6
g KV 82 2 300 & 200
Ch KVA
Km Km Ch
alis 01 no
5 403+ 408+ 411.8
gao AAC
200 000 35
n 13.8 ANT
5 2.7 Nil Nil Nil Nil Nil Nil Nil Nil
By 00 &
pas GANT
LT T/C Nil Nil Nil 87
s AAC
9.24 ANT
4 0.12 Nil Nil Nil Nil Nil Nil Nil Nil
0 &
GANT
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-46 of B-50
National Highways Authority of India
Design
Existing Km RSJ Pole Conductor Cable Crossings Transformer
Chainage
Type
152 116 116
Des of 125 Tota Ove
S X X X Le Sh
cri circuit X 70 Len l U/ r Ne To Capa
No 152 100 100 Size ngt Size ift
Fro pti (TC / 9 gth Leng G hea w tal city
. From To To 13 11 9 No. h ng
m on DC mtr. th d
mtr. mtr. mtr.
/SC)
Sq. Mt Sq. Nos No No No
Nos. Nos. Nos. Nos. Km. Km. Nos. Nos.
mm. r. mm. . s. s. s.
33 3c X
S/C 28 10 Nil Nil 3 1.2 3.93 100 388 2 Nil Nil Nil Nil Nil
KV 300
Ch 11 446 3c X 100
Km Km Ch S/C Nil 566 156 Nil 3 24 75.6 55 23 Nil 6 9 15
411 KV 2 300 KVA
6 408+ 417+ 441.4
.83 AAC
000 300 03
5 10.8 ANT
LT T/C Nil Nil Nil 45 4 2.1 Nil Nil Nil Nil Nil Nil Nil Nil
00 &
GANT
33 8.50 3c X
S/C 76 35 Nil Nil 3 2.72 100 388 2 Nil Nil Nil Nil Nil
KV 2 300
Ch 11 45.9 3c X 100
Km Km Ch S/C Nil 360 59 Nil 3 14.6 55 970 5 Nil 0 4 4
441 KV 9 300 KVA
7 417+ 423+ 428.0
.40 AAC
300 900 17
3 13.3 ANT
LT T/C Nil Nil Nil 29 4 3.12 Nil Nil Nil Nil Nil Nil Nil Nil
12 &
GANT
33 7.32 3c X
S/C 48 22 Nil Nil 3 2.3 100 404 2 Nil Nil Nil Nil Nil
KV 4 300
291 3c X
Ch 11 13.3 42.2 0 300 100
Km Km Ch S/C Nil 291 194 Nil 3 55 17 Nil 0 10 10
428 KV 8 25 3C X KVA
8 423+ 437+ 441.4 388
.01 95
900 500 98
7 AAC
24.3 ANT
LT T/C Nil Nil Nil 116 5 4.5 Nil Nil Nil Nil Nil Nil Nil Nil
00 &
GANT
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-47 of B-50
National Highways Authority of India
Design
Existing Km RSJ Pole Conductor Cable Crossings Transformer
Chainage
Type
152 116 116
Des of 125 Tota Ove
S X X X Le Sh
cri circuit X 70 Len l U/ r Ne To Capa
No 152 100 100 Size ngt Size ift
Fro pti (TC / 9 gth Leng G hea w tal city
. From To To 13 11 9 No. h ng
m on DC mtr. th d
mtr. mtr. mtr.
/SC)
Sq. Mt Sq. Nos No No No
Nos. Nos. Nos. Nos. Km. Km. Nos. Nos.
mm. r. mm. . s. s. s.
33 3.16 3c X
S/C 21 10 Nil Nil 3 1 100 202 1 Nil Nil Nil Nil Nil
KV 2 300
135 3c X
Ch 11 8.04 8 300 100
Km Km Ch S/C Nil 78 64 Nil 3 2.52 55 9 Nil 0 4 4
441 KV 6 3C X KVA
9 437+ 442+ 442.4 388
.49 95
500 500 50
8 AAC
3.64 ANT
LT T/C Nil Nil Nil 17 5 0.7 Nil Nil Nil Nil Nil Nil Nil Nil
0 &
GANT
33
S/C Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
KV
135 3c X
Ch 11 16.0 8 300 100
Km Km Ch S/C Nil 126 32 Nil 3 5.36 55 7 Nil 0 6 6
442 KV 92 116 3C X KVA
10 442+ 452+ 457.1
.45 4 95
500 800 47
0 AAC
ANT
LT T/C Nil Nil Nil 38 4 2.28 9.12 Nil Nil Nil Nil Nil Nil Nil Nil
&
GANT
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing Length 62.8km; Design Length 67.231km) in the state of Maharashtra
under Bharatmala Pariyojana on Hybrid Annuity Mode
Page B-48 of B-50
National Highways Authority of India
Type of Sluice
Existing (km) Design Chainage Pipe Crossings
lines Valve
S.
(Pressure
No.
From To From To / Under Type Nos. Size Nos. Nos. length
Gravity)
Ex.
Chalisga
1 408+000 415+600 411.835 Pressure DI K-9 500mm 3
on
Bypass
PVC
2 426+950 427+300 430.870 431.218 Pressure 90mm 2
4kg/sqcm
GI C
3 427+000 430.918 Pressure 80mm 1 90m
class
CI B
4 432+400 436.042 Pressure 250mm 1 90m
class
Ex. Chalisgaon
1 Bypass 402.407 -14.258 LHS Hand Pump
2 406+997 410.629 -27.878 LHS Hand Pump
3 434+940 438.909 -22.072 LHS Hand Pump
Notes:
(a) The type/spacing /size /specification of poles /towers/lines/cables to be used in shifting
work are as per the guidelines of utility owning department and it is solely between the
concessionaire and utility owning department. No change of scope shall be eligible or
no cost shall be paid for using different type/spacing/size /specification in shifted work
in comparison to those in the existing or for making any overhead crossing to
underground as per the requirement of utility owning department /construction of the
project highway. The concessionaire shall carry out joint site inspection with utility
owning department and get the estimates sanctioned from utility/owning department.
The assistance of Authority is limited to giving forwarding letter on the proposal of
concessionaire to utility owning department whenever asked by the concessionaire.
The decision / approval of utility owning department shall be binding on the
concessionaire. No COS or no cost shall be eligible on any account.
(b) The supervision charges at the rates/charges applicable between implementing agencies
of MoRTH and utility owning department shall be paid directly by the Authority to the
Utility Owning Entity as and when concessionaire furnishing a demand of Utility
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-49 of B-50
National Highways Authority of India
Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52);(Existing
Length 62.8km; Design Length 67.231km) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity
Mode
Page B-50 of B-50
National Highways Authority of India
SCHEDULE - C
PROJECT FACILITIES
1 Project Facilities
The Concessionaire shall construct the Project Facilities in accordance with the
provisions of this Agreement. Such Project Facilities shall include:
(a) Toll Plaza;
(b) Pedestrian Facilities;
(c) Street Lighting;
(d) Truck Lay-Byes;
(e) Bus Bays and Bus Shelters;
(f) Rest Areas;
(g) Traffic Aid Posts;
(h) Medical Aid Posts;
(i) Vehicle Rescue Posts;
(j) Telecom System;
(k) Operation and Maintenance Centre;
(l) Roadside Furniture;
(m) Landscaping and Tree Plantation;
(n) Highway Patrol;
(o) Ambulance;
(p) Cranes;
(q) Rain Water Harvesting;
(r) Others;
2 Project Facilities for Four-Laning
Project Facilities forming part of Four/Six Laning of Bodhre (km 390+000/Ch.
390.000) to Dhule (km 452+800/Ch. 457.231) road section of NH-211 (new NH No.
52); Design Length 67.231 km, including Chalisgaon, Mehunbare and Garthad
bypasses to be completed on or before the Construction Period have been described in
Annex-I of this Schedule-C.
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page C-1 of C-7
National Highways Authority of India
Annex - I
(Schedule-C)
Project Facilities for Four/Six Laning
1 Project Facilities
The Concessionaire shall construct the Project Facilities described in this Annex-I to
form part of the Four/Six Lane Project Highway. The Project Facilities shall include:
(a) Toll Plaza;
(b) Pedestrian Facilities;
(c) Street Lighting;
(d) Truck Lay-Byes;
(e) Bus Bays and Bus Shelters;
(f) Rest Areas;
(g) Traffic Aid Posts;
(h) Medical Aid Posts;
(i) Vehicle Rescue Posts;
(j) Telecom System;
(k) Operation and Maintenance Centre;
(l) Roadside Furniture;
(m) Landscaping and Tree Plantation;
(n) Highway Patrol;
(o) Ambulance;
(p) Cranes;
(q) Rain Water Harvesting;
(r) Others;
2 Description of Project Facilities
2.1 Toll plaza
Toll plaza has been provided at location given below: Specifications and other
requirements of the toll plazas shall be strictly as per schedule “D”.
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page C-2 of C-7
National Highways Authority of India
Specifications and other requirements of the toll plazas shall be strictly as per
schedule “D”
In addition to above toll plazas, there is one Toll Plaza (2+2 lane, Design Ch.
403.950) operated by MSRDC. As per MSRDC records, the Toll start date is
15.05.2010 and concession period is 12 Years 04 Months 25 Days up to 28/05/2022.
This toll plaza shall be operated by present concessionaire of MSRDC for 11.670 km
till the expiry of its Concession period. This section will be handed over after the
completion of concession period of present concessionaires.
2.2 Pedestrian facilities
The pedestrian facilities shall be as per the Schedule “B” and Schedule “D” and
include the provision of
i. Pedestrian Guardrail: Provide pedestrian guardrail at each bus bay locations,
Truck Lay byes, near School/Hospital and at Major Junctions.
ii. Pedestrian Crossings: Provide pedestrian crossing facilities at At Grade
Junctions.
2.3 Lighting:
The lighting facilities shall be provided as per the Schedule “B” and Schedule “D”,
but not limited to the following:
a) High-Mast Lighting
Provide High mast lighting at locations specified below and at all major junctions as
mention in schedules B.
b) Street Lighting
Provide Street lighting for Main Carriageway & Service Road/Slip Road at the
locations specified below:
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page C-3 of C-7
National Highways Authority of India
Note: The street lights also to be provided at ROB, Major Bridge, Toll Plaza, Bus
bays, Track lay-byes locations, Major Junctions and built up area along project road.
The lighting shall be as per Schedules D.
2.4 Truck lay-byes
Truck lay-byes for parking trucks with facilities like paved parking, rest areas with
toilets, drinking water, telephone etc. shall be provided at the following locations:
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page C-4 of C-7
National Highways Authority of India
Note: The locations of these Rest areas are tentative and shall be finalized by the
concessionaire in consultation with the IE and NHAI.
* Only Embankment Development and Boundary Wall is under the scope of work.
2.7 Traffic Aid Posts
Traffic aid posts shall be established as per the IRC: SP 84-2019, Four Lane Manual
guidelines and Schedule “D”.
2.8 Medical Aid Posts
Medical aid posts shall be established the IRC: SP 84-2019, Four Lane Manual
guidelines and Schedule “D”
2.9 Vehicle Rescue Posts
Vehicle Rescue posts shall be established the IRC: SP 84-2019, Four Lane Manual
guidelines and Schedule “D”
2.10 Telecom System
Telecom System shall be provided the IRC: SP 84-2019, Four Lane Manual
guidelines and Schedule “D”
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page C-5 of C-7
National Highways Authority of India
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page C-6 of C-7
National Highways Authority of India
2.15 Ambulance
Provide the facility of Ambulance covering the entire Project Highway. These shall
confirm to the specifications mentioned in Schedule D.
2.16 Crane
Provide the facility of Crane covering the entire Project Highway. These shall confirm
to the specifications mentioned in Schedule D.
2.17 Rain Water Harvesting Structures
Minimum 02 (Two) Nos. of Rainwater harvesting units per km length of the project
stretch shall be provided as part of the scope of the project. Locations shall be
finalized by the Authority Engineer, in consultation with the Authority.
(a) The locations and design of stretch (i.e.) diameter/length of recharge shaft etc.
shall be based on the rain fall intensity and geo-technical strata. The guidelines
and norms issued by the Central Ground Board may also be adopted while
finalizing the location and design of rainwater harvesting units.
(b) Rainwater Harvesting and Artificial recharging shall be provided on all the
buildings and structures such as Toll Plaza building, Way-side amenities, Grade
separated structures etc. which are to be developed as a part of project corridor.
2.18 Boundary Wall
Boundary wall shall be provided throughout the project length.
2.19 Highway Nest (Mini)
Highway Nest (Mini) shall be constructed on each side of the toll plaza within the
distance of 500m from toll plaza.
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page C-7 of C-7
National Highways Authority of India
SCHEDULE - D
(See Clause 2.1)
SPECIFICATIONS AND STANDARDS
2. Design Standards
3. The Project Highway including Project Facilities shall conform to design
requirements set out in the following documents:
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode
Page D-1 of D-3
National Highways Authority of India
Annex - I
(Schedule-D)
Specifications and Standards for construction
1. Manual of Specifications and Standards to apply
1.1 Subject to the provisions of Paragraph 2 of this Annex-I, Four/Six-Lanning of the
Project Highway shall conform to the “Manual of Specifications and Standards for
Four Laning of Highways (IRC:SP:84-2019)”, published by the Indian Road
Congress, referred to as the Manual and MORTH Specifications for Road and Bridge
Works. Where the specification for a work is not given, Good Industry Practice shall
be adopted to the satisfaction of the Independent Engineer
1.2 As regards, the work of utility shifting, the relevant specifications, relevant rules,
regulations and acts of Utility Owning Department/Agencies shall be applicable
2. Deviations from the Manual
The terms "Concessionaire", "Independent Engineer" and "Concession Agreement"
used in the Manual shall be deemed to be substituted by the terms "Concessionaire",
"Independent Engineer" and "Agreement" respectively.
Notwithstanding anything to the contrary contained in Paragraph 1 above, the
following Specifications and Standards shall apply to the Project Highway, and for
purposes of this Agreement, the aforesaid Specifications and Standards shall be
deemed to be amended to the extent set forth below:
Note 1: Deviations from the aforesaid Specifications and Standards shall be listed out
here. Such deviations shall be specified only if they are considered essential in view of
project-specific requirements.
Four/Six Laning of Bodhre (Ex. km 390+000/Ch 390.000) to Dhule (Ex. km 452+800/Ch 457.231) Section of NH-211
(New NH No. 52); Design Length 67.231km in the State of Maharashtra under Bharatmala Pariyojana on Hybrid
Annuity Mode