CLIENT
Public Health Engineering Department (PHED) Muzaffarabad
SUBMITTED BY
Dr. Fayaz Ahmed Khan
CLIENT: PROJECT: TITLE DESIGNED BY: REVISION / MODIFICATION
699
699
L E ROA
AIN HO D
NEW M NEW
el
699
lev
699
699 INL
i
dra
ET M
ert
inv
699 AIN
HOL
el
lev
699 E
ain
699
dr
699 FOO
d
erte
inv700.00
699
ROAD TPA
TH
698
8
69
699
PATH
699
FOOT 697
7
699 699
69
7
69 698 WA 0
K TAN TER 70 DRA
TRAC
700
ROAD 698
K IN
699
698 699
699
697 699
697
FOO 699
698 698 TPA
TH 699
PATH
FOOT
698
698
697 699
697 697 699
9
69
697
699 698
699
69 IRS
K
BLD
8
696
696
698STA
697 IN
C
69
8
TRA
A
699
698
R
D
696
8
696
69
9
698
697 RO
AD
697
NG
9
7
69
69
699
LDI
8
697
6
69
69
696
697
BUI
697
699
696
698
6
69
8
696
698
69
695
5
69
696 695 698
696
696
G
7
IN
696
5
69
ILD
69
7
696 69
669987
BU
696
695 696 K
696
TR AC
699 696
7
69
5 69
98 7
69
69 695
86
5
9 69
69
69
8 6
696
69 69
5 9
69
7 69 6
69
5
69
9
69
696
6 9
695
6
69
699
697
696
6
695
696995
7 69
69
5 694
7 5
69 96 69
69
699
6
6 5
66994
4 69 69
5 95
69 6
CK
8
695
69
695
9
6944
69 69 6
8
TRA
CK
69
698 94
695 69
696
9
694 6
69 69
4
TRA
5
69
696
6 5 4
69 69 69
694
5 4
694 69 69
7 6 5 4
69 69 69 69
697
7
69 4
69
695696
4
69
5
69
S/No.
REVISION / MODIFICATION
Revision
Dwg. No.
Read2024
May As Shown
.
inver00te
699
700.
INLET
MANHOLE
ELE
697.28
699 699 RC
C
ROAD SL PI
PE
O
699
PE Ø
1: 30
50 0m
0 m
9
699 699
69
699
699 MH-1 FOOTPATH
3 ELE
FOOTPATH 4 ELE
0
697.25
70
697.08 5 9
700 ELE 69
PVC PIPE Ø 150mm
697.06
SLOPE 1:500
SLOPE 1:500
699
1
699
698
698
699
698
69 9
ELE
698 696.91
9
69
697
AIN
697
DR
69
7 698 ELE
697.24
699
TRACK
698
2
698
ELE ELE
BLD
699
2
698
696.76 697.23
STAIRS
698
MH-2
697
697
698
698
697
ELE
699
694.48 ELE
697
696.61
3
699
698
5
4
BUILDING
697
697
698
699
697 698
7
69
RC
7
696 C
69
PI
SL PE
698
O Ø
PE 22
696 1: 5m
50 m
G
0
98 8
BUILDIN
669
6
69669
6
69
TABLE
1. INVERT ELEVATION @ INLET MANHOLE = 697.28
2. INVERT ELEVATION @ MH-1 MANHOLE = 697.25 69769
7 MAIN PIPE
3. INVERT ELEVATION @ MH-2 MANHOLE = 697.23 OUTLET
696
4. INVERT ELEVATION @ INLET POINT OF SETTLER = 697.23 DRAIN LEVEL
5. INVERT ELEVATION @ OUTLET POINT OF SETTLER = 697.08
698
697
6. INVERT ELEVATION @ INLET POINT OF ABR = 697.06 ELE
7. INVERT ELEVATION @ OUTLET POINT OF ABR = 696.91 696.56
696
8. INVERT ELEVATION
6 @ INLET POINT OF AF = 696.91
69
696
9. INVERT ELEVATION @ OUTLET POINT OF AF = 696.76
696
10. INVERT ELEVATION @ INLET POINT OF CT = 696.76
6
11. INVERT ELEVATION @ OUTLET POINT OF CT = 696.61 69
699
12. INVERT ELEVATION @ OUTLET GARDEN WATERING = 694.48
13. INVERT ELEVATION @ OUTLET MAIN DRAIN LEVEL = 696.56
6
69
CK
698
695
696
CLIENT: PROJECT: TITLE DESIGNED BY: TRA REVISION / MODIFICATION
0.30
PVC PIPE Ø 150mm ELE
0.98
4.50
ABR
1 1
5.80
0.25
SLOPE 1:500
ELE
696.91
0.25
9.00
AF
5.23
COLLECTION
TANK
ELE ELE 2
2 696.76 MH 2
697.23
ELE
697.23
0.30
0.30
2.77
ELE
1.58
694.48 ELE
0.30
0.30
696.61
704 704
702 702
ABR SETTLER
700 PVC Baffled pipe Inlet PVC pipe PVC outlet pipe Inlet PVC pipe 700
Ø150mm with Tee Ø150mm Ø150mm with tee Ø150mm
1 Main Hole 1
1 EL.698.33 1
698 698
EL.697.08 EL.697.23
EL.697.06
696 696
2 2
1 1
694 694
RCC G-21
100mm PCC G-10
692 692
690 690
699.451
699.001
698.902
698.562
698.938
698.887
NSL
0+000
0+010
0+020
0+030
0+040
0+050
RD
PROFILE 1-1
SCALE 1:150
702 702
AF COLLECTION TANK SETTLER
696 696
2 2
1 1
694 694
RCC G-21 RCC G-21
100mm PCC G-10 100mm PCC G-10
692 692
690 690
697.490
697.946
697.805
697.664
697.267
697.637
NSL
0+050
0+010
0+020
0+030
0+040
0+000
RD
PROFILE 2-2
SCALE 1:150
ABR AF
700 1 Inlet PVC pipe PVC Baffled pipe outlet PVC pipe PVC Baffled pipe 700
1 Ø150mm Ø150mm with Tee Ø150mm Ø150mm with Tee
Inlet PVC pipe PVC Desludging
EL.698.33 Main Hole Ø150mm pipe Ø 200mm
696 2 2 696
1 1
well compacted
shingle / gravel fill
694 694
RCC G-21
100mm PCC G-10
692 692
690 690
698.960
698.004
697.492
696.382
700.085
NSL (m)
-10.00
20.00
10.00
15.00
-5.00
5.00
DISTANCE (m)
0
PROFILE 3-3
SCALE 1:150
696 696
2
1 PPR outlet pipe
Ø63mm with valve
2
1
694 694
RCC G-21
100mm PCC G-10
692 692
690 690
699.001
-5.00 699.942
5.00 698.036
10.00 697.400
15.00 696.302
NSL (m)
-10.00
20.00
DISTANCE (m)
0
PROFILE 4-4
SCALE 1:150
SETTLER
700 700
1
1
PVC vent pipe
Ø100mm
EL.698.33
698 1 698
PVC inlet pipe EL.697.23
1
Ø150mm with tee
2
1
696 696
2
1
694 694
RCC G-21
100mm PCC G-10
692 692
690 690
699.963
698.857
697.649
697.085
696.175
NSL (m)
-10.00
20.00
10.00
15.00
-5.00
5.00
DISTANCE (m)
0 PROFILE 5-5
SCALE 1:150
0.30
1.28
0.30
4.50
5.75
0.25
14.35
0.30
9.00
6.42
B B
0.30
0.30
A
SETTLER PLAN
SCALE 1:75
0.20
0.20 EL.698.33
0.75
0.75
Outlet pipe
0.90
Elevation EL.697.23
EL.697.08 PVC inlet pipe
0.60
Ø150mm with tee
0.15
0.15
0.15
3.70
0.30
2.80
2.80
2.65
1.90
0.30
0.30
0.30
0.10
0.10
4.50 9.00
0.30 0.25 0.30
14.35
RCC G-21
SECTION AT A-A 100mm PCC G-10
SCALE 1:75
0.20
EL.698.33
0.20
inlet pipe
Ø150mm with tee Elevation
0.90
0.90
0.75
EL.697.23
EL.697.08
0.15
0.60
0.15
3.70
0.30
2.80
0.30 0.30 0.30
2.65
1.90
0.30
0.30
0.10
4.50
0.30 0.30
5.10
RCC G-21
SECTION AT B-B 100mm PCC G-10
SCALE 1:75
0.70
0.30
1.00
0.25
1.00
6.35
5.75
5.75
0.25
C C
1.00
0.25
1.00
0.30
16.15 3.00
D 0.30 0.30
ABR PLAN
SCALE 1:75
0.92
1.05
0.15
EL.697.06 EL.696.91
4.30
2.65
2.63
0.30
0.10
19.15
0.30 0.30
19.75
SECTION AT C-C RCC G-21
100mm PCC G-10
SCALE 1:75
0.20
PVC Baffled pipe
0.92
Ø150mm with Tee
EL.697.06
1.73
EL.696.91
1.08
0.15
0.30
3.70
4.30
0.10
2.63
well compacted
shingle / gravel fill
0.30
0.10
2.50
0.23
5.82
5.23
5.23
E E
2.50
0.30
19.15
0.30 0.30
19.75
F AF PLAN
SCALE 1:75
1.07
EL.696.91
EL.696.76
0.15
0.20
0.15
4.20
1.98
1.95
2.35
0.50
0.50
0.30
0.30
0.10
19.15
0.30 0.30
19.75
RCC G-21
SECTION AT E-E 100mm PCC G-10
SCALE 1:75
0.20
0.20
1.07
1.22
EL.696.91 AF Filter
Material EL.696.76
0.15
0.20
4.20
4.20
1.55
2.48
2.48
0.22
0.50
0.30
0.100.30
2.50 2.50
0.30 0.25 0.30
5.85
RCC G-21
SECTION AT F-F 100mm PCC G-10
SCALE 1:75
0.30
0.30
5.22
8.30
PVC inlet pipe
Ø150mm with tee
0.30
2.78
H PVC outlet pipe H
PPR outlet
pipe Ø63mm Ø150mm with tee
with valve
0.30
0.30
3.00
0.30 0.30
G
SECTION AT G-G
SCALE 1:75
0.20
1.37
EL.696.61
0.15
3.70
4.30
2.18
PPR outlet pipe
Ø63mm with valve
0.05
EL.694.48
0.30
0.10
0.30
8.30
0.30 0.30
8.90
RCC G-21
SECTION AT G-G 100mm PCC G-10
SCALE 1:75
0.20
0.20
1.22
1.37
EL.696.76
EL.696.61
0.15
0.15
4.30
2.33
2.18
0.30
0.30
0.10
0.10
3.00
0.30 0.30
RCC G-21
SECTION AT H-H 100mm PCC G-10
SCALE 1:75
(M d
)
10
IN
3. NOTES GIVEN IN THIS DRAWING ARE APPLICABLE TO ALL DRAWINGS UNLESS CONCRETE FRAME AS DETAILED IN THE STRUCTURAL DRAWINGS.
MENTIONED OTHERWISE. NOTES WRITTEN ON OTHER DRAWINGS, SHALL BE THE 3-D FINITE ELEMENT BASED SOFTWARE ETABS HAS BEEN USED FOR THE D D LOCATION OF THE BAR
APPLICABLE TO THAT PARTICULAR DRAWING ONLY UNLESS OTHERWISE ANALYSIS AND DESIGN OF C/C SPACING IN mm
CROSS-REFERENCED. THE STRUCTURAL MEMBERS WITH LOADING AND DESIGN CRITERIAN MENTIONED IN
4. MATERIAL FOR BACKFILLING AROUND FOUNDATIONS SHALL BE WELL COMPACTED USACE ENGINEERING MANUAL, ACI 318 AND BCP 2007. BAR DIAMETER (IN mm)
IN 150mm LAYERS. o o
90 HOOK d d TYPE REINFORCEMENT
135 HOOK
TOTAL NUMBERS OF BARS
2-FOUNDATIONS 8-GENERAL INFORMATION ABOUT DESIGN PARAMETERS (AS PER
1. THE LINES OF SLOPES AND EXCAVATION ARE TENTATIVE. PROPOSE ALTERNATE
BCP-SP 2007): 7.1 RESISTANCE FACTORS,
SLOPES ACCORDING TO THE SITE REQUIREMENTS SUBJECT TO THE APPROVAL. STIRRUPS AND TIE HOOKS 2. NOTATION AND SYMBOLS:
·FLEXURE AND TENSION FOR CONCRETE MEMBERS = 0.90
2. FOUNDATION SHALL BE PLACED ON FIRM AND UNDISTURBED SOIL.
· SHEAR AND TORSION FOR CONCRETE MEMBERS = 0.75 VARIOUS SYMBOLS AND NOTATIONS USED IN THE DRAWINGS ARE
3. DEWATERING SHALL BE CARRIED OUT BEFORE THE POURING OF CONCRETE IN
· AXIAL COMPRESSION FOR CONCRETE MEMBERS = 0.70
FOUNDATION, IF REQUIRED. T TOP FACE
· TENSION (YIELD) IN STEEL MEMBERS = 0.90 (mm)
4. FOR CAPACITY IMPROVEMENT OF SOIL, ENGINEERING FILLS HAVE BEEN SHOWN IN BAR DIA B BOTTOM FACE
D
THE DRAWING, HOWEVER IN SECTION WHERE WATER COMES OUT AFTER T1 TOP LAYER 1 (NEAREST TO TOP FACE)
EXCAVATION AND IS DIFFICULT TO COMPACT THE LAYERS, STONE SOLING OF THE b
d 10Ø 60 T2 TOP LAYER 2 (2ND FROM TOP FACE)
SAME THICKNESS SHALL BE PROVIDED.
B1 BOTTOM LAYER 1 (NEAREST TO BOTTOM FACE)
12d b
12Ø 75 B2 BOTTOM LAYER 2 (2ND FROM BOTTOM FACE)
3-REINFORCED CONCRETE 9-EXPANSION JOINTS CRITICAL SECTION B.F BOTH FACES
16Ø 95 F.F. FAR FACE
1. STRUCTURAL DESIGN IS BASED ON THE BUILDING CODE OF PAKISTAN & AMERICAN 1. EXPANSION JOINTS SHALL BE CLEAR OF DEBRIS AND OTHER INCOMPRESSIBLE MATERIAL.
CONCRETE INSTITUTE CODE OF REINFORCED CONCRETE ACI 318 & ACI 350R. THEY SHALL BE FILLED WITH THERMOPORE SHEET UP TO WATER STOPPER FROM NON N.F. NEAR FACE
2. ALL STRUCTURE CONCRETE IN REINFORCED SECTIONS SHALL HAVE A 28 DAYS FLOW FACE AND BITUMEN IMPREGNATED SHEET UP TO WATER STOPPER FROM FLOW SECTION MARKS
db
CYLINDER STRENGTH OF 20 MPa UNLESS OTHERWISE NOTED AND SHALL CONFORM FACE. THEY SHOULD BE SEALED AT THE FLOW FACE WITH SEALANT (SIKA OR
TO REQUIREMENTS OF PROJECT SPECIFICATIONS. CONTINUATION MARKS
EQUIVALENT).
3. CEMENT CONFIRMING TO ASTM C-150 TYPE-1 (ORDINARY PORTLAND CEMENT) SHALL 2. REINFORCEMENT STEEL DOWELS SHALL BE PROVIDED AT THE EXPANSION JOINTS
BE USED IN ALL CONCRETE WORK. EXTENDING AT LEAST 300MM INTO THE CONCRETE ON EACH SIDE OF THE EXPANSION
4. AGGREGATE SHALL CONFIRM TO ASTM C33 SPECIFICATION FOR CONCRETE JOINT. ALL DOWELS SHALL BE AT LEAST 25MM IN DIAMETER WITH ONE END FIXED IN SPLICED
AGGREGATE. STAGE 1 CONCRETE AND SHALL BE SLEEVED IN CLOSED END POLYTHENE, PVC OR GI BARS
5. WATER SHALL BE FREE FROM OIL OR OTHER MATERIAL THAT CAN ADVERSELY AFFECT PIPES TO ALLOW FREE MOVEMENT OF THE STRUCTURE IN DIRECTION PARALLEL TO THE 4d b
MIN. 40mm
FOR Ø10 TO Ø16
CONCRETE STRENGTH OR DURABILITY. DOWEL LENGTH. THERE MUST BE SUFFICIENT SPACE (AT LEAST 50MM) AT END OF THE 4d b>- 63mm
6. ALL THE REINFORCING STEEL SHALL CONFIRM THE REQUIREMENTS OF ASTM A615 DOWEL'S SLEEVE END TO ALLOW EXPANSION OF THE STRUCTURE. MAXIMUM SPACING OF
HAVING YIELD STRNEGTH OF 420 MPa (GRADE 60) THE DOWELS SHALL NOT BE MORE THAN 1000MM. 6d b FOR Ø20 AND ABOVE
7. PLAIN CEMENT CONCRETE (LEAN)/ SHALL HAVE A 28 DAYS CYLINDER STRENGTH OF 10 3. ALL WATER STOPPERS SHALL BE THERMALLY WELDED (USING APPROPRIATE EQUIPMENT)
MPa. L dh
TO JOIN THEM AND AVOID ANY SEEPAGES.
8. MASS CONCRETE SHALL HAVE A 28 DAYS CYLINDER STRENGTH OF 15 MPa.
9. PLUM CONCRETE SHALL HAVE A 28 DAYS CYLINDER STRENGTH OF 15 MPa WITH 50%
BOULDERS. MIN. 40mm MIN. 40mm
10. ALL REINFORCING STEEL SHALL BE ACCURATELY LOCATED IN THE FORMS AND HELD STANDARD HOOK DETAIL FOR LONGITUDINAL BARS.
FIRMLY IN PLACE BEFORE & DURING THE PLACEMENT OF CONCRETE BY MEANS OF WATER FACE RCC G20/G35
EXP. JOINT SEALANT
WIRE AND SUPPORTS ADEQUATE TO PREVENT DISPLACEMENT DURING THE
RCC G20 WATER FACE
COURSE OF CONSTRUCTION.
11. FABRICATION AND ERECTION OF STEEL REINFORCEMENT SHALL BE IN ACCORDANCE
GENERAL BAR SPACING
CONSTRUCTIN JOINT
WITH ACI-318-99. BITUMEN
12. SPLICING OF REINFORCEMENT SHALL BE STAGGERED. IMPREGNATED 75mmX75mm
>500mm
RCC STAGE
13. FOR BUNDLED BARS THE FOLLOWING MULTIPLIERS SHALL BE APPLIED TO VALUES IN SHEET 225mm WIDE WATER KEY
2
TABLES. STOPPERS SPACING BETWEEN LAYERS
A. 3-BAR BUNDLED IN TENSION OR COMPRESSION = 1.20 x TABLE VALUES. USE Ø25 SPACER BAR
RCC STAGE 1
B. 4-BAR BUNDLED IN TENSION OR COMPRESSION = 1.33 x TABLE VALUES. MIN. 50mm 300 300
225mm WIDE
C. LAP SLICES FOR EACH BAR IN A BUNDLE SHALL BE STAGGERED. ENTIRE BUNDLES
PVC SLEEVE
STEEL
WATER CONSTRUCTION JOINT BELOW WATER SURFACE LEVEL
SHALL NOT BE LAP SLICED. DOWELS
PIPE STOPPERS
@1m THERMOPORE
SHEET
EXPANSION JOINT DETAILS FOR
MEMBERS > 500mm THICK
14. LAP SPLICES SHALL NOT BE USED IN LOCATIONS OF MAXIMUM MOMENTS
SPACING BETWEEN BARS IN A LAYER
UNLESS OTHERWISE PERMITTED ON THE DRAWINGS.
15. WHEN BARS OF DIFFERENT SIZES ARE LAP SPLICED ,SPLICE LENGTH SHALL BE THE SHALL BE LARGER BAR DIAMETER OR 25mm
LARGER OF THE TWO. WHICHEVER IS GREATER.
16. A CLEAR COVER OF 75 MM SHALL BE PROVIDED FOR MEMBERS HAVING CONTACT
WITH WATER OR SOIL AND 40 MM CLEAR COVER FOR OTHER THAN MENTIONED.
BAR SPACING IN BEAM
5-CONSTRUCTION JOINTS
1. PVC WATER STOPS SHALL BE PROVIDED AT EVERY CONSTRUCTION JOINT. EXP.
JOINT SEALANT 40mm(SIKA / EQUIVALENT)
TABLE-2
RCC G20
WATER FACE 1.5 x LARGER BAR DIAMETER
fc'= 20 MPa fy= 420 MPa
OR 40 MINIMUM
BITUMEN BAR MIN. DEVELOPMENT LENGTH (MM) MIN. SPLICE/LAP LENGTH (MM) HOOK DEVELOPMENT
RCC STAGE 2
>500mm
6-SHORING AND BRACING IMPREGNATED SHEET DIAMETER LENGTH (MM) VERTICAL BAR SPACING IN COLUMNS
IN (MM) TOP BARS* OTHER BARS TOP BARS* OTHER BARS
1. SHORE & BRACE ALL PARTS OF THE STRUCTURE DURING CONSTRUCTION, TO
THE EXTENT NECESSARY TO ENSURE COMPLETE SAFETY, STRENGTH & RCC STAGE 1
MIN. 50mm 300 300 10 500 350 650 500 200
STABILITY OF ALL STRUCTURAL ELEMENTS UNDER ALL CONDITIONS OF LOADS 200mm WIDE WATER LEGEND
WHICH MAY OCCUR DURING CONSTRUCTION. SUCH SHORING & BRACING IS THE STOPPERS
PVC SLEEVE PIPE 50mm 13 650 525 850 650 250
CONTRACTOR'S SOLE RESPONSIBILITY AND IS NOT SHOWN ON STRUCTURAL STEEL DOWELS D25 MS = MILD STEEL
THERMOPORE SHEET
DRAWINGS OR SPECIFIED IN THE PROJECT. @1m PVC = POLYVINYLE CHLORIDE
16 800 625 1050 800 300
EXPANSION JOINT DETAILS IN WALLS CI = CAST IRON
19 950 750 1250 950 350 DI = DUCTILE IRON
<500mm THICK
SQ = SQUARE
22 1150 875 1425 1100 425 C.Jt = CONSTRUCTION JOINT
T&B = TOP AND BOTTOM
25 1250 975 1600 1250 475 NSL = NATURAL SURFACE LEVEL
EF = EACH FACE
29 1400 1100 1800 1400 550
FGL = FINISHED GROUND LEVEL
32 1600 1225 2050 1600 650 Ø = DIAMETER OF BAR
BF = BOTTOM FACE
* NOTE: HORIZONTAL OR NEARLY HORIZONTAL BARS SO PLACED THAT MORE THAN 300MM FRESH CONCRETE IS CAST
EF = EACH FACE
BELOW THEM.
db = BAR DIAMETER
D13@150
Ø13@150mm c/c
D13@150 D13@150
1 1
Ø13@150mm c/c
Ø13@150mm c/c D13@200
Ø13@200mm c/c
Ø13@150mm c/c
D13@150 D13@150
D13@150 D13@150
Ø13@150mm c/c
Ø13@150mm c/c
D13@150 D13@150
Ø13@150mm c/c
D13@150 D13@150
2 2
D13@150
Ø13@150mm c/c
D13@150
D13@150
3 4 5
Ø13@150mm c/c
Ø13@150mm c/c
D13@150 D13@150
D16@150 D13@150
D13@150
PROFILE 1-1
SCALE 1:75
Ø13@150mm c/c
PVC inlet pipe
Ø13@150mm c/c
Ø13@150mm c/c
Ø150mm with tee
D13@150 D13@150
D13@150
D13@150
D16@150 D13@150
PROFILE 2-2
SCALE 1:85
D13@150 D13@200 D13@200 D13@200 D13@150 Inlet PVC pipe Outlet PVC pipe
PVC Desludging
Ø13@150mm c/c
Ø150mm Ø150mm
pipe Ø 200mm
PVC Desludging AF Filter
pipe Ø 200mm Material AF Filter
Material
Ø13@150mm c/c
Ø13@150mm c/c
Ø13@200mm c/c
Ø13@200mm c/c
Ø13@200mm c/c
Ø13@150mm c/c
D13@150
shingle / gravel fill
Ø13@150mm c/c Ø13@150mm c/c
D13@150 D16@150
D16@150 D13@150
PROFILE 3-3
SCALE 1:50
Ø13@150mm c/c
Ø13@150mm c/c
D13@150
D13@150
D16@150 D13@150
PROFILE 4-4
SCALE 1:50
D13@150
Ø13@150mm c/c
Ø13@150mm c/c
Ø13@150mm c/c
Ø13@200mm c/c
D13@150 D13@200 D13@150
D16@150
Ø16@150mm c/c
D13@150
PROFILE 5-5
SCALE 1:50
D13@150
D13@200
Ø13@200mm c/c
Ø13@150mm c/c
Ø13@150mm c/c
D13@150 D13@150
B B
D13@150
Ø13@150mm c/c
SETTLER PLAN
SCALE 1:50
A
Ø13@150mm c/c
Ø13@150mm c/c
Ø13@150mm c/c
Ø13@200mm c/c
D13@150 D13@200 D13@150
D13@150
Ø16@150mm c/c
D16@150
SECTION AT A-A
SCALE 1:50
Ø13@150mm c/c
Ø13@150mm c/c
D13@150 D13@150
D16@150 D13@150
Ø16@150mm c/c
SECTION AT B-B
SCALE 1:50
D13@150 D13@150
D13@150 D13@150
Ø13@150mm c/c
Ø13@150mm c/c
C C
D13@150
Ø13@150mm c/c
D ABR PLAN
Ø13@150mm c/c
D13@150 D13@150
Ø16@150mm c/c
D13@150 D16@150
SECTION AT C-C
Ø13@150mm c/c
Main Hole M-2
(See Detail)
D13@150
outlet PVC pipe
D13@200 D13@200 D13@200
Ø13@150mm c/c
Ø150mm
Ø13@150mm c/c
Ø13@200mm c/c
Ø13@200mm c/c
Ø13@200mm c/c
Ø13@150mm c/c
D13@150 D13@150
Ø13@150mm c/c
D13@150
D16@150
SECTION AT D-D
SCALE 1:50
D13@150
Ø13@150mm c/c
Ø13@150mm c/c
D13@150 D13@150
E E
D13@150
Ø13@150mm c/c
F AF PLAN
Ø13@150mm c/c
D13@150 D13@150
Ø16@150mm c/c
D13@150 D16@150
SECTION AT E-E
Ø13@150mm c/c
D13@150
D13@200
Ø13@150mm c/c
Ø13@150mm c/c
Ø13@200mm c/c
D13@150
Ø13@150mm c/c
D13@150
D16@150
SECTION AT F-F
SCALE 1:50
Ø13@150mm c/c
D13@150
H H
Ø13@150mm c/c
Ø13@150mm c/c
D13@150 D13@150
D13@150
Ø13@150mm c/c
Ø13@150mm c/c
Ø13@150mm c/c
Ø13@150mm c/c
D13@150
D13@150
D13@150
Ø13@150mm c/c
D13@150
SECTION AT G-G
SCALE 1:50
Ø13@150mm c/c
D13@150 D13@150
Ø13@150mm c/c
Ø13@150mm c/c
D13@150
Ø13@150mm c/c
D13@150
SECTION AT H-H
SCALE 1:50