PT.

LESTARI BANTEN ENERGI

WORK ORDER
Notification No. : 1100179718 Notification Desc. : CHECK LIGHTING BOILER
MILL & CHIMNEY
Originator :
Func Loc : LB10UHA Func Loc. Desc. : BOILER

Word Order No. : 5100140538 Work Order Desc. : CHECK LIGHTING BOILE
Work Center : Electrical Boiler & Planner Group : ELB PIC :
Priority : 2-Medium WO Type : PM Permit Type : ND HIRA No. : 21-RA-00007
Plan Start : 01.03.2024 Plan Finish : 01.03.2024

Task List
No Description Work Center PIC Work Person Duration Actual PR Service
0010 CHECK LIGHTING BOILER MILL & ELBC 0 0 0
CHIMNEY
Spare Part
No Item Code Item Desc Planned Qty Remaining Qty Unit Stor. Bin PR / Res
0010 2001241 Lamp Philips MH 70W/640 E27 24 0 EA D35-11-01 0000159233
0020 2000563 HACK SAW BLADES 24 TPI 300 MM HSS 2 0 EA A02-01-01 0000159233
0030 2001241 Lamp Philips MH 70W/640 E27 72 0 EA D35-11-01 0000159233
0040 2001094 CABLE LUGS 35MM2 X M10, COPPER 20 0 EA D35-08-01 0000159233
0050 1004959 LEGRAND, TIME SWITCHES, P/N 412631 1 0 EA D35-06-01 0000159233
0080 2000359 DRILL BIT HSS 3MM 2 0 EA 0000159233

Safety Precaution/Control Measure:


(i) Hot Work Certificate* (ii) Confined Space Entry (iii) Excavation Work
Certificate* Certificate*

(iv) Electrical Safety (Earthing (v) Other Item.....


List)*

Completion:
Failure Mode Root Cause Activities

Notes/Attachment
CHECK LIGHTING BOILER MILL & CHIMNEY
1.FUEL OIL TANK

Respective Manager