Rev01

Comments or Notes:

Name LI Wang Su Add material and


1 08/12/2022 08/12/2022 08/12/2022 height dimensions
IFR
Date
Name LI Wang Su
0 21/11/2022 21/11/2022 21/11/2022
IFR
Date

REV. PREPARED CHECKED APPROVED MODIFICATIONS STATUS

THE CIRATA FLOATING SOLAR PHOTOVOLTAIC


POWER PLANT PROJECT
OWNER
PT Pembangkitan Jawa Bali Masdar Solar Energi
Menara Bidakara 2, Jl. Gatot Subroto, Kav. 71-73, Kota Jakarta
Selatan, Daerah Khusus Ibukota Jakarta 12870
PMC

Tractebel Engineering
CONTRACTOR

ONSHORE CONTRACTOR
BUT Sinohydro Corporation Limited
Menara Prima Lt.17 Jl. Kuningan Timur, Kec, Setiabudi, Kota
Adm. Jakarta Selatan, DKI Jakarta, Indonesia
OFFSHORE CONTRACTOR
HDEC Middle East Co DMCC
No.2701, 2702, 2705,2706, 2707, JBC 3, JLT Dubai
Powerchina Huadong Engineering Corporation Limited
No. 22 Chao Wang Road, Hangzhou, China
SUBCONTRACTOR
PT SUNGROW FLOATING INDONESIA
Wisma GKBI, Lantai 39 Suite 3901, Jalan Jenderal
Sudirman No. 28,Kota Adm. Jakarta Pusat, Provinsi DKI
Jakarta, INDONESIA

TITLE Drawings of Cable bracket-4

PROJECT DATE REF


DOCUMENT NO:
0088-PV-M-VDC-008 NO:
1
2022.12
1 2 3 4 5 6 7 8 9 10 11 12

A A

1 2 3 4
5 6 7 8 8 7 6 5
Single cell of calculation
1000

B B
8
500

9
Section
A-A

6 9

C C

1290
51135

232
10 11 12

D 6 D

9 Section
B-B

E E
500

F F

Technical description:
1.The bracket legs shall be installed on the floating body in advance, and the installation spacing shall be subject to the drawing;
2.The installation direction of the connecting bolts between the bracket leg and the floating body and the connecting bolts between
the bracket leg and the cross bar shall be subject to the drawing;
G 3.The center spacing of the three cable floats is 1000mm, and the steel wire rope is used to connect the union bolt, with the length G
of not less than 1000mm. The steel wire rope is anchored with a steel wire clamp, with the spacing of about 30mm-35mm.
According to GB6067.1-2010, the steel wire rope shall not slip;
OWNER OWNER'S CONSULTANT CONTRACTOR SUBCONTRACTOR PROJECT
DATE REV
01/06/2022 DATE MODIFICATION PREPARED CHECKED
NO. CIRATA FLOATING SOLAR PHOTOVOLTAIC POWER PLANT PROJECT

0 21/11/2022 - Wang Pan/Teng


DRAWN Wang
1 08/12/2022 Add material and height dimensions Wang Pan/Teng TITLE
H H
CHECKED Pan/Teng DRAWINGS OF CABLE BRACKET-4
PT PEMBANGKITAN JAWA-BALI INVESTASI - TRACTEBEL ENGINEERING BUT SINOHYDRO CORP. LTD PT SUNGROW FLOATING INDONESIA
MASDAR SOLAR ENERGY POWERCHINA HUADONG ENGINEERING CORP. LTD
JOINT VENTURE APPROVED Zhao/Chen

1 2 3 4 5 6 7 8 9 10 11 12