Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Bin store on route of escape will require

NORTH STAIR
FIRE LOBBY
mechanical smoke extract
LOBBY
LG-17 LG-18
5 sqm
WIREDSCORE
LG-11 Fewer than 60 people, doors can open inwards.

10 sqm
LIGHTWELL
90 LG-09
110 1095 °

GB-03
900
1
25.2 sqm

2
3
4

GB-05
5
DB-09

315
BIKE STORE

7
8
LG-08

9
10
11
12
220
5.3 sqm
1785 GB-04

DB-10
BIN STORE
LG-10 90
°
DB-18
Fixed bench area
Circa 2.07m DB-20 Face Flush
470
825

90
DB-19
90
Face Flush °
S.O. Point
Fixed servicing equipment
225

1275

DB-08
DRYING 2.8 sqm
ROOM LG-07

14 secure cycle positions.

DB-07
1400
3.2 sqm
W B-05

SHOWER
LG-06

100
99 sqm
OFFICE
LG-02 4.5 sqm
DDA
SHOWER LG-05

DB-06

2130
2045
Dim of riser as req'd with existing
W B-04

services. Door Centred


21 units
Dim of boxing as req'd with existing
395 1015

710
services.

*back of existing lift shaft as the this section

EQ
DB-17
starting line of WC block

1330
not FR

DB-14

1525
W B-03

DB-05
CL 300 DDA 3.4 sqm
Note: Timber joiner to confirm the wall TOILET LG-04

50
construction detail

EQ
S. O. P. 1150
610 *face of WC block wall to be in line

1
2
3
4
GB-07

5
6
7
8
9
10
11
12
with the outer face of existing lift shaft

NOTE:
General
wall
finish
shown
below.
Where
doors
exist
in
walls
please
see
door
schedule
for
finishes.
Steel
columns
to
have
intumescent
paint
finish
Brickwork
exposed,
made
good
and
painted.
Infill
brickwork
where
necessary.
Timber
panelling,
veneered
plyboard,
Contractor
to
supply
and
install.
Large
format
tile,
see
specification
document
Skimmed,
Painted,
Plasterboard
finish
(see
specification
document)
Skimmed,
Painted,
Plasterboard
finish
(see
specification
document)
CL

210
W B-02

DB-15
iR=190 WC
2 sqm

Wall LG-03
7500 C oR=290
S. O. P. DB-04
58 sqm
SOUTH STAIR
RECEPTION
LG-01 Wall to align through to GF riser and LOBBY LG-19

GB-01
conceal new steelwork to rear of
Panelling. Door opening as wide as
1
possible for services access.
2
W B-01

DB-03 3
1.9
Recess Under Waling beam DB-16 1.9
4 1.8 sqm
for Joinery. 150mm margin either side 2.060
5
TEA POINT 2.060
LG-13
6
7
8
Bench
1 2 3 4 5 6 7 8 9 10 11 12 13 14 DB-02 9

2925
10
11 CLEANERS
STORE & TANKLG-12
12
1.660

DB-01
1
2
3
1.9 1.9
4
2.060 2.060
5
6
7
8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 9

2925
ELECTRICAL ELECTRICAL 3.5 sqm 10
11
RISER LG-16 ROOM LG-15 1.660
12

Proposed Lower Ground Floor Plan


1
Scale: 1:100 Fire Strategy Lower Ground Floor Plan
2
Scale: 1:200
60 mins fire resistance 30 mins fire resistance

DRAWING
DRAWING NOTES
20/09/2023
Setting Out_Wall
Wall Types Key J North Stair Wall, Updated GF Slab edge
All dimensions to be checked on site prior to commencement of any works, and/or preparation of any shop drawings.
31/07/2023
Proposed Lower Ground Floor
i Door S.O. Removed
Sizes of and dimensions to any structural elements are indicative only. See structural engineers drawings for actual sizes/dimensions. SCALE
Sizes of and dimensions to any service elements are indicative only. See service engineers drawings for actual sizes and dimensions.
1. Insulated Blockwork 4. Stud Lining & Plasterboard Lining
0 1000 2500 5000 H Columns & WC Updated. Doors Updated to
WH Comments
27/07/2023
1:100 @ A3 /1:50@A1 PENSAER LONDON
This drawing to be read in conjunction with all other Architect's drawings, specifications and other Consultants' information. 5. Stud Partition 2 x plasterboards one side and 1 x DATE DRAWN BY
G Re-issued 19/07/2023
All proprietary systems shown on this drawing are to be installed strictly in accordance with the Manufacturers/Suppliers recommended
70mm Stud, 1 x 15mm Soundbloc either side, plasterboards SCALE 1:100 Apr 2023 RO
F LGF Updates 11/07/2023
details. 50mm quilt. Max Height 3.8m . 48Db. 6. Timber panel OR included within Joinery Package
E LGF Updates 14/06/2023 DWG No. REVISION CLIENT Woodhouse
Any discrepancies between information shown on this drawing and any other contract information or manufacturers/suppliers (TBC by Joinery Subcontractor) SET-W-LG
recommendations is to be brought to the attention of the Architect.
70mm Stud, 1 x 15mm Fireline either side,
D WC LG03 Ammended following DTM 06/06/2023 J
C Drawing Standards Re-issue, 3105/2023
DO NOT SCALE FROM THIS DRAWING. 50mm quilt. Max Height 3.8m . 48Db. 7. Blockwork [OMITTED] DRAWING STATUS PROJECT
B Drawing Standards Re-issue, Blockwork 24/05/2023
removed. INFORMATION Belgravia House
REV COMMENT DATE
Information contained on this drawing is the sole copyright of
Pensaer London and is not to be reproduced without their permission.
62-64 Horseferry Rd, London, SW1P 2AF

You might also like