Professional Documents
Culture Documents
LEED v5 BDC Core and Shell Public Comment 1
LEED v5 BDC Core and Shell Public Comment 1
LEED v5 BDC Core and Shell Public Comment 1
SYSTEM
BUILDING DESIGN AND CONSTRUCTION:
CORE AND SHELL
2
WE Prerequisite: Minimum Water Efficiency ................................................................................... 43
4
SCORECARD
INTEGRATIVE PROCESS, PLANNING, AND
ASSESSMENTS
Prerequisite: Climate Resilience Assessment
Required
Intent
To promote comprehensive assessment for climate resilience, aiming to increase awareness of hazards and
risks, in order to reduce vulnerabilities, while striving to ensure long-term safety and sustainability.
Requirements
Identify observed, projected, and future natural hazards and assess relevant effects to the project site and
building function. Identified hazards may be currently affecting the project or may affect it in the future.
Qualifying hazards are site-specific natural hazards that include, but are not limited to:
• Drought
• Earthquake
• Extreme Heat and Cold
• Flooding
• Hurricane and High Winds
• Hail
• Landslide
• Sea Level Rise and Storm Surge
• Tornado
• Tsunami
• Wildfire and Smoke
• Winter Storm
• Other (Specify)
The assessment shall demonstrate the relationships between the most impactful hazard(s) and the planning,
design, operations, and maintenance of the project to potentially enhance the project’s resilience to natural
hazards and extreme environmental stressors, including acute and chronic changing climate conditions.
Not all hazards listed will apply to the project site. Provide reasoning for not addressing any identified
hazard(s).
Intent
To promote social equity by conducting an analysis using a social impact checklist, and encouraging
prioritization of community well-being, inclusivity, and diversity for positive social outcomes.
Requirements
Complete the LEED Project Team Checklist for Social Impact (or equivalent*) to identify and address issues of
inequity related to the project, its community, team, and supply chain. Evaluate impacts based on the following
core themes:
• Affordability
• Accessibility
• Inclusivity
• Health and Wellness
• Community Engagement
• Workforce Impacts
• Diversity and Representation
Engage in research and consultation with key stakeholders and community members to ensure that all
checklist items are marked as either "Yes" or "No.”
Provide justification for each response marked as “Yes,” “No,” or “N/A” (Not Applicable). In cases of “No”
responses, the project team must, whenever feasible, include a description of their planned approach to
address the identified issue.
*Projects may submit equivalent checklists from established certifications, aligned with promoting equity and
community well-being.
7
Prerequisite: Carbon Assessment
Required
Intent
To understand and reduce long term carbon emissions including onsite combustion, grid-supplied electricity,
refrigerants, and upfront embodied carbon.
Requirements
Develop a 25-year projected carbon assessment for the project by utilizing the data from the following
prerequisites:
• EA Prerequisite: Operational Carbon Projection and Decarbonization Plan
o For operational carbon, projects must use the results from the business as usual (BAU)
projection through 2050, as amended by decarbonization measures outlined in their
decarbonization plan, if applicable. For emissions from grid-supplied electricity beyond 2050,
projects must use the 2050 emissions factor.
o Operational emissions must be broken down into emissions from onsite combustion and
emissions from grid-supplied electricity. (These are considered as two sources.)
• EA Prerequisite: Fundamental Refrigerant Management
o For refrigerant emissions, projects must use the total refrigerant global warming potential as
developed in the prerequisite, and most projects must assume a 5% annual leakage rate.
However, projects that pursue Option 2. Limit refrigerant leakage of the EA Credit: Enhanced
Refrigerant Management must assume a 2.5% annual leakage rate.
• MR Prerequisite: Assess Embodied Carbon
o For the upfront embodied carbon of the initial construction, projects must include:
- The total GWP of the covered materials in the structure, enclosure and hardscape
(SandE), as developed in the prerequisite.
- Plus 0.5 times the GWP of the covered materials in the SandE of the baseline project to
account for other upfront embodied carbon, including MEP, interiors and furnishings.
- Plus the A4-A5 emissions for projects that pursue that option
o Projects must assume that every 10 years (in years 10 and 20). renovations will cause
additional amounts of embodied carbon to be released each time equaling 0.25 times the
GWP of the covered materials in the SandE of the baseline. However, projects that purchase
carpet, ceiling tiles, gypsum wall board, and/or furnishings that are certified closed loop, as
documented in MR Credit: Optimized Building Products”, can reduce the 0.25 by 0.05 for each
material certified.
• Optional: LT Credit: Transportation Demand Management
o Using the VMT estimate as developed in the credit, and the projected carbon per mile over the
next 25 years as provided by USGBC to develop an assessment of the 25-year carbon
emissions associated with vehicle use.
8
Prerequisite: Tenant Guidelines
Required
Intent
To communicate and coordinate the sustainable design and construction features of a base building with the
tenants and facilitate tenant LEED certification so that the completed space more comprehensively addresses
the rating system requirements.
Requirements
Create Tenant Guidelines, to be shared with all tenants before signing the lease, including the following
content:
• A description of the sustainable design and construction features incorporated in the core and shell
project and the project’s sustainability goals and objectives, including those for tenant spaces.
• Guidance and recommendations for incorporating sustainable strategies, products, materials and
services in the tenant spaces. Refer to the attempted LEED prerequisites and credits of the base
building for content requirements.
• A point of contact, from the base building team, for further coordination of base building design and
construction documentation.
9
Credit: Green Leases
6 points
Intent
To ensure the tenants complete the sustainable design and construction features started by the base building
so that the completed space comprehensively addresses the rating system requirements.
Requirements
For any spaces or systems intended to be fit out by the project owner, identify the standards for the future fit-
out, incorporating the criteria referenced in the standard green lease document and commit to performing the
fit-out(s) in accordance with these standards.
Tenant Requirements shall include standards to ensure compliance with the following prerequisites for any
tenant-installed systems:
- IP Prerequisite: Social Equity Assessment
- IP Prerequisite: Climate Resilience Assessment
- SS Prerequisite: Resilient Site Design
- WE Credit: Enhanced Water Efficiency
- EA Prerequisite: Minimum Energy Efficiency
- EA Prerequisite: Fundamental Commissioning
- EA Prerequisite: Energy Metering and Reporting for all ASHRAE 90.1 Metering
requirements.
- MR Prerequisite: Planning for Zero Waste Operations
- EQ Prerequisite: Fundamental Air Quality
- EQ Prerequisite: Building Accessibility
Points are awarded according to Table 1 by incorporating the specified number of additional best practices into
the green lease.
• Require tenant to pay for tenant’s electric and non-electric energy use and water use,
• Implement cost recovery clause for energy efficiency upgrades benefiting the tenant,
• Disclose tracked common area energy use, peak demand, peak thermal demand, and onsite
combustion emissions to tenants,
• Disclose tracked common area water use to tenants,
• Disclose whole-building ENERGY STAR score to tenants,
• Ensure brokers or leasing agent(s) have energy training,
• Implement energy management best practices,
• Request annual tenant energy disclosure,
• Require energy efficiency fit out for tenants that improves upon EA Prerequisite: Minimum Energy
Efficiency requirement,
• Establish a tenant energy efficiency engagement and training plan,
• Demonstrate innovation in leasing,
• Meter or submeter additional tenant energy beyond that required in EA Prerequisite: Energy Metering
and Reporting.
10
Number of additional best practices Points
incorporated into the lease
Less than 5 1
5 to 8 2
9 to 12 3
12 to 15 4
AND/OR
AND / OR
11
Credit: Integrative Design Process
1 point
Intent
To support high-performance, cost-effective, and cross-functional project outcomes through an early analysis
and planning of the interrelationships among systems. To provide a holistic framework for project teams to
collaboratively address decarbonization, quality of life, and ecosystem restoration and conservation across the
entire LEED rating system.
Requirements
Beginning in pre-design and continuing throughout the design phases, identify and use opportunities to
achieve synergies across disciplines and building systems. Assemble and convene a diverse and
interdisciplinary project team. Ensure the process is an equitable, team effort through organized facilitation.
Work as a team to define project goals that address each of the LEED version 5 system goals:
decarbonization, quality of life, and ecosystem restoration and conservation. Some goals are likely to address
more than one system goal. Provide relevant analyses to inform the LEED project’s documents; including the
owner’s project requirements (OPR), basis of design (BOD), design and construction documents.
*Additional points are available under Project Priorities and Innovation to reward project teams for
including more topic areas for pre-design assessment and planning.
12
LOCATION AND TRANSPORTATION (LT)
LT Credit: Sensitive Land Protection
1 point
Intent
To cultivate community resilience by avoiding the development of environmentally sensitive lands that provide
critical ecosystem services and reduce the environmental impact from the location of a building on a site.
Requirements
Locate the development footprint on land that has been previously developed.
OR
Preserve and protect from all development and construction activity 40% of the greenfield area on the site and
locate the development footprint on land that does not meet the following criteria for sensitive land:
• Prime farmland. Prime farmland, unique farmland, or farmland of statewide or local importance as
defined by the U.S. Code of Federal Regulations, Title 7, Volume 6, Parts 400 to 699, Section 657.5
(or local equivalent for projects outside the U.S.) and identified in a state Natural Resources
Conservation Service soil survey (NRCS) (or local equivalent for projects outside the U.S.).
• Floodplains. A flood hazard area shown on a legally adopted flood hazard map or otherwise legally
designated by the local jurisdiction or the state. For projects in places without legally adopted flood
hazard maps or legal designations, locate on a site that is entirely outside any floodplain subject to a
1% or greater chance of flooding in any given year (100-year floodplain).
• Habitat. Land identified as habitat for the following:
o species listed as threatened or endangered under the U.S. Endangered Species Act or the
state’s endangered species act, or
o species or ecological communities classified by NatureServe as GH (possibly extinct), G1
(critically imperiled), or G2 (imperiled), or
o species listed as threatened or endangered specifies under local equivalent standards (for
projects outside the U.S.) that are not covered by NatureServe data.
o Water bodies. Areas on or within 100 feet (30 meters) of a water body, except for minor
improvements.
o Wetlands. Areas on or within 50 feet (15 meters) of a wetland, except for minor improvements.
• Steep slopes. For unstable, undeveloped slopes between 15% and 25%, protect from all development
and construction activity 40% of the steep slope area on the site (if such areas exist). For unstable,
undeveloped slopes steeper than 25%, protect from all development and construction activity 60% of
the steep slope area on the site (if such areas exist).
13
LT Credit: Equitable Development
1 – 2 points
Intent
To support the economic and social vitality of communities, provide opportunities for communities to live and
work in close proximity, encourage project location in areas with development constraints, and promote the
ecological, cultural, and health of the surrounding area while understanding the needs and goals of existing
residents and businesses.
Requirements
OR
AND
Utilize the results of the Prerequisite: Social Equity Assessment and partner with at least one organization that
supports the local community and help fulfill at least one critical need or goal of the surrounding community.
AND/OR
AND/OR
14
• For projects where the total gross floor area is 75% or more nonresidential, locate the project
boundary within a 1/2-mile (800-meter) walking distance of existing or planned transit stops and
dwelling units, such that the number of dwelling units exceeds the number of new full-time equivalent
jobs located in the project.
OR
Schools (2 points)
Meet any of the Options above.
OR
AND/OR
15
Path 2. Community partnership (1 point)
In collaboration with the school authorities, contract with the community or other organizations to provide at
least two types of dedicated-use spaces in the building, such as the following:
• commercial office;
• health clinic;
• community service centers (provided by state or local offices);
• police office;
• library or media center;
• parking lot;
• one or more commercial businesses
Locate the project building at a minimum of 300 feet (90 meters) distance from the property lines of the nearest
sensitive receptors (i.e., residential areas, schools, daycare centers, places of worship, hospitals, community
centers, and public parks).
AND
OR
16
LT CREDIT : COMPACT AND CONNECTED DEVELOPMENT
1- 6 points
Intent
To conserve land and ecosystem resources by encouraging development in areas with existing infrastructure.
To promote livability walkability, and transportation efficiency, including reduced vehicle distance traveled and
associated emissions.
Requirements
Table 1. Points for average existing density within 1/4 -mile of project (IP units)
Combined density Separate residential and nonresidential densities Points
Square feet per Residential density Nonresidential density
acre of buildable (DU/acre) (FAR)
land
22,000 7 0.5 1
35,000 12 0.8 2
Table 2. Points for average existing density within 400 meters of project (SI units)
Combined density Separate residential and nonresidential densities Points
Square meters per Residential density Nonresidential density
hectare of buildable (DU/hectare) (FAR)
land
5,050 17.5 0.5 1
8,035 30 0.8 2
DU = dwelling unit; FAR = floor-area ratio.
AND/OR
• For each qualifying transit route, only trips in one direction are counted towards the threshold.
• For weekend trips, only trips on the day with the higher number of trips are counted towards the
threshold.
17
• If a qualifying transit route has multiple stops within the required walking distance, only trips from one
stop are counted towards the threshold.
• Planned stops and stations may count if they are sited, funded, and under construction by the date of
the certificate of occupancy and are complete within 24 months of that date.
OR
Provide at least one accessible transit stop shelter within a ¼-mile (400-meter) walking distance from a
functional entry of the project. .
• For each qualifying transit route, total trips (inbound and outbound) are counted towards the threshold.
• If a qualifying transit route has multiple stops within the required walking distance, only trips from one
stop are counted towards the threshold.
• Only directly accessible trips within the specified distances are allowed. Trips available from connected
transit facilities do not contribute to the minimum trips under Path 2.
AND/OR
18
Table 6. Points for public uses
Uses Points
4–7 1
≥8 2
Schools
Meet any combination of the options below for a maximum of 6 points.
Physical education spaces that are part of the school campus but are located outside the project boundary,
such as playing fields and ancillary buildings used during sporting events only (e.g., concession stands) and
playgrounds with play equipment are excluded from the development density calculations.
OR
AND/OR
OR
19
Path 2. Pedestrian Access (1 – 2 points)
Locate the project with an attendance boundary where dwelling units are within no more than a 3/4-mile (1200-
meter) walking distance (for grades 8 and below, or ages 14 and below), and 1 1/2-mile (2400-meter) walking
distance (for grades 9 and above or ages 15 and above) of a functional entry of a school building. Provide
pedestrian access to the site from all residential areas in the attendance boundary. Points are awarded
according to Table 8.
OR
A planned transportation resource must be sited, funded, and under construction by the date of the certificate
of occupancy and complete within 24 months of that date.
AND/OR
20
Healthcare
Provide at least one continuous connection or a pathway that physically connects the project to an existing
external vehicular or pedestrian circulation network.
For previously developed existing rural healthcare campus sites, achieve a minimum development density of
30,000 square feet per acre (6890 square meters per hectare).
AND/OR
Intent
To promote infrastructure that supports multi-modal transportation choices and reduce vehicle distance
traveled and associated emissions. To encourage affordable transit opportunities that increase physical activity
and protect environmental and public health.
Requirements
Bicycle Network
Design or locate the project such that a functional entry and/or bicycle storage is within a 200-yard (180-meter)
walking distance or bicycling distance of a bicycle network that meets the following criteria:
• is a contiguous network that spans a distance of at least 3-miles (4800-meters) from the project
boundary and provides a comfortable transportation experience
• consists of bicycle paths, lanes or multi-use trails that are at least 8 feet (2.5 meters) wide for a two-
way path and at least 4 feet (1.2 meters) wide for a one-way path, or streets with a maximum speed
limit of 25 mph (40 kph).
Planned bicycle trails or lanes may be counted if they are fully funded by the date of the certificate of
occupancy and are scheduled for completion within three years of that date.
AND
Bicycle Storage
Provide short-term bicycle storage within 200 feet (60 meters) walking distance to any main entrance, but no
fewer than four storage spaces per building.
Provide long-term bicycle storage within 300 feet (90 meters) walking distance from any functional entry, but no
fewer than four storage spaces per building in addition to the short-term bicycle storage spaces. Long-term
storage must be indoors or covered to protect bicycles from weather.
Shared micromobility storage, bicycle sharing stations, and/or publicly available bicycle parking may be
counted for up to 50% of the required short-term and long-term storage space if it meets the maximum
allowable walking distance, is not double counted (i.e., the short-term and the long-term storage spaces are
counted separately), and the storage location is communicated to the building occupants and visitors.
22
Table 1. Number of Spaces Required for Short- and Long-term Bicycle Storage
Commercial,
Institutional, Residential Mixed-Use Retail
Schools, Healthcare
At least two short-
term bicycle storage
spaces for every
Short-term At least 2.5% of all peak visitors but no 5,000 square feet
storage fewer than four spaces per building (465 square meters),
but no fewer than two
Meet the storage storage spaces per
requirements for the building
At least 15% of all nonresidential and At least 5% of regular
At least 5% of all regular building residential portions of building occupants,
regular building occupants but no the project separately but no fewer than two
occupants but no less than one storage spaces per
Long-term
fewer than four storage space per building in addition
storage
storage spaces per three dwelling unit to the short-term
building in addition to
in addition to short- bicycle storage
short-term storage term storage spaces
spaces
Schools projects can exclude students grade 3 and younger from regular building occupant count for long-
term storage.
Healthcare projects can exclude patients from regular building occupant count for long-term storage.
AND/OR
Implement at least one of the following enhanced facilities for one point.
AND/OR
AND/OR
23
Large Occupancy Projects
The following guidance should be applied when determining the number of showers needed for projects with a
large number of occupants:
Provide at least one on-site shower with changing facility for the first 100 regular building occupants and one
additional shower for every 150 regular building occupants thereafter, up to 999 regular building occupants.
• one additional shower for every 500 regular building occupants, for the additional 1,000 – 4,999
regular building occupants
• one additional shower for every 1,000 regular building occupants, for the additional 5,000 + regular
building occupants.
Schools
AND
Provide dedicated bicycle lanes that extend from the student bike-parking location to at least the end of the
school property without any barriers (e.g., fences on school property).
AND/OR
Healthcare
Residential healthcare spaces with non-bicycling occupants may exclude these occupants from the Option 2.
Bicycle storage requirements.
24
LT Credit: Transportation Demand Management
1-2 points
Intent
To reduce pollution and land development effects from automobile use for transportation through encouraging
alternative transportation networks. To promote more livable and healthy communities through reduced vehicle
miles traveled and associated emissions.
Requirements
Assess the number of vehicle miles traveled and carbon emissions associated with the regular building
occupant commuting trips to and from the project building as outlined below:
• Estimate the vehicle miles traveled using the methodology outlined in the US Environmental Protection
Agency (EPA) Mixed-Use Trip Generation Model.
• Calculations are performed assuming in the baseline case that all regular building occupants commute
in single occupancy vehicles. The analysis requires an estimate of a normal pathway the vehicles may
take across a roadway network.
• Assess alternative transportation and active travel options available to regular building occupants. The
calculations must account for seasonal variations in the use of alternative commuting methods and
should indicate the distribution of commuting trips using each type of alternative transportation
strategy.
• Estimate total reduction of carbon emissions using the methodology outlined in the US Environmental
Protection Agency (EPA) Simplified Emissions Calculations or MOVES program.
AND
Implement one or more of the following strategies for one point each up to a total of two points.
OR
AND/OR
25
AND/OR
AND/OR
AND/OR
Mixed-use projects should determine the percentage reduction by first aggregating the parking amount of each
use type (as specified by the base ratios) and then determining the percentage reduction from the aggregated
parking amount.
Do not include parking spaces for fleet and inventory vehicles unless these vehicles are regularly used by
employees for commuting as well as business purposes.
26
LT Credit: Electric Vehicles
1-2 points
Intent
To encourage the use of electric vehicles and infrastructure and help diminish the negative health effects on
communities by lowering greenhouse gas emissions and other pollutants emitted from conventionally fueled
cars and trucks.
Requirements
Inform project occupants and visitors about the availability of public or on-street public EV charging stations
within a 1/4-mile (400-meter) radius of the project’s geographic center.
AND/OR
27
AND/OR
Any space with an installed EVSE counted for credit under Option 1 may not be counted for credit as an EV-
ready space under Option 2.
Schools
Meet Case 1 or Case 2 above.
AND/OR
Emission standards must be met for each bus and not by an average of the entire fleet serving the school.
Develop and implement a plan for 50% of all other (non-bus) vehicles owned or leased to serve the school to
be electric vehicles.
OR
28
SUSTAINABLE SITES (SS)
SS Prerequisite: Minimized Site Disturbance
Required
Intent
To limit site disturbance from design and construction activities and preserve existing native vegetation,
healthy soils, and wildlife habitats.
Requirements
Minimize site disturbance by designing and constructing the project site to meet all of the following
requirements, as applicable to the project:
29
SS Prerequisite: Resilient Site Design
Required
Intent
Reduce the risk of catastrophic natural events on-site and in adjacent landscapes by designing,
building, and maintaining sites to be resilient.
Requirements
Flooding: Design and build critical utilities, including electrical service infrastructure, HVAC service
infrastructure, communications services infrastructure, wastewater systems, and backup power/generators, to
withstand flood events up to the 500-year floodplain level. Define the 500-year floodplain based on locally
applicable science-based projections as outlined by the Intergovernmental Panel on Climate Change (IPCC)
scenarios or consider equivalent current and region-specific data. In addition, meet one of the following:
o Locate critical utilities at or above the 500-year floodplain level, as defined by local or regional
standards. For projects outside of the U.S., locate the critical utilities at or above the floodplain level
corresponding to a 500-year return period (a flood event with a 0.2% annual probability). If unable to
determine the 500-year floodplain due to insufficient data, implement flood-resistant design measures
based on the best available information and best management practices.
o Incorporate critical utilities within protective flood-proofed enclosures designed to withstand such flood
events.
o Implement best management techniques, including but not limited to elevated foundations, flood
barriers, waterproofing materials, green infrastructure, and flood vents designed to minimize damage
from floodwaters. Take into account topography, rainfall patterns, and potential sources of flooding
(e.g., rivers, storm surges).
30
SS Credit: Protect and Restore Biodiverse Habitat
1–2 points
Intent
To conserve existing natural areas, enhance biodiversity, and restore damaged areas to provide thriving
habitats for local wildlife.
Requirements
Preserve and protect from all development and construction activity 40% of greenfield area on the site (if such
areas exist).
AND
Restore a portion of the site, including the building footprint, identified as previously disturbed (if such areas
exist) and follow vegetation and soil requirements below. Vegetated roof surfaces may be included in the
habitat area calculations if the plants are native or adapted and provide habitat. Dedicated athletic fields that
are solely for athletic uses are exempted from counting toward the total site area. These areas may not count
toward the protected greenfield or restored habitat areas. Points are awarded according to Table 1.
Soil Restoration
Restore soils on site disturbed by previous development and from current construction activities. These
requirements apply only to previously disturbed areas that will be re-vegetated. Specify the methods used in
the soil restoration process and include the depth of restoration (inches/centimeters).
Neither imported soils nor manufactured soil blends designed to serve as topsoil may be mined from the
following locations or contain the following:
● soils defined regionally by the Natural Resources Conservation Service web soil survey (or local
equivalent for projects outside the U.S.) as prime farmland, unique farmland, or farmland of statewide
or local importance;
● soils from other greenfield sites; and
● sphagnum peat moss or organic amendments that contain sphagnum peat.
AND
Provide financial support equivalent to at least $0.40 per square foot (US $4 per square meter) for the total site
area (including the building footprint), or at least $5,000, whichever is greater. Financial support must be
31
provided to a nationally or locally recognized land trust or conservation organization within the same EPA
Level III ecoregion or the project’s state (within the same country, region, climate zone, or within 100 miles of
the project [160 kilometers] for projects outside the U.S.). For U.S. projects, the land trust must be accredited
by the Land Trust Alliance.
32
SS Credit: Accessible Open Space
1 point
Intent
To create exterior open space that encourages interaction with the environment, social interaction, passive
recreation, and physical activities. To increase the site users’ ability to access outdoor spaces by incorporating
elements of accessibility, inclusivity, and health and wellness into the site design.
Requirements
Provide outdoor space greater than or equal to 30% of the total site area (including building footprint).
At least 25% of the required outdoor open space must be vegetated space planted with two or more types of
vegetation or have overhead vegetated canopy. Plant vegetation that is not currently listed as invasive and that
is native or adapted to the project’s EPA Level III ecoregion (or local equivalent for projects outside of the
U.S.).
Wetlands or naturally designed ponds may count as open space if the side slope gradients average 1:4
(vertical:horizontal) or less and are vegetated.
AND
Provide site access and usability as required by local and national accessibility standards (e.g., Americans with
Disabilities Act). In addition, meet at least 4 of the following criteria for open space accessibility, inclusivity, and
health and wellness:
● publicly accessible during daylight hours and open to all members of the community;
● accessible to persons with disabilities and service animals;
● includes seating for 5% of occupants;
● includes elements that reduce noise pollution;
● designed to reflect the cultural and social diversity of the surrounding community;
● designed with input from community stakeholders, including representatives from historically
underserved or marginalized groups; and/or
● designed with input from behavioral health professionals and/or community stakeholders with
expertise in safety, neurodiversity, and/or social health and wellness.
33
SS Credit: Rainwater Management
1–3 points
Intent
To reduce runoff volume and improve water quality by replicating the natural hydrology and water balance of
the site, based on historical conditions and undeveloped ecosystems in the region to avoid contributing to
flooding downstream in frontline communities.
Requirements
OR
34
SS Credit: Enhanced Resilient Site Design
2 points
Intent
Reduce the risk of catastrophic natural events on-site and in adjacent landscapes by designing,
building, and maintaining sites to be resilient.
Requirements
Design, construct the site and site structures based on the following best practices for at least two of the
highest priority hazards identified for compliance with the Prerequisite: Climate Resilience Assessment:
Drought: Comply with WE Credit: Outdoor Water Use Reduction requirements. Specify native and/or drought-
tolerant adapted/appropriate plantings. Makeup water for any created water features must comply with SITES
C3.4, or local equivalent.
AND/OR
AND/OR
Flooding: In addition to meeting Prerequisite: Resilient Site Design, meet two or more of the following
strategies, in accordance with ASCE 24 and FEMA 543 standards, or local equivalent:
o Critical Utilities
▪ Locate critical utilities in new construction above the Design or Base Flood Elevation, plus
freeboard as recommended.
▪ In retrofits, locate critical utilities inside protective floodproofed enclosures to prevent water
intrusion.
▪ Design new potable water systems to resist flood damage, infiltration of floodwaters, and
discharge of effluent.
▪ Elevate onsite wellheads above surrounding landscape to allow contaminated surface water to
drain away.
▪ Design new sewage systems to avoid infiltration and backup from rising floodwaters.
▪ Design and anchor plumbing conduits, water supply lines, gas lines and electric cables that must
extend below the DFE (Design Flood Elevation) to resist the effects of flooding.
▪ Design and anchor rainwater storage tanks to resist flood forces.
o All structural materials, finish materials, and connectors used below DFE must be flood-resistant.
o Certify the project under a qualifying flood-resilient design standard(s).
AND/OR
Hail: Design and construct the site and site structures according to FORTIFIED Commercial High Wind and
Hail Specific Design Requirements for Hail, or local equivalent.
AND/OR
35
Hurricanes and High Winds: Design and construct the site and site structures according to FORTIFIED
Commercial Wind standards, or local equivalent. For projects in high-wind areas, design and construct the site
and site structures to comply with wind design measures per ASCE/SEI 7-10 in specified FEMA zones, or a
local equivalent. Backup Power is required in hurricane-prone regions. Install electrical connections with a
transfer switch or docking station (storm switch) to support connection of backup power for critical mechanical
and electrical systems. Create windbreaks using landscape forms, vegetation, and other locally appropriate
natural systems.
AND/OR
Sea Level Rise: Design and construct the site to accommodate at least 4 feet (1.2 meters) of flooding based
on sea level rise projections. In addition, meet two or more of the following:
o Incorporate elevated foundations to minimize projected flood damage to buildings.
o Use materials resistant to projected water damage for construction.
o Apply sealants and coatings to prevent projected water infiltration into structures.
o Install flood barriers to block projected floodwaters from entering buildings.
o Design green infrastructure solutions to manage projected storm surge and stormwater runoff
effectively.
o Ensure backup power systems are in place to maintain critical functions during projected flooding
events.
o Develop integrated drainage systems to manage projected excess flooding efficiently.
o Engage in community-level planning, partnerships, and/or design workshops to coordinate flood
mitigation efforts effectively and equitably address the needs of populations vulnerable to projected
flooding.
o Retrofit existing structures to enhance their resilience to future flood risks.
o Develop integrated drainage systems to manage projected excess flooding efficiently.
AND/OR
Tsunami: Mitigate the impact of tsunami through site planning strategies as described in Designing for
Tsunamis (US National Tsunami Hazard Mitigation Program), or local equivalent. Additionally, incorporate the
following elements from the TsunamiReady Guidelines:
o Install tsunami danger area and evacuation route signage.
o Install Public Alert-notified NOAA Weather Radio (NWR) receivers in critical facilities and public
venues, or local equivalent.
AND/OR
Wildfire: Follow wildfire management practices pertaining to wildland-urban interface design, vegetation
management, debris disposal, and fire safety for equipment referenced in the NWCG Standards for Mitigation
2023, or a local equivalent. Design and construct the site and site structures in compliance with SITES v2
Credit 4.11: Reduce the risk of catastrophic wildfire, or local equivalent. Reduce fuel using the Zone Concept
(firewise.org ‘Safer from the Start’ Appendix E), or a local equivalent.
AND/OR
Intent
To mitigate disparate impacts on microclimates and habitats caused by heat islands and extreme heat events.
Requirements
Tree Equity
For all U.S. projects only, evaluate the American Forests Tree Equity score for the site location. For projects in
areas ranked “High Priority” and “Highest Priority”, utilize the results of the evaluation to inform an increase in
on-site canopy cover from the existing condition. Projects with no exterior work are exempt from this
requirement.
For international projects, refer to the Prerequisite: Social Equity Assessment and evaluate the tree cover on-
site and in the surrounding community, either by utilizing a local tree census or conducting a site assessment.
Analyze the project’s local community composition to identify any neighboring underserved and/or
disadvantaged populations with lower tree canopy presence. Utilize the results of the evaluation to inform an
increase in on-site canopy cover from the existing condition to provide shade to neighboring underserved
and/or disadvantaged areas. Projects with no exterior work are exempt from this requirement.
AND
Alternatively, an SRI and SR weighted average approach may be used to calculate compliance.
Nonroof Measures
● Use the existing plant material or install plants that provide shade over paving areas (including
playgrounds) on the site within 10 years of planting. Install vegetated planters. Plants must be in place
at the time of occupancy permit and cannot include artificial turf.
● Provide shade with structures covered by energy generation systems, such as solar thermal collectors,
photovoltaics, and wind turbines.
● Provide shade with architectural devices or structures. If the device or structure is a roof, it shall have
an aged solar reflectance (SR) value of at least 0.28 as measured in accordance with ANSI/CRRC
S100. If the device or structure is not a roof, or if aged solar reflectance information is not available, it
shall have at installation an initial SR of at least 0.33 as measured in accordance with ANSI/CRRC
S100.
● Provide shade with vegetated structures.
● Use paving materials with an initial solar reflectance (SR) value of at least 0.33.
● Use an open-grid pavement system (at least 50% unbound).
37
High-Reflectance Roof
Use roofing materials that have an aged SRI equal to or greater than the values in Table 1. If aged SRI is not
available, the roofing material shall have an initial SRI equal to or greater than the values in Table 1.
Roof area that consists of functional, usable spaces (such as helipads, recreation courts, and similar amenity
areas) may meet the requirements of nonroof measures. Applicable roof area excludes roof area covered by
mechanical equipment, solar energy panels, skylights, and any other appurtenances.
Vegetated Roof
Install a vegetated roof using native or adapted plant species.
OR
The credit calculations must include all existing and new off-street parking spaces that are leased or owned by
the project, including parking that is outside the project boundary but is used by the project. On-street parking
in public rights-of-way is excluded from these calculations.
38
SS Credit: Light Pollution and Bird Collision Reduction
1 point
Intent
To increase night sky access, improve nighttime visibility, and reduce the consequences of development
for wildlife and people.
Requirements
Meet the following uplight requirements and light trespass requirements. Meet these requirements for all
exterior luminaires located inside the project boundary (except those listed under “Exemptions”), based on the
following:
● the photometric characteristics of each luminaire when mounted in the same orientation and tilt as
specified in the project design; and
● the lighting zone of the project property (at the time construction begins). Classify the project under
one lighting zone using the lighting zones definitions provided in the Illuminating Engineering
Society and DarkSky International (IES/IDA) Model Lighting Ordinance (MLO) User Guide.
Uplight
Do not install any uplights onsite.
Light Trespass
Do not exceed the following luminaire backlight and glare ratings (based on the specific light source
installed in the luminaire), as defined in IES TM-15-11, Addendum A, based on the mounting location and
distance from the lighting boundary.
39
Table 1. Maximum backlight and glare ratings
Orient all luminaires less than two mounting heights from the lighting boundary such that the backlight points
toward the nearest lighting boundary line. Building-mounted luminaires with the backlight oriented toward the
building are exempt from the backlight rating requirement.
AND
40
Design and build the building, site structures, glazed corners, glazed railings, and fly-through conditions to be
visible as physical barriers to birds. For all site structures and façade materials included in the first 40 feet (12
meters) above grade (measured from grade at all points), and 40 feet (12 meters) above any green roof, use
only glazing and materials listed in the American Bird Conservancy's (ABC) Threat Factor Database with a
Threat Factor of 30 or below, or meet alternative prescriptive criteria outlined by the ABC. All glazed corners or
fly-through conditions must also have a Threat Factor of 30 or below.
For the purposes of this credit, qualifying materials include glazing that incorporates physical signals to birds
created by fritting and UV coatings; non-glazing, opaque and non-reflective materials such as concrete; glazing
behind qualifying sunshades and screens; glazing to which materials such as qualifying window films have
been applied. For the purposes of this credit, fly-through conditions are defined as an open pathway for flight
through and between site structures.
41
WATER EFFICIENCY (WE)
WE Prerequisite: Water Metering and Reporting
Required
Intent
To conserve potable water resources, support water management, and identify opportunities for additional
water savings by tracking water consumption.
Requirements
• Install (or utilize existing) permanent water meters to monitor, record and report the total water
consumption for each water source for the building and associated grounds. Report whole-project use
for each type of water source supplied to the building and associated grounds, with the following
additional provisions: The facility manager and/or tenant must be able to access the meter data.
• Meter alternative water sources separately from municipally supplied potable water.
• Projects whose water use for irrigation is metered at the campus system level must submit an
engineering calculation that accurately reflects the water consumption of the landscaped area within
the project boundary or prorate irrigation data for the project boundary from the campus meter.
• Commit to sharing with USGBC the resulting whole-project water usage data at least annually.
The requirements may be applied to the project scope of work and exclude future tenant utility services and
submeters that will be installed in the tenant scope of work.
42
WE Prerequisite: Minimum Water Efficiency
Required
Intent
To reduce potable water consumption and the associated energy consumption and carbon emissions required
to treat and distribute water and preserve potable water resources through an efficiency first approach. To
support high-performance, cost-effective water system design outcomes and water management in operations
by estimating projected annual potable water use.
Requirements
AND
Meet the minimum water efficiency requirements for Option 1, Option 2, and Option 3 below for only the base
building fixtures and fittings, appliances, equipment, process water and outdoor water use. For tenant spaces,
include manufacturer documentation for the base building’s fixtures and fittings, appliances and equipment in
the Prerequisite: Tenant Guidelines.
OR
Projects located where standard supply pressure is different than the LEED baseline supply pressure may
calculate the water consumption of flow fixtures and fittings at the local standard supply pressure.
AND
Commercial clothes washer ENERGY STAR for commercial clothes washers with ≤ 8.0 cubic
feet (227 liters) capacity or performance equivalent
Residential dishwashers (standard ENERGY STAR or performance equivalent
and compact)
Pre-rinse spray valves ≤ 1.3 gpm (4.9 lpm)
Ice machine ENERGY STAR or performance equivalent and use either air-
cooled or closed-loop cooling, such as chilled or condenser water
system
Commercial Kitchen Equipment Requirement (IP) Requirement (SI)
Dishwasher Undercounter ≤ 1.6 gal/rack ≤ 6.0 liters/rack
Stationary, single ≤ 1.4 gal/rack ≤ 5.3 liters/rack
tank, door
44
Combination Countertop or ≤ 1.5 gal/pan ≤ 5.7 liters/pan
Oven stand
Roll-in ≤ 1.5 gal/pan ≤ 5.7 liters/pan
AND
AND
Reduce outdoor water use through one of the following options. Nonvegetated surfaces, such as permeable or
impermeable pavement, should be excluded from landscape area calculations. Athletic fields and playgrounds
(if vegetated) and food gardens may be included or excluded at the project team’s discretion.
Path 1. No irrigation
Show that the landscape does not require a permanent irrigation system beyond a maximum two-year
establishment period.
OR
45
Path 2. Efficient irrigation
Reduce the project’s landscape water requirement by at least 30% from the calculated baseline for the site’s
annual Theoretical Irrigation Requirement (TIR). Reductions must be achieved through plant species selection
and irrigation system efficiency, as calculated by the TIR methodology outlined by the Environmental
Protection Agency (EPA).
46
WE Credit: Enhanced Water Efficiency
1–5 points
Intent
To reduce potable water consumption and the associated energy consumption and carbon emissions required
to treat and distribute water and reward use of alternative water sources that preserve potable water resources.
Requirements
Implement strategies below for a maximum of 5 points. Projects with a cooling tower can earn up to a maximum
of 4 points from Options 1, 2, and 3.
Any future installed fixtures must be included in the calculations as neutral (same as the baseline water
consumption rates) unless one of the following can be provided:
• Applicable plumbing code
• Tenant final construction drawings
AND/OR
48
Table 5: Compliant municipal steam systems
To use Table 5, the project must be connected to a municipal or district steam system that does not allow the
return of steam condensate.
AND/OR
OR
Path 1. Cooling tower and evaporative condenser cycles of concentration (1-3 points)
For cooling towers and evaporative condensers, conduct a one-time potable water analysis, measuring at least
the five control parameters listed in Table 7.
49
Calculate the maximum number of cooling tower cycles by dividing the maximum allowed concentration level of
each parameter by the actual concentration level of each parameter found in the potable makeup water
analysis. Limit cooling tower cycles to avoid exceeding maximum values for any of these parameters.
The materials of construction for the water system that come in contact with the cooling tower water shall be of
the type that can operate and be maintained within the limits established in Table 8.
OR
Meet the maximum calculated number of cycles to earn 1 point and use a minimum
20% alternative water
Meet the maximum calculated number of cycles to earn 1 point, and increase the 3
number of cycles by a minimum of 30% by increasing the level of treatment and/or
maintenance in condenser or make-up water systems
OR
Meet the maximum calculated number of cycles to earn 1 point and use a minimum
30% alternative water
Projects whose cooling is provided by district cooling systems are eligible to achieve Path 1 if the district cooling
system complies with the above requirements.
OR
Achieve increasing levels of cooling tower water efficiency beyond a water-cooled chiller system with axial
variable-speed fan cooling towers having a maximum drift of 0.002% of recirculated water volume and three
cooling tower cycles. Points are awarded according to Table 9.
Table 9. Points for reducing annual water use compared to Water-Cooled Chiller
System
Percentage Reduction Points
25% 1
50% 2
100% 3
Projects whose cooling is provided by district cooling systems are eligible to achieve Path 2 if the district cooling
system complies with the above requirements.
OR
50
Path 3. Process Water use (1-3 points)
Demonstrate that the project is using minimum 20% alternative water to meet process water demand for 1 point,
using minimum 30% alternative water to meet process water demand for 2 points or using minimum 40%
alternative water to meet process water demand for 3 points. Ensure that alternative water is of sufficient quality
for its intended end use.
Minimum percentage of alternative water used should be based on water use during the month with the highest
water demand.
Process water uses eligible for achievement of Path 3 must represent at least 10% of total building regulated
water use and may not include water used for cooling. Eligible subsystems may include:
• Boilers
• Humidification systems
• Other subsystems using process water
Projects served by district systems are eligible to achieve Path 3 if the district system complies with minimum
thresholds for alternative water use.
51
WE Credit: Water Reuse
1 – 2 points
Intent
To reduce potable water consumption and the associated energy consumption and carbon emissions required
to treat and distribute water, preserve potable water resources, and increase water system resilience by using
alternative water supply.
Requirements
OR
Projects can also earn points for alternative water in Credit: Enhanced Water Efficiency.
52
WE Credit: Water Metering and Leak Detection
1 point
Intent
To conserve potable water resources, support water management, limit potential material waste due to water
leak damages, and identify opportunities for additional water savings by tracking water consumption.
Requirements
Additionally, install permanent water meters for each applicable base building subsystem defined below:
• Indoor plumbing fixtures and fittings. Meter systems serving at least 80% of indoor fixtures and fittings
described in Prerequisite: Minimum Water Efficiency, either directly or by deducting all other measured
water use from the measured total water consumption of the building and grounds.
• Irrigation system
• Each makeup water system (e.g., cold water inlet for domestic hot water, swimming pools, chilled water
systems, process water systems)
• Commercial kitchen (if the kitchen serves at least 100 meals per day of operation)
• Laundry (if the project includes commercial laundry equipment that processes at least 120,000 lbs.
(57,606 kg) of laundry per year or if the project includes a public laundry room)
The facility manager and/or tenant must be able to access the submeter data in real-time via local network,
BMS, cloud service, app, or online database. All submeters must be capable of recording data at least hourly.
Residential only
Install a permanent water meter for each residential dwelling unit that measures the total potable water use for
the unit. These meters need not to be utility-owned/utility-grade.
OR
The leak detection system should be able to identify a leak triggered by abnormal flow rate above normal range,
or physically detect a water leak, and initiate an alarm upon a leak detection.
The facility manager and/or tenant must be able to access the sensor data in real-time via local network, BMS,
cloud service, app, or online database.
Develop an action plan that addresses how the building manager or tenant will have access to data in real time;
and how the building manager or tenant will address and remedy any detected leak.
Intent
To enable building stakeholders to visualize how their current design decisions will impact their project’s long-
term operational carbon emissions and to ensure that stakeholders are planning for low carbon outcomes from
the project’s inception.
Requirements
Estimate the amount of energy and energy type used for each of the following end-uses: space heating; service
hot water; cooking; cooling; refrigeration; ventilation; plug and process loads; other.
Option 1: Design the project to be capable of operating above 20 °F (-6.5 °C) using electricity only and without
onsite combustion, except for emergency power.
OR
Option 2: If the project has not been designed to be capable of operating above 20 °F (-6.5 °C) using electricity
only and without onsite combustion, create a plan detailing how this end state could be achieved by 2050.
• The plan shall be a narrative no more than two (2) pages in length.
54
• The narrative shall describe the retrofits to be made, with the approximate timeline and cost of each of
the retrofit measures.
• Equipment and/or building materials that will be discarded due to the required retrofits should be
described along with new equipment to be purchased.
• Electrification “readiness” strategies incorporated into the initial design should be described along with
a rough estimate of the avoided cost, avoided disruption, and avoided materials waste afforded by
each readiness measure. Some common readiness strategies include oversizing electrical panels
and/or service or installing conduit for future loads, enhanced envelope, or heating distribution systems
that can accommodate the lower temperatures of future heat pumps
• The building owner or owner’s representative shall attest that they have reviewed the Decarbonization
Plan.
Intent
To promote resilience and reduce the environmental and economic harms of excessive energy use and
greenhouse gas emissions that disproportionately impact frontline communities by achieving a minimum level of
energy efficiency.
Requirements
Comply with ANSI/ASHRAE/IES Standard 90.1 or an approved equivalent standard. The referenced version of
Standard 90.1 with errata shall be:
• 2019 with Addendum cr for projects registered prior to January 1, 2028.
• 2022 for projects registered on or after January 1, 2028
56
EA Prerequisite: Fundamental Commissioning
Required
Intent
To improve energy performance and limit GHG emissions by verifying that systems are operating as per their
design intent.
Requirements
OR
57
EA Prerequisite: Energy Metering and Reporting
Required
Intent
To support energy management practices and facilitate identification of ongoing opportunities for energy and
greenhouse gas emissions savings by tracking and reporting building energy use and demand.
Requirements
Install (or utilize existing) measurement devices to monitor, record, and report whole-building and tenant energy
use for each type of energy supplied to the building, for each electrical end-use, and for equipment per
ANSI/ASHRAE/IES Standard 90.1, with the following additional provisions:
• The referenced version of Standard 90.1 with errata shall be:
o 2019 for projects registered prior to January 1, 2028
o 2022 for projects registered on or after January 1, 2028
• Buildings eligible for exceptions to 90.1-2019 Section 10.4.6 or 90.1-2022 Section 10.4.7 shall install
measurement devices capable of monitoring whole-building energy use for each building energy source
and building peak electricity demand at least monthly.
• Install an electricity meter for each non-transient residential dwelling unit.
• Meter and report the following separately from total electrical energy with recording and reporting
requirements identical to those defined for total electrical energy:
o On-site renewable electricity generation
o Electric Vehicle Supply Equipment (EVSE) associated with electric vehicle charging used
primarily for off-site vehicles.
• Commit to sharing metered data with USGBC at least annually.
Exception: Future tenant utility services and meters that will be installed in the tenant scope of work.
58
EA Prerequisite: Fundamental Refrigerant Management
Required
Intent
To reduce greenhouse gas emissions from refrigerants by accelerating the phase-out of refrigerants with high
global warming potential and by reducing refrigerant leakage.
Requirements
Option 1. No Refrigerants
Do not use refrigerants in the project.
OR
Option 2. Refrigerants
Comply with the following:
• Refrigerant Inventory. Complete an inventory of the refrigerant-containing equipment installed within the
project scope of work and any existing equipment owned by the building owner. The inventory shall include
the refrigerant type, global warming potential (GWP), amounts of refrigerants contained in each, and the
total GWP of all refrigerants.
• Global warming potential of refrigerants. For all new refrigerant containing equipment, do not exceed the
global warming potential (GWP) maximums in Table 1 below in accordance with the Table 2 schedule for
non-A5 (developed) countries and A5 (developing) countries. Evaluate available alternatives during the
design process for any refrigerants with GWP > 700.
• Leak check. Prior to substantial completion, check refrigerant-containing equipment for refrigerant leaks
and repair all leaks identified. For systems with field-assembled joints, perform leak check, vacuum check,
and pressure check prior to charging with refrigerant.
Exception: Natural refrigerants with GWP < 25 are exempted from leak check requirements.
59
Table 1. GWP caps for refrigerants in refrigeration, air conditioning, and heat pump products
GWP limit or
Compliance
prohibited
Subsector Products and Systems Date
substances
Stationary air conditioning Residential and light commercial air conditioning and heat
and heat pumps pumps systems 700 Jan 1, 2025
Variable refrigerant flow systems 700 Jan 1, 2026
Heat pump service hot water heaters (including heat pumps used for service hot water 700 Jan 1, 2025
heating)
Chillers Comfort cooling 700 Jan 1, 2025
Data centers, computer room air conditioning and information technology equipment 700 Jan 1, 2027
cooling
Vending machines 150 Jan 1, 2025
Retail food -refrigerated 500 g of refrigerant or less and outside scope of UL 621,
150 Jan. 1,2027
food processing and edition 7
dispensing More than 500 g of refrigerant and outside scope of UL 621, List #1 prohibited Jan. 1,2027
equipment (self- edition 7
contained) Ice cream makers within the scope of UL 621, edition 7 List #1 prohibited Jan. 1,2028
Retail food – other remote refrigerated food processing and dispensing equipment List #1 prohibited Jan 1, 2027
Self-contained automatic Batch type: harvest rate <=1,000 lb. ice per 24 hours 150 Jan 1, 2026
commercial ice machines
Continuous type: harvest rate <=1,200 lb. ice per 24 hrs. 150 Jan 1, 2026
Batch type: harvest rate above 1,000 lb. ice per 24 hrs. List #1 prohibited Jan. 1,2027
Continuous type: harvest rate above 1,200 lb. ice per 24 hrs. List #1 prohibited Jan. 1, 2027
Chillers (process) Industrial process refrigeration with exiting fluid ≥ to -50 °C (- 700 Jan 1, 2026
58 °F) and < -30 °C (-22 °F)
Industrial process refrigeration with exiting fluid ≥ to -30 °C (- 700 Jan 1, 2028
22 °F)
Ice Rinks 700 Jan 1, 2025
Industrial process With 200 or more lb. refrigerant charge excluding high 150 Jan 1, 2026
refrigeration (not using temperature side of cascade system and temperature of
chillers) refrigerant entering the evaporator ≥-30 °C (-22 °F)
With less than 200 lb. refrigerant charge and temperature of 300 Jan 1, 2026
refrigerant entering the evaporator ≥ -30 °C (-22 °F)
High temperature side of cascade system and temperature of 300 Jan 1, 2026
refrigerant entering the evaporator ≥ -30 °C (-22 °F)
With refrigerant entering evaporator ≥ 50 °C (-58 °F) and < - 700 Jan 1, 2028
30 °C (-22 °F)
Table 1 Notes:
1. Source: EPA 2023 AIM Act Technology Transitions Rule using 100-year GWP values from the IPCC's Fourth Assessment Report (AR4)
(water heating matches HVAC heat pump requirements). Additional reference guidance will be provided for projects outside the US with
GWP values referenced to the IPCC’s Fifth or Sixth Assessments (AR5 or AR6).
2. Prohibited substances:
• List # 1 Prohibited: R-402A, R-402B, R-404A, R-407A, R-407B, R-407C, R-407F, R-407H, R-408A, R-410A, R-410B, R-411A, R-
411B, R-417A, R-417C, R-420A, R-421A, R-421B, R-422A, R-422B, R-422C, R-422D, R-424A, R-426A, R-427A, R-428A, R-434A, R-
437A, R-438A, R-507A, HFC-134a, HFC-227ea, R-125/290/134a/600a, (55/1/42.5/1.5), RB-276, RS-24 (2002 formulation), RS-44
(2003 formulation), GHG-X5, Freeze 12
• List #2 Prohibited: R-402A, R-402B, R-404A, R-407B, R-408A, R-410B, R-417A, R-421A, R-421B, R-422A, R-422B, R-422C, R-422D,
R-424A, R-428A, R-434A, R-438A, R-507A, R-125/290/134a/600a (55/1/42.5/1.5), RS-44 (2003 formulation), GHG-X5
60
Table 2. Schedule for GWP Limit Compliance.
Registration Projects in non-A5 (developed) countries to Projects in A5 (developing) countries to
year comply for all products and systems with comply for all products and systems with
compliance dates on or before: compliance dates on or before:
2026 Jan. 1, 2025 NA
2027 Jan. 1, 2026 NA
2028 Jan. 1, 2027 NA
2029 Jan. 1, 2028 Jan. 1, 2025
2030 Jan. 1, 2028 Jan. 1, 2026
After 2030 Jan. 1, 2028 Jan. 1, 2027
61
EA Credit: Electrification
1-4 points – 4 points are required for LEED Platinum projects
Intent
To encourage building designs that do not depend on burning fuel onsite except in extreme situations, leading to
better indoor and outdoor air quality and to low carbon operations as the grid decarbonizes.
Requirements
To qualify, space heating equipment in climate zones 3 and above and service hot water heating (SWH)
equipment with total project SWH capacity exceeding 34,000 Btu/h (10 kW) must have a weighted average
efficiency of at least:
• 1.5 COP (3 points)
• 2.0 COP (4 points)
Heating equipment in climate zones 3 and above or service water heating systems with total SWH capacity
exceeding 34,000 Btu/h (10 kW) installed in the project scope of work must have a combined weighted average
COP or UEF of 2.0. Points are awarded according to Table 1 based on the project scope of work.
62
Table 1. Points for no on-site combustion, limited scope
Minimum project scope of work Points
One or more heating, service water heating, or process heating systems 1
At least 30% of the project’s peak combined heating and service water heating load 2
• Emergency support systems refers to power generators or backup systems designed to operate in
the event of a power outage or extreme temperature event (systems are not exempt for locations where
power outages commonly occur for more than 200 hours per year).
Include the details for electrification readiness in the project plans and the tenant guidelines; and include tenant
guidance for designing and installing efficient electrified systems. Provide the following infrastructure as
applicable to the project application, and sized to ensure the capability to meet the requirements referenced
above:
• Dedicated physical space for future electric space heating, service water heating, or process heating
equipment. Provide designated spaces of sufficient size for outdoor heat pump equipment.
• Chase ways with space for refrigerant lines, condensate drainage, or other required piping.
• When electrical distribution systems are installed within the project scope, provide junction box in the
same physical space as the space allocated for the future electric equipment; and dedicated electrical
panel space for an appropriately phased branch circuit sized to accommodate the future electric
equipment or appliances to meet the specified load.
• For portions of the building where ventilation air is not installed within the project scope of work,
infrastructure such as shafts, ductwork, etc. capable of supporting energy recovery ventilation for at
least 50% of ventilation air.
63
EA Credit: Reduce Peak Thermal Loads
1-5 points
Intent
To reduce the size and cost of the low-carbon 2050 grid, which must have the capacity to meet the heating and
cooling loads of buildings during peak temperature events, and to increase the survivability and resiliency of
buildings experiencing loss of power.
Requirements
Projects using energy simulation and the ASHRAE 90.1 Building Envelope Trade-off compliance path for EA:
Prerequisite Minimum Energy Efficiency and EA: Credit Enhanced Energy Efficiency shall have a proposed
envelope performance factor less than or equal to the base envelope performance factor.
Infiltration. Demonstrate through an air leakage test a measured air leakage of the building envelope less than
or equal to Table 1, below. Buildings smaller than 25,000 square feet (2,322 square meters) shall use a whole
building air leakage test.
AND / OR
Exceptions: Kitchen exhaust and supply and, in aggregate, fan systems supplying no more than 10% of the
project’s total outdoor air, provided that such systems in total do not provide more than 20% of the project’s total
outdoor air.
AND / OR
64
Option 3. Thermal bridging (1 point)
Comply prescriptively with the thermal bridging requirements of ASHRAE 90.1 2022, Section 5.5.5.
Without exceptions for Climate zones 0 through 3.
AND / OR
Table 2. Points for meeting caps on sum of sensible peak heating and cooling loads.
Points New Construction Major Renovation
1 16 Btu-h/ft2 (50 W/m2) 20 Btu-h/ft2 (63 W/m2)
2 12 Btu-h/ft2 (38 W/m2) 15 Btu-h/ft2 (47 W/m2)
3 8 Btu-h/ft2 (25 W/m2) 10 Btu-h/ft2 (32 W/m2)
OR
Table 3. Points for percentage improvement due to envelope measures (1-2 points)
Points Percent improvement in sum of peak heating and cooling loads
1 10%
2 20%
AND / OR
OR
65
Case 3. Peak heating and cooling load performance index (ASHRAE 90.1 Appendix G Energy
Simulation)
Demonstrate a Performance Index (PI) calculated in accordance with ASHRAE 90.1 Normative Appendix G
“Performance Rating Method, replacing all references to “cost” with “the sum of peak heating and peak cooling
loads.
Table 4. Points for Performance Index for peak heating and cooling loads:
Performance Index Points
0.5 1
0.4 2
0.3 3
66
EA Credit: Enhanced Energy Efficiency
1-7 points – 7 points are required for LEED Platinum projects
Intent
To design buildings with minimal energy use to reduce the environmental and societal damage caused by
resource extraction, air pollution, and greenhouse gas emissions and to facilitate the transition to a clean energy
future.
Requirements
OR
67
Table 1. Points for ASHRAE 90.1-2022 Section 11 Credits
Compliance Path
Case 1. ASHRAE
Case 2. ASHRAE 90.1-2022
90.1-2019 Sections 5
Points Sections 5 to 11
to 10
Central All Other
All Other Central systems
systems
1 13 Credits 9 Credits NA NA
2 26 Credits 18 Credits Min required by 90.1-2022 Min required by 90.1-2022
3 39 Credits 27 Credits Min required + 13 credits Min required + 9 credits
4 52 Credits 36 Credits Min required + 26 credits Min required + 18 credits
5 65 Credits 45 Credits Min required + 39 credits Min required + 27 credits
6 78 Credits 54 Credits Min required + 52 credits Min required + 36 credits
Table 1 notes:
• Excludes 90.1 2022 Section 11 Additional Efficiency Requirements credits for E01, P01, R01, Q01, Q02, Q03, and
G01 through G06, except to meet the minimums required by ASHRAE 90.1 2022 for Case 2 because these are
recognized in other LEED Energy and Atmosphere credits.
AND/OR
68
Table 2. Plug and Process Equipment criteria for Case 1
Equipment Category Applicable Equipment Criteria Points
People Conveyance • Elevators ISO 25745. 2
• Escalators At least Class A rated
• Moving Walkways
Data Center Electrical Electrical System Design ASHRAE 90.4-2022. 1
System Design electrical loss component (ELC)
is at least 20% lower than the maximum
design electrical loss.
Refrigeration Referenced in ASHRAE 10% improvement beyond ASHRAE 1
systems: 90.1-Section 6.8 Tables 90.1 Section 6.8 Tables
AND not ENERGY STAR
eligible
Refrigerated Warehouse California Title 24-2022 Section 120.6
refrigerated warehouse requirements
Airport equipment: Baggage handling Individual Carrier Systems (ICS) with 2
equipment variable frequency drive
Aircraft + jetway air Preconditioned Air (PCA) Systems with
conditioning efficiencies meeting ASHRAE 90.1
prescriptive efficiencies for HVAC
equipment
Data Centers:
Data centers that comprise at least 40% of the project’s gross area with the electrical system in the project
scope earn 2 points for complying with the Data Center electrical system requirements.
Warehouse:
Refrigerated warehouses that comprise at least 20% of the project’s gross floor area with the refrigeration
systems in the project scope earn 2 points for complying with the Refrigeration system requirements.
Points are awarded according to Table 3, with lower thresholds for projects excluding the onsite renewable
energy contribution from the Proposed Building Performance, and higher thresholds for projects including the
onsite renewable contribution.
69
Table 3. Points for percentage improvement in PI below PIT
Percentage Reduction Percentage Reduction
excluding renewable or including renewable
contribution contribution Points
10%
2% 1
5% 20% 2
8% 30% 3
11% 40% 4
14% 50% 5
17% 60% 6
20% 70% 7
70
EA Credit: Renewable Energy
1-4 points – 4 points are required for LEED Platinum projects
Intent
To encourage and recognize the use of renewable energy to reduce environmental and economic impacts
associated with fossil fuel energy use and increase the supply of new renewable energy within the electrical
grid, fostering a just transition to a green economy.
Requirements
(a) Tiers 1 – 3: The percentage of total annual base building site energy use supplied or procured by renewable
energy
OR
(b) Tier 1: The minimum rated renewable capacity where A = the sum of the gross floor area of all floors up to
the three largest floors.
Percent of
Points Percent of Annual Percent of Annual
Minimum Rated Annual Base
or Base Building Site Base Building Site
Capacity1 Building Site
Energy Energy
Energy
A * 1 W / ft2
1 or 15% 35% 100%
(A * 10.8 W/m2)
A * 2 W / ft2
2 or 30% 70% 200%
(A * 21.6 W/m2)
3 65% 100%
4 100% 200%
71
RENEWABLE ENERGY CRITERIA (Options 1 and 2)
Renewable Energy Classifications
• Tier 1: On-site renewable energy generation or equity project.
The renewable generation equipment may be located:
o On the project site
o On the campus on which a project is located
o On the site of equity project, provided that the renewable power system is provided, installed, and
commissioned at no cost to the equity entity, that the ownership of the renewable power system is
transferred to the equity entity, and that the rights to the power provided be given to the equity entity.
Tier 1 renewable systems shall be installed and commissioned within the project scope of work or a
separate commissioning scope of work completed before the final LEED application.
AND / OR
Solar readiness:
72
Solar Zone: A designated solar zone shall be included in the project design.
• Designate a dedicated solar zone area equal to at least 40% of the gross roof area.
• Conduct an analysis to determine the most appropriate location for optimal location of the solar zone,
avoiding shading from trees, buildings, etc., and accounting for future construction that may result in
shading.
• Perform a wind and load analysis and confirm that the roof or other structure encompassing the solar
zone is designed to accommodate all mounting configurations identified in the tenant guidelines.
• Total area shall be comprised of areas that have no dimension less than five feet and are no less than
160 square feet.
• No obstruction, such as vents, chimneys, or roof-mounted equipment shall be located in the solar zone
or planned for future installation in the solar zone.
• Any obstruction located on the roof or other part of the building that projects above a solar zone shall be
located at least twice the distance, measured in the horizontal plane, of the height difference between
the highest point of the obstruction and the horizontal projection of the nearest point of the solar zone,
measured in the vertical plane. (Exceptions: projects located within 10 degrees of the earth’s equatorial
plane, or any obstruction located north of all points of the solar zone in the northern hemisphere, or any
obstruction located south of all points of the solar zone in the southern hemisphere).
• All sections of the solar zone located on steep-sloped roofs shall have an azimuth range between 90
degrees and 300 degrees of true north.
• If the project is intended to include future mechanical or electrical equipment in or near the solar zone,
tenant guidelines shall include a sample plan showing how the equipment can be installed to maintain
the integrity of the solar zone.
Mounting Considerations: Identify the panel-mounting options most likely to be implemented in a future solar
panel installation. Provide documentation confirming that the roof warranty is not affected by the future
installation of solar panels. Install roof-penetrating mounts at the time of roof installation if analysis indicates
roof-penetrating mounts are best-suited for the project application. (Note: roof-penetrating mounts must be
designed to limit thermal bridging and included in the envelope commissioning).
Interconnection pathways: Construction documents shall indicate locations reserved for inverters and
metering equipment, and a pathway reserved for routing of conduit from the solar zone to the point of
interconnection with the electrical service. For projects with high service water heating loads, where there is the
potential for the solar zone to be used for water heating, construction documents shall indicate a pathway for
routing of plumbing from the solar zone to the water-heating system.
Electrical service:
• The main electrical service panel shall have a minimum busbar rating of 200 amps.
• The main electrical service panel shall have a reserved space to allow for the installation of a double
pole circuit breaker for a future solar electric installation. The reserved space shall be permanently
marked as “For future solar electric”.
73
EA Credit: Enhanced and Ongoing Commissioning
1-3 points
Intent
To further ensure that the constructed project functions as it was designed, and that it continues to maintain its
energy performance over time.
Requirements
Comply with either or both of the following options for a maximum of 3 points.
OR
Path 2: Enhanced Commissioning for Building Enclosure and MEP Systems (2 points)
▪ Comply with Path 1, AND
▪ Provide commissioning for mechanical, electrical, plumbing, data center, process, building monitoring,
and renewable energy systems or components installed within the project scope of work. For any
systems or controls that require future interconnection with tenant systems, provide templates for future
commissioning of these interconnections addressing the most likely tenant interconnection scenarios in
the systems manual and tenant guidelines. At a minimum, provide these templates for design review
checks, functional tests, and systems manual addenda.
AND / OR
74
Path 2 Applicability Criteria for smaller, simpler projects: Projects with HVAC supplied by unitary systems and/or
electric heating and/or central heating, AND EITHER
▪ Residential building type with less than 10,000 ft2 (930 m2) common area, OR
▪ Building gross floor area less than 25,000 ft 2 (2,300 m2) OR
▪ Total installed cooling, total installed heating, and total installed refrigeration capacities are each less
than 340 kBtu/h (28 tons, 100 kW).
1. Technology. Provide technology meeting the specified criteria for the MBCx Path(s) pursued. Technology
requirements are incremental to the EA Prerequisite Energy Metering and Reporting requirements:
Monitoring: Monitoring and/ or metering
▪ Energy Systems (Table 2: Paths 1A and 2A)
▪ HVAC Systems (Table 3: Paths 1B).
Analytic platform: A remotely accessible platform with software functionality to perform smart analytics
and visually present the data:
▪ Energy Information System (Table 2: Paths 1A and 2A)
▪ Fault Detection and Diagnostics (Table 3: Paths 1B). FDD software shall be integrated with the
Building Automation System if included in the project.
2. Process and Communications: A commitment to implement MBCx for a minimum of three years, either
through a three-year contract with an independent MBCx provider or through an MBCx provider who is a
qualified staff person with tasks included in their job description. The MBCx provider shall communicate
regularly with the building operator and/or energy manager and perform other services as per the Process
requirements for MBCx Path(s) pursued. MBCx shall commence no later than building occupancy and shall
be fully coordinated between the commissioning provider, facilities management, tenants, and the
monitoring-based commissioning provider (MBCxP). The process shall include the following:
Ongoing Commissioning Plan (All Paths). Develop an on-going commissioning plan addressing the
following, including any technology and process requirements specific to the path(s) pursued:
▪ Roles and responsibilities.
▪ Coordination with tenants for commissioning of tenant improvements, particularly as it relates to
interconnection with base building systems.
▪ Software technology description.
▪ Data or points to be tracked, with frequency and duration for trend monitoring, and baseline
reference or acceptable values when applicable.
▪ Review process that will be used to evaluate performance.
▪ Action plan for identifying, prioritizing, correcting, and verifying correction of operational errors and
deficiencies.
▪ Frequency of analyses or review in the first year, and in subsequent analysis cycle(s) if different
than the first year
MBCx Review of System, Equipment and Operational controls (All Paths). MBCxP shall conduct a
review of the following systems and equipment as applicable by the end of the warranty period, and at
least every two years subsequently, integrating the review with the Energy Information review and/or
Fault Detection and Diagnostics review as applicable:
▪ System sensor calibration.
▪ Equipment operation matches occupancy schedules.
▪ Zone temperature setpoints and deadbands,
▪ Control system overrides.
▪ Control system resets.
▪ Trend analysis of hot water/chilled water valve operation.
▪ Energy recovery operation.
▪ Daylighting controls
75
Energy Information Review (Path 1A and 2A). MBCxP review and coordination of energy information
with facilities staff:
▪ Dynamically: Identify anomalies and alert staff expeditiously.
▪ At least monthly: Review and reporting summary of anomalies and trends
▪ At least quarterly: Review and reporting summary with regards to occupancy/equipment schedules
▪ At least annually: Review and reporting summary of energy use intensity trend, benchmark, energy
saving opportunities, actions taken, planned actions.
Fault Detection and Diagnostics Review (Path 1B). MBCxP review and coordination of fault detection
information with facilities staff:
▪ Regular analysis occurring on a cycle. The analysis for each cycle shall include MBCxP review of
fault detection and diagnostics, identification of operational errors, investigation to determine the
root cause of errors and deficiencies, discussion and prioritization of issues, identification and
implementation of a corrective action plan, incorporation of the plan in the work order system, and
verification of correct operation once corrective action has been taken.
- Analysis cycle at least quarterly for the first year. Subsequent analysis cycles shall be at least
annually.
- Documentation pertaining to system operation shall be updated during each analysis cycle.
- At each analysis cycle, the MBCxP shall meet with staff and review the summary report.
▪ Regular communications with staff.
- The MBCxP shall alert facilities staff expeditiously when major faults are identified.
- At least monthly, the MBCxP shall provide a summary of faults detected. At least quarterly,
MBCxP shall communicate with facilities staff to discuss and prioritize issues.
76
Table 2. Technology requirements for Energy Information System (EIS) / Energy Monitoring.
Path 1A Path 2A
Basic Enhanced
Monitoring Monitoring
Visualization and reporting of total project energy use and tenant energy use by energy source
(For tenant energy distribution not in project scope, EIS must be expandable to address the requirements)
Annual energy benchmarking of energy use intensities x x x
Comparison of energy consumption to prior interval, and to x x x
same interval of prior year:
Annually x x x
Monthly x x x
Weekly1 x x (Electric) x (Electric)
Daily1 x x (Electric) x (Electric)
Hourly “Loadshape” (daily, weekly, peak day, and average x x (Electric) x (Electric)
monthly and annual for weekday and weekend)
Normalization of energy consumption x x
Automated reporting of energy use anomalies x x
Heat map charts x
Greenhouse gas emissions reporting x
Tenant portal with capability to provide visualization and x x x
reporting of tenant energy use by energy source and base
building data for shared systems serving the tenants.
Monitoring, visualization, and reporting of data for the following end-uses, at least hourly
(For project scope, with capability to monitor, visualize, and report future fitouts)
Monitoring required in EA Prerequisite: Energy Metering and
Reporting3
Onsite electric generation x x x
HVAC electrical use x x
Interior lighting x x
Exterior lighting x x
Receptacle circuits x x
Refrigeration systems x x
Incremental monitoring beyond EA Prerequisite: Metering and
Reporting3
Electric vehicle charging x x x
Thermal and/or electric storage x x
Elevators, escalators, and/or moving walkways x x
Computer room IT equipment2 x x
Commercial kitchen equipment2 x x
2
Other process equipment x x
Tenant energy use per energy source and end-use data for x x
tenant spaces > 10,000 ft2 (930 m2), or the capability for the
system to monitor these upon tenant buildout.
Table 2 notes:
1. Weekly and Daily comparison of energy consumption for tenant energy use by energy source is only required for
electricity for tenant spaces greater than 10,000 ft2 (930 m2).
2. Exception to monitoring and visualization requirements: computer room IT, commercial kitchen, or other process
equipment in spaces with less than 10 kW rated capacity for the referenced equipment.
3. Path 1A and Path 2A(Basic Monitoring) require visualization and reporting of monitoring data that is mostly mandatory in
EA Prerequisite: Energy Metering and Reporting (Incremental monitoring requirements are focused on large loads).
Path 2A(Enhanced Monitoring) requires incremental metering beyond the requirements in EA Prerequisite: Energy
Metering and Reporting.
77
Table 3. Technology requirements for Fault detection and diagnostics system
Path 1B
78
EA Credit: Grid-Interactive
1–2 points
Intent
To enhance power resiliency, and position buildings as active partners contributing to grid decarbonization,
reliability, and power affordability through integrated management of building loads in response to variable grid
conditions.
Requirements
Evaluate grid-interactive measures with regard to the current and forecasted grid context, location, building type,
and ownership structure and account for the results in decision-making.
Provide interval recording meters and equipment capable of accepting an external signal.
Include automatic load management controls capable of storing the electric or thermal energy during off-peak
periods or periods with low grid carbon intensity; and using stored energy during on-peak periods or periods of
high grid carbon intensity.
AND/OR
AND/OR
79
Automated Demand Response System-Level Controls.
Provide automated demand response (ADR) controls for at least two of the following for systems installed within
the tenant scope of work.
• HVAC systems (50% of rated capacity).
• Lighting systems (50% of power)
• Automatic receptacle controls
• Service water heating (90% of capacity)
• Electric vehicle supply equipment (EVSE)
Have in place a control system that automatically sheds electricity demand in response to triggers denoting
strain on the grid or high grid emissions, Examples include:
• Signal from a demand response (DR) program provider
• Data obtained through an API indicating high grid emissions.
• Peak demand tariff period when the grid is operating in the highest demand window.
• Time-of-use rate when pricing is highest.
80
EA Credit: Enhanced Refrigerant Management
1–2 points
Intent
To reduce greenhouse gas emissions by accelerating the use of refrigerants with low global warming potential
and promoting better refrigerant management practices.
Requirements
Note: Tables 1 and 2 refer to the tables in the Fundamental Refrigerant Management Prerequisite.
OR
AND/OR
Design, construct, and operate the project refrigerant-using equipment to minimize refrigerant leakage:
Design.
• Refrigerant-using equipment shall be self-contained, with no field-installed piping:
81
o For equipment with refrigerants > 700 GWP AND
o For at least 80% of the total GWP of refrigerants used in the project
• Specify an “automatic leak detection” system in fully enclosed spaces with equipment that has an
overall refrigerant charge exceeding 100 tons of equivalent CO2 emissions (tCO2e).
Installation.
• Field-installed refrigerant piping shall use brazed or press type fittings.
• Refrigerant-using equipment shall be installed and tested in accordance with published best practice for
limiting refrigerant leakage.
Operation.
Have in place a refrigerant maintenance plan and designate a responsible oversight party through a third-party
service provider contract or by designating a qualified staff person with tasks included in their job description.
The plan shall include standards for record-keeping and protocols for:
• Updating the refrigerant inventory
• Tracking and recording refrigerant charge and leakage rates for all refrigerant using equipment
• Ensuring that installation, maintenance, and removal of refrigeration-containing equipment is performed by
appropriately certified refrigeration personnel, including in tenant spaces
• Annual audit and calibration of automatic leak detection systems
• For equipment without automatic leak detection systems, checking pressure loss and leaks at least as
frequently as follows for equipment containing refrigerant with total GWP as follows: every 24 months
for 50 tCO2e or less; every 12 months for 50 to 500 tCO2e; every 3 months for more than 500 tCO2e
• Maximum time frame for repairing leaks identified.
• More frequent leakage testing and repair if the total annual refrigerant recharge / leakage exceeds 5%
At a minimum, protocols must meet the more stringent of the manufacturers’ recommendations and regulatory
requirements.
82
MATERIALS AND RESOURCES (MR)
MR Prerequisite: Planning for Zero Waste Operations
Required
Intent
To reduce the disproportionate burden of landfills and incinerators that is generated by building occupants’
waste hauled to and disposed of in landfills and incinerators through reduction, reuse, and recycling service and
education, and to conserve natural resources for future generations. To set up the building for success in
attempting zero waste operations.
Requirements
During design, work with the owner to identify waste minimization goals and strategies for the project to divert
waste post-occupancy. Create a plan for materials recovery and circularity during operations.
83
MR Prerequisite: Assess Embodied Carbon
Required
Intent
To track the upfront embodied carbon (i.e. the embodied carbon from the extraction and manufacturing phases)
of major materials used in the structure, enclosure, and hardscape, which constitutes the bulk of the embodied
carbon emissions on new construction and major renovation projects, and to enable projects to see how they
compare with baseline values.
Requirements
All projects must track the embodied carbon impacts (Global Warming Potential, or GWP) and quantities of the
covered structural, enclosure and hardscape materials for the project and compare the results to the values
found in Table 1, using either whole building life-cycle assessment or EPDs. Projects must compare the total
GWP of the structure, enclosure, and hardscape of their project with the total GWP of a baseline project that
used the same amount of each material and that met the values in Table 1.
Reductions are not required for this prerequisite. Material values must be based on as-built quantities and the
embodied carbon data must include at least a cradle-to-gate scope (modules A1-A3 at least). Products for which
embodied carbon data is not available may use regional or country averages.
At a minimum, covered materials include the asphalt, concrete, cement, structural masonry units, glass, and
steel used in the structure, enclosure, and hardscape.
Asphalt 72.6
≤2499 277
3000 318
4000 352
5000 382
6000 407
≥7200 402
Cement 858
Glass 1,401
Steel
84
Rebar (fabricated) 850
85
MR Credit: Building and Materials Reuse
1–5 points
Intent
To reduce embodied carbon, keep materials in circularity, reduce demand for virgin material sourcing, preserve
cultural resources and histories, and foster markets for reuse materials.
Requirements
Demonstrate reduced environmental effects during initial project decision-making by reusing existing building
resources or by fostering markets for reuse materials. Achieve points through building and/or material reuse.
Historic, abandoned, or unsafe buildings: Portions of buildings deemed structurally unsound or hazardous can
be excluded from the credit calculations.
AND/OR
Assess Procurement of Off-site Salvaged or Reused Materials: For all projects, survey and identify material
procurement opportunities from offsite reuse and/or salvage sources.
86
Table 2. Points for salvaging materials
Salvage Strategies Points
Salvage at least 50% of 1 targeted material types 1 point
Salvage at least 50% of 2 other material types
Salvage equivalent weighted average
At least 50% of 2 targeted material types 2 points
At least 50% of 4 other material types
Salvage equivalent weighted average
Salvage % per Material Type = Amount of Material Type Salvaged/ Total Amount of Material Type in
Deconstruction / Demolition Scope
AND/OR
87
Table 4. Points for reusing materials
Reuse Strategies Points
Reuse at least 25% of 1 targeted material types 1 point
Reuse at least 25% of 2 other material types
Reuse equivalent weighted average
Reuse at least 25% of 2 targeted material types 2 points
Reuse at least 25% of 4 other material types
Reuse equivalent weighted average
Reuse % per Material Type = Amount of Material Type Reused / Total Amount of Material Type in CS Scope
88
MR Credit: Reduce Embodied Carbon
1-8 points – 2 points from Options 1-3 are required for LEED Platinum projects
Intent
To reduce embodied carbon of major structural and enclosure materials on new construction and renovation
projects. To track carbon emissions during the construction process. To understand the lifecycle impacts of
building structures and enclosures.
Requirements
Reduce embodied carbon of major structure, enclosure, and hardscape materials. All documentation is to be
based on as-built materials and quantities. All ancillary structures, such as parking structures or outbuildings
within the LEED project boundary must be included in the calculations. Projects comply with one or more of the
Options below for points.
Path 1 10% 2
Path 2 20% 3
Path 3 30% 4
Path 4 40% 5
Path 5 50% 6
Earn an additional 1 point if the project shows a 20% reduction in 3 or more impact categories in addition to
GWP.
No impact category assessed as part of the life-cycle assessment may increase by more than 10% compared
with the baseline building. All pathways must be based on as-built final construction materials and quantities.
The baseline and proposed projects must be of comparable size, function, orientation, and operating energy
performance. Minimum included impact categories for the WBLCA:
● global warming potential (greenhouse gasses), in kg CO2e;
● depletion of the stratospheric ozone layer, in kg CFC-11e;
● acidification of land and water sources, in moles H+ or kg SO2e;
● eutrophication, in kg nitrogen eq or kg phosphate eq;
● formation of tropospheric ozone, in kg NOx, kg O3 eq, or kg ethene; and
● depletion of nonrenewable energy resources, in MJ using CML / depletion of fossil fuels in TRACI.
OR
89
Option 2. Procurement of Low-Embodied Carbon Construction Materials (1-5 Points)
Purchase structure, enclosure, and hardscape materials that, in total for the whole project, have lower embodied
carbon emissions than if the project would have selected products that met industry average benchmarks
(cradle-to-gate modules A1-A3 at least).
At a minimum, include the following covered materials when included in the project: asphalt, concrete, structural
masonry, steel, board insulation, aluminum extrusions, structural wood and composites, cladding, and exterior
glazing including frames. Compare results from the actual as-built material quantities to a hypothetical baseline
project defined as one that uses the same amounts of each material, and where each material has the GWP
equal to the values in Table 1 of Prerequisite: Assess Embodied Carbon. Where benchmark GWP values are
not available from the Prerequisite Table 1, use CLF Baselines for those product categories.
Earn points by reducing embodied carbon from the baseline project according to Table 2.
Path 1 10% 1
Path 2 20% 2
Path 3 30% 3
Path 4 40% 4
Path 5 50% 5
OR
Points are awarded for achieving Tier 1 through Tier 3 limits for purchased materials according to Table 4.
Points are additive for up to a maximum of 5 points from any product categories.
Non-Wood GSA Better than average Top 40% thresholds Top 20%
Products Thresholds* thresholds
Materials not on Better than CLF Better than EC3 “achievable” N/A
GSA list Baseline
GWP Limits
Masonry - 1 point -
Asphalt - 1 point
AND/OR
Path 1 Track all fuel and utility usage for contractor jobsite operations A5 1
Path 2 Track all fuel and utility usage for contractor and subcontractor jobsite A5 2
operations
Path 3 Track all fuel and utility usage for contractor and subcontractor jobsite A4 and A5 3
operations, plus fuel usage for contractor and subcontractor materials
deliveries and waste hauling
Intent
To reduce concentrations of chemical contaminants that can damage air quality and the environment, and to
protect the health, productivity, and comfort of installers and building occupants.
Requirements
Specify and install paints, coatings, adhesives, sealants, flooring, walls, ceilings, insulation, furniture, and/or
composite wood products that meet low-emitting criteria. Earn points according to Table 1.
Products to be specified and installed by tenants may be excluded. A project on which no applicable products
are specified and installed in a given category, achieves compliance for the category.
PRODUCT CATEGORIES:
The paints and coatings product category includes all interior paints and coatings wet-applied on site,
specialized finishes (dyes, sealers, hardeners and toppings for concrete floors), and plasters. Include at a
minimum the following types of paints and coatings, as defined in SCAQMD Rule 1113.
The adhesives and sealants product category includes all interior adhesives and sealants wet-applied on site.
Include at a minimum the following types of adhesives and sealants, as defined in SCAQMD Rule 1168.
Flooring
Non-structural flooring materials, by surface area or cost, meet the VOC emissions evaluation
The flooring product category includes all types of hard and soft surface flooring finishes (ex. carpet, ceramic
tile, vinyl, rubber, engineered, solid wood, stone, terrazzo, laminates), raised flooring systems, wall base,
transition strips/stair nosing, entryway systems, area rugs, wood and composite wood subflooring,
underlayments, and other floor coverings.
92
Exclude poured concrete, subflooring (include subflooring in the composite wood category, if applicable), water-
resistive barriers (material installed on a substrate to prevent bulk water intrusion), and wet-applied products
applied on the floor (include in paints and coatings category).
Walls
Wall systems, by surface area or cost, meet the VOC emissions evaluation.
The walls product category includes all finish wall treatments (wall coverings, wall paneling, wall tile), gypsum or
curtain walls, retail slatwall, trim, interior and exterior doors, non-structural wall framing, interior and exterior
windows, window treatments, countertops, laminate/veneer used for built-in cabinetry, non-structural sandwich
panels, and CMU.
Exclude cabinetry (include the composite wood components of built-in cabinetry in the composite wood category
and free-standing cabinetry in the furniture category), and vertical structural elements (include structural wood
panels or structural composite wood in the composite wood category, if applicable), bathroom accessories, and
door hardware.
Ceilings
Ceilings products, by surface area or cost, meet the VOC emissions evaluation.
The ceilings product category includes all ceiling panels, ceiling tile, surface ceiling structures such as gypsum
or plaster, suspended systems (including canopies and clouds), and glazed skylights.
Exclude overhead structural elements (include structural elements in the composite wood category, if
applicable).
Insulation
Insulation products, by surface area or cost, meet the VOC emissions evaluation.
The insulation product category includes all thermal and acoustic boards, batts, rolls, blankets, sound attention
fire blankets, foamed-in place, loose-fill, blown, and sprayed insulation.
Exclude insulation for HVAC ducts and plumbing piping from the credit. Insulation for HVAC ducts may be
included at the project team’s discretion.
Furniture
Furniture in the project scope of work, by cost, area, or number of units, meets the furniture emissions
evaluation.
The furniture product category includes all seating, desks and tables, filing/storage, free-standing cabinetry,
systems furniture, moveable/demountable partitions, bathroom/toilet partitions, shelving, lockers, specialty and
custom fixtures and furniture, and furnishing items (such as area rugs, cubicle curtains, mattresses, and mirrors)
purchased for the project.
Exclude office and bathroom accessories, art, recreational items, and planters from the credit.
Composite Wood
Composite wood products, by area or cost, meets the Formaldehyde emissions evaluation.
The composite wood product category includes all particleboard, medium density fiberboard (both medium
density and thin), hardwood plywood with veneer, composite or combination core, and wood structural panels or
structural wood products.
If a composite wood product has a finish or treatment applied off-site (including but not limited to fire-retardant,
paint, stain or other coating), the off-site applied finish or treatment must also be listed in the composite wood
category and comply with the VOC emissions evaluation criteria.
93
Exclude products for which composite wood is a component (ex. wood doors, engineered flooring, custom
furniture). Instead, include the finished product in the flooring, walls, ceilings, or furniture category, as
appropriate.
Low-emitting criteria
OR
Inherently nonemitting: Stone, ceramic tile, or solid wood products that have no resins/binders, adhesives,
sealers, coatings, sealants, or joined components (ex. gaskets, internal/core components) that are not also
inherently nonemitting sources.
Salvaged and reused materials: Product is more than one year old at the time of use.
If another product (including but not limited to adhesives, sealants, paints, and coatings) is applied to the
inherently nonemitting material and has a separate manufacturer and cost, to the end-user, from the original
material, the applied product may be documented as a separate product and meet the low-emitting criteria
applicable to the applied product, even if applied off-site.
If another product is applied to the INSR material and does not have a separate manufacturer and cost, to the
end-user, the result is considered a new finished product that no longer qualifies as an inherently nonemitting
material and is subject to the VOC emissions evaluation criteria.
Seating products must be evaluated using the seating scenario. Classroom furniture must be evaluated using
the standard school classroom scenario. Other products should be evaluated using the open plan or private
office scenario, as appropriate. The open plan scenario is more stringent.
Statement of product compliance must be made by the manufacturer or a USGBC-approved third-party. Any
testing must follow the test method specified in the applicable regulation. If the applicable regulation requires
subtraction of exempt compounds, any content of intentionally added exempt compounds larger than 1% weight
by mass (total exempt compounds) must be disclosed.
94
● California Air Resource Board (CARB) 2007 Suggested Control Measure (SCM) for Architectural
Coatings
● South Coast Air Quality Management District (SCAQMD) Rule 1113, amended February 5, 2016,
effective date most current at the time of the project’s LEED registration date.
● Adhesives and sealants:
● SCAQMD Rule 1168, amended November 4, 2022, effective date most current at the time of the
project’s LEED registration date.
OR
If a composite wood product has a finish or treatment applied off-site (including but not limited to fire-retardant,
paint, stain or other coating), the off-site applied finish or treatment must meet the VOC emissions evaluation.
This applies to a finish or treatment applied less than one before installation to a salvaged or reused composite
wood product.
95
MR Credit: Optimized Building Products
1–5 points
Intent
To encourage the use of products and materials for which life-cycle information is available and that have
environmentally, economically, and socially preferable life-cycle impacts. To reward project teams for selecting
products from manufacturers who have verified improved environmental life-cycle impacts.
Requirements
Select nonstructural building products that achieve multiple optimization criteria across five impact areas:
climate health, human health, ecosystem health, social health and equity, and circular economy.
Figure 1 illustrates how eligible multi-attribute product documentation and certifications are valued in LEED,
where:
• Column A lists the eligible types of product documentation. All eligible product documentation is
prepared by a manufacturer or certification organization.
• Columns B-F indicate how each product documentation or certification is valued across the optimized
product impact areas. The values in these columns represent a “multi-attribute score” for the
product. The “multi-attribute score” will be multiplied by the number of products, cost, area, or volume,
depending on the credit option and pathway chosen in Option 1 or Option 2.
• A single product may only claim one multi-attribute score per impact area (up to the maximum score
achieved for the product from columns B-F). Some products may have one single attribute, in which
case the multi-attribute score is worth the total for that documentation type. In other cases, a single
product may have more than one certification or documentation and add them together. In this case, the
maximum values from the columns B-F are added together to obtain a single multi-attribute score
(multiplier) for the product, up to a maximum of score of 5.0. Note: double-counting of impact areas is
not allowed.
o For example, if a product has a Product-Specific Type III EPD and a Cradle to Cradle Silver
certification, that product will result in a multi-attribute score of 4.0:
▪ Column A: Climate Health - 1.0 score (maximum of 1.0 from Product-Specific Type III
EPD and 0.5 from Cradle to Cradle Silver)
▪ Column B: Human Health - 1.0 score from Cradle to Cradle Silver
▪ Column C: Ecosystem Health - 1.0 score from Cradle to Cradle Silver
▪ Column D: Social Health and Equity - 0.5 score from Cradle to Cradle Silver
96
Figure 1. Optimized Product Valuation by Eligible Product Documentation
97
Option 1: Product Disclosure and Optimization from All Product Categories (1-2 Points)
Select and install nonstructural materials that are optimized across multiple impact areas according to Figure 1.
Products can come from any category so long as they are permanently installed. Products with eligible
documentation are valued for their multi-attribute score, up to a maximum score of 5 per unique product. See
Equation 1 for an example of how to calculate multipliers for a unique product.
The amount of optimized products per product category is calculated by multiplying each individual product’s
value (cost, area, volume or unit) times the product’s multi-attribute score from Figure 1 (columns B-F). Each
individual product’s multi-attribute score in the product category is then added together to determine the total
optimized product value for that product category.
To determine if the product category includes enough optimized products to earn points, compare the total
optimized product value for the category to the total value (without multipliers) for all products in the product
category, including those products that do not have sustainability attributes.
98
MR Credit: Construction and Demolition Waste Diversion
1–2 points
Intent
To reduce construction and demolition waste disposed of in landfills and incineration facilities and the
environmental impacts of manufacturing new materials and products, including embodied carbon. To delay the
need for new landfill facilities that are often located in frontline communities and create green jobs and materials
markets for building construction services.
Requirements
Develop and implement a construction and demolition materials management plan and achieve points through
diversion and recycling. Waste diversion and recycling calculations must be by weight. If volume is provided for
some materials, use an approved volume-to-weight conversion factor. Exclude excavated soil, land-clearing
debris, and hazardous waste from calculations.
Any materials sent to a commingled recycling facility for processing must take the facility average recycling rate
and any materials destined for alternative daily cover (ADC) or incineration/energy recovery must be included as
waste (not diverted).
Divert at least 35% of waste by employing best practice strategies like reuse/salvage, manufacturer take-back
programs, source-separation (with dedicated recycling) of specific materials, and targeting of high value
materials like carpet, ceilings, gypsum board, and furniture. Points are awarded according to Table 1.
Table 1. Points for CandD Diversion. Select any criteria up to a total of 2 points:
Thresholds Points
Divert 35% of all construction and demolition waste materials 1
AND
Source-separate and recycle three materials
Divert 50% of all construction and demolition waste materials 2
AND
Use third-party verified commingled recycling facilities
OR
Source-separate and recycle five materials
OR
source separate and recycle at least 2 targeted materials: Carpet, ceilings, gypsum board, or furniture
*Minimum quantities are required for source separated materials.
99
INDOOR ENVIRONMENTAL QUALITY (EQ)
EQ Prerequisite: Fundamental Air Quality
Required
Intent
To design for above average indoor air quality with features to control PM2.5 to support occupant health and
well-being.
Requirements
AND
AND
Entryway Systems
Install permanent entryway systems to capture dirt and particulates entering the building at regularly used
exterior entrances. Acceptable entryway systems include permanently installed grates, grilles, slotted systems
that allow for cleaning underneath, rollout mats, and any other materials manufactured as entryway systems
with equivalent or better performance. Entryway systems are not required at doors leading from the exterior to
loading docks or garages but must be installed between these spaces and adjacent indoor spaces. Entryway
Systems are required only at the ground level, for each residential entrance from the outdoors.
AND
For Healthcare projects, provide pressurized entryway vestibules at high-volume building entrances.
100
AND
101
EQ Prerequisite: No Smoking or Vehicle Idling
Required
Intent
To prevent or minimize exposure of building occupants, indoor surfaces, and ventilation air distribution systems
to environmental tobacco smoke, smoke produced from the combustion of cannabis and controlled substances,
the emissions produced by electronic smoking devices, and the emissions produced by idling vehicles.
Requirements
Smoking includes tobacco smoke, as well as smoke produced from the combustion of cannabis and controlled
substances and the emissions produced by electronic smoking devices.
During Construction: Prohibit smoking inside the building and within 25 feet (7.5 meters) of the building
openings. Install signage that prohibits smoking inside the project during construction.
During Building Operations: Prohibit smoking inside the building with limited exceptions (see below).
Prohibit smoking outside the building except in designated smoking areas located at least 25 feet (7.5 meters)
(or the maximum extent allowable by local codes) from all entries, outdoor air intakes, and operable windows.
Communicate the no-smoking and vehicle idling prohibition and any designated smoking areas or no idle zones
to occupants. Have in place provisions for enforcement or no-smoking or no-idling signage.
Exceptions for Vehicle Idling: may include cold weather-related considerations, emergency or safety situations,
or specific vehicle needs/requirements.
102
EQ Prerequisite: Building Accessibility
Required
Intent
To support diverse physical needs of occupants and increase widespread usability of the building.
Requirements
All projects must support access for those with physical disabilities through designs meeting
all locally applicable accessibility code.
AND
1. All regularly used exterior building entrances are ADA compliant with ramps to accommodate elevation
change, not wheelchair lifts.
2. Reception desks, security counters and service counters all have a front approach wheelchair
accessible section.
3. Provide wave-to-open or vertical hand / foot press door operators at all building entrances.
4. Primary circulation paths are minimum 6 feet (1.8 meters) width.
5. Turn circles in primary circulation paths and all restrooms are minimum 5’-7” (1.7 meters).
Exceptions to the requirements because of a limited scope of work, historic preservation requirements, or local
code exemptions will be considered.
103
EQ Credit: Enhanced Air Quality
1 point
Intent
To design for increased levels of indoor air quality beyond the prerequisite to better protect the health of building
occupants.
Requirements
AND/OR
Table 1. Additional Design Limits for Enhanced Indoor Air Quality Procedure
Design Compound or PM2.5 Enhanced IAQP*
PM2.5 10 ug/m3
Formaldehyde 20 µg/m³
Ozone 10 ppb
*[references for enhanced IAQ limits]
AND/OR
104
EQ Credit: Occupant Experience
1-4 points
Intent
To optimize people’s comfort, well-being, and enjoyment and maximize the likelihood of consistent satisfaction
and ongoing stewardship related to the indoor environment.
Requirements
Minimize the effect on building occupants of site exterior noise produced by road traffic, aircraft flyovers,
railroads, outdoor facility MEP and building services equipment, etc.
AND/OR
Comply with all of the following requirements for regularly occupied spaces:
• Solar glare control: Provide manual or automatic (with manual override) glare-control devices.
Use light fixtures with a luminance of less than 7,000 candela per square meter (cd/m)2 between 45
and 90 degrees from nadir.
OR
Achieve a Unified Glare Rating (UGR) rating of <19 using software modeling calculations of the
designed lighting. (Modeling must be performed as outlined in the NEMA white paper on Unified
Glare Rating).
Exceptions include wallwash fixtures properly aimed at walls, as specified by manufacturer’s data,
indirect uplighting fixtures, provided there is no view down into these uplights from a regularly
occupied space above, and any other specific applications (i.e. adjustable fixtures).
• Color Rendering: Use light sources that have a Color Rendering Index (CRI) of at least 90. Or a
Color Fidelity Index greater than or equal to 78 and a gamut index between 97 and 110, determined
in accordance with Illuminating Engineering Society (IES) TM-30.
AND/OR
Design the building floorplates and interior layout to provide at least 30% of the regularly occupied area to be
within a 20 ft (6 m) horizontal distance of envelope glazing in each floor. The glazing must have a visible light
transmittance (VLT) above 40%.
AND
105
For these areas, use interior finishes with a surface reflectance greater or equal to 80% for ceilings and 50% for
walls. If included in the project scope, use furniture finishes with a surface reflectance greater or equal to 45%
for work surfaces and 50% for movable partitions.
AND/OR
Perform a daylight simulation analysis for the project to understand and optimize access to daylight and visual
comfort. Use the calculation protocols outlined below. Develop a summary report of the expected daylight
conditions for each regularly occupied space.
Achieve an average sDA300/50% value for the regularly occupied floor area of at least 40%. Points are as
follows:
≥40% 1
≥55% 2
≥75% EP
Additionally, calculate the average sDA300/50% value for the total regularly occupied floor area.
The sDA and ASE calculation grids should be no more than 2 feet (600 millimeters) square and laid out across
the regularly occupied area at a work plane height of 30 inches (760 millimeters) above finished floor (unless
otherwise defined). Use an hourly time-step analysis based on typical meteorological year data, or an
equivalent, for the nearest available weather station. Include any permanent interior obstructions. Moveable
furniture and partitions may be excluded.
*[LM-83 language for modeling of exterior ground/bldgs, commonly excluded from LEED submissions]
If the finishes in the space will not be completed, use the following default surface reflectances: 80% for ceilings,
20% for floors, and 50% for walls. Assume that the entire floor plate, except for the core, will be regularly
occupied space.
Intent
To encourage holistic biophilic design with benefits for both human health and the environment.
Requirements
Integrate attributes from The Practice of Biophilic Design by Kellert and Calabrese:
• Direct Experience of Nature. Directly integrate nature into the space by bringing natural
elements inside. Integrate at least 4 attributes.
• Indirect Experience of Nature. Indirectly integrate nature into the space through
representations, mimicry, or patterns of nature. Integrate at least 5 attributes.
• Experience of Space and Place. Cultivate connections that support health and wellbeing by
including spatial or architectural features with characteristics of the natural environment that
positively impact health and wellbeing. Integrate at least 3 attributes.
*strategies can be taken from any biophilic design framework or leading references, such as Terrapin
Bright Green, but must fit into the categories above.
OR
AND
Demonstrate holistic biophilic design by incorporating façade design, or design strategies within 20 feet of the
building exterior, that utilize biophilic elements to positively impact both occupants and the environment.
Examples may include dynamic or kinetic façade elements that respond to environmental conditions, design
elements that provide habitat for local wildlife, vegetative cover provide shading or glare control, etc.
Intent
To support diverse needs of occupants and increase widespread usability of the building.
Requirements
Alternative strategies that contribute to the widespread inclusivity of the space may be accepted but must fit into
one of the three categories above.
108
EQ Credit: Resilient Spaces
1 point
Intent
To support design features that increase the capacity for occupants to adapt to changing climate conditions and
be protected from events that may compromise the quality of the indoor environment and subsequently
occupant health and wellbeing.
Requirements
Design the project with the capability to maintain habitable temperatures during a power outage. Consider
extreme heat and cold outdoor temperatures appropriate for the locale in your analysis.
Designate specific thermal safety zones where habitable conditions will be maintained during a power outage.
The total population in all thermally safe zones must be equal to or greater than the normal building occupancy.
The zone occupant density shall be no greater than one person per 20 ft² (1.9 m). All habitable zones must have
access to natural ventilation through features such as windows, doors, panels, or louvers.
Consider the heat stress index for the general population and for vulnerable populations, such as those in
nursing homes, schools, and inpatient facilities.
AND/OR
Procedures for using the management mode must be prescribed in the building’s operational plans.
AND/OR
Design 75% of the regularly occupied spaces to have operable windows with the capability to provide access to
outdoor air during heat waves or localized power outages. The windows must meet the opening size and
location requirements of ASHRAE 62.1-2022 section 6.4.
AND/OR
Design for one of the hazards identified as high priority in the Prerequisite: Climate Resilience Assessment:
Path 1. Tornado, Hurricane and High Winds: Safe rooms and areas of refuge (1 point)
Design and build the site and site structures to include safe rooms or refuge areas based on FEMA P-361 (for
projects with public/community use) and P-431 (for projects without public/community use).
109
AND/OR
Path 2. Earthquake: Earthquake resilience for furniture and equipment and unobstructed means of
egress (1 point)
i. Enhanced Non-structural Design - Anchor Heavy Building Contents: In addition to any code requirements,
heavy building contents such as tall bookshelves, storage racks, server racks, file cabinets, appliances
and mounted televisions which are a potential life-safety hazard are anchored per FEMA E-74 (2011) or
equivalent. (REDi Version 1.0 Criterion 2.3.5)
ii. Safer Egress: Stair framing elements and their connections are designed and detailed to maintain support
of the design dead and live loads during the expected lateral drifts of the primary structure under the code-
defined MCE earthquake event with limited damage. (REDi Version 1.0 Criterion 2.5.1)
iii. Safer Egress - Doors: Egress doors are designed to accommodate drifts (and residual drifts) such that
they remain operable following the design level earthquake. (REDi Version 1.0 Criterion 2.5.2)
110
EQ Credit: Air Quality Testing and Monitoring
1 point
Intent
To support better management of indoor air quality and identify opportunities for health-based approach to
building operations.
Requirements
Provide outdoor air monitors for at least three of the following parameters:
● particulates (PM2.5, PM10),
● Nitrogen dioxide (NO2),
● Ozone (O3),
● Carbon monoxide (CO)
Monitors must be building grade or better (for example Reset Air Accredited Monitors grade B or UL 2905 grade
B). Monitor density and location requirements will be provided in the reference guide.
111
PRIORITIES AND INNOVATION (IN)
IN Credit: Project Priorities
1-9 points
Intent
Requirements
Achieve a regional priority credit from USGBC’s Credit Library. These credits have been identified by USGBC as
having additional regional importance for the project’s region.
AND/ OR
Achieve a project-type credit from USGBC’s Credit Library. These credits have been identified by USGBC as
addressing unique needs for the given adaptation or building application.
AND/OR
Achieve an exemplary performance credit from USGBC’s Credit Library. These credits have been identified by
USGBC as going above and beyond an existing LEED v5 prerequisite or credit in the LEED v5 priority areas of
scale, decarbonization, resilience, health, equity, and/or ecosystems.
AND/OR
AND/OR
Achieve significant, measurable, environmental performance using a strategy not addressed in the LEED green
building rating system.
112
IN Credit: LEED Accredited Professional
1 point
Intent
To encourage the team integration required by a LEED project and to streamline the application and certification
process.
Requirements
At least one principal participant of the project team must be a LEED Accredited Professional (AP) with a
specialty appropriate for the project.
113
APPENDIX I. LEED PLATINUM
REQUIREMENTS
• EA CREDIT: ELECTRIFICATION – 4 points are required for LEED Platinum projects
• EA CREDIT: ENHANCED ENERGY EFFICIENCY – 7 points are required for LEED Platinum projects
• EA CREDIT: RENEWABLE ENERGY – 4 points are required for LEED Platinum projects
• MR CREDIT: REDUCE EMBODIED CARBON – 2 points from Options 1-3 are required for LEED
Platinum projects
114