Hazardous ground movements Injuries by employment type Notifiable incidents by area


resulting from ineffective or
inadequate ground control have the
potential for serious injury or death. 63% of the 180 notifiable incidents
Effective ground control starts with occurred during surface operations
identifying the potential for hazardous
ground movements, analysing and
assessing the risk and implementing
controls to eliminate or reduce the
3
Contract
11
Company
exposure. It is important to understand
hazardous areas in your workplace
and the potential outcomes if ground
control is inadequate.
Injuries by nature (top 3) 37% of the 180 notifiable incidents
This snapshot covers the period from occurred during underground operations
1 July 2019 to 30 June 2020 (unless
36% were fractures
otherwise stated). During this period
there were a total of 14 injuries and
180 incidents involving ground control.
Bruise or
For more information about contusion had the
occupational safety and health, visit 2nd highest at 29%
our website www.dmirs.wa.gov.au
Laceration had the
3rd highest at 21%
@DMIRS_WA
Notifiable incidents by
Department of Mines, legislative description
Industry Regulation and Safety
Injuries by location in the last
5 financial years 66% extensive subsidence,
settlement or fall of ground or
any major collapse.
Injuries by severity 14

12 14% potentially serious


occurrence
10

8 13% earth movement caused


8 of the 14 injuries by seismic event.
6
identified as ground control injuries
were classified as serious 4 4% inrush of water
2
3% other
4 of the 14 injuries 0
were lost time 2015-16 2016-17 2017-18 2018-19 2019-20
Surface Underground

Injuries by part of body (top 4) Notifiable incidents by location in the last 5 financial years

29% of the 14 injuries 140


were foot and toes 120
100
Head, back and 80
Surface
hand had the 2nd 60
highest at 14% 40 Underground
each 20
0
2015-16 2016-17 2017-18 2018-19 2019-20

Note: The information in this snapshot has come from a keyword search of incident reports.
Some recent incidents Applying the
hierarchy of control
Wall failure 04/07/19 Inrush of water 11/02/20
Things you can do

A wall failure dislodged about 1,000 A supervisor at an underground mine


bcm of material at an open pit. Some saw that a rush of mud and water had
material made contact with the tyres occurred from the base of a disused
of a truck being loaded adjacent to vent shaft following a heavy rain event.
the highwall. The driver was taken to Work in the area had ceased due to
the site medic for assessment. The the weather event and no workers
wall was subject to regular prism were in the vicinity at the time of the Eliminate – Safely remove loose
monitoring. The wall was barricaded incident. The decline and services rock overhanging a workplace.
and a geotechnical inspection planned. were damaged. An investigation was
commenced.

Spotlight on Mines Safety Significant Incident Report No. 282

Substitute – Mine design should


Fall of ground in a development heading resulting in serious injury
address ground control issues (e.g.
10 August 2020 prevent formation of underground
pillars that may become highly
stressed; limit the formation of
troublesome bullnoses in open pit
wall).

Isolate / segregate – Monitor for


ground movement and install catch
bunds of appropriate size and
distance from the hazard to stop
the movement of unstable rock.
Contributory causes
• Use of an out-of-date rock mass
model to assess the design.
• The planning and design process
ground support was only installed
did not consider local geotechnical
on the side wall leaving the face
information at the newly
unmeshed. Engineering – Understand your role
established heading.
• Development methodology and in the design quality control and
• Geological information was not
jumbo setup resulted in rows on assurance of ground support and
available for the development
the face bored before all the lifter reinforcement at your site.
heading due to infrequent
tubes had been installed.
mapping.
• A 4.9 metre drill steel was used
• Geotechnical inspections were
to establish the heading and may
not completed as per the Ground
have impacted on directional
Control Management Plan.
control within fractured or blocky
• A large number of geological ground resulting in excessive
structures that indicate the damage to the perimeter and face. Administration – Make sure you
presence of blocky ground were follow the site's formal procedures
• Inadequate inspections by
not identified prior to the incident. to stay clear of hazards.
competent person(s) before
• Excessive material fell from the commencement of drilling.
backs during scaling, indicating
• Lack of training in geotechnical
the presence of poor ground
hazard awareness.
conditions, however additional

PPE – Wear PPE appropriate for


the task at hand and the types of
hazards it can control.