Pipes are intended to be used for Oil Product and shall be supplied in double random
length full compliance to API 5L PSL2 STD, 45th Edition and attached specifications beveled
ends protected with solid plastic end protector (suitable for secured handling of the pipe) and
of the following specifications and quantities indicated hereunder, coated with extruded
polyethylene coating in full compliance with DIN 30670 S-v STD.
Page 3 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Hot bend shall be manufactured from pipe with wall thickness suitable to match the required
thickness after forming (i.e the thinning shall be calculated to be avoided by selecting higher thickness
(line pipe).
The mother pipe for hot induction bend shall be (LSAW) type. The tangent line for hot induction
bend shall be 500 mm for both ends.
Item Size Angle Surface Materials Min Req. Type End Qty.
No. inch condition Wall thick. Finish
C10 56 64° P.E Coated API 5L- X70 22.2 mm 10D Beveled 7
Thick.≥3mm
C11 56 58° P.E Coated API 5L- X70 22.2 mm 10D Beveled 2
Thick.≥3mm
C12 56 75° P.E Coated API 5L- X70 22.2 mm 10D Beveled 2
Thick.≥3mm
Page 4 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Note:
1- Bidder to consider that “ 10 “SCOP personnel for (7) days shall have a checking visit for the
proposed manufacturer to ensure the ability of manufacturer to supply required quantity within
timetable where the cost of the SCOP delegation trips, accommodation, transportation shall be
borne by the contractor.
2- Bidder to consider that “ 10 “SCOP personnel for (10) days shall have a checking visit for the
proposed RAW materials (plates) manufacturer during manufacturing period where the cost of
the SCOP delegation trips, accommodation, transportation shall be borne by the contractor.
3- Bidder to consider that “ 15 “SCOP personnel for (10) days shall have a checking visit for the
proposed line pipes manufacturer during manufacturing period where the cost of the SCOP
delegation trips, accommodation, transportation shall be borne by the contractor.
Page 5 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Confirmation,
deviation or
Information filled by SCOP
clarification
by bidder
site for received materials: …….
x Manufacture
x Supply
Other ………………
USA, UK, CANADA, JAPAN, ITALY, BELGIUM, GERMANY,
country of origin for required
FRANCE, SPAIN, SWITZERLAND, NORWAY, SWEEDEN,
materials within the tender
FINLAND, NETHERLANDS, AUSTRIA ,SOUTH KOREA, INDIA,
CHINA AND TURKEY .
USA, UK, CANADA, JAPAN, ITALY, BELGIUM, GERMANY,
raw material country of origin FRANCE, SPAIN, SWITZERLAND, NORWAY, SWEEDEN,
related to pipe only FINLAND, NETHERLANDS, AUSTRIA ,SOUTH KOREA, INDIA,
CHINA AND TURKEY .
USA, UK, CANADA, JAPAN, ITALY, BELGIUM, GERMANY,
accepted pipes manufacturing FRANCE, SPAIN, SWITZERLAND, NORWAY, SWEEDEN,
origin FINLAND, NETHERLANDS, AUSTRIA, SOUTH KOREA, INDIA,
CHINA AND TURKEY .
18 months from the date of received the last shipment
Guarantee
at site.
X Required in scope of work
A) pipes
Not required in scope of work
API 5L A 53
pipe manufacturing X
standard(latest edition)
OTHER
A106
Page 6 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
other
Internal lining
Cladding
Other
Important requirements for The polyethylene and the adhesive at the pipe ends
HDPE coating layers shall be cut back by 150 mm
Page 7 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Other
catalogue for pipe and coating X Required . (4) Nos not required
mill
required making information SCOP name, project No., contract No., pipe materials,
material grade, diameter, wall thickness in mm, length,
name of pipe manufacturer, name of coating mill
Proposed country of origin for To be filled by bidder in the next field (according to SCOP
pipe as well as the vendors requirements .
Page 8 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Required tools and field complete with all accessories and installation kits for
material field girth welds
As per table (B ) attached
Quantity of H.S.S
1-The H.S.S used for field joints coating, consist of Two layers
structure, First layer: low pre-heat modified bitumen sealant
adhesive, and Second layer: thick-wall irradiated cross linked
Requirements for s elf-
polyolefin.
adhesive H.S.S to be applied by
2- Cut back area of steel surface to be coated with HSS, shall
bidder be 300 mm of length.
3- The total thickness of H.S.S shall be (3) mm
Page 9 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
X ASME B16.49
Bends manufacturing
standard(latest edition)
Other
Bends protection
X External 3 layers of high thermal
density polyethylene insulation
galvanized bare
PSL1 X PSL2
Raw pipe of bend
spec f cation level
Other
catalogue for pipe bends and Required (..) Nos X not required
coating mill
required making information SCOP name, project No., contract No., bend
materials, material grade, diameter, wall thickness
in mm, length, name of bend manufacturer, name
of coating mill
Page 11 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Page 12 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
SCOP
Page 13 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Page 14 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Note: All Inspection Certificates Shall Be as per EN 10204 Type 3.2 or 3.1 as per approved
inspection test plan.
Page 15 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Contractor shall bear all the costs of the Inspection Agency and of SCOP's Inspection Department
while performing their inspection duties mentioned in the Contract. The Contractor shall bear the costs
of testing inspection.
1.2 SCOP’s Inspection Department and/or the Inspection Organization nominated as aforesaid shall
collectively fall under the heading of “ Inspection Authority “ or "Inspection Agency “ which shall (for
the purposes of the Contract) be deemed to act on behalf of the Engineer.
The procedure of notices and divisions of duties between the contractor, SCOP and nominated
inspection organization shall be decided by SCOP.
1.3 All inspection and tests carried out by the inspection authority shall be performed in accordance with
the standards mentioned in the contract to ensure complete adherence to the contract requirements.
1.4 The Contractor shall be responsible for supplying the Inspection Agency in good times all drawings,
specifications and design documents required for the performance of the inspection work.
1.5 The Quality Control Plan (QCP) and Inspection Test Plan (ITP) Procedures describing the inspection
criteria and methods of the manufacturer’s shop and field shall be established by the Contractor and be
submitted for SCOP approval prior to the commencement of the manufacturing and the inspections for
each equipment or material including in this contract.
The ITP documents shall include but not limited the following;
Page 16 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
reports shall not relieve the contractor from any of his responsibilities and liabilities under the
Contract.
1.7 In case of conflict between the Contractor’s and the Contract Specifications and/or the code
requirement (referred to in the Contract) the most stringent requirement shall apply.
1.8 The Inspection Agency shall constantly keep record of their inspection activities. The records shall be
available for the Engineer at his request.
1.9 The Contractor’s inspectors shall be responsible for full dimensional checking of items and for seeing
that all points mentioned in these Inspection Requirements are observed.
1.10 When ordering materials, equipment or machinery from suppliers and sub–suppliers which are
subject to the Inspection Agency’s inspection, the contractor and suppliers must clearly show on
their order that the material and / or equipment is subject to inspection by the said Agency’s
inspector. Certificates and data folders etc. required must also be specified in the order.
1.11 The compliance with the specifications contained in the Contract Documents will be the responsibility
of the Contractor in accordance with the terms of the Contract.
1.12 Where material has been ordered and is not subject to inspection, it will be the responsibility of the
contractor to expedite the completion of data called for and to distribute that data.
1.13 The Inspection Authority shall delegate its specially trained inspection to the manufactures' mills and
works, where items related to the Contract are being processed manufactured, assembled and/or
fabricated to examine, inspect, check and witness tests during all phases of processing, manufacturer's
fabrication and / or assembly and on the completed item to ensure its complete conformity with the
requirements of the Contract.
1.14 The Inspection Authority shall delegate its specially trained inspectors to the places where items
included in the contract are being fabricated and /or assembled and erected to examine, inspect, check
and witness tests during all phases of fabrication and/or Assembly.
1.15.1 Inspection Certificates, shop tests certificates, fabrication certificates, performance test certificates and
all other certificates issued by the inspection Authority must be fully detailed containing all the
relevant data required and conforming that the item certified conforms to the Requirements of the
Contract.
1.15.2 All material inspection certificates and mill test certificates regarding inspection activities according to
approved inspection test plan should be submitted to SCOP for review.
Page 17 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
1.15.3 Contractor is responsible to submit material certificate and mill test certificate for any equipment or
material not mentioned in the inspection test plan (if any) approved by third party inspection agency
and submit it to SCOP review.
1.16All certificates, reports etc. issued by the Inspection Authority shall be in English language.
1.17 The Inspection Authority, in addition to its certificate shall submit to SCOP monthly progress report on
its activities at the manufacturer’s workshop and mills. The Inspection Authority shall immediately
inform SCOP of any interruption, delay or difficulty. The Inspection Authority shall accordingly be
present at the exact date at the manufacturer’s mills and works to perform their required inspection
duties.
1.18 The Contractor shall send the Inspection Authority all information necessary to carry out
inspections of the equipment and materials such as purchase order number, supplier’s and /or
manufacturer’s name, excepted time of delivery and specification thereof. The Contractor shall be
responsible for all coordination work of the nominated Inspection Organization inspectors and
suppliers to ensure their presence at the places of inspection at the right time.
1.19 The working procedure with the Inspection Authority shall be established by the Contractor within one
month after the signature of the Contract and to be submitted for the Engineer for approval, which shall
be given back to Contractor within three (3) weeks after receipt thereof.
The Contractor shall give all the necessary documentation and information required by the nominated
Inspection Agency(s) so as to enable them to determine the scope of work.
1.20 SCOP reserves the right to witness tests and carry out inspection visits at any time during the
fabrication of materials and equipment included in the Contract at the cost of SCOP. (Except factory
visit if any mentioned in the contract to be at the cost of contractor).p
1.21 During the Inspection and whenever there is a conflict between codes, standards or specification the
most stringent requirement shall be followed.
1.22 Definitions:
The following definitions shall apply unless the context otherwise admits:
"Test": Shall mean to perform physical examination to verify the soundness of any materials and / or
equipment as per approved inspection procedure and / or approved procedures and based on the
contractor's, or manufacturer’s practices.
"Witness”: Shall mean to be present during the applicable tests. (the witness may done for percentage of
such test according to the approved inspection test plan)
Hold (H): Same as witness point except that the supplier may not proceed the test without present
during the applicable tests.
Page 18 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
"Check or Random Witness”: Shall mean to be present only at certain or some instances of the erection
of tests or may review the results of certain test of analysis or take measurements of certain
dimensions. (To be discussed upon approval of inspection test plan).
“Inspect“: Shall mean the Inspection of the Contractor’s or manufacturers own routine for quality
control, which can be proceeded on their own free independent schedules regardless of the presence of
the Inspection Authority, however, they are able to have always access to the work done at any time
provided the access does not disturb their established work schedule, and only if such disturbances
have direct effect on the quality of the work.
“Review“: Shall mean examine records or reports concerning tests which are submitted to inspectors for
the final approval.
2 Specific
2.1 Reference codes and standards
Contractor shall take in consideration the following international standards (as minimum) latest
edition:-
- API 5L
- ISO 15590-1
-DIN 30670
- DIN 30672
3.1 For the equipment which does not require to be inspected by the Inspection Agency, the Contractor
shall provide certificate of quality issued by the manufacturer's works and reviewed by Inspection
Agency.
3.2 The Inspection Agency may at its discretion or after the request of the Contractor accept certificates
of manufacturers or other Inspection Agency and has the right to waive certain inspection, or deviate
from the Contract Inspection Requirement subject to the Engineer approval thereof.
3.3 When inspection and tests of referred to in sub-clause (4) hereof are complete, the Inspection Agency
shall issue the relevant Inspection Certificate certifying that the said equipment had been inspected by
Page 19 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
the Inspection Agency and its quality had met the requirements of the technical specifications
mentioned in the contract.
The form and the content of the Inspection Certificate to be issued by the Inspection Agency shall be
agreed upon with the Contractor and approved by the Engineer. For the reason for the release of
payment to the Contractor, the Inspection Agency shall issue release notes to the Contractor and to the
Engineer immediately after completion of the Inspection Agency's inspection for item or items stating
that it or they had been tested, inspected and accepted by the Inspection Agency.
3.4 All material, equipment and machinery inspected and certified by the Inspection Agency shall be
clearly identified to have been so inspected and certified. Material or equipment and machinery subject
to the Inspection Agency's survey which do not bear the Inspection Agency's identity shall be
considered as not having been inspected and the Engineer has the right to reject the said materials,
machinery and/or equipment, in case they have not been so identified through fault of the Inspection
Authority.
3.5 In addition to the Contractor's own inspection, the Inspection Authority shall inspect at mills and
fabricators shops materials and equipment to be used in parts under pressure above atmospheric
pressure, or subject to external pressure.
3.6 Certification of equipment may include approval of calculation and their suitability's for the purpose
required.
3.7.1 As so as practical after the signature of the contract with Inspection agency and prior to
commencement of individual inspections, the Contractor shall provide to Inspection Authority and to
the Engineer the Inspection Schedule of the items subjected to inspection as per sub-clause (4) hereof
giving the names and addresses of manufacturers, suppliers etc. and the estimated dates of
commencement of inspection and times for fabrication etc. and the extent of inspection for each
individual item subject to inspection.
3.7.2 Dates of fabrication indicated in the list referred to in sub-clause (3.7.1) hereof will be informative only.
The Contractor shall be responsible for notifying the Inspection Agency within (30) days before an
approximate date of the beginning of the test of equipment or machinery and, to precise the time (5)
five working days before the actual starting of the testing.
3.7.3 If the Contractor fails to carry out his duties under this sub-clause (3.7) hereof the machinery and/or
equipment subsequently not certified will at the Engineer's option be rejected. The Contractor shall
ensure that the requirements of sub-clause (3.7.2) hereof are included in the respective contracts with
his sub-suppliers.
3.7.4 Neither failure on the part of (SCOP) to discover or reject defective design work or goods furnished by
contractor, nor payment, or partial or entire use of the goods shall be construed to be an acceptance of
Page 20 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
any work or goods which is not in accordance with the SPECIFICATIONS or provisions of the
CONTRACT.
3.7.5 The cost of conducting any and all inspections and/or tests under this ARTICLE shall be solely borne
by the contractor.
4 Specific
The Inspection Agency shall inspect the quality and witness the tests of the material and equipment,
the list of which is given below. It is to be understood that this list is a general one and shall be detailed
in the inspection test plan and proceed by Supplier and the Inspection Authority prior to
commencement of work.
Scope of Inspection
(At the Manufacturer's Workshop and Mills).
Some Inspection Requirements mentioned in paragraph (4) may be modified as per agreement during
approval inspection test plan.
The following requirements are outlined as inspection requirements to be carried out by the Inspection
Authority and to highlight specific points requiring special attention, and are not intended to be
exhaustive.
Checking of the mill analysis reports to ensure adherence to the specification mentioned in the contract.
In addition samples shall be taken by the Inspection Authority Inspector in order to satisfy himself that
the chemical properties of the steel are within the range required.
Page 21 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Checking the mill test certificates issued by the material manufacturer's inspector(s). Witnessing of the
calibration of the testing equipment.(calibration certificates shall be valid)
Witnessing the actual testing from time to time.
C-Ultrasonic Testing (full Scan for all plates surface to insure absent from lamination)
Checking of calibration of testing devices at least twice per shift or whenever there is a change of
operator. .(calibration certificates shall be valid)
Checking of the standard used for calibration, witnessing of actual testing.
D- Metallurgical Examination
Both Macro and Micro examination of selected specimens of the finished product shall be conducted to
ensure uniformity of grain size and structure and absence of harmful defects.
The micrographs and macrographs of the examined product are to be included in the Inspection
Authority’s certificate or reports. Test frequency shall be one per heat.
4.1.1.2 Welding Material
The welding materials, unless already approved by the Inspection Authority, shall be tested and certified.
The supplier shall inform the Inspection Authority of the type of the welding material that shall be used
for different phases of the supply for his approval prior to the commencement of any welding
operation.
The Inspection Authority accordingly shall issue certificates confirming the suitability of welding
material for the duties required for.
4.1.1.3 Line Pipes
A- Inspection before Commencement of Fabrication
Checking the presence of the Inspector’s stamps or initials on the plate material to ensure the pipes are
fabricated from certified material (where applicable).
Checking the identification of heat number and plate number of the plate.
Visual inspection before forming, checking plate mill certificate, reports and the Inspection Authority
Certificates.
Witnessing the welding procedure qualification tests (previous qualification shall not be accepted).
B- Witnessing the Mechanical and chemical Tests required by the Codes and the Contract for pipe
production and Metallographic test for seam weld.
Checking of calibration of pressure gauges and checking of the functioning of the recording devices at
start of each shift.
Witnessing of testing.
Examination of recording charts.
Issuing of Hydrostatic Testing Certificates.
D- Physical Properties of the Finished Pipe
Page 22 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Mechanical and physical properties of the finished pipe shall be checked to ensure adherence to the
Contract Specification.
Mechanical test shall include but not limited (as per API 5L) the following :
a- Tensile test for pipe body and seam weld.
b- CVN impact test for pipe body and seam weld.
c- DWT for pipe body.
d- Guided – bend test.
e- Hardness test.
E- Ultrasonic Inspection
Checking of calibration of testing at least twice per shift or whenever there is a change in the operator.
Checking of the standard used for calibration and witnessing of actual testing.
F- Radiographic Examination of Weld Seams
Witnessing of welding procedure qualification testing. (Old qualification shall not be accepted).
Welder / operator performance qualification testing. (Old qualification shall not be accepted).
Repair of defective seams shall be performed manually and by qualified welders.
Approval and qualification procedures for repairs of defective seams.
Welders must have a valid certificate as defined in API 5L latest edition.
H- Inspection after Completion
A- Checking manufacturing procedure specifications (MPS) qualification test bend which includes:
1- Visual inspection for lamination, cracks, notches, gouges & other imperfections.
2- Dimensional inspection including radius & wall thickness.
3- Checking of chemical composition & mechanical properties.
4- Tensile test.
Page 23 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
5- Impact test.
6- Through – thickness hardness when necessary.
7- Surface hardness.
8- Metallography.
9- Guided bend on weld seam.
10- Flattening.
11- UT or RT on weld seam.
12- MT or PT on bend body.
13- UT on bend body for transverse & laminar defects when necessary.
14- Visual & dimensional for bend angle, radius, ovality, internal diameter.
B- Production Bending
1- Visual inspection for lamination, cracks, notches, gouges & other imperfections.
2- Surface hardness.
3- Guided bend on weld seam.
4- Flattening test.
5- UT or RT on weld seam.
6- MT or PT on bend ends and weld seam.
7- MT or PT on bend body.
8- UT on bend body for transverse defects & laminations.
9- Checking level of residual magnetism.
10- Checking of repairs (repair by welding is not permitted).
11- Dimensional check including minimum wall thickness, diameter of bend body, diameter at
ends, out-of-roundness ends, out-of-roundness body, linear dimensions, bend angle, bend radius,
end squareness, out of plane.
4.3.1 Inspection of the material of painting, coating including heat shrink sleeves, etc. at
manufacturer’s work:
Checking the chemical, physical and mechanical properties of the material of painting, coating including
heat shrinks sleeve etc. and issue certificates regarding their conformity with the Contract
Requirements.
Witness the qualification tests of the painting, coating systems including heat shrink sleeve, etc.
Page 24 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
4.3.2 Inspection during and after application of the painting, coating including heat shrink sleeves, etc.
at manufacturer’s work:
Checking of cleaning of surface to be coated, surface preparation, anchor profile and primer application.
Witness the thickness measurement.
Witnessing holiday, bonds and other tests.
Checking on the calibration of holiday test device.
Qualification of the application procedure and repair procedures.
Checking of repairs.
5 Pre-Inspection Meeting
Contractor shall arrange Pre-Inspection Meeting to discuss Inspection Test Plan.
6 Factory Acceptance Test (FAT)
Contractor shall submit the FAT procedure for SCOP's approval prior to the commencement of FAT.
FAT shall be witnessed by third party inspection and SCOP representatives as per contract document.
The FAT visit shall include audit third party inspection activities during the manufacturing of equipment
as per the audit form attached:
MAX
Actual
# Indications Evaluation Notes
Degree
degree
1 Work Orders
1.1 Company / Agency (TPI) interaction with work orders
Page 25 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Bidder compliance
Inspection Title Action and reply for each
Page 26 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
point
Page 27 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Page 28 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
Evaluation of Suppliers/Sub-Contractors
A contract HSE Manager shall ensure that the HSE requirements of the contract with the
suitable information are incorporated into relevant requisitions for materials and
equipment.
The following key HSE requirements shall be addressed in the requisition:
• Design HSE issue to be addressed by Supplier
• Provision of Material Safety Data Sheets (MSDS) for all chemicals .
• Environmental approvals must be obtained for all chemicals before entering the
country.
• Restrictions on materials included in the supply.
• Ergonomics issue which shall be addressed by Supplier .
• Environmental issues which shall be addressed by supplier
• Provision of maintenance of HSE record file .
• Compliance with Supplier’s HSE management System requirements.
Page 29 of 31
SCOP Title: PIPELINES PROJECT FROM BASRHA - HADITHA
Iraq - Baghdad Date: 07/5/2024
During the technical bid evaluation, the responsible discipline engineer shall check that
relevant HSE issues have been adequately addressed.
Review of Suppliers
After placement of the order, the contract HSE Manager shall review
appropriate Supplier documents to ensure the HSE requirements of the contract
have been adequately addressed. Any non-conformance should be raised with
Suppliers/ Vendors.
The responsible discipline engineer shall review appropriate Suppliers / Sub-
Contractors deliverables to ensure that HSE requirements of contract have been
adequately addressed.
Supplies of Equipment