REPORT IO-1

INCIDENT AND OPERATIONS REPORT


Edition: 27/03/2023
WEEK 19-25 OF THE MONTH OF MARCH
Versión: 1.0
2023 Page 1 de 8

1. SCOPE OF THE REPORT

Applies to the Hurst 100hp Bávaro Princess laundry steam boiler and installation and commissioning of
a hot water boiler cleaver brooks 60hp in Punta Cana princess.

2. RESPONSIBILITIES

Directed by: Rafael Edwards BSME


Executed: Jezreel Algenis Cuesta
Verify: Rafael Edwards BSME

3. MAINTENANCE AND REPAIR

Hurst 100hp Bávaro Princess Laundry steam boiler

1- Repair of the flame sensor due to a broken line.

2- The daily tank dams were cleaned due to an oil spill.

3- The relay for remote on/off of the oil recirculation pump was installed.

4- The mechanical connection of the emulsion system was made.

5- The ignition cable and transformer of the burner were repaired.

6- Remote reset of the boiler was enabled.

Hot water boiler cleaver brooks 60hp in Punta Cana princess

1- The oil digital temperature control was installed.

2- The Valve and fuel intake of the general HFO tank were installed.

3- The Valve and oil filter of the daily HFO tank were installed.

4. OBSERVATIONS

1- It is No events for now.

PREPARED BY REVIEWED BY APPROVED BY


Jezreel Algenis Cuesta Ing. Rafael Edwards Ing. Rafael Edwards

Date:27/03/2023 Date: 27/03/2023 Date: 27/03/2023


REPORT IO-1
INCIDENT AND OPERATIONS REPORT
Edition: 27/03/2023
WEEK 19-25 OF THE MONTH OF MARCH
Versión: 1.0
2023 Page 2 de 8

5. ATTACHMENTS

Flame Sensor Probe Test

Flame Sensor Broken line

PREPARED BY REVIEWED BY APPROVED BY


Jezreel Algenis Cuesta Ing. Rafael Edwards Ing. Rafael Edwards

Date:27/03/2023 Date: 27/03/2023 Date: 27/03/2023


REPORT IO-1
INCIDENT AND OPERATIONS REPORT
Edition: 27/03/2023
WEEK 19-25 OF THE MONTH OF MARCH
Versión: 1.0
2023 Page 3 de 8

Spill dam dirty with spill Wash of Spill dam with


Diesel

Cleaned spill dams

PREPARED BY REVIEWED BY APPROVED BY


Jezreel Algenis Cuesta Ing. Rafael Edwards Ing. Rafael Edwards

Date:27/03/2023 Date: 27/03/2023 Date: 27/03/2023


REPORT IO-1
INCIDENT AND OPERATIONS REPORT
Edition: 27/03/2023
WEEK 19-25 OF THE MONTH OF MARCH
Versión: 1.0
2023 Page 4 de 8

Relay for remote on/off

Mechanical connection of the emulsion


system

Damaged ignition cable

PREPARED BY REVIEWED BY APPROVED BY


Jezreel Algenis Cuesta Ing. Rafael Edwards Ing. Rafael Edwards

Date:27/03/2023 Date: 27/03/2023 Date: 27/03/2023


REPORT IO-1
INCIDENT AND OPERATIONS REPORT
Edition: 27/03/2023
WEEK 19-25 OF THE MONTH OF MARCH
Versión: 1.0
2023 Page 5 de 8

Repaired ignition cable

Measurement of the
programmer for remote reset

Remote reset on Remforce

PREPARED BY REVIEWED BY APPROVED BY


Jezreel Algenis Cuesta Ing. Rafael Edwards Ing. Rafael Edwards

Date:27/03/2023 Date: 27/03/2023 Date: 27/03/2023


REPORT IO-1
INCIDENT AND OPERATIONS REPORT
Edition: 27/03/2023
WEEK 19-25 OF THE MONTH OF MARCH
Versión: 1.0
2023 Page 6 de 8

Oil digital
temperature
control

Oil temperature sensor on


Buster

PREPARED BY REVIEWED BY APPROVED BY


Jezreel Algenis Cuesta Ing. Rafael Edwards Ing. Rafael Edwards

Date:27/03/2023 Date: 27/03/2023 Date: 27/03/2023


REPORT IO-1
INCIDENT AND OPERATIONS REPORT
Edition: 27/03/2023
WEEK 19-25 OF THE MONTH OF MARCH
Versión: 1.0
2023 Page 7 de 8

Valve and fuel intake of the


general HFO tank

Valve and oil filter of the daily HFO tank

PREPARED BY REVIEWED BY APPROVED BY


Jezreel Algenis Cuesta Ing. Rafael Edwards Ing. Rafael Edwards

Date:27/03/2023 Date: 27/03/2023 Date: 27/03/2023


REPORT IO-1
INCIDENT AND OPERATIONS REPORT
Edition: 27/03/2023
WEEK 19-25 OF THE MONTH OF MARCH
Versión: 1.0
2023 Page 8 de 8

6. CHANGES CONTROL

CHANGES CONTROL
No.
Description of Changes
Version Date Approved

N/A

PREPARED BY REVIEWED BY APPROVED BY


Jezreel Algenis Cuesta Ing. Rafael Edwards Ing. Rafael Edwards

Date:27/03/2023 Date: 27/03/2023 Date: 27/03/2023