LOGBOOK
Instructions
This book is issued to you to provide a history of your training and to act as a weekly record by
the work on which you are engaged.
Immediately this book is issued to you, you should, I consultation with your Training
Officer, complete the details required on the previous page.
It is your responsibility to make the main entries of the log book and keep it up to date.
Entries must be regularly initialed by your Supervisor. You must ensure that;
Recording
1. A neat concise description of each of your training location and the work on which you
are engaged.
2. Relevant sketches, data and circuit diagrams.
3. References to textbooks, standards and other technical information related to the
work being under taken.
4. Constructive comments on the work being undertaken and your considered opinion as
to its value as training.
1. Student’s name: Nurul Syafiqah Binti Zulkifli
5. Year: 2022/2023
6. Home address: No 6, Taman Bunga Tanjung 3, Jalan Jalong, 31100 Sungai Siput (U),
Perak
7. Address during practical training: D-19-2, Block D, Sri Putramas 1, Jalan Putramas 1,
Jalan Kuching, Kuala Lumpur, 51200 Wilayah Persekutuan Kuala Lumpur
8. Place of training: Malaysia Rail Link Sdn Bhd, Level 3, Menara 1 Dutamas, Solaris
Dutamas, No 1 Jalan Dutamas 1, 50480 Kuala Lumpur
WEEK 1
1. Report duty (INFRA)
27/9/2023
WEEK 3
1. Study on MRL’s IT Policies: IT Vendor (INFRA)
Management
- Comparing the current policy with the
International Standard Operational (ISO) policy.
2/10/2023 - Analysing the terms and conditions, service
level agreements (SLAs) to gain a
comprehensive understanding of the vendor
relationships.
(APPS)
WEEK 4
1. Design prototype for user screen for travel (APPS)
9/10/2023
management system that includes designing:
10/10/2023 - Main screen of the system
- User new travel request form page
- User view form after submitting the form page
- User’s request history page
11/10/2023
Platform used: PowerApps
SUPERVISOR
DATE EXACT WORK OF NATURE
REMARKS
13/10/2023
WEEK 5
WEEK 6
23/10/2023
MC
24/10/2023
1. Preparing the System Design Specification (APPS)
Document (SDSD) for e-Travel Request Form (e-
TRF)
- Designing the Entity Relationship Diagram
25/10/2023
(ERD) based on the gathered information.
- Deciding the list structure designed for the
system.
(INFRA)
26/10/2023 1. Review and enhancing of MRL IT Policy
- Access Policy Amendments:
27/10/2023
SUPERVISOR
DATE EXACT WORK OF NATURE
REMARKS
o User Roles: Define specific user roles
and their access levels.
o Access Requests: Streamline the process
for requesting access.
o Access Review: Implement periodic
access reviews for security.
o Logging and Monitoring: Enhance
logging and monitoring of access
activities.
- IT Vendor Management
o Contract Terms: Specify IT service level
agreements in contracts.
o Security Standards: Require vendors to
adhere to defined security standards.
o Vendor Audits: Conduct regular audits of
vendor compliance.
WEEK 7
1. Update e-TRF prototype. (APPS)
30/10/2023
2. System testing on Change Management – CRA
functionalities.
31/10/2023
WEEK 8
1. Develop e-Travel Request Form(e-TRF) Application (APPS)
6/11/2023
(Requestor Part)
7/11/2023 - Create and design main screen for e-TRF.
- Design and develop the requestor history screen
8/11/2023 functionalities.
9/11/2023
10/11/2023
WEEK 9
16/11/2023
17/11/2023
WEEK 10
1. Continue developing the e-TRF system on cancel (APPS)
20/11/2023
functionalities (Part Requestor).
21/11/2023
22/11/2023
23/11/2023
WEEK 11
1. Develop the e-TRF system functionalities for Admin (APPS)
27/11/2023 part.
WEEK 12
1. Continue develop the e-TRF system functionalities (APPS)
4/12/2023
for Admin part.
5/12/2023 2. Solve issue regarding on “Attachment” field in the
admin form.
6/12/2023 3. Code the main screen of the system according to its
user.
7/12/2023 4. Meeting with the development teams regarding issue
on the approver part.
8/12/2023
WEEK 13
1. Continue develop the e-TRF system functionalities (APPS)
11/12/2023
for Admin part.
12/12/2023 2. Solve issue regarding on “Attachment” field in the
admin form.
13/12/2023 3. Code the main screen of the system according to its
user.
14/12/2023
SUPERVISOR
DATE EXACT WORK OF NATURE
REMARKS
4. Meeting with team to solve issue regarding on the
approver part.
15/12/2023
5. Update “Master List (Approver)” SharePoint data
after discussing with the team.
WEEK 14
1. System testing with IT Application Team (APPS)
- Test Flow for Requestor Screen
18/12/2023
- Test Flow for Approver Screen
- Test Flow for Admin Screen
1. First level e-TRF UAT with Admin Department
19/12/2023
(Travel Management Unit).
1. Implement adjustments based on the feedback
20/12/2023
received during the initial User Acceptance Testing
21/12/2023 (UAT).
- Add hover at all screen galleries.
- Add new field at Admin Screen:
o Departure Date
o Arrival Date
22/12/2023 o Radio button (With/Without Breakfast)
- Standardise all of date format.
WEEK 15
WEEK 16
WEEK 17
1. Review MRL Policies: Evaluate the current policies (INFRA)
8/1/2024
of MRL.
9/1/2024 2. Assess Procedures: Examine and assess the
established procedures.
3. Evaluate Processes: Review the operational
processes within MRL.
10/1/2024 4. Compare with ISMS 2013: Assess the alignment of
MRL's policies, procedures, and processes with the
ISMS version of 2013.
WEEK 18
1. Review MRL Policies: Evaluate the current policies (INFRA)
15/1/2024
of MRL.
16/1/2024 2. Assess Procedures: Examine and assess the
established procedures.
17/1/2024 3. Evaluate Processes: Review the operational
processes within MRL.
4. Compare with ISMS 2013: Assess the alignment of
18/1/2024 MRL's policies, procedures, and processes with the
ISMS version of 2013.
WEEK 19
1. 2nd User Acceptance Testing (UAT) for e-TRF. (APPS)
- Verify user interface responsiveness and
usability.
- Test data input and processing accuracy.
- Address any identified bugs or issues promptly.
22/1/2024 - Gather feedback from users for further
improvements.
- Update documentation and training materials
based on UAT findings.
25/1/2024 THAIPUSAM
1. Improvements to be made after 2nd UAT: (APPS)
- Implement the "Generate PDF" functionality on
the Requestor screen.
- Ensure the generated PDF includes a checklist
26/1/2024
and grade information.
- Include the date of verification in the PDF.
- Update ESG data entry per flight as necessary.
WEEK 20
1. Improvements to be made after 2nd UAT: (APPS)
- Display admin TMU name in Screen Gallery for
both received and completed requests.
29/1/2024
- Capture admin PIC name based on status and
date.