Professional Documents
Culture Documents
Wo Blasting
Wo Blasting
Wo Blasting
Blaster
23/07/2023
ARDIANTO
BLASTING DESIGN PT.KTC COAL MINING & ENERGY
IPA Consession
Blast No Kedang Murung, Kota Bangun
Kalimantan Timur
Row Hole
R BV
Vibration
KV 1443.2
PPV K V .
BV 1.588 Q
PPV 2.48 mm/s PPV = KV x [R / sqrt(Q)]^[-BV]
Total
80 Pit Location PIT SELATAN AN 1,100 Kg IHD 6M/500Ms - Pcs Loading Time Damage
Burden 4.0 Meter FO 88 Liter IHD 6M/3000Ms 19 Pcs Start 07:00 Structural
Spacing 5.0 Meter Dinamite 40.00 Kg IHD 6M/6000Ms 80 Pcs Finish 17:30 Equipment
No Of Hole 80 Hole Emulsion 0 Kg Surface Delays 42 ms/ 9 M - Pcs Time Fired 18:00 LEGEND :
Size Holes 5.0 Inch Total Explosive 1,228 Kg Surface Delays 67 ms/ 9 M - Pcs Result Of Blast 0 109 Ms
Avernage Depth 4.0 Meter Powder Factor 0.19 Kg/Bcm Surface Delays 109 ms/ 9 M 61 Pcs Ground Vibration 67 Ms
2
Calculated Blast Area 1,600.0 M Detonator Listrik s Pcs Fragmentasi 42 Ms
3
Calculated Blast Volume 6,400 M
Remaks,
Prepared By, Acknowledged By, Approved By,
1, Wethole = 80 Hole
2, Dryhole = Hole
(Saldy Ariza ) ( Umardin ) ( Agung Suryanto) ( Harun Al Rasyid )
Drill & Blast Engineer Kepala Gudang Project Manager Kepala Teknik Tambang