Contract COMPANY Document No.

VARIOUS HVAC AND MECHANICAL WORKS ID-TNR-CAMP-HVA-0601- 540096


AT BALIKPAPAN AND SITES
Revision: 0.1 Status: IFC

Doc Type: CAL System / S-System: / Discipline: HVA Revision Date: 07 Okt 2021
Originator Document No : 0601 Page 1 of 10

GENERAL ARRANGMENT NPU COLD


PT. BUKAKA TEKNIK UTAMA, Tbk
STORAGE
This document has been generated by an Electronic Document Management System. When it is printed, it shall be considered as “For information only copy”.
The controlled copy is the screen version, and thus, it is the holder’s responsibility to make sure that he/she holds the latest valid version.

GENERAL ARRANGMENT NPU COLD STORAGE

0.1 07 Okt 2021 IFC Issued For Comment WS TJR RT


Rev Date Status Revision Memo Issued Checked Approved COMPANY

This document is the property of PERTAMINA HULU MAHAKAM and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename : Survey_report
Contract COMPANY Document No.
VARIOUS HVAC AND MECHANICAL WORKS ID-TNR-CAMP-HVA-0601- 540096
AT BALIKPAPAN AND SITES
Revision: 0.1 Status: IFC

Doc Type: CAL System / S-System: / Discipline: HVA Revision Date: 07 Okt 2021
Originator Document No : 0601 Page 2 of 10

TABULATION OF REVISED

REVISIONS REVISIONS
PAGE REMARKS PAGE REMARKS
0.1 0.2 0.3 0.4 0.5 0.1 0.2 0.3 0.4 0.5
1 X 50
2 X 51
3 X 52
4 X 53
5 X 54
6 X 55
7 X 56
8 X 57
9 X 58
10 59
11 60
12 61
13 62
14 63
15 64
16 65
17 66
18 67
19 68
20 69
21 70
22 71
23 72
24 73
25 74
26 75
27 76
28 77
29 78
30 79
31 80
32 81
33 82
34 83
35 84
36 85
37 86
38 87
39 88
40 89
41 90
42 91
43 92
44 93
45 94
46 95
47 96
48 97
49 98

This document is the property of PERTAMINA HULU MAHAKAM and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename : Survey_report
Contract COMPANY Document No.
VARIOUS HVAC AND MECHANICAL WORKS ID-TNR-CAMP-HVA-0601- 540096
AT BALIKPAPAN AND SITES
Revision: 0.1 Status: IFC

Doc Type: CAL System / S-System: / Discipline: HVA Revision Date: 07 Okt 2021
Originator Document No : 0601 Page 3 of 10

TABULATION OF REVISED

REVISIONS REVISIONS
PAGE REMARKS PAGE REMARKS
0.1 0.2 0.3 0.4 0.5 0.1 0.2 0.3 0.4 0.5
99 148
100 149
101 150
102 151
103 152
104 153
105 154
106 155
107 156
108 157
109 158
110 159
111 160
112 161
113 162
114 163
115 164
116 165
117 166
118 167
119 168
120 169
121 170
122 171
123 172
124 173
125 174
126 175
127 176
128 177
129 178
130 179
131 180
132 181
133 182
134 183
135 184
136 185
137 186
138 187
139 188
140 189
141 190
142 191
143 192
144 193
145 194
146 195
147 196

This document is the property of PERTAMINA HULU MAHAKAM and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename : Survey_report
Contract COMPANY Document No.
VARIOUS HVAC AND MECHANICAL WORKS ID-TNR-CAMP-HVA-0601- 540096
AT BALIKPAPAN AND SITES
Revision: 0.1 Status: IFC

Doc Type: CAL System / S-System: / Discipline: HVA Revision Date: 07 Okt 2021
Originator Document No : 0601 Page 4 of 10

REVISION PAGES DESCRIPTION

NO PAGE SUBJECT DESCRIPTION OF CHANGE REV.

This document is the property of PERTAMINA HULU MAHAKAM and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename : Survey_report
Contract COMPANY Document No.
VARIOUS HVAC AND MECHANICAL WORKS ID-TNR-CAMP-HVA-0601- 540096
AT BALIKPAPAN AND SITES
Revision: 0.1 Status: IFC

Doc Type: CAL System / S-System: / Discipline: HVA Revision Date: 07 Okt 2021
Originator Document No : 0601 Page 5 of 10

TABLE OF CONTENT

TABLE OF CONTENT ................................................................................................... 5

1. GENERAL ........................................................................................................... 6
1.1 OBJECTIVE ............................................................................................................ 6
1.2 SCOPE .................................................................................................................... 6

2. DEFINITION ........................................................................................................ 6

3. REFERENCE ...................................................................................................... 7
3.1 STANDARDS AND CODES .................................................................................... 7
3.2 CONTRACTOR DOCUMENT .................................................................................. 7
3.3 ABBREVIATIONS ................................................................................................... 7
4. GENERAL ARRANGMENT NPU COLD STORAGE……………………………….8
4.1 GENERAL DATA .................................................................................................... 8
4.3 EVAPORATOR UNIT .............................................................................................. 8
4.4 CONDENSING UNIT ............................................................................................... 9
4.5 CONTROL PANEL AND PARTS ............................................................................ 9

This document is the property of PERTAMINA HULU MAHAKAM and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename : Survey_report
Contract COMPANY Document No.
VARIOUS HVAC AND MECHANICAL WORKS ID-TNR-CAMP-HVA-0601- 540096
AT BALIKPAPAN AND SITES
Revision: 0.1 Status: IFC

Doc Type: CAL System / S-System: / Discipline: HVA Revision Date: 07 Okt 2021
Originator Document No : 0601 Page 6 of 10

1. GENERAL
PT. Bukaka Teknik Utama (BTU) recently awarded a contract from Pertamina Hulu Mahakam
(PHM). The object of the contract is the engineering, procurement and execution of all related work
required for various HVAC & Mechanical works improvement for building, but not limited to:
1. HVAC Improvement at OFK Building
2. Sea Water Reverse Osmosis Improvement at Bekapai LQ
3. Cold Storage Container Improvement at Various Sites
4. Various Mechanical, Electrical and HVAC Works at Balikpapan and Sites (Call-off)
The work includes temporary work and services, detail engineering and workshop drawing,
management of the work, hoardings & scaffoldings, supplying all managerial personnel,
manpower, equipment, tools and materials.

1.1 Objective

The objective of this report is to General Arrangment NPU cold storage applied on PHM Facilities.

1.2 Scope
The scope of this report is to General Arrangment NPU cold storage applied on NPU facility.

2. DEFINITION
Term Definition
COMPANY COMPANY is defined as PT. PERTAMINA HULU
MAHAKAM
CONTRACTOR CONTRACTOR is PT. BUKAKA TEKNIK UTAMA, Tbk
CONTRACT Agreement between COMPANY and CONTRACTOR
The organization that issues the purchase order and
PURCHASER specification to the VENDOR. The PURCHASER is PT.
BUKAKA TEKNIK UTAMA, Tbk
SUBCONTRACTOR/VENDOR/ Party which supplies equipment/materials or services
SUPPLIER specified and ordered by CONTRACTOR
MANUFACTURE Party which manufactures equipment/materials
specified and ordered by CONTRACTOR

This document is the property of PERTAMINA HULU MAHAKAM and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename : Survey_report
Contract COMPANY Document No.
VARIOUS HVAC AND MECHANICAL WORKS ID-TNR-CAMP-HVA-0601- 540096
AT BALIKPAPAN AND SITES
Revision: 0.1 Status: IFC

Doc Type: CAL System / S-System: / Discipline: HVA Revision Date: 07 Okt 2021
Originator Document No : 0601 Page 7 of 10

3. REFERENCE
3.1 Standards and Codes
 ASHRAE Standard 15 & 34 (2019)
 ASHRAE Handbook 2018-Refrigeration (IP)
 ASHRAE Handbook 2018-Refrigeration (SI)
3.2 Contractor Document
 Project Specification & Drawing
 ID-TTN-CAMP-HVA-0601-540096, General Arrangement NPU Cold storage

3.3 Abbreviations
Term Definition
m Meters
m2 Square meters
m3 Cubic meters
°C Degrees Celsius
K Kelvin
kg Kilogram
h Hour
w Watt
kW Kilowatt
kJ Kilojoules
% Percent
pc Piece
pcs Pieces
kWh Kilowatt hour
k Thermal insulation conductivity
U Thermal transmittance
Temp Temperature
Resp Respiration heat
Q Heat
m1 Total storage capacity

m2 Product supply each day

This document is the property of PERTAMINA HULU MAHAKAM and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename : Survey_report
Contract COMPANY Document No.
VARIOUS HVAC AND MECHANICAL WORKS ID-TNR-CAMP-HVA-0601- 540096
AT BALIKPAPAN AND SITES
Revision: 0.1 Status: IFC

Doc Type: CAL System / S-System: / Discipline: HVA Revision Date: 07 Okt 2021
Originator Document No : 0601 Page 8 of 10

4. GENERAL ARRANGMENT CPU COLD STORAGE


4.1 General Data

Unit COLD STORAGE


Quantity 1 (one) unit
Size 3700X2500X2600 (LxWxH)
Type Chiller - Air Cooled
Configuration Single Unit
Manufacturer PT.TRANSCOOL ENGINEERING
Model
Serial Number

4.2 Insulation

Insulation Material PolyIsocyanurate foam board (PIR)


Manufacture / Model PT.Alsun Suksesindo / KOOLPANEL
Density 40 - 60 kg/m3%
Thickness 150 mm
Life Time 7-10 years
Thermal Conductivity 0,023 W/m.K
Skin Food Grade
Connection Cam-Lock Split Joint
Fire Testing Yes
Accessories Pintu Swing, 1.0m x 2.0, Rata Lantai
Handel, Engsel, Door Lock, Hanger, Heater Pintu,
Ventilator
Sealant, Cam-Lock Plug / screw, Weatherproof Lamp
Floor Polyurethane, Density 43 – 45kg/m3
Finishing Alumunium Bordess, tbl 3mm

4.3 Evaporator Unit

Manufacture / Model GACC RX 040.1/2-70.E-1846106M


Capacity 5.3 kW
Fan 2 pieces
Air Flow 6100 m³/h
Fin Spacing 7,00mm
Surface 29.4 m²
Dry Weight 50 kg
Tubbes Copper
Fins Aluminum

This document is the property of PERTAMINA HULU MAHAKAM and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename : Survey_report
Contract COMPANY Document No.
VARIOUS HVAC AND MECHANICAL WORKS ID-TNR-CAMP-HVA-0601- 540096
AT BALIKPAPAN AND SITES
Revision: 0.1 Status: IFC

Doc Type: CAL System / S-System: / Discipline: HVA Revision Date: 07 Okt 2021
Originator Document No : 0601 Page 9 of 10

4.4 Condensing Unit

Manufacture / Model ZXL040BE


Capacity 5,27 kW
Fan 1 piecess
Refrigerant R 404A
Type Air Cooled Condenser
Accessories Oil Separator, Filter Drier, Solenoid Valve, Check Valve, Stop
Valve, HP/LP Switch, Accumulator, Receiver Tank, Sight Glass,
Pressure Gauge, Soft Temper Copper Piping System, Chasis

4.5 Control Panel and Parts

Komponen MCCB/MCB, AC Contactor, Thermal Overload, Phase Failure,


Indicator Lamp, Timer, Temperature and defrost controller,
On/Off Push Button, Hour meter, Emergency Stop Button.
Expansion Valve DANFOSS TES2 complete with Orifice
Electrical Cable Standard SNI (merk kabel 3 besar)
Cooper Pipe Hard Temper ASTM B 280 (Suction Line min. 7/8” tbl 0.81mm &
Liquid Line Min. 3/8” Tbl. 0.56mm), Isolasi Pipa, Refrigerant
R404a

This document is the property of PERTAMINA HULU MAHAKAM and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename : Survey_report
Contract COMPANY Document No.
VARIOUS HVAC AND MECHANICAL WORKS ID-TNR-CAMP-HVA-0601- 540096
AT BALIKPAPAN AND SITES
Revision: 0.1 Status: IFC

Doc Type: CAL System / S-System: / Discipline: HVA Revision Date: 07 Okt 2021
Originator Document No : 0601 Page 10 of 10

This document is the property of PERTAMINA HULU MAHAKAM and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.