Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Control methode 7/7

Change item Potential


Process Check Item Control Methode
Before After problem

-Check Resistance
Winding (start Prod)
assy Used 2 winding Used 3 winding Material wire Wrong -Check Label Material
MC MC enamel material at bobin (start Prod)
- Control by design jig

connection

connection
-Electric check Inter -Electric check - Interconection system

Inter
- Twisting - Twisting Electric check &
Coil Assy Twisting
1 MP Condition of - Interconection system
- Fluxing
connection

- Fluxing wire Open circuit fluxing, soldering &

connection
- Soldering connection crimping
Inter

- Soldering - 100% check open


- Crimping Inter circuit by performance
- Crimping
test
1 MP 1 MP

Housing
Assy
Epoxy Assy

Terminal
Assy
No Change
Final
check

You might also like