Louver Checklist

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

PQ Builders Pte Ltd

18 Enterprise Road Singapore 629824


Tel: +65 6266 2218 Fax: +65 6266 3238
s E-mail : builders@pqholdings.com
Website : www.pqholdings.com
Your Most Reliable Business Partner Company Reg. No. : 198802736E
G.S.T. No. : M2-0081422-3

Inspection Checklist for Louver installation


C885 Project
Project: _______________________________________
Architecture
Trade: _______________________________________

Location (attach drawings): _______________________________________

Date: _______________________________________

Item Subject Yes No Comments


1. Reference Line / Setting out correct.

2. Main frame/ Sub frame is done


according to approved drawings.
Materials are correct and sizes are
correct
3. Carry out pull put test on anchor bolts

4. Check louver materials are according


to approved drawings and being
installed according to approved
drawings
5. Check louver blades gaps and mullion
are correct
6. Check main frame and sub frame
positioning is correct based on
approved drawings
7. If any welding is involved ensure
correct weld type is done. Thickness
is as per approved drawings.

Any other comments (if any):

Page 1 of 2
PQ Builders Pte Ltd
18 Enterprise Road Singapore 629824
Tel: +65 6266 2218 Fax: +65 6266 3238
s E-mail : builders@pqholdings.com
Website : www.pqholdings.com
Your Most Reliable Business Partner Company Reg. No. : 198802736E
G.S.T. No. : M2-0081422-3

Signed by Sub Contractor:

Name: ___________________________
Company: ___________________________
Signature: ___________________________

Signed by Main Contractor:

Name: ___________________________
Company: ___________________________
Signature: ___________________________

Signed by RTO/RE:

Name: ___________________________
Company: ___________________________
Signature: ___________________________

Page 2 of 2

You might also like