Project: Construction of 4-Lane Greenfieldexpressway spur from Delhi-Vadodara Greenfield expressway near Bandikui to Jaipur

in Bharatmala Pariyojana Phase-I in the state of Rajasthan on Hybrid Annuity mode, from Design Chainage Km. 00+000 to Km.
66+916 (Total Length 66.916).

Contractor: M/s G R Infraprojects Concessionaire : M/s G R Bandikui Jaipur Independent Engineer: M/s L.N. Malviya Infra Client: National
Projects Pvt Ltd in Association with Pioneer Highways Authority of
Limited Expressway Private Limited
Infra Consultants Pvt Ltd. India

CEMENT TEST (IS: 4031)


Source of Cement Batch No/Week No.
Grade of Cement Date of Testing
FINENESS OF CEMENT ( IS : 4031 / PART - I )
Wt. Of Cement Permissible Limit, IS :
Trial. No. IS Sieve (mm) Wt. Of Sample % of Retained Average Retained
Retained 8112
1
< 10 % on 90mic IS
2
Sieve
3

STANDARD CONSISTENCY OF CEMENT (IS : 4031 / PART - IV)

Penetration of the Is the penetration


Wt. Of Cement (gm) Wt. Of Water (gm) plunger from the between Standard consistency,
Trial. No. Remarks
= A = B bottom of Vicat 5 to 7 mm P = B/A x 100
Mould (mm) (Yes / No)

INITIAL AND FINAL SETTING TIME (IS: 4031 / PART - V)

Time when needle


Water 0.85% of Time when the needle Initial Setting Time
makes an impression
Sl. No. Wt. Of Cement (gm) Standard Time of Adding Water fails to penetrate test > 30
but the attachment
Consistency (gm) block by 5+/- 0.5mm minutes
fails to do so

1 2 3 4 5 6 (5-4)

COMPRESSIVE STRENGTH OF CEMENT(IS : 4031 / PART VI)

Compressive Strength
Date of Date of Weight of Mortar Load in Avearage Compressive
Sl. No.
Casting Testing Cube ( gms. ) KN Strength N/mm2
N/mm 2

9
Remarks………………………………………………………………………………………………………………………

Tested By Checked By Checked By

Contractor's Representative Concessionaire's Representative IE's Representative