Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Project: Construction of 4-Lane Greenfieldexpressway spur from Delhi-Vadodara Greenfield expressway near

Bandikui to Jaipur in Bharatmala Pariyojana Phase-I in the state of Rajasthan on Hybrid Annuity mode, from Design
Chainage Km. 00+000 to Km. 66+916 (Total Length 66.916).

Independent Engineer: M/s L.N. Malviya Client: National


Concessionaire : M/s G R Bandikui
Contractor: M/s G R Infraprojects Limited Infra Projects Pvt Ltd in Association Highways Authority of
Jaipur Expressway Private Limited
with Pioneer Infra Consultants Pvt Ltd India

SIEVE ANALYSIS OF DENSE BITUMINOUS MACADAM


(As per MoRT&H Table 500-10)
Source of Sample : Sampling date :
Sample No : : Testing date :
Name of Layer : Tested by :
Sample wt. : Location :

Weight
IS Sieve Cumm. wt. Cumulative % % of
Retained JMF Specification
Size (mm) Retained (gm) Retained Passing
(gm)

Remarks :……………………………………………………………………………………………………………………………

Contractor's Concessionaire's Independent Engineer's


Representative Representative Representative

You might also like