Eng.

Task to do Task to
Member Overview Project Schedule Cost Control MP Development
Development from Superior do by self

PROJECT OVERVIEW CLUTCH FY20 = still on schedule


= already recovery
ASPECT OPTION: → FOLLOW CATEGORY ASPECT IN DEPT POLICY FY20
Safety (S), HR, Delivery(D), Quality(Q), Project(P), More Efficiency (CR / Purch), Manufacturing Excellent(ME), Moral = delay > 1 week

ROL Job 2020 2021 Link


Setting
ASPECT/ ITEM Status PJ CODE PIC TARGET
attach
Schedule
E Qty
4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3

DR 5.1 Jig Design Total Trial


Edit
D40L O/R Manuf Install DR6 L/O
CL-20-01 Aab 1
L/O
Delete
DEVELOP

New insert
D No Delay
Model Feasibility Edit
DR 5.1 Jig Design O/R Manufacture Install Total Trial ER L/O
D55L Study
CL-20-02 Akbar 1 Delete
Install insert

Edit
Semi Auto Tapper Study Fix Design O/R Manufacture install ER L/O
Reduce
C
MP
Check Rotor Finish CL-20-03 Josh 1 0 claim Delete
1&2 insert
ICR 20-027, Project CODE CL-20-003 (Semi Auto
Improve
Auto-insert wire for Tapper Check Rotor Finish 1&2 harus segera di Feasibility
Study
DR 5.1 Manufacture Install QC L/O
Edit
Q
Claim
wire cutting MC CL-20-04 Josh 1 0 claim Delete
clossing.
IMPROVE

insert

Reduce destructive Study Fix Design O/R Manufacture Install ER L/O ▼28% Edit
test rotor finishing part/day
CL-20-05 Josh 1 Delete

Reduce
step #1
ICR Mohon submit Check FA Number terlebih 0.37 Bil/Y insert
C
Expense
Lifetime up Grinding
dahulu Study Fix Design O/R ManufacInstall ER
▲40% Edit
L/O Lifetime
Stone step 3 CL-20-06 Toro 2 ture Delete
Send FA Number Update Edit Masspro Schedule 0.31 Bil/Y insert

TOTAL PJ / JOB 10 NOW

Add Schedule Download SAVE & SEND TO SUPERIOR, MEMBER, COORD