May2024 To Dec2024 Construction Rate 2
May2024 To Dec2024 Construction Rate 2
COIMBATORE - 9500385799
CONSTRUCTION SPECIFICATIONS
Rate of
1 Rs.1900 Rs.1900 Rs.2000 Rs.2300
Construction
Framed Structure
Framed Structure Framed Structure Framed Structure
Type of (with pillar &
4 (with pillar & with (with pillar & with (with pillar & with
Construction without Roof
Roof Beam) Roof Beam) Roof Beam)
Beam)
Building Set Manually with Digital Survey with Digital Survey with Digital Survey with
5
Out Marking Ropes and Pegs Total Station Total Station Total Station
10' Including 10'9" Including Slab 10'9" Including Slab 10'9" Including Slab
7 Roof Height
Slab Thickness Thickness Thickness Thickness
5 Feet(additional
Foundation 7 Feet (additional 7 Feet (additional 7 Feet (additional
10 Depth Client
Depth Depth Client Scope) Depth Client Scope) Depth Client Scope)
Scope)
Footing
11 9" to 1' Depth 1 to 1.5' Depth 1 to 1.5' Depth 1 to 1.5' Depth
Concrete Depth
3'- All the Walls are 3'- All the Walls are 3'- All the Walls are
3'- Outer Walls plastered both sides plastered both sides plastered both sides
12 Basement Work
only plastered with water proofing with water proofing with water proofing
admixture admixture admixture
Basement
Manual with Earth Rammer with Earth Rammer with Earth Rammer
17 Compaction
Compaction machine machine machine
Method
Damp Proof
2" thick DPC at Floor 2" thick DPC at Floor 2" thick DPC at Floor
18 Treatment at ---
Level Level Level
Basement
Anti Termite
19 --- Treated at Basement Treated at Basement Treated at Basement
Treatment
Compound
On Final Stage Along Building Plinth Along Building Plinth Along Building Plinth
20 Wall
without Link Beam Beam Beam
Construction
1.25" Thick-Teak 1.5" Thick-Teak Door 1.5" Thick-Teak Door 1.5" Thick-Teak Door
Main Door- 3.5'
26 Door & Frame- & Frame- Worth & Frame- Worth & Frame- Worth
x 7'
Worth Rs.30000 Rs.50000 Rs.50000 Rs.50000
Sall Frame & Sall Frame & TeakFrame & 1.25" Thick-Teak
Bed Door- 3' x
28 Membrane Door Membrane Door Membrane Door Door & Frame-
7'
Worth Rs.8000 Worth Rs.8000 Worth Rs.13000 Worth Rs.30000
31 Window Grill 10mm Rod 12mm Rod 12mm Rod 12mm Rod
External
32 Plumbing Pipe PVC/UPVC UPVC UPVC UPVC
material
Internal Hot
33 Cold Plumbing CPVC CPVC CPVC CPVC
Pipe material
Triple Line
Triple Line- Triple Line-
Plumbing Pipe - (Corporation Water,
34 Single Line Corporation Water & Corporation Water &
method Bore Water & Solar
Bore Water & Solar Bore Water & Solar
Water)
Plumbing Pipe - Fixing Away from Fixing Away from Fixing Away from
35 Fixing along Wall
Fixing Wall Wall Wall
Fybros/ Anchor
40 Switches GM/Legrand Basic GM/ Legrand Basic GM/ Legrand Basic
Roma
Only LED or Tube All Rooms Provided All Rooms Provided All Rooms Provided
41 Lightings light Wall light with Concealed with Concealed with Concealed
Provision Ceiling Lights Ceiling Lights Ceiling Lights
Provided at
42 UPS wiring Provided at all Points Provided at all Points Provided at all Points
Specific Points
Four Corners of
43 CCTV Wiring --- --- ---
Building
Staircase RCC Waist Slab Monolithic RCC Monolithic RCC Monolithic RCC
44
Structure & Brick Steps Staircase Staircase Staircase
SS Railing with
Inner Staircase SS Railing- SS Railing- SS Railing-
45 Glass (OR) MS with
Railing Rs.600/Rft Rs.800/Rft Rs.800/Rft
Wood
Internal Ceiling Gypsum Platering + 2 coat Birla Putty + 1 2 coat Birla Putty + 1
47 ---
Putty 1 coat Asian Primer coat Asian Primer coat Asian Primer
External 1:5 mix with 1:5 mix with 1:5 mix with
49 Cement 1:5 mix Waterproofing Waterproofing Waterproofing
Plastering Admixture Admixture Admixture
Cement
Plastering
50 Manually Mixer Machine Mixer Machine Mixer Machine
Mortar
Preparation
Cement
Power Trowel Power Trowel Power Trowel
51 Plastering Manually
Machine Machine Machine
Application
Column
Concrete on
52 Manually Mixer Machine Mixer Machine Mixer Machine
Site
Preparation
Pillars&Brick; Pillars&Brick; Pillars&Brick;
Beams&Brick Joints; Beams&Brick Joints; Beams&Brick Joints;
To Avoid
53 --- Electrical Groves Electrical Groves Electrical Groves
Cracks
provided with Glass provided with Glass provided with Glass
Fibre Mesh Fibre Mesh Fibre Mesh
Area Between
Cement
55 Compound Tile Flooring Tile Flooring Tile Flooring
Plastering
Wall & Building
Surkhi with Baby Surkhi with Baby
Weathering Additionally Surkhi with Baby
56 chips and Cement chips and Cement
Course Charged per SFT chips and Tile Finish
Flooring Finish Flooring Finish
Basement
1' From Ground 1' From Ground 1' From Ground
57 Height of On Ground Level
Level Level Level
Parking Floor
Cost of
Constructing
58 3800000.00 3800000.00 4000000.00 4600000.00
Builtup Area=
2000 Sft
6000 L - Water
Tank / Sump @
Rs.12/Litre:
59 FlyAsh Brick 72000.00 72000.00 72000.00 72000.00
work Tank:::
(RCC@
Rs.16/Litre)
8000 L - Septic
Tank@
Rs.12/Litre
Three
60 96000.00 96000.00 96000.00 96000.00
Chambered
brick Work (RR
Masonry @
Rs.10/Litre)
Compond Wall -
61 140Rft @ 252000.00 252000.00 252000.00 252000.00
Rs.1800/Rft
Steel Staircase
62 30000.00 30000.00 30000.00 30000.00
to 2nd Floor
Total Cost of
63 Completion of 4250000 4250000 4450000 5050000
Project Rs.
NOTE: Owner's Scope
4 Electricial fittings like Fan, Light, Motor Pumps are Not Included
100%
TOTAL
Mode of Payment - Zero Advance Scheme:
1 Advance - Mobilisatioin 0%
2 On the Day of Footing Concrete 10%
3 After completion of Basement 10%
4 After completion of GF Lintel Level 10%
5 On completion of G.F- R.C Roof Concrete 10%
6 After completion of FF Lintel Level 10%
7 After completion of F.F- R.C Roof Concrete 10%
9 After Completion of Internal plastering 10%
10 After Completion of External plastering 15%
11 After Completion of Flooring 10%
12 At the time of Handing Over of Key 5%
100%
TOTAL