SILENT VALLEY CONSTRUCTION

COIMBATORE - 9500385799

CONSTRUCTION SPECIFICATIONS

Engineer: C.Satchithananda Moorthy.,M.E(Struct)

Date: 20-05-2025 This Rate Valid upto:31-12-2024


Model:1 Ground Floor:1000Sft --- First Floor:1000Sft TOTAL AREA = 2000 SFT

HEADS SPEC-0 SPEC-1 SPEC-2 SPEC-3

Rate of
1 Rs.1900 Rs.1900 Rs.2000 Rs.2300
Construction

Structurally Designed- Structurally Designed- Structurally Designed-


Columns, Beams, Columns, Beams, Columns, Beams,
Structural Footings, Slabs, Footings, Slabs, Footings, Slabs, etc.,
2 ---
Design etc.,Drawings are etc.,Drawings are Drawings are
provided before provided before provided before
agreement agreement agreement

Solid Concrete Wire Cut Red Bricks/ Wire Cut Red


3 Bricks Red Bricks
Blocks FLyAsh Bricks/ FLyAsh

Framed Structure
Framed Structure Framed Structure Framed Structure
Type of (with pillar &
4 (with pillar & with (with pillar & with (with pillar & with
Construction without Roof
Roof Beam) Roof Beam) Roof Beam)
Beam)

Building Set Manually with Digital Survey with Digital Survey with Digital Survey with
5
Out Marking Ropes and Pegs Total Station Total Station Total Station

Roof Concrete - M-15 : Manual


6 M-20 : RMC M-20 : RMC M-20 : RMC
Grade Mix / RMC

10' Including 10'9" Including Slab 10'9" Including Slab 10'9" Including Slab
7 Roof Height
Slab Thickness Thickness Thickness Thickness

CLASS- A CLASS- A CLASS- A


CLASS- B
(Chetinad, JSW, (Chetinad, JSW, (Chetinad, JSW,
8 Cement (Maha, Ultra,
Ramco Ultratech, Ramco Ultratech, Ramco Ultratech,
Penna, etc)
Dalmia etc) Dalmia etc) Dalmia etc)
Sun , Ogun,
9 Steel SSI , SAIL, VIZAG SSI , SAIL, VIZAG SSI , SAIL, VIZAG
Magnum

5 Feet(additional
Foundation 7 Feet (additional 7 Feet (additional 7 Feet (additional
10 Depth Client
Depth Depth Client Scope) Depth Client Scope) Depth Client Scope)
Scope)

Footing
11 9" to 1' Depth 1 to 1.5' Depth 1 to 1.5' Depth 1 to 1.5' Depth
Concrete Depth

3'- All the Walls are 3'- All the Walls are 3'- All the Walls are
3'- Outer Walls plastered both sides plastered both sides plastered both sides
12 Basement Work
only plastered with water proofing with water proofing with water proofing
admixture admixture admixture

Charged per Sft


13 Sunshades after completion No Extra Charges No Extra Charges No Extra Charges
of work

Charged per Sft


14 Lofts after completion No Extra Charges No Extra Charges No Extra Charges
of work

15 M-Sand Market Available Washed M-Sand Washed M-Sand Washed M-Sand

Concreting Manual with Vibrator with Vibrator with Vibrator


16
Method Compaction machine machine machine

Basement
Manual with Earth Rammer with Earth Rammer with Earth Rammer
17 Compaction
Compaction machine machine machine
Method
Damp Proof
2" thick DPC at Floor 2" thick DPC at Floor 2" thick DPC at Floor
18 Treatment at ---
Level Level Level
Basement

Anti Termite
19 --- Treated at Basement Treated at Basement Treated at Basement
Treatment

Compound
On Final Stage Along Building Plinth Along Building Plinth Along Building Plinth
20 Wall
without Link Beam Beam Beam
Construction

2" thick Sill Concrete


Sill Beam 2" thick Sill Concrete 2" thick Sill Concrete
21 --- below Windows and
below Windows below Windows below Windows
Throghout Building

Cut Lintel- Only


Full Lintel-Above all Full Lintel-Above all Full Lintel-Above all
22 Lintel Beam above windows &
walls at 7' walls at 7' walls at 7'
Doors
23 Flooring Tile Rs.60/sft Rs.60/sft Rs.60/sft Rs.60/sft

Toilet & Rs.40 to 50 Rs.40 to 50 UPTO Rs.40 to 50 UPTO Rs.40 to 50 UPTO


24
Kitchen Tile UPTO Lintel Level Roof Level Roof Level Roof Level

Sit Out Rs.40 to 50 UPTO Rs.40 to 50 UPTO Rs.40 to 50 UPTO


25 ---
Elevation Tile Roof Level Roof Level Roof Level

1.25" Thick-Teak 1.5" Thick-Teak Door 1.5" Thick-Teak Door 1.5" Thick-Teak Door
Main Door- 3.5'
26 Door & Frame- & Frame- Worth & Frame- Worth & Frame- Worth
x 7'
Worth Rs.30000 Rs.50000 Rs.50000 Rs.50000

Main Door Brass or Brass


27 Full Brass Full Brass Full Brass
Fittings Coated

Sall Frame & Sall Frame & TeakFrame & 1.25" Thick-Teak
Bed Door- 3' x
28 Membrane Door Membrane Door Membrane Door Door & Frame-
7'
Worth Rs.8000 Worth Rs.8000 Worth Rs.13000 Worth Rs.30000

Bed Door Powder Coated SS or Brass Coated SS or Brass Coated


29 Brass Fittings
Fittings Fittins Fittings Fittings

Sall Wood/ UPVC Polished Teak


30 Windows UPVC @ Rs.550/sft UPVC @ Rs.550/sft
@ Rs.450/sft Wooden Window

31 Window Grill 10mm Rod 12mm Rod 12mm Rod 12mm Rod

External
32 Plumbing Pipe PVC/UPVC UPVC UPVC UPVC
material
Internal Hot
33 Cold Plumbing CPVC CPVC CPVC CPVC
Pipe material
Triple Line
Triple Line- Triple Line-
Plumbing Pipe - (Corporation Water,
34 Single Line Corporation Water & Corporation Water &
method Bore Water & Solar
Bore Water & Solar Bore Water & Solar
Water)

Plumbing Pipe - Fixing Away from Fixing Away from Fixing Away from
35 Fixing along Wall
Fixing Wall Wall Wall

Bath Fittings Rs.100000- Rs.100000- Rs.150000-


36 for this Uncertain Parryware/Kerovit/Ja Parryware/Kerovit/Ja Parryware/Kerovit/Ja
Project(2+1) quar quar quar
Over Head
Additionally
37 Tank- Tripple 1000 Litre- 2 Nos. 1000 Litre- 2 Nos. 1000 Litre- 2 Nos.
Charged
Layer White
any ISI wire say
38 Wire Finolex Finolex Finolex
ORBIT, Miller
On all 4 walls of On all 4 walls of On all 4 walls of
Electrical
39 Limited room as per client's room as per client's room as per client's
Points on Wall
requirement requirement requirement

Fybros/ Anchor
40 Switches GM/Legrand Basic GM/ Legrand Basic GM/ Legrand Basic
Roma

Only LED or Tube All Rooms Provided All Rooms Provided All Rooms Provided
41 Lightings light Wall light with Concealed with Concealed with Concealed
Provision Ceiling Lights Ceiling Lights Ceiling Lights

Provided at
42 UPS wiring Provided at all Points Provided at all Points Provided at all Points
Specific Points

Four Corners of
43 CCTV Wiring --- --- ---
Building

Staircase RCC Waist Slab Monolithic RCC Monolithic RCC Monolithic RCC
44
Structure & Brick Steps Staircase Staircase Staircase

SS Railing with
Inner Staircase SS Railing- SS Railing- SS Railing-
45 Glass (OR) MS with
Railing Rs.600/Rft Rs.800/Rft Rs.800/Rft
Wood

Internal Wall Cement Plaster + Cement Plaster +2 Cement Plaster +2


Gypsum Platering +
46 Plastering 2 coat Putty + 1 coat Birla Putty + 1 coat Birla Putty + 1
1 coat Asian Primer
Painting coat Primer coat Asian Primer coat Asian Primer

Internal Ceiling Gypsum Platering + 2 coat Birla Putty + 1 2 coat Birla Putty + 1
47 ---
Putty 1 coat Asian Primer coat Asian Primer coat Asian Primer

1:4 mix- Groves 1:4 mix- Groves


Groves made using
Ceiling made using KORAI made using KORAI
48 1:4 mix KORAI GRASS mat
Plastering GRASS mat while GRASS mat while
while Concreting
Concreting Concreting

External 1:5 mix with 1:5 mix with 1:5 mix with
49 Cement 1:5 mix Waterproofing Waterproofing Waterproofing
Plastering Admixture Admixture Admixture
Cement
Plastering
50 Manually Mixer Machine Mixer Machine Mixer Machine
Mortar
Preparation
Cement
Power Trowel Power Trowel Power Trowel
51 Plastering Manually
Machine Machine Machine
Application
Column
Concrete on
52 Manually Mixer Machine Mixer Machine Mixer Machine
Site
Preparation
Pillars&Brick; Pillars&Brick; Pillars&Brick;
Beams&Brick Joints; Beams&Brick Joints; Beams&Brick Joints;
To Avoid
53 --- Electrical Groves Electrical Groves Electrical Groves
Cracks
provided with Glass provided with Glass provided with Glass
Fibre Mesh Fibre Mesh Fibre Mesh

2 coat Birla white on 2 coat Birla white on 2 coat Birla white on


2 coat White
External 3 sides & Putty finish 3 sides & Putty finish 3 sides & Putty finish
54 Wash on all 4
Painting with Asian Apex with Asian Apex with Asian Apex
Sides
Paint on Front Side Paint on Front Side Paint on Front Side

Area Between
Cement
55 Compound Tile Flooring Tile Flooring Tile Flooring
Plastering
Wall & Building
Surkhi with Baby Surkhi with Baby
Weathering Additionally Surkhi with Baby
56 chips and Cement chips and Cement
Course Charged per SFT chips and Tile Finish
Flooring Finish Flooring Finish

Basement
1' From Ground 1' From Ground 1' From Ground
57 Height of On Ground Level
Level Level Level
Parking Floor

Cost of
Constructing
58 3800000.00 3800000.00 4000000.00 4600000.00
Builtup Area=
2000 Sft

6000 L - Water
Tank / Sump @
Rs.12/Litre:
59 FlyAsh Brick 72000.00 72000.00 72000.00 72000.00
work Tank:::
(RCC@
Rs.16/Litre)

8000 L - Septic
Tank@
Rs.12/Litre
Three
60 96000.00 96000.00 96000.00 96000.00
Chambered
brick Work (RR
Masonry @
Rs.10/Litre)

Compond Wall -
61 140Rft @ 252000.00 252000.00 252000.00 252000.00
Rs.1800/Rft

Steel Staircase
62 30000.00 30000.00 30000.00 30000.00
to 2nd Floor

Total Cost of
63 Completion of 4250000 4250000 4450000 5050000
Project Rs.
NOTE: Owner's Scope

1 Electricity and Water will be provided by Owner

2 BoreWell, Pump Set,

3 Electricity Final Shiffting,Panel Box, Earthing & Govt.Charges

4 Electricial fittings like Fan, Light, Motor Pumps are Not Included

5 Interior Works are not included in the estimation


Mode of Payment

1 Advance - Mobilisatioin 10%


2 After Completion of Plinth Beam 10%
3 After completion of Basement 10%
4 After completion of GF Lintel Level 10%
5 On completion of G.F- R.C Roof Concrete 10%
6 After completion of FF Lintel Level 10%
7 After completion of F.F- R.C Roof Concrete 10%
9 After Completion of Internal plastering 10%
10 After Completion of External plastering 10%
11 After Completion of Flooring 5%
12 At the time of Handing Over of Key 5%

100%
TOTAL
Mode of Payment - Zero Advance Scheme:

1 Advance - Mobilisatioin 0%
2 On the Day of Footing Concrete 10%
3 After completion of Basement 10%
4 After completion of GF Lintel Level 10%
5 On completion of G.F- R.C Roof Concrete 10%
6 After completion of FF Lintel Level 10%
7 After completion of F.F- R.C Roof Concrete 10%
9 After Completion of Internal plastering 10%
10 After Completion of External plastering 15%
11 After Completion of Flooring 10%
12 At the time of Handing Over of Key 5%

100%
TOTAL