CV Ir. Ts. Dr. Ashita S. Pereira

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

CURRICULUM VITAE KAKITANGAN YANG TERLIBAT

1. Nama : Ir. Ts. Dr. Ashita S. Pereira

2. Tarikh Lahir : 21 Oktober 1967

3. Warganegara : Malaysia

4. Kelulusan Akademik :

Bil. Peringkat Kelulusan Bidang Pengajian Pengkhususan Tahun Nama Institusi


(Ijazah/Sarjana/PhD) Dianugerahkan
1 PhD Engineering Traffic Engineering 2020 Universiti Tunku Abdul
Rahman
2. Sarjana Sains (M. Sc) Transportation Planning Traffic and 1998 Universiti Teknologi
Transportation Malaysia (UTM)
3. Ijazah (B. Eng (Hons) Civil Engineering Traffic and 1992 Universiti Malaya (UM)
Transportation
6. Keahlian Badan Profesional (sekiranya ada) :

Bil. Nama Badan Profesional No. Keahlian Tarikh Luput Keahlian

Lembaga Jurutera Malaysia (Jurutera Profesional


1. Dengan Perakuan C19715 31/December/2024
Amalan)
2. The Institution Of Engineers, Malaysia 13422 31/December/2024

3. Kementerian Sumber Asli & Alam Sekitar CEP0352 31/May/2024


(Jururunding Subjek)
4. Lembaga Teknologis Malaysia (MBOT) PT23060033 1/June/2024

5. Pertubuhan Perancang Malaysia Associate Member -

7. Senarai Nama Kajian Yang Pernah Dilaksanakan :


Government/ Tahun Kajian Peranan/Jawatan Di Dalam Kajian
Bil. Nama Kajian Private/Luar Nama Pelanggan Dilaksanakan
Negara
Projek Menaiktaraf Jalan Ft012 Jalan Kuantan-Segamat, Daerah Kerajaan JKR 2023- sedang Traffic Impact Assesment
1. Rompin, Pahang (Fasa 2) dijalankan

2. Rancangan Kawasan Khas Tapak Warisan Dunia Melaka Kerajaan PLAN Malaysia 2023- sedang Transport Planning - Sektor
dijalankan Pengangkutan
TRAFFIC IMPACT ASSESSMENT STUDY FOR THE PROPOSED NEW 2023- sedang
3. SEREMBAN KTMB STATION -Detail Swasta KL Consult dijalankan Traffic Impact Assesment
Report Preparation
4. Penang Industry masterplan Kerajaan PLAN Malaysia 2023- sedang Transport Planning - Sektor
dijalankan Pengangkutan
5. Connectivity And Mobility Study (CMS) for LRT Mutiara Line-Penang Kerajaan Systra SA Malaysia 2023-sedang Traffic and Landuse Study
dijalankan
Cadangan Pembinaan Jalan Susur Keluar Masuk Bertingkat Dari Kerajaan Universiti Malaya 2023 Traffic Impact Assessment
6. Lebuhraya Persekutuan Ke Universiti Malaya(UM) & Pusat
Perubatan Universiti Malaya (PPUM)

7. The Proposed Jalan Sultan Tengah Road Upgradingand New Bridge Swasta PPES/SMSB 2023-sedang Traffic Impact Assessment & Road
Over Sungai Santubong dijalankan Safety Audit
8. Traffic Management Plan For The Development Of Kuching Urban 2023-sedang
Transportation System (Kuts), Kuching, Sarawak, Swasta Sarawak Metro Sdn Bhd dijalankan Traffic Management Plan

9. Kajian Penggubahan Rancangan Tempatan untuk ECRL Kerajaan Iktisas Planner Sdn Bhd 2023 Transport Planning
: Selangor
10. Rancangan tempatan Majlis Daerah Kuala Selangor Kerajaan UrbanScale/MPKS 2023 Transport Planning

11. Kajian Rancangan Wilayah: Pelan Pengurusan Persempadanan


Antara Pekan-Kuantan-Kemaman- Dungun-Jerantut Kerajaan UrbanScale/PLAN 2023 Transport Planning

12. Kajian Tahap Ketepuan Dan Penentuan Intensiti Pembangunan Kerajaan AJM Planning and Urban 2023 Transport Planning
Bandar Design Group
Proposed Industrial Park Development on Lot 149-150, 664-665, Swasta Sulling Hill Sdn Bhd 2023 Traffic Impact Assessment
13. 668, 801-802, 1349-1353, 1362,189 And
10635 (Also Known As Pt66) At Mukim 19, Seberang Perai
Bandar Malaysia - Seri Kembangan Expressway (BSE) Proposal Swasta LSH Infra Sdn Bhd 2023 Transport Specialist
Desktop Study For The Proposed Elevated Expressway From Bandar
14.
Malaysia To Seri Kembangan (BSE)

Traffic Impact Assesment for Denai Alam Rest and Service Area Swasta ProLintas Sdn Bhd 2023 Traffic Impact Assessment
(Puncak Pedana Bond & Kwasa Damansara Bound) For Projek
15.
Lintasan Damansara-Shah Alam Sdn Bhd

16. Pelan Induk Pengurusan Lalulintas Majlis Bandara Shah Kerajaan Majlis Bandaraya Shah 2022 Transport Planning
Alam Alam
Bandar Malaysia - Seri Kembangan Expressway (BSE) Proposal Swasta LSH Infra Sdn Bhd 2022 Transport Planning
Desktop Study For The Proposed Elevated Expressway From Bandar
17.
Malaysia To Seri Kembangan (BSE)

Traffic Impact Assesment (TIA) for Engineering, Procurement, Swasta HSS Integrated Sdn Bhd 2021 Traffic Impact Assessment
Construction And Commisioning Of The East Coast Rail Link Project-
18.
Preliminary Design Works For Section A (Kota Bharu To Dungun)
Government/ Tahun Kajian Peranan/Jawatan Di Dalam Kajian
Bil. Nama Kajian Private/Luar Nama Pelanggan Dilaksanakan
Negara
Civil & Structural Engineer As Lead Consultant For The Preparation,
Submission And Approval For The Amendment To The Klia (10km X
Jurutera perunding
19. 10km) Master Layout Plan (Pelan Induk Perancangan) And The Swasta 2021 Traffic Impact Assessment
Subsequent Infra Structure Works And Associated Services For Meinhardt Sdn Bhd
Malaysia Airports (Sepang) Sdn Bhd

The Feasibility Study And Implementation Plan On The Proposed


Rail Connectivity For Kulim International Airport (KXP) And Sidam
20. Logistics, Aerospace & Manufacturing Hub (SLAM HUB) For The Swasta Minconsult 2021 Traffic and Transport Study
Northern
Corridor Implementation Authority (NCIA)
Traffic Impact Assessment (TIA) Study For The Environmental Swasta HSS Integrated Sdn Bhd 2020 Traffic Impact Assessment for DEIA
Impact Assessment (EIA) For The Proposed East Coast Rail Line
21.
(ECRL) For Section C, Phase 2 (C2): Gombak-Serendah -Pelabuhan
Klang.
22. Kajian Sempadan Antarabangsa Malaysia-Thailand (Perlis, Kedah, Government Urbanscale 2021 Local Plan (Transport Sector)
Perak, Kelantan)
Traffic Impact Assessment for Proposed Junction Serving Phase A8- Project Manager (Traffic Impact
a11(a) & Phase A8-10, Located Along Persiaran Panglima Hitam and Assessment -TIA )
23. Proposed New Junctions Serving Phase A8-11(b), Located Along Private Alam Impian Development 2021
Persiaran Tun teja

Cadangan Penyatuan Tanah Untuk Tujuan Menaiktaraf Kolam Project Manager (Traffic Impact
Tadahan Air Secara Tertutup (Fasa 1) Dan Pembangunan Kediaman Assessment -TIA )
24. (Fasa 2) Di Atas Lot 481350 & Lot 481349, Lorong Maarof, Bangsar, Private Sri Haneco sdn. bhd. 2021
Mukim Kuala
Lumpur, Wilayah Persekutuan.
25. Traffic Impact Assessment for The Proposed Two Storey Logistics Hisham Mohamad Project Manager (Traffic Impact
Complex at Bukit Raja, Klang, Selangor Darul Ehsan. Private Architect 2021 Assessment -TIA )

Submission and approval for the amendment to the KLIA (10km x Jurutera Perunding Project Manager (Traffic Impact
10km) Master Layout Plan (Pelan Induk Perancangan) and the Meinhart Assessment -TIA )
26. subsequent infra structure works and associated services for Private 2021
Malaysia Airports (Sepang) sdn bhd

Proposed Mixed Development On Lot 555 (77.78 ACRES), LOT 25 Private BERJAYACITY SDN BHD 2021 Project Manager (Traffic Impact
(81.19 acres) and PT 1687 Mukim Sungai Tinggi, Daerah Ulu Assessment -TIA )
27.
Selangor, SELANGOR DARUL EHSAN

28. Kajian Pelan Tindakan Khas Bandar Baharu Paya Besar Government PLANMalaysia 2021 Transport Specialist
29. Kuching Urban Transportation System (KUTS) Phase 1 – Samarahan Private Minconsult Sdn Bhd/NCIA 2021 Transport Specialist
Line (Line 1) and Serian Line (Line 2)
30. The Business Model Study And Implementation Plan For The
Development Of Pulau Pangkor Passenger & Cargo Jetty Terminal Private PWC/NCIA 2021 Transport Specialist
And Complex
31. ADB Penang Smart Mobility Private Ramboll Group 2021 Transport Specialist
Proposed Mixed Development Of 9PD Located On Lot 15694, Lot Private Wan Husin & Associates 2021 Transport Specialist
15695, Lot 30621, Lot 20145, Lot 16408 And
32.
RAC Land (Approx. 36.67 Acres), Mukim Port Dickson, Daerah Port
Dickson Negeri Sembilan
Kajian Sempadan Antarabangsa Malaysia - Thailand Government PLANMalaysia 2021 Trafic and Transportation &
33.
Infrastructure Sector
34. Rancangan Kawasan Khas Sedili, Kota Tinggi, Johor Government PLANMalaysia 2021 Traffic Consultant/Trafic and
Transportation Sector
The Feasibility Study And Implementation Plan On The Proposed
Rail Connectivity For Kulim International Airport (KXP) And Sidam
36. Logistics, Aerospace & Manufacturing Hub (SLAM HUB) For The Private Minconsult Sdn Bhd 2020 Ridership Study
Northern Corridor Implementation Authority (NCIA)

Kuching Urban Transportation System Phase 1 – Samarahan Sarawak Metro Sdh Bhd / ERE Project Manager (Traffic Impact
37. Line(Line 1) and Serian Line (Line 2) Private Consulting Group Sdn Bhd 2020 Assessment -EIA )

Traffic Impact Assessment (TIA) Study For The Environmental Private HSSI Sdn Bhd 2020 Project Manager (Traffic Impact
Impact Assessment (EIA) For The Proposed East Coast Rail Line Assessment -EIA )
38.
(ECRL) For Section C, Phase 2 (C2): Gombak-Serendah- Pelabuhan
Klang.
39. Ridership study for the Proposed New KTM Station at Kepong Baru - Private UOA Development Bhd 2020 Project Manager /Ridership Study
Re-study
40. Engineering, Procurement, Construction And Commisioning Of The HSSI Sdn Bhd/ CCCC (ECRL) Project Manager (Traffic Impact
East Coast Rail (ECRL) Project – Premilinary Design Work for Section Private Sdn Bhd 2020 Assessment -EIA )
A
Engineering, Procurement, Construction And Commisioning Of The Private HSSI Sdn Bhd/ CCCC (ECRL) 2019 Project Manager (Traffic Impact
East Coast Rail (ECRL) Project - Consultancy Services For The New Sdn Bhd Assessment -EIA )
41.
Railway Scheme And Scheme Design Study

Premilinary Traffic Impact Assessment Studies for Transit Oriented AECOM Perunding Sdn Project Manager (Pembangunan
Developments (TOD) at Kota Bharu, Bukit Besar, Kota Sas, Bentong, Bhd/CCCC Berorientasikan Transit (TOD)/ Traffic
42. Serendah, Port Klang and ITT Gombak for the East Coast Rail Link Private 2018 Impact Assessment)
Project - Part A : ECRL Study

43. Ridership Study (ECRL) for 3 Stations : Serendah, Kampar and Private AECOM Perunding Sdn Bhd, 2018 Project Manager (Ridership Study)
Puncak Alam
44. TIA for East Coast Rail Link (ECRL) Phase 2 Package 3 Private AECOM Perunding Sdn Bhd 2017 Project Manager (Traffic Impact
Assessment)
45. Premilinary Design For East Coast Rail Link (ECRL) Project Ch 0 To Private HSS Integrated Sdn Bhd 2017 Project Manager (Traffic Impact
Ch 220 Assessment)
46. Proposed East Coast Rail Link (ECRL) Extension from Gombak to Port ERE Consulting Group Sdn Project Manager (ECRL Phase 2) (Traffic
Klang and Kota Bharu to Pengkalan Kubor Private Bhd/CCCC 2017 Impact Assessment (EIA)
Government/ Tahun Kajian Peranan/Jawatan Di Dalam Kajian
Bil. Nama Kajian Private/Luar Nama Pelanggan Dilaksanakan
Negara
47. Feasibility Study on a Proposed of Bus Rapid Transit Systen for Kota Government Prasarana Malaysia Berhad 2017 Project Manager (Kajian
Kinabalu, Sabah Kemungkinan (Feasibility)
48. Penang Stations LRT Private SSP Consortium (Gamuda) 2016 Project Manager (Traffic Impact
Assessment)
49. Traffic Impact Assessment of Traffic Management Plan (TMP) for Project Manager (Traffic Impact
MRT SSP Line (Elevated South-Section 1) Construction Private Gamuda-MMC 2016 Assessment)

50. Klang Valley Mass Rapid Transit System Line 2 Private MRTC-Gamuda 2015 Project Manager (Traffic Impact
Assessment DEIA)
51. Klang Valley Mass Rapid Transit System Line 1 Private MRTC-Gamuda 2010 Project Manager (Traffic Impact
Assessment (EIA)
52. Kajian Sempadan Antarabangsa Malysia - Thailand Government Urban Scale Studio 2021 Project Manager (Trafik dan
Pengangkutan)
53. Punjab Intermediate Cities Improvement Project Urban Mobility Luar Negara Minconsult Sdn. Bhd. 2021 Penasihat Teknikal (Perancangan
Design and Supervision (UMDS) Consultant (Pakistan) Pengangkutan)
54. Environmental Impact Assessment For The Proposed Bayan Lepas Private ERE Consulting Group Sdn Bhd 2021 Project Manager (Traffic Impact
Light Rail Transit Segment 5 Penang Assessment (EIA)
55. Desktop Study for the purposed Elevated Expressway from Bandar Private Besteel Engineering 2021 Premilinary Forecast -Desktop Study
Malaysia to Seri Kembangan (BSE)
Cadangan pembangunan perdagangan bercampur yang terdiri Private Wiradani Development Sdn 2021 Project Manager (Traffic Impact
daripada 2 blok pangsapuri perkhidmatan 22 tingkat di atas Lot Bhd Assessment)
56.
PT9525 Mukim Ampang, Daerah Hulu Langat, Selangor

57. Proposed Caltex Petrol Station at Jalan Meranti Jaya, Taman Project Manager (Traffic Impact
Meranti Jaya,Mukim Dengkil, Daerah Sepang. Selangor Private Kerjaya Sepakat Sdn Bhd 2021 Assessment)

Cadangan Pembangunan (Kediaman) 1 Blok Pangsapuri (Ppam) 37 Private Setiakon Engineering Sdn Bhd 2021 Project Manager (Traffic Impact
Tingkat (431 Unit) Di Atas Lot 2487, Jalan Sri Bintang 5, Segambut, Assessment)
58.
Mukim Batu, Wilayah Persekutuan Kuala Lumpur

Traffic Impact Assessment Study For Proposed Residential Private Matrix Concepts (NS) Sdn Bhd 2021 Project Manager (Traffic Impact
Development Of Nusari Aman 3, Bandar Sri Sendayan, Daerah Assessment)
59.
Seremban, Negeri Sembilan Darul Khusus.

60. Proposed Residential Development On Lot 4267, 4268 & 512 At Private Impero Land Sdn Bhd 2020 Project Manager (Traffic Impact
Jalan Sentul Maju, Sentul, Kuala Lumpur Assessment)
61. DUTA - ULU KELANG EXPRESSWAY (PHASE 2A) -Traffic Private Ekovest Management 2020 Project Manager Independent Traffic
Due Dilengence and Techical Audit Study
62. RKAT Kem Kukusan Tawau Private EEC Sdn. Bhd. 2020 Project Manager (Traffic Impact
Assessment)
63. Independent Traffic Study For The Duta – Ulu Kelang Expressway Private Ekovest Management 2020 Project Manager Independent Traffic
(Phase 3) – Study
Premilminary Traffic Impact Assessment Study For The Proposed Private SSF Venture Sdn Bhd 2020 Project Manager Independent Traffic
Mixed Development On Lot 33635, Jalan Sri Semantan 1, Mukim Study
64.
Kuala Lumpur, Wilayah Persekutuan.

Cadangan Meroboh Bangunan Sedia Ada Dan Membina Semula


Bangunan Hotel 47 Tingkat Dengan 2 Tingkat Mezzanine , Di Atas
Lot Pt 9 Seksyen 52, Persiaran Barat, Mukim Bandar Petaling Project Manager (Traffic Impact
65. Private Glomic Tower Sdn Bhd 2020
Jaya,Daerah Petaling, Selangor Darul Ehsan Untuk Tetuan Glomics Assessment)
Tower Sdn Bhd

Permohonan Kebenaran Merancang Mengikut Seksyen 21 Akta 172


Bagi Cadangan Meroboh Dan Membina Semula Bangunan
Perindustrian Serta Permohonan Pernyerahan Balik Dan
Pemberimilikan Semula Tanh Di Bawah Seksyen 2048 Ktn Di Atas Project Manager (Traffic Impact
66. Private Tembikar Wei Khing Sdn Bhd 2020
Lot 736 Dan Lot 3957, Jalan Kapar/Ku3, Sungai Pinang, Mukim Assessment)
Kapar, Daerah Klang, Selangor Darul Ehsan Untuk Tetuan Tembikar
Wei Khing Sdn Bhd.

Trafic Impact Assessment For Environmental Impact Assessment Private EKL Business Sdn Bhd 2020 Project Manager (Traffic Impact
(Eia) Study For Quarry Project In Segari Melintang Forest Reserve, Assessment)
67.
Kinta Manjung District, Perak Darul Ridzuan.

Permohonan Kebenaran Merancang Bagi Cadangan Pembangunan


Bercampur Di Atas Lot- Lot 149, 150, 189, 664, 665, 668, 801, 802,
1349, 1350, 1351, 1352,
68. Private Waz Lian Holdings 2020 Project Manager
1353, 1362 Dan Pt 66, Mukim 19, Seberang Perai Tengah, Pulau
Pinang Untuk Tetuan Waz Lian Holdings Sdn Bhd (Traffic Impact
Assessment)
Cadangan Perubahan Guna Tanah Dan Intensiti Pembangunan Pelan Project Manager (Traffic Impact
Tempatan Di Atas Lot 481475, Jalan Manis, Mukim Kuala Lumpur, Assessment)
69. Zon Strategik Pusat Bandar Tun Razak- Sungai Besi Seperti Di Peta Private MX Too Sdn Bhd 2020
Indeks Bernombor 212 Untuk Tetuan Rontaco Sdn Bhd

Cadangan Perubahan Intensiti Pembangunan Pelan Tempatan Di Project Manager (Traffic Impact
Atas Lot 292 Dan Lot 323, Jalan Utara, Bandar Kuala Lumpur, Zon Assessment)
70. Strategik Pusat Bandar Raya Seperti Di Peta Indeks Bernombor 127 Private MX Too Sdn Bhd 2020
Untuk Tetuan Rontaco Sdn Bhd

Permohonan Kebenaran Merancang Pelan Susunatur Bagi Cadangan Project Manager (Traffic Impact
Pecah Sempadan Untuk Tujuan Perdangangan Bercampur Di Atas Pt Assessment)
71. 1107, Persiaran Sukan, Seksyen 13 Shah Alam, Selangor Untuk Private Bijak Fajar Sdn Bhd 2020
Tetuan Perbadanan Kemajuan Negeri Selangor (PKNS).

Traffic Impact Assessment For The Proposed Mixed Development Private Foremost Wealth 2020 Project Manager (Traffic Impact
On Part Of Lot Pt 47250 At Persiaran Mahkota Cheras 1- Jalan Management Assessment)
Temenggung 21/9, Bandar Mahkota Cheras, Selangor.
Government/ Tahun Kajian Peranan/Jawatan Di Dalam Kajian
Bil. Nama Kajian Private/Luar Nama Pelanggan Dilaksanakan
Negara
72. Proposed Repositioning Of Kertih (Rantau Land) As Sustainable Traffic Consultant/Trafic and
Community Living At Mukim Kertih, Daerah Kemaman, Terengganu Private Urban Scale Studio/ KLCC 2020 Transportation Sector
Darul Iman
73. Rancangan Tempatan Daerah Kuala Kangsar 2035 (Penggantian) Government AJM Planning And Urban 2020 Traffic Consultant/Trafic and
Design Group Sdn Bhd Transportation Sector
74. Kajian Rancangan Kawasan Khas Tapak Warisan Dunia George Town Government PLANMalaysia @Pulau Pinang/ 2020 Traffic Consultant/Trafic and
(Penggantian) Citiplan Network Transportation Sector
75. Rancangan Tempatan Majlis Bandaraya Pulau Pinang (Penggantian) Government AJM Planning And Urban 2020 Traffic Consultant/Trafic and
2030 Design Group Sdn Bhd Transportation Sector
76. AJM Planning And Urban Traffic Consultant (Trafic and
Kajian Special Agro Economic Zone (SAEZ) Government Design Group Sdn Bhd 2020 Transportation & Infrastructure Sector)

77. Rancangan Tempatan Daerah Kota Tinggi 2030 (Penggantian) Government PPZS/Citiplan Network 2020 Trafic and Transportation
Consultant
78. Permohonan Pindaan Kebenaran Merancang Bagi Cadangan Private Acer Venture Sdn. Bhd. 2019 Project Manager (Traffic Impact
Membina 4 Unit Kedai Pejabat 2 Tingkat Di Atas Sebahagian Lot Pt Assessment)
5015, Jalan Pjs 2/7, Daerah Petaling, Selangor

79. Traffic Circulation, Congestion And Management Study For The Private GEMBOX Berhad 2019 Project Manager (Traffic Impact
Temporary Night Market At Nilai Vision City Assessment)
80. Traffic Impact Assessment Study For Change Of Zoning To Project Manager (Traffic Impact
Commercial At The Proposed Development Nipah 2 On Lot 11979, Private Titijaya Land Berhad 2019 Assessment)
Jalan Nipah, Ampang, Kuala Lumpur
81. Proposed Mix Development On Lot 30354 At Jalan 34/26 , Wangsa Setapak Heights Project Manager (Traffic Impact
Maju, Mukim Setapak, Kuala Lumpur For Messrs Setapak Heights Private Development 2019 Assessment)
Development Sdn Bhd
Traffic Impact Analysis For The Proposed Junctions Serving Phase A8- Project Manager (Traffic Impact
11(a) And Phase A8-10, Located Along Persiaran Panglima Hitam Assessment)
82. And Proposed New Junctions Serving Phase A8-11(b), Located Along Private I&P Group 2019
Persiaran Tun Teja, Alam Impian Development

83. Kajian Trafik Bagi Jalan Lapangan Terbang Subang Lama Daripada Private MTransport Consult Sdn Bhd 2019 Project Manager (Traffic Impact
Persimpangan Lebuhraya Persekutuan Sehingga Persimpangan Assessment)
Jalan Sungai Buloh, Daerah Petaling, Selangor”

84. Proposed Development on Lot 16378 with Approximately 66.40ha BSS Development Sdn. Project Manager (Traffic Impact
(164.08 acres) at Mukim Labu, Daerah Seremban, Negeri Sembilkan Private Bhd. 2019 Assessment)
Darul Khusus
85. Proposed Langkawi Velodrome, Langkawi, Kedah Darul Aman. Private MMC-Gamuda Joint 2019 Project Manager (Traffic Impact
Venture Assessment)
86. Cadangan Membina Dan Menyiapkan Sebuah Stesen Minyak Private Rushdanmdsalleh Architect 2019 Project Manager (Traffic Impact
Petronas Di Atas Lot GRN 162462, Lot 10592, Mukim 19, Seberang Assessment)
Perai Tengah, Pulau Pinang Untuk Petronas Dagangan Berhad

87. Permohonan Kebenaran Merancang Bagi Tujuan Perumahan


Melalui Serah Balik Dan Berimilik Semula (Seksyen 204a)( KTN 1965)
Di Atas Lot 369, Lot 422 Dan Lot 665, Mukim Tampin Tengah,
Private Protasco Development Sdn Bhd 2019 Project Manager
Daerah Tampin, Negeri Sembilan Darul Khusus - (Traffic Impact
Assessment)

88. Traffic Impact Assessment For The Proposed Mixed Development


On Lot 480093 & 480094 Mukim Kuala Lumpur, Wilayah Private Akitek Akiprima 2019 Project Manager
Persekutuan.
89. Traffic Impact Assessment Study For The Proposed Waldorf Kelip- Private Rawang Lakes Sdn. Bhd. 2019 Project Manager
Kelip International School, Bandar Tasik Puteri BTP 2, At Lot 1571,
Mukim Rawang, Daerah Gombak, Selangor Darul Ehsan

90. Traffic Impact Assessment Study for The Proposed New Mcdonald’s
Drive-Thru Restaurant At Petronas Station In Bukit Beruntung, Private YD Planners Sdn Bhd 2019 Project Manager
Serendah, Selangor Darul Ehsan
91. Preliminary Traffic Impact Assessment Study For Proposed Private Vanacres Sdn Bhd/ Titijaya 2019 Project Manager (Traffic Impact
Apartment Development And New 3k Complex At Persiaran Land Assessment)
Kewajipan , Subang Jaya, Selangor Darul Ehsan.

92. Proposed Mixed Development in Semenyih, Selangor Darul Ehsan Private Inch Kenneth Kajang Rubber 2019 Project Manager (Traffic Impact
(Additional Traffic Studies) PLC Assessment)
93. Traffic Impact Assessment Study For Proposed Irama Sendayan
Housing Development At Lot 5366 - Lot 5367, Lot 5369 - Lot 5375,
Lot 5405 -Lot 5406, Lot 5408 - Lot Project Manager (Traffic Impact
Private Matrix Concepts (NS) Sdn Bhd 2019
5409, Lot 5415, Lot 26305 - Lot 26307, Lot 73455 And Assessment)
Lot 73459 - Lot 73460 , Mukim Labu Daerah Seremban, Negeri
Sembilan Darul Khusus
94. The Proposed Of Upgrading And Expansion Of Terminal Building, Private Consortium CPG Consultants Pte 2019 Project Manager (Traffic Impact
Aircraft Parking Apron And Associated Facilities At Penang Ltd (CPG) and AHS Architects Sdn Assessment)
International Airport, Malaysia Bhd (AHS

95. The Profiling & Strategic Implementation Plan For Special AJM Planning And Urban Traffic Consultant (Kajian Strategik)
Development Zone (SDZ) in Northern Corridor Economic Region Government Design Group Sdn Bhd 2019
(NCER)
96. Rancangan Fizikal Zon Persisiran Pantai Negara (RFZPPN) AJM Planning And Urban Traffic Consultant (National Physical Plan
Government Design Group Sdn Bhd 2019 – Sektor Pengangkutan)

97. JPBD Selangor/ AJM Planning And Perunding Trafik dan Pengangkutan
Rancangan Kawasan Khas Kuala Kubu Bharu (RKK KKB) Government Urban Design Group Sdn Bhd 2019 (Sektor Trafik dan Pengangkutan)

98. Rancangan Tempatan Majlis Bandaraya Ipoh 2035 (Penggantian) Government Majlis Bandaraya Ipoh/ 2019 Perunding Trafik dan Pengangkutan
Citiplan Network /Sektor Pengurusan Lalu Lintas dan
Pengangkutan Awam
Government/ Tahun Kajian Peranan/Jawatan Di Dalam Kajian
Bil. Nama Kajian Private/Luar Nama Pelanggan Dilaksanakan
Negara
99. Rancangan Tempatan Daerah Tampin 2035 Government Citiplan Network 2019 Perunding Trafik dan Pengangkutan
/Sektor Pengurusan Lalu Lintas dan
Pengangkutan Awam

100. Trafic Impact Assessment For Second Schedule Environmental Private Ir Dr Aziz Consults Sdh Bhd 2018 Project Manager(Traffic Impact
Impact Assessment For The Proposed Tanjung Agas Industrial Park Assessment – EIA S2)
Reclamation, Kuantan, Pahang

101. Traffic Impact Assessment Study For The Proposed Housing Private MS Property Development Sdn 2018 Project Manager (Traffic Impact
Development on Lot 6452, Batu 7 Jalan Maran, Mukim Bukit Bhd Assessment)
Segumpal, Daerah Maran, Pahang Darul Makmur.

102. Bamboo Garden Traffic Impact Assessment Private Tiarawoods Sdn Bhd/ UOA 2018 Project Manager (Traffic Impact
Assessment)
103. Proposed Development Of Bandar Sempadan Kota Putra, Mukim Project Manager (Traffic Impact
Batang Tunggang Kiri, Daerah Padang Terap, Kedah Darul Aman Private KP Border City Sdn Bhd 2018 Assessment)

104. Traffic Impact Assessment Study For The Proposed Development 62- Private Welton Builder Sdn Bhd 2018 Project Manager (Traffic Impact
Storey Suite Service (Orion Tower) On Lot 803-808, 1327, 1328 And Assessment)
1354, Jalan Palmer / Jalan Imbi, Seksyen 67, KL

105. Traffic Impact Assessment Study For The Proposed Development Private ASIE Sdn Bhd 2018 Project Manager (Traffic Impact
Parcel S – Dewan Bandaraya Kuala Lumpur (Dbkl) Housing At Part Of Assessment)
Lot Pt456 , Jalan Sentul, Mukim Setapak, Kuala Lumpur.

106. Trafic Impact Assessment Study for The Proposed Development At Project Manager (Traffic Impact
Phase 1-Lot 5867, Mukim Si Rusa, Daerah Port Dickson, Negeri Private GD Holdings Bhd 2018 Assessment)
Sembilan Darul Khusus
107. Proposed Vision Central PT3373 Development, Nilai, Negeri Private GD Holdings Bhd 2018 Project Manager (Traffic Impact
Sembilan Darul Khusus Assessment)
108. Trafic Impact Assessment Study for Sentul Land, Kuala Lumpur Private OSK Property Holdings 2018 Project Manager (Traffic Impact
Berhad Assessment)
109. Traffic Study for LOT 106278 Development, Teluk Gong, Daerah Private Total Teamwork Sdn Bhd 2018 Project Manager (Traffic Impact
Klang Assessment)
110. Traffic Imact Assessment Study for Replanning Alam Impian, Shah Private S P Setia Bhd Corporate HQ 2018 Project Manager (Traffic Impact
Alam, Selangor Assessment)
111. Sunway Velocity Signage Study Private Sunway Integrated 2018 Project Manager (Kajian Signage)
Properties Sdn Bhd
112. Mitsui Outlet Park, Bayan Lepas Penang Private SATO KOGYO Co., Ltd. 2018 Project Manager (Traffic Impact
Assessment)
113. Traffic Study for Proposed Development Intensity at Klang Sentral, Private Titijaya Land Bhd 2018 Project Manager (Traffic Impact
Klang Assessment)
114. Comprehensive Development Plan of Wilayah Perak Selatan Private AJM Planning and Urban 2018 Project Manager (Perancangan
Design Group Sdn. Bhd. Pengangkutan)
115. Urban Design Guidelines for Development Surrounding HSR Stations Government AJM Planning And Urban 2018 Project Manager (TOD)
Design Group Sdn Bhd
116. Environmental Impact Assessment For The Proposed Tanjung Agas Project Manager (Traffic Impact
Industrial Park, Kuantan, Pahang (Traffic Impact Assessment (EIA) Private Velcro Envirotech Sdn Bhd 2017 Assessment (EIA)

117. Proposed Masterplan At South Zone On Lot 5061 Private IIUM Properties ( 2017 Project Manager (Pelan Induk
,Mukim Setapak, Gombak Urbanisma) Pengangkutan)
118. Putrajaya Sentral Private Sapura Properties 2017 Project Manager (Traffic Impact
Assessment)
119. Proposed Mixed Development At Kampung Bukit Kuang, Jalan Private JUBIMAS SDN BHD 2017 Project Manager (Traffic Impact
Masjid, Terengganu Assessment)
120. Projek Pembesaran Dan Menaiktaraf Lapangan Terbang Sultan Private Euro Saga Sdn. Bhd. 2017 Project Manager (Traffic Impact
Ismail Petra Kota Bharu, Kelantan Assessment)
121. Rancangan Tempatan Majlis Bandaraya Shah Alam (Pengubahan 3) Government MBSA/CitiPlan Network 2017 Perunding Trafik dan
2020 Pengangkutan
122. Origin Destination Majlis Bandaraya Shah Alam Government MBSA 2017 Project Manager (Kajian
Pengangkutan)
123. Traffic Impact Assessment Study For UOA Pantai 2 Development Private UOA Development Bhd. 2017 Project Manager (Traffic Impact
Assessment)
124. Traffic Impact Assessment Study For The Proposed Of Mix Project Manager (Traffic Impact
Development At Lot 2507, Bangsar South City, Kuala Lumpur Private UOA Development Bhd. 2017 Assessment)

125. Traffic Impact Assessment Study For The Proposed Mix B&G Global Property Sdn Bhd Project Manager (Traffic Impact
Development At Bandar Sungai Buaya, Rawang,Selangor Darul Private 2017 Assessment)
Ehsan
126. Traffic Study For The Proposed Mixed Development At PTD 155868 Ehsan Plant & Property Sdn Project Manager (Traffic Impact
And PTD 155869, Mukim Tebrau, Daerah Johor Bharu, Johor Darul Private Bhd. 2017 Assessment)
Takzim
127. Traffic Study For The Proposed Mixed Development At Lot 31576- Ehsan Plant & Property Sdn Project Manager(Traffic Impact
31579, Bandar Baru Nilai, Seremban, Negeri Sembilan Private Bhd. 2017 Assessment)

Traffic Impact Assessment Study For The Proposed Rawang Lakes Private Rawang Lakes Sdn. Bhd. 2017 Project Manager(Traffic Impact
Bandar Tasik Puteri Development BTP 8/16 And Btp 5 (P5&6) At Assessment)
128.
Mukim Rawang, Daerah Gombak, Selangor Darul Ehsan

129. Cadangan Pembangunan Kediaman Di Atas Lot 45648, Jalan Project Manager (Traffic Impact
33/142,Bukit Mandarina, Mukim Petaling, Daerah Kuala Lumpur Private Caprice Land Sdn Bhd 2017 Assessment)

Proposed Traffic Study For The Proposed Plant For Secret Recipe Private Dunamis Consult 2017 Project Manager (Traffic Impact
Manufacturing Sdn Bhd At Lot Pt 9907, No 8 Jalan Teknologi 3/4, Assessment)
130.
Kota Damansara, Petaling Jaya

131. MBPJ Bus Shelter Government MBPJ/ Urban Scale 2017 Project Manager (Kajian
Pengangkutan)
Government/ Tahun Kajian Peranan/Jawatan Di Dalam Kajian
Bil. Nama Kajian Private/Luar Nama Pelanggan Dilaksanakan
Negara
132. Cadangan Pembangunan Pangsapuri Perkhidmatan Di Atas Lot 5598 Private Ancubic Holdings Sdn Bhd 2017 Project Manager (Traffic Impact
Mukim Kuala Lumpur Assessment)
Proposed Penang Airport Complex Development Comprising Airport Private Ideal LPY Development Sdn 2017 Project Manager (Traffic Impact
Multilevel Carpark Complete With Infrastructure Works On Jalan Bhd Assessment)
133.
Sultan Azlan Shah, Mukim 12, Daerah Barat Daya, Pulau Pinang

134. Cadangan Pembangunan Pangsapuri Perkhidmatan Di Atas Lot 5598 Private Ancubic Holdings Sdn Bhd 2017 Project Manager (Traffic Impact
Mukim Kuala Lumpur Assessment)
135. Proposed Residential Development At Bandar Sri Menjalara Private Setiakon Engineering Sdn. 2017 Project Manager (Traffic Impact
Bhd. Assessment)
136. Mixed Development Sri Petaling 2 Private UOA BERHAD 2017 Project Manager (Traffic Impact
Assessment)
137. WKL 16077 Xin Hwa Private M/S Xin Hwa Trading & 2017 Project Manager (Traffic Impact
Transport Sdn. Bhd Assessment)
138. Traffic Management Study for Lot 152, Jalan Ampang Private Amat Perdana Sdn Bhd 2017 Project Manager (Traffic Impact
Assessment)
139. Proposed Residential Development at Lot 26921 (HSD 120381), Private Skyload Express Sdn Bhd 2017 Project Manager (Traffic Impact
Persiaran Dutamas Assessment)
140. Traffic Impact Assessment (TIA) Study for the R&R on Lot 5062, Private IIUM Properties ( 2017 Project Manager (Traffic Impact
Mukim Setapak, Gombak Urbanisma) Assessment)
141. UKM Conceptual MasterPlan Private UKM 2017 Project Manager (Pelan Induk
Pengangkutan)
142. Proposed Banquet Facilities And Ancillary Building At Part Of Pt. Private Puncak Niaga Properties 2017 Project Manager (Traffic Impact
No.2513, Seksyen 13- Puncak Niaga Assessment)
143. RAC SUBANG Private Titijaya Land Bhd 2017 Project Manager (Traffic Impact
Assessment)
144. Traffic Impact Assessment For The Proposed Street Mall And Racing Private Puncak Alam Housing Sdn Bhd 2017 Project Manager (Traffic Impact
Circuit Assessment)
145. Rawang Lakes Bandar Tasik Puteri Development BTP 5 Private Rawang Lakes Sdn. Bhd. 2017 Project Manager (Traffic Impact
Assessment)
146. Mixed Development On NI7E Project in Nilai Impian Private Sdn Bhd 2017 Project Manager (Traffic Impact
Assessment)
147. Residential Development On Lot 55499 Taman Desa Aman Private Builtamont Development Sdn. 2017 Project Manager (Traffic Impact
Bhd Assessment)
148. Sunway Velocity Two Private Sunway Velocity TWO Sdn Bhd 2017 Project Manager (Traffic Impact
Assessment)
149. Mixed Development At Lot 36381, Bukit Jalil Private Twinwood Development Sdn 2017 Project Manager (Traffic Impact
Bhd Assessment)
150. Sunway Velocity Two Private Sunway Velocity TWO Sdn Bhd 2017 Project Manager (Traffic Impact
Assessment)
151. Mixed Development At Lot 36381, Bukit Jalil Private Twinwood Development Sdn 2017 Project Manager (Traffic Impact
Bhd Assessment)
152. Proposed Development at Taman Desa on Lot PT 9420- RA Private RAMRAIS & PARTNERS 2017 Project Manager (Traffic Impact
Assessment)
153. Proposed Three-Storey Church Developmenton on Lot 16746 (PT Private Tetuan Grace Assembly of God 2017 Project Manager (Traffic Impact
715), Lorong SS 23/6E, Taman Sea Assessment)
154. Selayang Residential Private Topview Housing Sdn Bhd 2017 Project Manager (Traffic Impact
Assessment)
155. Proposed 28-Storey Service Apartment On Lot 810, Lorong Peel Private SME Associates Sdn Bhd 2017 Project Manager (Traffic Impact
Assessment)
156. Proposed Development at Plot B, Seksyen 90, Jalan ShahBandar, Private Tanda Warisan Sdn Bhd 2017 Project Manager (Traffic Impact
Kuala Lumpur Assessment)
157. PPM1A Development At Precinct 11, Putrajaya Private Brew Vantage Sdn Bhd 2016 Project Manager (Traffic Impact
Assessment)
158. Comprehensive Development Plan for Malaysia Vision Valley AJM Planning and Urban Traffic Consultant/ Perhubungan &
Government Design Group Sdn. Bhd. 2016 Perancangan Pengangkutan

159. Subang-Klang Expressway Pre-Feasibility Study Private EEC Sdn. Bhd. 2016 Project Manager (Traffic Impact
Assessment)
160. Rawang Lakes Residential Development Private Rawang Lakes Sdn. Bhd. 2016 Project Manager (Traffic Impact
Assessment)
161. Mixed Development on Lot 30353,alan 34/26, Wangsa Maju Private Setapak Heights Development 2016 Project Manager (Traffic Impact
Sdn. Bhd. Assessment)
162. TIA - Sutera Damansara, Sg Buloh Private OSK Property Holdings Bhd 2016 Project Manager (Traffic Impact
Assessment)
163. TIA for Residential Developmentin Kota Gadong Private Riverine Projects Sdn. Bhd. 2016 Project Manager (Traffic Impact
Assessment)
164. Vision City Development, Nilai, Negeri Sembilan Private GD Holdings Bhd 2016 Project Manager (Traffic Impact
Assessment)
165. Riveria Development (Lot 1233 (Pt110)) At Brickfields, Kuala Lumpur Private Titijaya Land Bhd 2016 Project Manager (Traffic Impact
Assessment)
Proposed Office Suite And Commercial Development At Lot 9, Project Manager Pembangunan
Lorong Sultan, Seksyen 52, Daerah Petaling Jaya, Selangor For KUB Berorientasikan Transit (TOD)/ Traffic
166. Tower Sdn Bhd ("Project") Private Kub Tower Sdn Bhd 2016 Impact Assessment Kajian Trafik
Impak

167. Proposed Development of 36 floor Servis Apartment at Lot 11272 & Private Huatland Development Sdn. 2016 Project Manager (Traffic Impact
11273, Mukim Ampang Bhd. Assessment)
168. Development On Lot 235, Mukim Jus, Daerah Jasin, Melaka Private PRIMA 2016 Project Manager (Traffic Impact
Assessment)
169. Traffic Study for Bangsar South City Private UOA BERHAD 2016 Project Manager (Traffic Impact
Assessment)
170. Sri Petaling Mixed Development Private UOA BERHAD 2016 Project Manager (Traffic Impact
Assessment)
171. Development of Taman Sri Gading , Machap, Melaka Private Mampan Esa (Melaka) Sdn Bhd 2016 Project Manager (Traffic Impact
Assessment)
Government/ Tahun Kajian Peranan/Jawatan Di Dalam Kajian
Bil. Nama Kajian Private/Luar Nama Pelanggan Dilaksanakan
Negara
172. Proposed Mixed Development On Lots No. 1835, 1317 And 1316 Project Manager (Traffic Impact
(2.91 Acres), Jalan Tuanku Rahman, Kuala Lumpur. Private Titijaya Land Sdn Bhd 2016 Assessment)

173. Penang Waste Transfer Station and Reclamation at Batu Maung, Private Titijaya Land Sdn Bhd 2016 Project Manager (Traffic Impact
Penang Assessment)
174. Proposed Petrol Station and Fast Food on Lot PT 65056,Persiaran Private Sime Darby Bhd. 2016 Project Manager (Traffic Impact
Hamzah Alang, Klang Assessment)
175. Proposed 22 Estate Workers’ Housing Project In Semenyih, Selangor Private Inch Kenneth Kajang Rubber 2016 Project Manager (Traffic Impact
Darul Ehsan PLC Assessment)
176. Impiana Cherating Hotels And Residences Private Impiana Sdn Bhd 2015 Project Manager (Traffic Impact
Assessment)
177. Labuan Development Blueprint Study: Connectivity & Traffic Consultant/ Perhubungan &
Transportation Planning Government Perbadanan Labuan 2015 Perancangan Pengangkutan

178. Penang Mitsui Outlet Park And Multilevel Car Parking Private MAHB 2015 Project Manager (Traffic Impact
Assessment)
179. Sky Cab (Cable Car) in Pulau Pinang Private MRCB 2015 Project Manager (Traffic Impact
Assessment)
180. Pulau Banding Traffic Management Study, GRIK Private EMKAY Holdings Berhad 2015 Project Manager (Pengurusan Trafik)

181. LRT Line 3 Bandar Utama to Klang Government Syarikat Prasarana 2015 Project Manager (Traffic Impact
Assessment)
Project Manager(Perancangan
182. Alor Star Urban Design and Building Height Study Government JPBD 2015 Pengangkutan)

Project Manager(Perancangan
183. Prima Tanjung 12 Township Development Private PR1MA 2015 Pengangkutan)

184. Proposed Mixed Evelopment In Semenyih, Selangor Darul Ehsan Private INCK Kenneth Kajang 2015 Project Manager (Perancangan
Rubber Pengangkutan)
185. Tradewinds Square Development Private Tradewinds Imternational 2015 Project Manager (Traffic Impact
Assessment)
186. Mixed Development on Lot 256 & Lot 257, Batu 9, Hulu Langat Private GMG Green Land Sdn. Bhd. 2015 Project Manager(Traffic Impact
Assessment)
187. AEON Shopping Mall, Taman Maluri Private AEON (M) Sdn. Bhd 2015 Project Manager (Traffic Impact
Assessment)
AEON BIG Malaysia Sdn. Project Manager(Perancangan
188. AEON Big Subang Private Bhd. 2015 Pengangkutan)

189. Sendayan Techpark TIA for EIA Private Matrix Group Bhd 2015 Project Manager (Traffic Impact
Assessment)
190. TNB Headquarters Redevelopment Private TNB 2015 Project Manager (Traffic Impact
Assessment)
191. Elevated Sprint Traffic Review at Pusat Bandar Damansara Private Selangor Properties 2015 Project Manager (Kajian Semula
Trafik)
192. Traffic Impact Assessment for Environmental Impact Assessment of Private ERE Consulting Group 2015 Project Manager(Traffic Impact
Penang LRT Line Assessment DEIA)
193. Traffic Assessment for the EIA for the Proposed DUKE 3 Private Ekovest Bhd 2015 Project Manager (Traffic Impact
Assessment)
Luar Negara Project Manager/Perancangan
194. Marrakech City Transport Masterplan (Marrakech) Moroccan Government 2014 Pengangkutan

195. Tradewinds International Mixed Land-Use Development at Jalan Private TRADEWINDS 2014 Project Manager (Traffic Impact
Sultan Ismail, Kuala Lumpur Assessment
196. Glenmarie Mixed Development Private GMG Green Land Sdn. Bhd. 2014 Project Manager (Traffic Impact
Assessment)
197. Gua Musang Cement Plant and Quarry Private Environment Asia Sdn. Bhd. 2014 Project Manager (Traffic Impact
Assessment)
198. Gentrification and Beautification of Jalan Tuanku Abdul Government DBKL 2014 Urban Renewal Study
Rahman/Jalan Haji Taib
199. Royal Selangor Golf Club (Stakeholder) Traffic Study/Audit for KLIFD Private RSGC 2014 Project Manager (Traffic Impact
Assessment)
200. Traffic Study for Proposed Mix Development on Lot 135 Jalan Peel Private Austral Meridien Sdn. Bhd. 2014 Project Manager (Traffic Impact
Assessment)
201. Taman Sri Muda Shop Lot Private AEH Capital Sdn Bhd. 2014 Project Manager (Traffic Impact
Assessment)
202. Tradewinds Istana Mixed Development at Jalan Raja Chulan Private TRADEWINDS 2014 Project Manager (Traffic Impact
Assessment)
203. SJKT Sg. Renggam Government MOE 2014 Project Manager / Rekabentuk
Struktur
Project Manager/Perancangan
204. Carey Island Transport Masterplan Private Sapura Properties 2013 Pengangkutan

205. Proposed Serendah Junction Upgrading Private Ultmate Essence Sdn Bhd 2013 Project Manager (Traffic Impact
Assessment)
206. Transportation Master Plan for the Proposed New Government City Luar Negara NIGERIAN GOVERNMENT 2013 Project Manager (Perancangan
in Ogun State, Nigeria (Nigeria) Pengangkutan)
207. Abeokuta Urban Renewal Scheme Transportation Masterplan, Ogun Luar Negara Nigerian Government 2013 Project Manager (Perancangan
State, Nigeria (Nigeria) Pengangkutan)
208. Cheras Mixed Development Private Accolade Land Sdn Bhd 2013 Project Manager (Traffic Impact
Assessment)
209. Rawang Townhouse Development Private Primarc Development 2013 Project Manager (Traffic Impact
Assessment)
210. Parcel Q Bandar Sri Permaisuri Mixed Development Private Seal Properties 2013 Project Manager (Traffic Impact
Assessment)
211. Proposed Development Of Kota Putra Rubber City As Special Border Perunding Alam Bina Sdn. Project Manager/Perancangan
Economic Zone (SBEZ) Within The Natural Rubber Economic Belt Private Bhd. 2013 Pengangkutan
(NREB)
Government/ Tahun Kajian Peranan/Jawatan Di Dalam Kajian
Bil. Nama Kajian Private/Luar Nama Pelanggan Dilaksanakan
Negara
212. Feasibility Study for a New Airport in Mukah, Sarawak Government Economic Planning Unit 2013 Project Manager (Kajian Kemungkinan
(EPU) (Feasibility))
213. Opus Mixed Development in Bandar Sri Damansara Private OSK PROPERTY HOLDINGS 2013 Project Manager (Traffic Impact
BHD. Assessment)
214. Connaught Bridge Power Station Reconstruction Private TNB 2012 Project Manager (Traffic Impact
Assessment)
215. Skypark Terminal Rail Link Private Skypark 2012 Project Manager (Traffic Impact
Assessment)
216. Prime Minister’s Office, Brunei Roundabout/Junction Analyses Private Brunei PM'S Office 2012 Project Manager (Kajian
Persimpangan)
217. Jeniang Transfer Scheme and Naok Reservoir, Kedah Private DOE 2011 Project Manager (Traffic Impact
Assessment)
218. Sanitary Landfill at Lahat Private DOE 2010 Project Manager (Traffic Study for
EIA)
219. Proposed Expansion of PD-Lubricant Oil Blending Plant at Shell Private SHELL 2010 Project Manager (Traffic Impact
Refinery Complex, Port Dickson Assessment)
220. Proposed Integrated Steel Mill at Teluk Kalong Industrial Estate, Private DOE 2009 Project Manager (Traffic Impact
Kemaman, Terengganu Assessment DEIA)
221. Traffic Survey for Redevelopment of Atria Damansara Private OSK Property Holdings Bhd. 2009 Project Manager (Traffic Impact
Assessment)
222. Traffic Impact Assessment for Tanjong Langsat Port, Johor Private MERC 2009 Project Manager (Traffic Impact
Assessment)
223. Soba Residential Transportation Masterplan, Khartoum, Sudan Luar Negara Sudanese Developers 2009 Project Manager (Traffic Impact
Assessment)
224. Solid Waste Incinerator in Cameron Highlands Traffic Impact Private 2008 Project Manager (Traffic Impact
Assessment for EIA Assessment)
225. Ashworth Mixed Development Private Accolade Land Sdn Bhd 2008 Project Manager (Traffic Impact
Assessment)
226. Alsunut Development Infrastructure Masterplan Luar Negara DAL Group 2008 Project Manager (Perancangan
(Sudan) Pengangkutan)
227. Alsunut Development Transportation Masterplan, Sudan Luar Negara DAL Group 2008 Project Manager (Perancangan
Pengangkutan)
228. East Coast Expressway Feasib9ility Study Private Daya 1998 Ketua Traffic Consultant (Kajian
Feasibiliti)
229. Sungai Petani – Kulim – Bandar Baharu Expressway Private Daya 1998 Project Manager (Traffic Impact
Assessment)
230. Chennai – Tambaram Elevated Expressway and Chennai – Hosur Negara Luar G2G 1997 Perunding Trafik (Lebuhraya)
Expressway (India)
231. Gebeng Industrial Park Transport Masterplan Private PSEDC 1996 JuruteraTrafik (Pelan Induk
Pengangkutan)
232. Butterworth – Kulim Highway and Seremban – Port Dickson Private Gamuda 1996 Perunding Trafik (Lebuhraya)
Highway
233. Berjaya Industrial Park Development Transport Masterplan Private Berjaya Land 1996 JuruteraTrafik (Pelan Induk
Pengangkutan)
234. Miri Resort City Transport Masterplan Private MRCT 1996 JuruteraTrafik (Pelan Induk
Pengangkutan)
235. Universiti Malaya Subregional Traffic Study Private UM 1996 Traffic Consultant (Kajian Trafik)

236. Ampar Tenang Estate Transport Masterplan Private Sime Darby 1996 Traffic Consultant (Pelan Induk
Pengangkutan)
237. Universiti Islam Antarabangsa Kuantan Campus Transport Private NA 1995 JuruteraTrafik (Pelan Induk
Masterplan Pengangkutan)
238. Padang Meha Estate Transport Masterplan Private Sime Darby 1995 Traffic Consultant (Pelan Induk
Pengangkutan)
239. Socfin Estate Transport Masterplan Private Socfin 1995 Traffic Consultant (Pelan Induk
Pengangkutan
240. Commercial Development at Jalan 51A/223 Private ITM 1995 Traffic Consultant (Traffic Impact
Assessment)
241. Traffic Impact Assessment for Larkin Central Development Private JSEDC 1995 Traffic Consultant (Traffic Impact
Assessment)
242. Tanjung Aru Reclamation Traffic Study Government Majlis Bandaraya Kota 1995 Traffic Consultant (Traffic Impact
Kinabalu Assessment)
243. Kuchai Entrepreneur's Park Junction Analysis Private UEM Sunrise 1995 Traffic Consultant (Traffic Impact
Assessment)
244. Traffic Impact Assessment for Mont' Kiara Development Private UEM Sunrise 1994 Traffic Consultant (Traffic Impact
Assessment)
245. Traffic Study for Wisma ATRIA Redevelopment, Damansara Jaya Private OSK Holding Berhad 1994 Traffic Consultant(Traffic Impact
Assessment)
246. Trasnport Circulation Scheme for Bandar Baru Nilai Bus & Taxi Private BBN 1994 Traffic Consultant (Traffic Impact
Terminus Assessment)
247. Traffic Study for Hume Headquarters Private Hong Leong 1994 Traffic Consultant (Traffic Impact
Assessment)
248. Nellore Bypass Road Privatisation Scheme Negara Luar G2G 1994 Traffic Consultant (Traffic Impact
(India) Assessment)
249.
Privatisation of Sedenak - Kulai Highway, Johor Private LLM 1994 Traffic Consultant (Traffic Impact
Assessment)
250.
Traffic Study for Yangon - Mandalay Union Highway Negara Luar G2G 1994 Traffic Consultant (Traffic Impact
(Myanmar) Assessment)
251.
Traffic Study for Guthrie Outer Ring Road Private Guthrie 1994 (Traffic Impact Assessment)

8. Anugerah Yang Pernah Diperolehi (sekiranya ada) :

Bil. Nama Anugerah Tahun Dianugerahkan Badan / Organisasi Yang Menganugerahkan

1. NIL NIL NIL


9. Pengalaman Kerja (bermula dari pekerjaan terkini):

Bil. Nama Firma Jawatan Dalam Firma Tarikh Mula Perkhidmatan Tarikh Tamat Bilangan Tahun
(DD/MM/YYYY) Perkhidmatan Pengalaman
(A) (DD/MM/YYYY) (B -A)
(B)
1. JA Project Consultant Sdn Bhd Director 12/January/2015 Current 9.1

2. JA Consult Principal 1/February/2008 Current 16.1

3. Symonds Travers Morgan Sdn Bhd Director 1/September/1998 31/December/2007 9.0

4. Jurutera Perunding Daya Sdn. Bhd. Head of Deparment 1/August/1997 31/August/1998 1.0

5. Perunding Trafik Klasik Sdn. Bhd. Senior Traffic Engineer 21/October/1994 31/July/1997 3.0

6. The MVA Consultancy Sdn. Bhd. Traffic Engineer 1/October/1990 30/September/1994 5.0

You might also like