Existing
canal
61
30°
KEY PLAN

LEGEND :

70
Fence 1

Ø
Fence 2

Fence 3

Retaining Wall

Steel Pipe

67
Reinforced Concrete Pipe
52,35

Aerator Machine

Drainage

B B sdasdasd
TUGAS BESAR SDB

POTONGAN BB DRAWING TITLE

Ø 70 BEND 30
DERAJAT
A NUMBER DRAWING SHEET NO.
KEL.5B
KEL5B/01/2024
TAMPAK ATAS REFERENCE DRAWING SCALE
1:1

UNIT REVISE
Centimeter 0

MATA KULIAH

Ø70
TL 3202 SEWERAGE DAN DRAINASE
PROGRAM STUDI TEKNIK LINGKUNGAN
FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN
INSTITUT TEKNOLOGI BANDUNG

CHECKED BY : DATE APPROVED BY : DATE

KELOMPOK/GROUP TUGAS

KELOMPOK 5 GRUP B
CHECKED BY : DATE APPROVED BY : DATE

67

ASISTEN

Koordinator Asisten : Dhimas Dwinandha

POTONGAN AA Asisten Kelompok : Aurelia Fellita Shandy

DRAWN BY : DATE CHECKED BY : DATE

Kelompok 5B 12/03/2024