MBPP-MUPS-0.2MA2
Project/Build Name: KINGFISHER HYD 101 (ROMP-3) Vendor Submittal Ref. No: IN10021036
Submittal title:Submission of GA & SLD for MBPP-MUPS-0.2MA2
Date Submitted: 30/03/2023 Rev. No.: 04
Vendor Contact Name: Sanjoy K.Pal Contact Email: sanjoy.k.pal@in.abb.com
Declarations by Vendor
Description: MBPP-MUPS-0.2MA2
AWS Specification References*: ---- HYD101-ACM-A1-XX-SP-E-0007
Note: Technical submittals are to be submitted as one pdf file with all accompanying drawings and data included (see page 2 for information). This completed form to be
used as the lead sheet (first) page for each specific technical submittal for review. Submittals received in any other format will be rejected without review.
** Where the proposal does not conform to the design specification (or any products as listed therein), the contractor shall document proposed deviations – refer to page 3.
Reviewers Comments*
A = Examined no
comments
B = Proceed provided
A that work is in
compliance with
A B C D comments made
C = Rejected - re-submit
after correction
D = Not Reviewed /
Format not applicable
Technical submittals are reviewed for compliance with general arrangement and requirements specified under the contract. Fabrication, manufacture or construction may
proceed subject to incorporation of the amendments noted hereon. Dimensions, coordination with associated plant and all other services and site conditions compliance with
statutory regulations and compliance with specified requirements, remain the responsibility of the Vendor.
* For projects designed by external agencies, Consultant shall provide comments in the space provided and attach additional pages as required and issue it to the
Construction Manager. For projects designed by AWS, respective DE engineers shall provide comments in the Agile (preferred). Optionally they can use the above space
for providing comments
Mohanakumar
Engineer: Saket Suman Reviewed by: Date: 17/04/2023
Subramanian
Amazon Confidential – Do Not Distribute
1
LLE SUBMITTAL REVIEW FORM – LV PANELBOARDS
MBPP-MUPS-0.2MA2
Project Name: KINGFISHER HYD 101 (ROMP03) Submittal Ref. No: IN10021036
Submittal title: Submission of GA & SLD MBPP-MUPS-0.2MA2
Vendor/ Manufacture Name: ABB India Ltd., Nashik
Date Submitted:30/03/2023 Rev. No: 4
Tick confirm included and insert references within boxes identifying supporting documentation included within this submission)
B
Low Voltage Switchgear Type MNS B
CUSTOMER : KINGFISHER
CONSULTANT : AECOM
C
PROJECT DESCRIPTION : KINGFISHER HYD101 (ROMP-3) C
F During the installation, commissioning period and the time of operation, client is obliged to follow all instructions and recommendation given by manufacturers of individual instruments installed inside supplied equipment F
Based on Prepared JC Date 10/03/2022 Title GENERAL ARRANGEMENT DRAWING FOR Order No = N00
04 29/03/2023 JC Customer: Checked MV Approved PK MBPP-MUPS-0.2MA2 3100131372 +
03 26/09/2022 JC KINGFISHER Project name DCC Code Lang.
02 15/06/2022 JC Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 01
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS1E21036R016B Pages 05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-K1-14
Thickness: 80-120 Microns.
C INTERNAL WIRE C
f) Standard : IEC 61439-1 & 2 7 LABELS FERRUL MARKINGS
g) Metal thickness : Sheet steel (GSM275) a) External Main Label : Traffolyte plastic - Phenolic Gravoply (Color as per approved label list)
1) Frame: C-Sections are of 2mm thick GSM275 b) Feeder description : Traffolyte plastic - Phenolic Gravoply (Color as per approved label list)
2) Load bearing Members: 2mm Sheet Steel GSM275 c) Components : Yellow Sticker with black letters
3) Top sheet: 1.5mm Sheet Steel GSM275
4) Non Load bearing Doors/Covers: 1.5mm Painted CRCA
8 ROUTINE TEST
i) Gland Plate :
a) Common : As per IEC61439-1
1) Material : SINGLE CORE CABLE : ALUMINUM with 3mm
MULTI CORE CABLE : Alu Zink with 3mm 9 CONTROL/AUX SUPPLY
D D
j) Gasket requirement : Required for Doors with EPDM Material. a) Control supply (Wire bus-A1,A2) : 230V AC Supply For Breaker Control & indication Circuits
3 BUSBAR with 6 Sqmm wire (Refer Control Supply Distribution Scheme Circuit).
a) Rated Current : 250A b) Control supply (Wire bus-B1,B2) : 230V AC Supply For Panel illumination & space heater
b) Main Busbar (HBB) : with 6 Sqmm wire (Refer Control Supply Distribution Scheme Circuit).
1) Phase : NA
Material : NA 10. Space heater,Thermostate circuit,Door limit switch & Illumination lamp will be mounted in Cable Chamber.
2) Earth : 1x30x10 11. Caution Label shall be Provided for all cable chambers & Danger board Label for ACB back doors.
Material : Copper (Grade 99.9 % pure) 12. All doors will be earthed with 2.5Sqmm Braided Copper Yellow-Green Wire and connected to frame/structure.
3) Vertical DBB (VBB) : 40x10
13. Mimic - Materials-Radium sticker, Width-20mm, Color - ORANGE Contrasting with finish background. R4
E E
c) Busbar Identification : All Busbars shall be identified at frequent interval 14. Operating height shall be Min-400mm & Max-1800mm.
with R Y B Colour Stickers. 15. Panel dimension - 640 X 650 x 2200 mm
Earth Busbar shall be identified with Green and Yellow stickers.
d) Busbar Insulation :
Main-Busbar: Insulated (Black with Heatshrinkable Sleeves)
Earth-Busbar: Nill
F F
Based on Prepared JC Date 10/03/2022 Title GENERAL ARRANGEMENT DRAWING FOR Order No = N00
04 29/03/2023 JC Customer: Checked MV Approved PK MBPP-MUPS-0.2MA2 3100131372 +
03 26/09/2022 JC KINGFISHER Project name DCC Code Lang.
02 15/06/2022 JC Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 02
02
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS1E21036R016B Pages 05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
P01F
70 70 600
ABB MNS
EARTH
100
EARTH BUS
R3 BUS QAB12 QAB11 QAB31 QAB13
XSH1
N L-2
XP
A RATING
-PFL1-S1-PFL2-S1-PFL3-S1
A
PLATE
CONTROL
R4
A TB's
72 E XA1
INCOMER
B XT4_ 200AT(250AF),4P
68 E XT4-4P Assembly Plate
C R4
64 E XT4_ 200AT(250AF),4P
XA2
D
60 E SKRU-3B
E XT4-4P Assembly Plate
56 E
F XT4_ 200AT(250AF),4P
52 E XA3
G
48 E 40E
2200
2200
B 44 E BUSCOUPLER
CABLE
B
CASTLE PANEL ALLEY
J LOCK-3BP PADLOCK
XA4
40 E PROVISION XM
FRONT
K XT4_ 200AT(250AF),4P
10E
36 E XT4-4P Assembly Plate
L CASTLE
32 E LOCK-3BQ XA5
M
28 E XT4_ 200AT(250AF),4P
10E
N XT4-4P Assembly Plate
24 E
-PFL1-S2-PFL2-S2-PFL3-S2
P
20 E XA6
Q XT4_ 200AT(250AF),4P
16 E XT4-4P Assembly Plate
R POWER TERMINAL
12 E
Front View
Q2
IO LOGIK
X80 X104
D 400 D
600
550
200
0
25
100 100
600
FOUNDATION PLAN
PANEL DIMENTIONS IN MM
600
E
LENGTH 640 E
225
250
200 HEIGHT 2200 NOTE: GLAND PLATE DRILLING IS NOT IN ABB SCOPE
125
0 R3 NOTE:
75 450 75 1.THREE LOCKS ENGRAVING WITH LETTER 3B, 3BP & 3BQ.
2.TWO KEYS ENGRAVING WITH LETTER 3BP & 3BQ.
TOP VIEW
F F
Based on Prepared JC Date 10/03/2022 Title GENERAL ARRANGEMENT DRAWING FOR Order No = N00
04 29/03/2023 JC Customer: Checked MV Approved PK MBPP-MUPS-0.2MA2 3100131372 +
03 26/09/2022 JC KINGFISHER Project name DCC Code Lang.
02 15/06/2022 JC Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 03
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS1E21036R016B Pages 05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
90
B B
C C
130
BKR.
ON TEXT HEIGHT: 20mm
P01F
30
80
35
E E
-PFL1 - R-PHASE
-PFL2 - Y-PHASE
-PFL3 - B-PHASE
F F
Based on Prepared JC Date 10/03/2022 Title GENERAL ARRANGEMENT DRAWING FOR Order No = N00
04 29/03/2023 JC Customer: Checked MV Approved PK MBPP-MUPS-0.2MA2 3100131372 +
03 26/09/2022 JC KINGFISHER Project name DCC Code Lang.
02 15/06/2022 JC Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 04
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS1E21036R016B Pages 05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
NAMEPLATE DETAILS A
MBPP-MUPS-0.2MA2
SOURCE
20 20
LOCATION
R3
B B
40
FEEDER NAME
40
RATING
FEEDING TO
250A,3Ph,4W,35KA
25 85
TEXT HEIGHT: 5 mm
P01F
FED FROM:MSDB-0.2MA2
MBPP-MUPS-0.2MA2 INCOMER
200AT
250AF FEEDS: MBPP-MUPS-0.2MA2
C
MBPP-MUPS-0.2MA2 P01F
FED FROM: MBPP-MUPS-0.2MA2
P01F
FED FROM: MUPS 0.2MA2
C
P01F
FED FROM: MBPP-MUPS-0.2MA2 P01F
FED FROM: MBPP-MUPS-0.2MA2
P01F
200AT
BUSCOUPLER
D 250AF D
E E
F F
Based on Prepared JC Date 10/03/2022 Title GENERAL ARRANGEMENT DRAWING FOR Order No = N00
04 29/03/2023 JC Customer: Checked MV Approved PK MBPP-MUPS-0.2MA2 3100131372 +
03 26/09/2022 JC KINGFISHER Project name DCC Code Lang.
02 15/06/2022 JC Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 05
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS1E21036R016B Pages 05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A
ABB India Limited A
ELDS - Low Voltage Switchgear,
Plant-3, Plot No. B-81, MIDC, Ambad,
Nashik - 422010
B
Low Voltage Systems B
CUSTOMER : KINGFISHER
CONSULTANT : AECOM
C C
PROJECT DESCRIPTION : KINGFISHER HYD101 (ROMP-3)
REVISION NO : 03
E E
REVISION COMMENT : REVISED FOR APPROVAL
F During the installation, commissioning period and the time of operation, client is obliged to follow all instructions and recommendation given by manufacturers of individual instruments installed inside supplied equipment F
Based on Prepared NB Date 3/10/2022 Title PROJECT TITLE PAGE Order No = MBPP-MUPS-0.2MA2
03 26/09/2022 PG Customer: KINGFISHER Checked KV Approved PK 3100131372 + SLD
02 20/06/2022 NB Project name DCC Code Lang.
01 30/05/2022 NB Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 1
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS2E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MBPP-MUPS-0.2MA2
MAKE LIST
03 26/09/2022 PG Customer: KINGFISHER Checked KV Approved PK 3100131372 + SLD
02 20/06/2022 NB Project name DCC Code Lang.
01 30/05/2022 NB Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 2
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS2E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
INCOMING CABLE
INDICATION LAMPS
OUTGOING CABLE
-PFL2-S1, S2 Y-PH HEALTHY LAMP-YELLOW
B B
3
C -QABX MOTOR PTOTECTION CIRCUIT BREAKER C
I>
-SKRU
E E
R3
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MBPP-MUPS-0.2MA2
DEVICE TAG LIST
03 26/09/2022 PG Customer: KINGFISHER Checked KV Approved PK 3100131372 + SLD
02 20/06/2022 NB Project name DCC Code Lang.
01 30/05/2022 NB Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 3
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS2E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 250A, 415 VOLT, 35kA for 1Sec, 50 Hz, 3Ph, 4W+E, COPPER BUSBAR
A A
-QABX
MCCB, I>
200A, 4P
XT4N 250 TMA In=200A
BREAKER VERTICAL FEEDER
TAG AT RATING AF RATING DESCRIPTION CABLE SIZE
NUMBER LOCATION
FED FROM:MSDB-0.2MA2
-QAB1 P01F P01F 200A 250A 1R X 1C x 95 Sqmm. Cu.
MBPP-MUPS-0.2MA2 INCOMER
B B
C C
D D
FROM MSDB-0.2MA2
FEEDER
MCCB INCOMER
TYPE
SCHEME NO MNS3E21036R061
MODULE SIZE 1V-600
E PROT. RELAY -- E
MFM/ACB/RELAY COMM --
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MBPP-MUPS-0.2MA2
TYPICAL SLD MCCB INCOMER
03 26/09/2022 PG Customer: KINGFISHER Checked KV Approved PK 3100131372 + SLD
02 20/06/2022 NB Project name DCC Code Lang.
01 30/05/2022 NB Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 4
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS2E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 250A, 415 VOLT, 35kA for 1Sec, 50 Hz, 3Ph, 4W+E, COPPER BUSBAR
A A
-QABX I>
MCCB,
200A, 4P
XT4N 250 TMA In=200A 4 VERTICAL FEEDER
BREAKER AT RATING AF RATING DESCRIPTION CABLE SIZE
TAG NUMBER LOCATION
FED FROM: MBPP-MUPS-0.2MA2
-QAB2 P01F P01F 200A 250A 1R X 1C x 95 Sqmm. Cu.
FEEDS: MUPS 0.2MA2
C C
LOAD
D D
FEEDER
MCCB OUTGOING
TYPE
SCHEME NO MNS3E21036R313
MODULE SIZE 1V-600
E PROT. RELAY - E
MCCB COMM. --
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MBPP-MUPS-0.2MA2
TYPICAL SLD MCCB OG (BUS-A)
03 26/09/2022 PG Customer: KINGFISHER Checked KV Approved PK 3100131372 + SLD
02 20/06/2022 NB Project name DCC Code Lang.
01 30/05/2022 NB Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 5
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS2E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 250A, 415 VOLT, 35kA for 1Sec, 50 Hz, 3Ph, 4W+E, COPPER BUSBAR
BUS-A
A A
C C
D BUS-B D
FEEDER
MCCB BUSCOUPLER
TYPE
SCHEME NO MNS3E21036R161
MODULE SIZE 1V-600
E PROT. RELAY -- E
MFM/ACB/RELAY COMM --
A A
-QABX I>
MCCB,
200A, 4P
XT4N 250 TMA In=200A 4 VERTICAL FEEDER
BREAKER AT RATING AF RATING DESCRIPTION CABLE SIZE
TAG NUMBER LOCATION
C C
LOAD
D D
FEEDER
MCCB OUTGOING
TYPE
SCHEME NO MNS3E21036R313
MODULE SIZE 1V-600
E PROT. RELAY - E
MCCB COMM. --
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MBPP-MUPS-0.2MA2
TYPICAL SLD MCCB OG (BUS-B)
03 26/09/2022 PG Customer: KINGFISHER Checked KV Approved PK 3100131372 + SLD
02 20/06/2022 NB Project name DCC Code Lang.
01 30/05/2022 NB Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 7
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS2E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A A
B B
(MNS3E21036R061)
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R061
TITLE COVER SHEET
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB INCOMER WITHOUT METERS DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 1
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R061 Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. CONTACTS TO EPMS
3/2F
3/2F
3/2F
3/2F
A A
XA1 1
4
XA1
-PFL1-S1
X1 X2 R-PH LINE VOLTAGE
HEALTHY -QAB1 21
RED 3/2D 95
-SQ
-PFL2-S1 24 22
-SY
X1 X2 Y-PH LINE VOLTAGE 98 96
HEALTHY
YELLOW
B B
-PFL3-S1
X1 X2 B-PH LINE VOLTAGE XA1 6 5 XA1
HEALTHY XA1 3 2 XA1
BLUE
MPCB
-QAB12 2.5A, 3P
MS132-2.5A
1 2
I>
3 4
C C
5 I>
I> 6
NL-1
-QAB11
MPCB
2.5A, 3P
MS132-2.5
D D
1 2
I>
3 4 -XP
I>
1
240VAC SUPPLY TO
5 6 SKRU INTERLOCK CKT
-XP
I>
2
R Y B N
E POSITIVE E
CURRENT R Y B N
DIRECTION
INCOMER
415V, 3PH, 4W+PE
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R061
POWER LINE CIRCUIT
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB INCOMER WITHOUT METERS DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 2
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R061 Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
R
R R
Y
Y Y
A B A
B B
N
N N
-QAB31
MPCB
6A, 3P
B MS132-6.3 B
1 2
I>
3 4
I>
1
SP1 240VAC CONTROL SUPPLY
-XSH1 FOR SPACE HEATER
5 6
I>
2
SP2
-XSH1
C C
2 4 6 8
-QAB1
2/6A I> I> I> I>
MCCB
200A, 4P
XT4N 250 TMA
1 3 5 7
D D
E E
2/2A
2/2A
2/2A
2/1A
R1 Y1 B1 N1
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R061
POWER LINE CIRCUIT
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB INCOMER WITHOUT METERS DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 3
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R061 Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
BILL OF MATERIAL
A SL.NO DESCRIPTION TAG NO. QTY MODEL NO MAKE A
1 200A, 4P MCCB, TYPE: XT4N 250 TMA -QAB1 1 XT4N 250 TMA ABB
5 'R' PHASE HEALTHY INDICATION LAMP, 230V AC, Ø22.5mm (RED) -PFL1-S1 1 CL-523R ABB
6 'Y' PHASE HEALTHY INDICATION LAMP, 230V AC, Ø22.5mm (YELLOW) -PFL2-S1 1 CL-523Y ABB
7 'B PHASE HEALTHY INDICATION LAMP, 230V AC, Ø22.5mm (BLUE) -PFL3-S1 1 CL-523L ABB R2
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R061
BILL OF MATERIAL
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB INCOMER WITHOUT METERS DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 4
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R061 Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal diagram
© Copyright 2012 ABB. All rights reserved.
A
Strip A
XA1
function text
1 BREAKER CLOSE STATUS TO EPMS(SER)
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R061
TERMINAL DIAGRAM
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB INCOMER WITHOUT METERS DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 5
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R061 Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal diagram
© Copyright 2012 ABB. All rights reserved.
A
Strip A
XP
function text
1 240VAC SUPPLY TO SKRU INTERLOCK CKT
B B
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R061
TERMINAL DIAGRAM
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB INCOMER WITHOUT METERS DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 6
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R061 Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal diagram
© Copyright 2012 ABB. All rights reserved.
A
Strip A
XSH1
function text
1 240VAC CONTROL SUPPLY FOR SPACE HEATER
B B
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R061
TERMINAL DIAGRAM
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB INCOMER WITHOUT METERS DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 7
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R061 Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A A
B B
C
SCHEMATIC DRAWINGS FOR MCCB C
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R161
TITLE COVER SHEET
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB BUSCOUPLER WITHOUT METER DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 1
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R161 Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CONTACTS TO EPMS
250A, 415V AC, 50Hz, 3PH,4W, Cu (BUS-A)
© Copyright 2012 ABB. All rights reserved.
-QAB4 21
2/2B 95
2 4 6 8
-SQ
-QAB4 24 22
SY
2/7B I> I> I> I> 98 96
MCCB K1
200A, 4P
B XT4N 250 TMA B
1 3 5 7
-PFL1-S2
C X1 X2 R-PH BUS-B C
RED
VOLTAGE HEALTHY
-PFL2-S2
X1 X2 Y-PH BUS-B
VOLTAGE HEALTHY
YELLOW
-PFL3-S2
X1 X2 B-PH BUS-B
MPCB VOLTAGE HEALTHY
-QAB13 2.5A, 3P BLUE
MS132-2.5A
D D
1 2
I>
3 4
I>
R2
5 6
I>
NL-2
E E
R R
R
Y Y
Y
B B
B
N N
N
250A, 415V AC, 50Hz, 3PH,4W, Cu (BUS-B)
240VAC SUPPLY
FROM INCOMER
A A
XM
DOOR
E 1
PE
N 2
B B
P 3
UPS#ON
BYPASS
S1 4
SKRU
FROM FIELD
S2 5
C C
4 6
KEY INSERTED
D 7
3 8
KEY INSERTED
B 11
E E
1 12
KEY REMOVED
A 13
F F
Based on Prepared NB Date 3/10/2022 TitleSKRU Order No = MNS3E21036R161
INTERLOCK CIRCUIT
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB BUSCOUPLER WITHOUT METER DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 3
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R161 Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
BILL OF MATERIAL
A SL.NO DESCRIPTION TAG NO. QTY MODEL NO MAKE A
1 200A, 4P MCCB, TYPE: XT4N 250 TMA -QAB4 1 XT4N 250 TMA ABB
SKRU KEY DETAILS : 2.TWO KEYS ENGRAVING WITH LETTER 3BP & 3BQ 2 -- PATLON
5 'R' PHASE HEALTHY INDICATION LAMP, 230V AC, Ø22.5mm (RED) -PFL1-S2 1 CL-523R ABB
C 6 'Y' PHASE HEALTHY INDICATION LAMP, 230V AC, Ø22.5mm (YELLOW) -PFL2-S2 1 CL-523Y ABB C
7 'B PHASE HEALTHY INDICATION LAMP, 230V AC, Ø22.5mm (BLUE) -PFL3-S2 1 CL-523L ABB
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R161
BILL OF MATERIAL
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB BUSCOUPLER WITHOUT METER DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 4
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R161 Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal diagram
© Copyright 2012 ABB. All rights reserved.
A
Strip A
XA4
function text
1 BREAKER CLOSE STATUS TO EPMS(SER)
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R161
TERMINAL DIAGRAM
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB BUSCOUPLER WITHOUT METER DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 5
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R161 Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal diagram
© Copyright 2012 ABB. All rights reserved.
A
Strip A
XM
function text
1 EARTHING
2 NEUTRAL
3 PHASE
B 4 UPS# ON BYPASS B
5 UPS#ON BYPASS
6 KEY INSERTED
7 KEY INSERTED
8 KEY REMOVED
9 KEY REMOVED
C 10 KEY INSERTED C
11 KEY INSERTED
12 KEY REMOVED
13 KEY REMOVED
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R161
TERMINAL DIAGRAM
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB BUSCOUPLER WITHOUT METER DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 6
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R161 Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A A
B B
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R313
TITLE COVER SHEET
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB 4P OUTGOING DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 1
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R313 Pages 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
415V, 3PH,4W+PE, 50Hz, 250A, 35kA for 1Sec.
R
© Copyright 2012 ABB. All rights reserved.
R R
Y
Y Y
B
B B
A A
N
B N
2 4 6 8
-QABX K1
MCCB I> I> I> I>
200A, 4P
XT4N 250 TMA
B 1 3 5 7 B
C C
D D
PE
R Y B N
E E
CURRENT
DIRECTION POWER FEEDER
F
*** K1-SKRU INTERLOCK F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R313
POWER LINE CIRCUIT
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB 4P OUTGOING DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 2
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R313 Pages 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CONTACTS TO EPMS
© Copyright 2012 ABB. All rights reserved.
BREAKER CLOSE BREAKER NOT TRIP BREAKER CLOSE BREAKER NOT TRIP BREAKER CLOSE BREAKER NOT TRIP BREAKER CLOSE BREAKER NOT TRIP
A STATUS STATUS STATUS STATUS STATUS STATUS STATUS STATUS A
XA2 1
4 XA3 1 XA5 1 XA6 1
XA2 XA3 4 XA5 4 XA6 4
XA2 3 2 XA2 XA2 6 5 XA2 XA3 3 XA3 6 5 XA3 XA5 3 XA5 6 5 XA5 XA6 3 XA6 6 5 XA6
2 XA3 2 XA5 2 XA6
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R313
POWER LINE CIRCUIT
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB 4P OUTGOING DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 3
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R313 Pages 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
BILL OF MATERIAL
A SL.NO DESCRIPTION TAG NO. QTY MODEL NO MAKE A
B B
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R313
BILL OF MATERIAL
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB 4P OUTGOING DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 4
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R313 Pages 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal diagram
© Copyright 2012 ABB. All rights reserved.
A
Strip A
XA2
function text
1 BREAKER CLOSE STATUS TO EPMS(SER)
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R313
TERMINAL DIAGRAM
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB 4P OUTGOING DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 5
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R313 Pages 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal diagram
© Copyright 2012 ABB. All rights reserved.
A
Strip A
XA3
function text
1 BREAKER CLOSE STATUS TO EPMS(SER)
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R313
TERMINAL DIAGRAM
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB 4P OUTGOING DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 6
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R313 Pages 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal diagram
© Copyright 2012 ABB. All rights reserved.
A
Strip A
XA5
function text
1 BREAKER CLOSE STATUS TO EPMS(SER)
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R313
TERMINAL DIAGRAM
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB 4P OUTGOING DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 7
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R313 Pages 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal diagram
© Copyright 2012 ABB. All rights reserved.
A
Strip A
XA6
function text
1 BREAKER CLOSE STATUS TO EPMS(SER)
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R313
TERMINAL DIAGRAM
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name MCCB 4P OUTGOING DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 8
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R313 Pages 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A A
B B
ILLUMINATION CIRCUIT
D
(MNS3E21036R901) D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R901
TITLE COVER SHEET
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name SPACE HEATER CKT DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 1
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R901 Pages 4
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A
PROVIDED IN EACH VERTICAL (WILL BE PROVIDED IN CABLE ALLEY) A
240V AC SUPPLY FOR SPACE HEATER FROM BUS
SP1 SP2
R2
-X60 1 2
1 3
-FCM10
B 2 POLE 2 4
B
MCB, 6A
C C
1 1
BT1 SFC1
THERMOSTAT 2 Door limit Switch. 2
D D
-EA1
** LAMP
EB1
Space Heater, 100 W, 240V AC
(BOTTOM OF EACH
VERTICAL PANEL)
E E
SPACE HEATER ILLUMINATION
240V AC 240V AC
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R901
CONTROL CIRCUIT
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name SPACE HEATER CKT DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 2
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R901 Pages 4
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
BILL OF MATERIAL
A SL.NO DESCRIPTION TAG NO. QTY MODEL NO MAKE A
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R901
BILL OF MATERIAL
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name SPACE HEATER CKT DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 3
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R901 Pages 4
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal diagram
© Copyright 2012 ABB. All rights reserved.
A
Strip A
X60
function text
1 240VAC CONTROL SUPPLY FROM BUS
B B
C C
D D
E E
F F
Based on Prepared NB Date 3/10/2022 Title Order No = MNS3E21036R901
TERMINAL DIAGRAM
04 10/03/2023 NB Customer: KINGFISHER Checked KV Approved PK 3100131372 + LV
03 26/09/2022 PG Project name SPACE HEATER CKT DCC Code Lang.
02 20/06/2022 PG Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 4
Rev. Code Date Name AECOM MBPP-MUPS-0.2MA2 India Ltd., Nashik, LVS MNS3E21036R901 Pages 4
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A
ABB India Limited A
EPDS - Low Voltage Switchgear,
Plant-3, Plot No. B-81, MIDC, Ambad,
Nashik - 422010
B
Low Voltage Systems B
CUSTOMER : KINGFISHER
CONSULTANT : AECOM
C C
PROJECT DESCRIPTION : KINGFISHER HYD 101 (ROMP-03)
REVISION NO : 03
E E
REVISION COMMENT : 3rd SUBMISSION FOR APPROVAL
F During the installation, commissioning period and the time of operation, client is obliged to follow all instructions and recommendation given by manufacturers of individual instruments installed inside supplied equipment F
Based on Prepared BIJENDRA Date 9/29/2022 Title Order No = MNS9E21036R016B
03 26.09.22 SRM Customer:KINGFISHER Checked Bijendra & Kathir Approved PK 3100131372 + MBPP-MUPS-0.2MA2
02 31.05.22 BPN Project name PROJECT DESCRIPTION DCC Code Lang.
01 11.03.22 BPN Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 0
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS9E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A A
B B
D D
E E
F F
Based on Prepared BIJENDRA Date 9/29/2022 Title Order No = MNS9E21036R016B
03 26.09.22 SRM Customer:KINGFISHER Checked Bijendra & Kathir Approved PK 3100131372 + MBPP-MUPS-0.2MA2
02 31.05.22 BPN Project name Title Cover Sheet DCC Code Lang.
01 11.03.22 BPN Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 1(A00)
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS9E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
COMMUNICATION ARCHITECTURE
© Copyright 2012 ABB. All rights reserved.
B B
P01F
MOXA E1210
IO UNIT
C C
LEGENDS
MODBUS TCP/IP
COMMUNICATION WITH
CAT6 CABLE (EPMS SCOPE)
MODBUS RS485
COMMUNICATION (OEM SCOPE)
D D
E E
F F
Based on Prepared BIJENDRA Date 9/29/2022 Title Order No = MNS9E21036R016B
03 26.09.22 SRM Customer:KINGFISHER Checked Bijendra & Kathir Approved PK 3100131372 + MBPP-MUPS-0.2MA2
02 31.05.22 BPN Project name COMMUNICATION ARCHITECTURE DCC Code Lang.
01 11.03.22 BPN Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 2(N02)
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS9E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
TO
A ETHERNET SWITCH A
IO LOGIK E1210
B B
24V DC
0 1 2 3 +VE 4 5 6 7 C 8 9 10 11 +VE 12 13 14 15 C + - G
C C
-AUX.SUPPLY
X104 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
X104 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32
D D
E E
MBPP-MUPS-0.2MA2 INCOMER
MBPP-MUPS-0.2MA2 INCOMER
UPS OUTPUT
UPS INPUT
UPS OUTPUT
UPS INPUT
BUSCOUPLER
BUSCOUPLER
UPS INPUT
UPS INPUT
SPARE
SPARE
SPARE
SPARE
F F
Based on Prepared BIJENDRA Date 9/29/2022 Title Order No = MNS9E21036R016B
03 26.09.22 SRM Customer:KINGFISHER Checked Bijendra & Kathir Approved PK 3100131372 + MBPP-MUPS-0.2MA2
02 31.05.22 BPN Project name IO LOGIK E1210 DCC Code Lang.
01 11.03.22 BPN Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 3(N03)
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS9E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
-X80 1 2
Q2
2 POLE
B MCB, 6A
B
+VE
AUX. Source for
C -VE MOXA E1210 C
D D
E E
F F
Based on Prepared BIJENDRA Date 9/29/2022 Title Order No = MNS9E21036R016B
03 26.09.22 SRM Customer:KINGFISHER Checked Bijendra & Kathir Approved PK 3100131372 + MBPP-MUPS-0.2MA2
02 31.05.22 BPN Project name POWER LINE DIAGRAM DCC Code Lang.
01 11.03.22 BPN Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 4(N03)
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS9E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
BILL OF MATERIAL
© Copyright 2012 ABB. All rights reserved.
C C
D D
E E
F F
Based on Prepared BIJENDRA Date 9/29/2022 Title Order No = MNS9E21036R016B
03 26.09.22 SRM Customer:KINGFISHER Checked Bijendra & Kathir Approved PK 3100131372 + MBPP-MUPS-0.2MA2
02 31.05.22 BPN Project name BOM DCC Code Lang.
01 11.03.22 BPN Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 5
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS9E21036R016B Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminal diagram
© Copyright 2012 ABB. All rights reserved.
A
Strip A
21 BKR CLOSE (P01F) MUDB 0.2MA2 LOAD BKR
X80 22 BKR CLOSE (P01F) MUDB 0.2MA2 LOAD BKR
function text 23 BKR NOT TRIP (P01F) MUDB 0.2MA2 LOAD BKR
1 AUX. Source for MOXA E1210 24 BKR NOT TRIP (P01F) MUDB 0.2MA2 LOAD BKR
26 SPARE
B B
Strip 27 SPARE
X104 28 SPARE
29 SPARE
function text
30 SPARE
1 BKR CLOSE (P01F) MBPP-MUPS-0.2MA2 INCOMER
31 SPARE
2 BKR CLOSE (P01F) MBPP-MUPS-0.2MA2 INCOMER
32 SPARE
3 BKR NOT TRIP (P01F) MBPP-MUPS-0.2MA2 INCOMER
C C
4 BKR NOT TRIP (P01F) MBPP-MUPS-0.2MA2 INCOMER
F F
Based on Prepared BIJENDRA Date 9/29/2022 Title Order No = MNS9E21036R016B
03 26.09.22 SRM Customer:KINGFISHER Checked Bijendra & Kathir Approved PK 3100131372 + MBPP-MUPS-0.2MA2
02 31.05.22 BPN Project name TERMINAL DIAGRAM DCC Code Lang.
01 11.03.22 BPN Consultant: KINGFISHER HYD101 (ROMP-3) Doc. No. Page 6
Rev. Code Date Name AECOM India Ltd., Nashik, LVS MNS9E21036R016B Pages 7
1 2 3 4 5 6 7 8