Rate Amount

1.00 Taking down old type/defective electric energy meters of 179.00 Each Job 250 44750
Single/Three phase and deposited the same in MES store
yard complete all as specified and directed.
2.00 Supply, installation, testing & commissioning of Three phase 172.00 Each 1600 275200
Meter box
Make: Sintex) SPGSMB3527 (Three Phase) or equivalent in
makes given in Appendix 'A'.
3.00 Supply, installation, testing & commissioning of Single Phase 7.00 Each 1300 9100
Meter box
Make: Sintex SPGSMB2525 (Single Phase) or equivalent in
makes given in Appendix 'A'.
4.00 Supply and Installation of Smart Three Phase Meter with the 110.00 Each 16000 1760000
following specifications:
• AC Three Phase Four Wire, Tamper Proof, Static Meter of
Class 1.0, 415 V, 50 Hz, 10 A-60 A conforming to IS-16444
and relevant IEC standards with inbuilt 865-867 MHz Radio
Frequency communication facility with self healing Mesh
network with default and on demand display, billing data
generation facility, anti-tamper features, Microprocessor and
LED/LCD based circuitry.
• Meter Should support the following data : 30 min
instantaneous data for voltage, current, power factor, power,
cumulative energy and frequency, 30 load survey data for
energy, monthly billing survey for Cumulative Energy and
Max Demand
• Meter should have connect / disconnect functionality
operatable from prepaid billing software
• The meter should support open communication protocol
DLMS with the software
MAKE: Secure, L&T, Schneider, EI measure.
Note:
(a) The contractor would be responsible from removing the
existing meter, noting down the reading and depositing it with
the MES.
(b) It would be possible to run the meter in both prepaid and
postpaid mode
(c) The meters would carry 5 year warranty.

5.00 Supply and Installation of Smart Single Phase Meter with 7.00 Each 12000 84000
the following specifications:
• AC Single Phase Two Wire, Tamper Proof, Static Meter of
Class 1.0, 240 V, 50 Hz, 10 A-60 A conforming to IS-16444
and relevant IEC standards with inbuilt GPRS
communication with default and on demand display, billing
data generation facility, anti-tamper features, Microprocessor
and LED/LCD based circuitry.
• Meter Should support the following data : 30 min
instantaneous data for voltage, current, power factor, power,
cumulative energy and frequency, 30 load survey data for
energy, monthly billing survey for Cumulative Energy and
Max Demand
• Meter should have connect / disconnect functionality
operable from prepaid billing software
• The meter should support open communication protocol
DLMS with the software
Note:
(a) The contractor would be responsible from removing the
existing meter, noting down the reading and depositing it with
the MES.
(b) It would be possible to run the meter in both prepaid and
postpaid mode
(c) The meters would carry 5 year warranty.
6.00 Supply and Installation of Smart Three Phase Meter with the 62.00 Each 19000 1178000
following specifications:
• AC Three Phase Four Wire, Tamper Proof, Static Meter of
Class 1.0, 415 V, 50 Hz, 10 A-60 A conforming to IS-16444
and relevant IEC standards with inbuilt GPRS
communication with self healing Mesh network with default
and on demand display, billing data generation facility, anti-
tamper features, Microprocessor and LED/LCD based
circuitry.
• Meter Should support the following data : 30 min+B9
instantaneous data for voltage, current, power factor, power,
cumulative energy and frequency, 30 load survey data for
energy, monthly billing survey for Cumulative Energy and
Max Demand
• Meter should have connect / disconnect functionality
operable from prepaid billing software
• The meter should support open communication protocol
DLMS with the software
MAKE: Secure, L&T, Schneider

Note:
(a) The contractor would be responsible from removing the
existing meter, noting down the reading and depositing it with
the MES.
(b) It would be possible to run the meter in both prepaid and
postpaid mode
(c) The meters would carry 5 year warranty.

7.00 All as per item No 6 here in before but as repeaters. 1.00 Each 12000 12000
8.00 Supply and Installation of IP-67 protection Gateway 3.00 Each 120000 360000
compatible for remote Automatic Metering Infrastructure
(AMI) solution and capable of communicating with the smart
energy Meter in the corresponding frequency band and with
the data server through GPRS/Ethernet. It would have
internal memory to store data of at least 200 modules. It
would have inbuilt battery back-up. It would have IP-67
protection. It would support auto discovery of the meters and
self healing mechanism for the breaks in the RF network.

Make: Cyanconnode, L&T. Secure, Schneider

9.00 Supply and Configuration of the Web based Software with 179.00 Each Meter 2500 447500
following modules:
(i) Meter Data Management Module
The meter data management module would be responsible
for collecting the data from the concentrator and make the
data available to the billing system. The meter data
management system would capture and provide the
following data:
(a) 30 min instantaneous data from all the meters for seven
parameters – Cumulative Energy, Cumulative Apparent
Energy (as applicable), Power, Current, Voltage, Power
Factor and Frequency
(b) Monthly billing survey data for cum energy and max
demand
(ii) Postpaid /Prepaid Billing Module
The billing module would collect the data from the meter data
management module, calculate the energy consumption,
calculate billing determinant and make energy data / billing
data available to admin and end users. The billing module
would include functionalities for tariff setup, bill format setup,
bill adjustment, occupation billing and vacation billing. It
would allow postpaid and prepaid functionality as required.
9.01 Contd (module)...........(iii) Occupation and Vacation 0
Module
The system would support occupation / vacation and billing
reports.
the software would be collecting data from DCU. The
software would provide access to staff as well as the
occupant for the data.
(iv) Web site: There would be a dedicated website for the
AGE and BSO team to view all the data and information. The
designated users in MES would have the admin access to
the application. The MES staff would also have the access of
the key information on an android mobiles app (for admin
use).
(v) Customer Portal
The system would include a customer portal for the resident
/occupant to log in and view their own energy / billing data.
There would be android and iOS mobile apps for the user to
monitor its own data and balance on regular basis.
(vi) Energy Accounting Module
The system would include features of energy accounting.
The system would be able to account for total energy block
wise, facility wise and would also allow calculations of
unaccounted energy in case total energy meter is also
available.
(vii) Communication Module
The system would provide communication of energy data
and bills via print, email and sms methods.
(viii) Meter Master Data
The system would support meter master data repository. The
system would support meter replacement process.
(ix) Excel Export
The system would support export of metering and billing data
in excel format.

9.02 (x) Customer Care Module - the software would include a 0


customer care module where the user would be log in any
complaints. The service provider would monitor the
complaints and carry out the necessary activities for the
complaints resolution.
(xi) Meter Installation Module - The software would include
an app based meter installation module where the meter
installation or changes can be captured on the app itself and
the readings may be demonstrated to the user if required on
the app itself.
(xii) Activities Communication - The software support
communication of the various activities such as occupation,
vacation, meter change. personal detail change etc. with the
user as well as the department on email. Make: Authorized
by the selected Meter Vendor
Note: (a) The software would be hosted on MEITY (Ministry
of Information Technology) approved GCC (Government
Community Cloud). It would be transferred to MES Server
whenever the server is made available.
(b) The software would contain two year defect liability
including all operating expenses such as GPRS charges,
hosting charges etc.
(c) Quoted rates are included with 2 years of necessary
connection charges from any mobile company after
completion of work. On completion of DLP of 02 years
necessary payment will be made by Deptt for renewal of
charges for actual operation of SIM.
10.00 Supply and fix all in one Desktop PC with dual core 1.00 Each 70000 70000
processor 4GB RAM, 1TB HDD, Windows 10 PC 21.5"
monitor 1-CD/DVD Combo Drive ,RWType, 4 USB port
including Video card, Cordless key board & Mouse with
licensed Operating system (Windows 10) complete all as
specified.
11.00 Supply and fix of all in one printer for print, copy scan with 1.00 Each 3000 3000
USB, wireless, complete all as specified and directed by
Engg-in-charge. Make Samsung model No Pro express
M3370FD or equivalent in makes given in Appendix 'A'.
12.00 Supply and fixing of UPS with following specifications 1.00 Each 25000 25000
complete all as specified and directed by Engg-in-charge:-
(a) capacity of 1500 VA with output voltage 230V AC +/-10%
of frequency 50 Hz+/-1%.
(b) Battery of 12 Volt 40 AH-3 nos with min 30 min backup
with full battery condition,
(c) Output waveform of Pseudo sine. (d) off mode battery
charging with high voltage protection
(e) Battery warranty of atleast two years

13.00 M&L for Sub main wiring (with approved colour coding as per 180.00 RM 400 72000
IS) with single core FRLS PVC insulated flexible
multistranded copper conductor 1.1 KV grade (main cable :
number of runs indicated below) along with one run of single
core FRLS PVC insulated flexible solid/multistranded copper
conductor 1.1 KV grade for earthing in and including PVC
conduits concealed of suitable size, for 2 runs of 6 sq. mm
main cable + 1 run of 4 Sq. mm earth cable complete all as
specified and directed.
Note: (i) Connections of cables with MCBs or bus bars shall
be done through appropriate
size brass/copper thimbles.

14.00 M&L for Sub main wiring (with approved colour coding as per 120.00 RM 900 108000
IS) with single core FRLS PVC insulated flexible
multistranded copper conductor 1.1 KV grade (main cable :
number of runs indicated below) along with two run of single
core FRLS PVC insulated flexible solid/multistranded copper
conductor 1.1 KV grade for earthing in and including PVC
conduits concealed of suitable size, for 4 runs of 10 sq. mm
main cable + 1 run of 6 Sq. mm earth cable as in
replacement of old unserviceable wiring complete all as
specified and directed.
Note: (i) Connections of cables with MCBs or bus bars shall