Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

One Straight Line, One Healthy Bottom Line

With a modular design and 88% fewer connections, the


SPM® Simplified Frac Iron rewrites frac-site economics.

Case Study

THE INNOVATION THE CHALLENGE HIGHLIGHTS


Featuring a single, large-bore design and A traditional frac site comes with a maze • Single large-bore design with 88%
pre-assembled, modular components, the of multiple iron strings and numerous fewer connections, potential leak
SPM® Simplified Frac Iron reduces by more twists, turns, and connections. Rig-up paths, straps, and ground iron
than 88 percent the number of required is not only costly and time-consuming, • Reduced rig-up time with single
connections on a frac site—along with
but the work site is rife with potential connection at the end of each skid
much of the ground iron and other tripping
trip hazards and leak paths. Small pipe
hazards. • Redundant, seven-inch SPM® Isolation
diameters and contorted flow paths can and Directional Valves—unique to the
The 7 1/16” 15,000 psi main line is mounted wear hard on internal components. Every industry—keeping high-pressure fluids
on fit-for purpose skids, each with a single problem has to be addressed, adding safely under control
connection on each end, vastly simplifying additional maintenance costs and NPT.
and reducing rig-up time. Its design also • Reliable API flange connections
features industry-unique, seven-inch SPM® One customer recently operating in the instead of hammer-union, improving
Isolation and Directional Valves, one of Eagle Ford Shale sought to significantly safety margins and fastener
which includes a hydraulic actuator for safe reduce this associated time and cost. At redundancy
remote operations, allowing operators to the time, they were spending more than • Smaller total site footprint
keep high-pressure fluid in check. $1.1 million on 3-inch iron for each rig-up.
• 7 1/16” 15K API-6A style flanged iron
Fewer connections mean fewer leak paths Each rig-up procedure required 10-12
and failure points, facilitating a far safer and employees working 8-12 hours, which • 123 bbl/min max flow rate
more efficient work environment, along isn’t out of the ordinary.
• Modular skids featuring jacks for
with a smaller site footprint.
Company leadership was aware but easy installation alignment
The SPM® Simplified Frac Iron is paired skeptical of various monoline designs • Optional goat head
with SPM Oil & Gas’ OSL, Vertical Zipper on the market, since most had only
and Frac-stack technology to deliver cost • 3” 15K Safety Iron® inlets on
achieved mixed success at best.
savings through enhanced operational manifold skid
efficiency and reduced non-productive time
(NPT). Robust and streamlined, it can be
tailored to any basin or condition.
THE SOLUTION THE RESULT
Having heard positive things about the The first unit has been running successfully
SPM® Simplified Frac Iron, company for over a year now, with around a billion
leadership reached out to SPM Oil & pounds of sand through it. In fact, it
Gas for an operational prototype of its required nothing more than routine
maintenance.
large-bore design. We obliged, educating
the customer that the unique advantages Anecdotally, the customer also observed
offered by the system could significantly fewer vibrations, reduced valve and seat
reduce cost and NPT. wear, and a lower cycle rate for equipment
components, further saving on maintenance
This was the first job/prototype unit as and parts.
noted previously, the large-bore linear
After the single installation, company
design had also demonstrably reduced
leadership was fully convinced of its
fluid friction, along with the component
benefits, placing an immediate order for
wear associated with it. This, we thier fleets for the remainder of the year.
explained, would further reduce costs. Leveraging the technological advantage of
Rig-up would require only 2-3 employees the SPM® Simplified Frac Iron, the company
has since won contracts from E&P
working 3-4 hours—versus the 10-12
companies they have never done business
employees working 8-12 hours currently
with before.
required—achieving significant
efficiencies in time and costs while
creating a safer work environment.

SPM Oil & Gas

601 Weir Way T +1 800 342 7458


Fort Worth, TX 76108 F +1 817 977 2508
USA www.spmoilandgas.com Copyright © 2021 SPM Oil & Gas, Inc. All rights reserved.

You might also like