Zebra Crossing

Pavement
Zebra Crossing
Pavement
Dotted-Type
Audion-Tactile Blocks
End-Kerbstone
2500 Kerbstone Flushed 2503 Laid at 1:15. Line-Type
with Pavement Surface. Audio-Tactile Blocks Dotted-Type
End-Kerbstone Audion-Tactile Blocks
Laid at 1:15. Dotted-Type
0
30 500 Audion-Tactile Blocks
0.50

Construction Limit

Construction Limit
1:10
1 :1
0 1:15
3750

slope =1:15 Slope =1:15


300 3750
500 3750
Interlocing Block-Paved Line-Type
Dotted-Type
-Flush with the Pavement Surface. Audio-Tactile Blocks
Audion-Tactile Blocks
KERB-RAMP AT MID-BLOCK WITH AUDIO-TACTILE BLOCKS
End-Kerbstone
Laid at 1:15.
Line-Type
Audio-Tactile Blocks
Pavement
Pavement Zebra Crossing
3750
Line-Type Dotted-TypeTactile
Audio-Tactile Blocks End-Kerbstone End Flushed
to the Pavement Surface Blocks
Kerbstone Flushed
with Pavement Surface. Building

Construction Limit
2500

End-Kerbstone slope =1:15


Laid at 1:15. Building
Interlocking Block Paved Line-Type
- Flush with Pavement Surface. Audio-Tactile Blocks
KERB-RAMMP AT INTERSECTION WITH AUDIO-TACTILE BLOCKS
FLARED KERB RAMP WITH AUDIO-TACTILE BLOCKS
Department of Urban Development & Building Reviewed & Designed By : Consultant Client Scale REV : AUGUST 2023
DOHWA Engineering Co. Ltd.
Construction (DUDBC)
in Association with Acting Team Leader : DJ LEE Approved By : SIDDHARTHNAGAR TITLE : TYPICAL DRAWINGS
Regional Urban Development Project (RUDP) ERMC (P.) Ltd., SILT Consultants (P.) Ltd., and As Shown
West Urban Corridor (WUC) Development Project Reviewed By : URBAN ROAD DRG NO : SIM/RD/TD/11
DIGICON (P.) Ltd.
Babarmahal, Kathmandu, Nepal Mid- Baneshwor, Kathmandu Checked By : CH:0+000 - 25+485.87 Km
Tel: 01- 4589393 Designed By : SHEET NO : 18