Calculation
Calculation
Matrix no:
Program/Major:
Area (m2) /
IBS
No. Elements Length Coverage IBS Score
Factor
(m)
Part 1: Structural Systems
(i) 79.7 x2)+ 0.6 20740/21569.6 0.96 X 0.6 X 50=
71.1 x2)+ =0.96 28.80
In-situ column with 76.4 x2)+
timber formwork 94.2+
105.3+
• Precast two-way slab
89.3 +
• Precast beam 86.4) x 25=
1 20740m2
(ii) 1.0 829.6/21569.6= 0.038X 1.0 X 50
• Precast lightweight 0.038 =
cast-iron roof truss 1.9
1.0 30.67
Total Part 1
Part 2: Wall Systems
(i) 14500m 0.5 14500/ 0.4X0.5X20=
36000= 0.4 4.0
Internal wall Type A1:
autoclaved aerated
concrete (AAC) block
system – total length of
580m (each floor)
580X 25 = 14500
Vertical repetition of
structure = 85%
(ii) 4
Usage of precast
staircases = 90%
(iii) 3
Repetition of floor-to-
floor height = 75%
(iv) 2
(v) 2
(vi) 4
(vii) 6
Usage of Modular
gridlines = 80%
Total Part 3 24