1.1 Currently at Level 9. Logo Layout (refer email 16/5) – to proceed. Doka
1.2 Tower crane tie-back – superimpose and affected. Refer email 12/6 for modi- KTI
fication.
1.3 KTI
Screen height – 2 meter sufficient, to confirm. Doka to share pictures using
net as extension.
1.4 LED Screen Concept. Position accepted. Current aspect ratio (4:3, KTI
6.4m:4.8m). Require confirmation if prefer aspect ratio (16:9, 6.4m,3.8m).
Power supply 30kW required.
1.6 Material delivery tentatively in Sept 2024 (3 months production, 1 month de-
livery). Doka
2.2 Material delivery tentatively in Sept 2024 (3 months production, 1 month Doka
delivery).
3.2 Excess material from Hotel Tower to apply onto Tower A. Doka
______________________________________________________________________________________________
DOKA FORMWORK MALAYSIA SDN. BHD. Page 1 of 2
Lot 6, Jalan Teknologi, Taman Sains Selangor 1,
Kota Damansara 47810 Petaling Jaya, Selangor,
Malaysia | 47810 Petaling Jaya | Malaysia
______________________________________________________________________________________________
DOKA FORMWORK MALAYSIA SDN. BHD. Page 2 of 2