Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

National Institutional Ranking Framework

Ministry of Human Resource Development


Government of India
Submitted Institute Data for NIRF'2020'
Institute Name: Veermata Jijabai Technological Institute [IR-E-C-33641]

Sanctioned (Approved) Intake


Academic Year 2018-19 2017-18 2016-17 2015-16 2014-15 2013-14

UG [4 Years Program(s)] 621 540 540 540 - -

PG [2 Year Program(s)] 392 392 - - - -

Total Actual Student Strength (Program(s) Offered by Your Institution)


(All programs No. of Male No. of Female Total Students Within State Outside State Outside Economically Socially No. of students No. of students No. of students No. of students
of all years) Students Students (Including male (Including male Country Backward Challenged receiving full receiving full receiving full who are not
& female) & female) (Including male (Including male (SC+ST+OBC tuition fee tuition fee tuition fee receiving full
& female) & female) Including male reimbursement reimbursement reimbursement tuition fee
& female) from the State from Institution from the Private reimbursement
and Central Funds Bodies
Government

UG [4 Years 1874 804 2678 2340 323 15 611 1332 1800 21 122 0
Program(s)]

PG [2 Year 564 160 724 643 81 0 50 370 408 0 12 0


Program(s)]

Placement & Higher Studies

UG [4 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students Academic Year No. of students No. of students Median salary of No. of students
students intake in the students admitted in admitted through graduating in placed placed selected for Higher
year the year Lateral entry minimum stipulated graduates(Amount in Studies
time Rs.)

2013-14 540 557 2014-15 133 2016-17 624 521 600000(Six Lakh) 96

2014-15 540 555 2015-16 133 2017-18 626 524 784000(Seven Lakhs 102
Eighty Four Thousand)

2015-16 540 621 2016-17 126 2018-19 622 501 765000(Seven Lakh) 112

PG [2 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students graduating in minimum No. of students Median salary of No. of students
students intake in the students admitted in stipulated time placed placed selected for Higher
year the year graduates(Amount in Studies
Rs.)

2015-16 410 380 2016-17 339 201 425000(Four Lakhs 11


Twenty Five
Thousand)

2016-17 410 359 2017-18 354 207 670000(Six Lakhs 13


Seventy Thousand)

2017-18 392 355 2018-19 345 210 600000(Six Lakhs ) 7


Ph.D Student Details
Ph.D (Student pursuing doctoral program till 2018-19)

Total Students

Full Time 97

Part Time 115

No. of Ph.D students graduated (including Integrated Ph.D)

2018-19 2017-18 2016-17

Full Time 14 4 7

Part Time 19 9 15

Financial Resources: Utilised Amount for the Capital expenditure for previous 3 years
Financial Year 2018-19 2017-18 2016-17

Utilised Amount Utilised Amount Utilised Amount

Annual Capital Expenditure on Academic Activities and Resources (excluding expenditure on buildings)

Library 5265377 (Fifty Two Lakhs Sixty Five Thousand Three Hundred 3937697 (Thirty Nine Lakhs Thirty Seven Thousand Six 5416459 (Fifty Four Lakh Sixteen Thousand Four Hundred
Seventy Seven) Hundred Ninety Seven) Fifty Nine)

New Equipment for Laboratories 60497389 (Six Crore Four Lakhs Ninety Seven Thousand 64275398 (Six Crore Forty Two Lakhs Seventy Five Thousand 32766676 (Three Crore Twenty Seven Lakhs Sixty Six
Three Hundred Eighty Nine) Three Hundred Ninety Eight) Thousand Six Hundred Seventy Six)

Engineering Workshops 7723340 (Seventy Seven Lakhs Twenty Three Thousand 1534011 (Fifteen Lakhs Thirty Four Thousand Eleven) 262265 (Two Lakhs Sixty Two Thousand Two Hundred Sixty
Three Hundred Forty) Five)

Other expenditure on creation of Capital Assets (excluding 62191099 (Six Crore Twenty One Lakhs Ninety One Thousand 63314501 (Six Crore Thirty Three Lakhs Fourteen Thousand 52942855 (Five Crore Twenty Nine Lakhs Forty Two Thousand
expenditure on Land and Building) Ninety Nine) Five Hundred One ) Eight Hundred Fifty Five)

Financial Resources: Utilised Amount for the Operational expenditure for previous 3 years
Financial Year 2018-19 2017-18 2016-17

Utilised Amount Utilised Amount Utilised Amount

Annual Operational Expenditure

Salaries (Teaching and Non Teaching staff) 461408988 (Forty Six Crore Fourteen Lakhs Eight Thousand 366296945 (Thirty Six Crore Sixty Two Lakhs Ninety Six 364353441 (Thirty Six Crore Forty Three Lakhs Fifty Three
Nine Hundred Eighty Eight) Thousand Nine Hundred Forty Five) Thousand Four Hundred Forty One )

Maintenance of Academic Infrastructure or consumables, 118343070 (Eleven Crore Eighty Three Lakhs Forty Three 41688277 (Four Crore Sixteen Lakhs Eighty Eight Thousand 39989430 (Three Crore Ninety Nine Lakhs Eighty Nine
other running expenditures etc.(excluding maintenance of Thousand Seventy) Two Hundred Seventy Seven) Thousand Four Hundred Thirty)
hostels and allied services)

Seminars/Conferences/Workshops 20562243 (Two Crore Five Lakhs Sixty Two Thousand Two 14598708 (One Crore Forty Five Lakhs Ninety Eight Thousand 14192564 (One Crore Forty One Lakhs Ninety Two Thousand
Hundred Forty Three) Seven Hundred Eight) Five Hundred Sixty Four)

PCS Facilities: Facilities of physically challenged students


1. Do your institution buildings have Lifts/Ramps? Yes, more than 80% of the buildings

2. Do your institution have provision for walking aids, includingwheelchairs and transportation from one building to another for Yes
handicapped students?

3. Do your institution buildings have specially designed toilets for handicapped students? Yes, more than 80% of the buildings

You might also like