SP-31-RF-04 Excavation Work Permit Request Form
SP-31-RF-04 Excavation Work Permit Request Form
SP-31-RF-04 Excavation Work Permit Request Form
Issue: 01
Excavation Work Permit Request Form Issue Date: Feb 08, 2024
Page: 1 of 1
Work Order No: ________________ EXCAVATION WORK Excavation Work Permit No: ___
Location: _ _ PERMIT Issue Date ___________________
Is the excavation more than 1.2m depth Is a Confined Space PTW required
SAFETY PRECAUTIONS
□ Watchman □ Flagman □ Safety Signs □ Warning Tape □ Permanent barricade
□ Spoil clearance □ PPE □ Others
FACILITY
In case of presence of underground facilities, hand excavation must be done to expose them and after a Site Survey shall
be done by Subcontractor and Contractor to ensure all necessary precautions are taken and eventually allow mechanical
excavation.
Are the underground pipes, cables, etc. in the area exposed? □ YES □ NO
TO BE FILLED BY CONTRACTOR
Are the underground pipes, cables, etc. within 15 m of existing facilities? □ YES □ NO
The Site has been checked and working Area accepted The Site has been checked and working Area accepted
APPROVAL
______________________________________
__________________________
SUPERINTENDENT CONSTRUCTION MANAGER OR DELEGATE