REE M&E Joint Stock Company

Công ty cổ phần cơ điện lạnh REE M&E

Project Done by
NTT Global Data Centers HCMC1 Mai Thanh Trieu
Dự Án Thực hiện
Address Check by
Ho Chi Minh City Truong Quang Tue
Địa Chỉ Kiểm Tra
Items Code
HVAC -
Bộ Môn Mã số

SERVICE TIME OF CHILLED WATER STORAGE TANK

I. According to Ashrae hand book:

The total cooling load per hour can be calculated from the following:
𝑘𝑗
𝑄 (𝑘𝑊ℎ)𝑥3600( )
𝑉(𝑚 ) = 𝑘𝑊ℎ
𝑘𝑔 𝑘𝑗
∆𝐾𝑥998( )𝑥4.2( )𝑥𝑇𝑎𝑛𝑘 𝐹𝑂𝑀
𝑚 𝑘𝑔𝐾

𝑘𝑔 𝑘𝑗
𝑉 𝑚 𝑥∆𝐾𝑥998 𝑥4.2 𝑥𝑇𝑎𝑛𝑘 𝐹𝑂𝑀
𝑚 𝑘𝑔𝐾
𝑄 (𝑘𝑊ℎ) =
𝑘𝑗
3600( )
𝑘𝑊ℎ
Where:
V (m³) : Tank volume, Refer drawing No. NTT-ARP-DR-ME-10-LZZ-0006
Q 1 (kWh) : Total cooling load per hour
∆K : The water temperature difference, 8K - refer to MEPF Basic Design Report
Tank FOM : The ratio of the amount of energy removed from storage to the amount of energy
put into storage during one charge/discharge cycle, 80~90%

Total coolig load for phase 1:


Q= 3200 Kw (Refer drawing No. NTT-ARP-DR-ME-10-LZZ-0006)
Service time of chilled storage tank:
𝑄
𝑡(ℎ) =
𝑄

Volume of Number of
Tank FOM Q1 t
Tank tank Remarks
(m³) (set) (%) (kWh) (hour) (min)

16.5 1 85 131 0.04 2.45

16.5 2 85 261 0.08 4.90

16.5 3 85 392 0.12 7.35