Description: Additional Fire Alarm Termination Point for Ammonia Room Level 1.5
FIELD OBSERVATIONS:
Referring to DCR-028, there is an additional ammonia room at Level 1.5 within the same
compartmentation as of Ammonia Room at Level 1. Due to additional gases equipment and
small tanks, additional flame detectors are required to be installed (responsible by other
GC).
Due to additional detectors, IAQ is required to take the termination points and provide
necessary termination points for the other GC (Kellington) and conduct programming for
the additional detectors on the fire alarm panel at Level 1. The testing of the individual
detector is responsible by Kellington.
Note: Pursuant to the conditions of contract, the Contractor is instructed to proceed with the work without further delay.
1 week
Estimated Schedule
Estimated Cost (RM) RM 50,000.00 (for termination and
(Days)
programming work)
IAQ accepts this FI with condition below:
1. IAQ required minimum 2 weeks to complete to scope.
Signature
Signature
Name Sivalingam Terupathy Dirk Hewer *Estimated Cost exceeding threshold RM460k
Approved by IFKM - BI Approved by IFKM – Approved by IFKM –
Execution/ Technical Project Manager Management
Copy: BI Commercial – Thomas Mieck / Aziyah
IFKM Management
FM Team
WĂŐĞϭ ŽĨϭ
dŚŝƐĚŽĐƵŵĞŶƚĐŽŶƚĂŝŶƐĐŽŶĨŝĚĞŶƚŝĂůĂŶĚƉƌŽƉƌŝĞƚĂƌLJŝŶĨŽƌŵĂƚŝŽŶŽĨ/ŶƚĞƌŶĂƚŝŽŶĂů&ĂĐŝůŝƚLJŶŐŝŶĞĞƌŝŶŐ͘ŽŶŽƚĐŽƉLJŽƌĚŝƐƚƌŝďƵƚĞǁŝƚŚŽƵƚ
ƉƌŝŽƌǁƌŝƚƚĞŶƉĞƌŵŝƐƐŝŽŶ͘dŚŝƐĚŽĐƵŵĞŶƚŝƐĂƵƚŚŽƌŝnjĞĚĨŽƌƵƐĞƵŶƚŝůƌĞůĞĂƐĞďĞĐŽŵĞƐĞĨĨĞĐƚŝǀĞ͘hƐĞŽĨĂƐƵƉĞƌƐĞĚĞĚŽĨŽďƐŽůĞƚĞĚŽĐƵŵĞŶƚŝƐ
ƉƌŽŚŝďŝƚĞĚ͘/ƚ͛ƐƚŚĞƵƐĞƌ͛ƐƌĞƐƉŽŶƐŝďŝůŝƚLJƚŽǀĞƌŝĨLJƚŚŝƐĚŽĐƵŵĞŶƚŝƐĐƵƌƌĞŶƚƉƌŝŽƌƚŽĞĂĐŚƵƐĞ͘
1 $ddiWiRQaO dHWHFWRUV aQd FaEOiQg ZRUNV IURP $PPRQia
5RRP /HvHO 1 SURvidHd Ey .HOOiQgWRQ 1 $ddiWiRQaO WHUPiQaWiRQ SRiQWV WKURXgK H[iVWiQg PRdXOHV SURvidHd
2 .HOOiQgWRQ UHVSRQViEOH WR FRQdXFW IOaPH dHWHFWRUV Ey ,$4
WHVWiQg aQd FRPPiVViRQiQg FRPSOyiQg ZiWK 8/)M FRdHV 2 3URgUaPPiQg RI WKH addiWiRQaO dHWHFWRUV via IiUH aOaUP SaQHO aW
/HvHO 1 Ey ,$4