GOVERNMENT OF JAMMU& KASHMIR

OFRICE OF THE CHIEF ENGNEER,JAL SHAKTIPHE)DEPARTMENT,JAMMU


Sub:-RevisedTechnical tothe workWSs DodasanRemote'
Sanction underJJM
)
Ref: Thisoffice Approval
Administrative II/904of2022-23
No. PHEJ/DB/A.A/JJIM/ foranamountof Rs. 939.42
dated31-08-2022 lakh
& RevisedAdministrative
Approval No. PHEJDB/A.A/JM/II/1413of2024-25dated08-05-2024
foran amountofRs. 938.86
lakh
ü)Technical videNo.PHEJ/
accordedby thisoffice
Sanction DB/TS/1377
of2022-23
dated09-09-2022
ü)Superintending Ergineer, Hydraulic Circle forwarding
Rajouri's No.SEHR/PHE/647-48
letter dated28-05-2024
T.S No.PHEJ/DB/TSs,144 of2024-25
Dated |-06--2024
The Superintending Engineer, Hydraulic CircleRajouri,videhisabovereferred has recommended
letter theaccordofReised
Technical Sanctionto the variouscomponents ofthe workwss Doasan Remote' under JJM. The workwas originally accorded
TechnicalSanction by thisoffice videNo. PHEJ/ DB/TS/1377of2022-23 dated09-09-2022foran amountofRs.906.57 Lakh.However,
the ExecutiveEngineer has now soughtrevised Technical Sanctionto the work duetorevision ofDetailedProject
Report.AccordofRevised
TechnicalSanction ishenceobligatory tofulfill
codal formalities
fortendering /makingpaymentto the executing agency.
Now,therefore, as recommended by the SuperintendingEngineer, Hydraulic CircleRajouri,
videhisabove referred letter,
the
Technical Sanction already accordedvidethisoffice No. PHEJ/ DB/TS/ 1377 of2022-23dated09-09-2022issued underendorsement No.
PHEJ/DB/13298-99dated09-09-2022amounting to Rs.906.57 lakhisherebycancelled and insupersession
ab-initio to the Ordersso
issued, RevisedTechnical Sanction ishereby accordedto thefollowing components ofthework"WSSDodasan Remote'
1. Providing & installation pumping machinery, voltagestabilizers,& LTcontrol panelswith otheralliedmaterials (Rs.190.00
lakh)
2. Construction of5,000 GPH RSFPcomprising of pre-sedimentationtank,flocculator,
coveredbeds,chemicalhouseincl. testing
andcommissioning (Rs.81.79 lakh)
3. Redevelopment of04 Nos.existing bore well(Rs.8.00 lakh)
4. Construction of05Nos.pump room(Rs.40.70 lakh)
5. Construction of50,000 ginssumptank /GSR (Rs.27.04lakh)
6. Construction of 02Nos.20,000 glns capacitysumptank/GSR (Rs.21.06 lakh)
7. Construction of 05Nos. 10,000 glnscapacity sumptank/GSR (Rs.36.45 lakh)
8. Construction of boundary wall (Rs.14.62 lakh)
9. Installation of390Nos.FHTC@700/=each(Rs.2.73 lakh)
10.Prouiding, laying fitting
& network
ofdistribution (Rs.359.98 lakhy
11.Providing,laying & fttingofR/main (Rs.46.38 lakh)
12.Installation ofsign board(Rs.0.30lakh)
foran amount Rs.829.05
of lakh(RupeesEight Hundred TwentyNineLakhandFiueThousand only),as perenclosed estimates
and drawings, by debittoM.H. JalJeevanMission (JJM)

i
TheTechnical Sanctionaccordedshall
The workisexecuted
it.The costofworkshall
be subject
afterobserving
tothefollowing
allcodal
notexceedtechnically
conditions:
formalities/
sanctioned
procedures/JJM
cost.
guidelines.

it.Thework isexecutedaftervetting ofdetailed drawings and structural drawing/ designby thecompetent

. authority
tu. Components
following
forwhich
Thattheinter
awardofthecontract.
vi. Thework iscompleted
all standard
Technical
seposition
design
Sanction
ofthecontract

instipulatedtime.
parameters and B.I.S codes.
hasbeen accordedmustbe executedinfull within
doesnotchangedueto thechangeinthequantities
the sanctionedcost.
ofanyofthe components aferthe

vii. Strictqualitycontrolismaintained inaccordance withstandard specifications.


vil. TheTechnical
inthedetailed
sanction
estimate.
shall notbe construedas an authority ora certificate
forthecorrectness ofthe measurements provided

i While
executing the workandmakingthepayment,
workhasbeenachievedandthatthecodal/
theBxecutiveEngineershall
parametersandprovisions
technical
fullysatisyhimself ofthe
that theobjective
havebeenstrictly
adhered to.
x Thereshall be no overlapping offundingforanyofthecomponents coveredunder thisorderunderany otherHead viz,
District
Plan,CSs,BADP, NABARD, Languishing, etc.
xi.Thissanction shallnotabsolve the implementing/executingagency fromobtainingnecessary clearances/approvals/
checks
fromDIC/ other government approvedagencies, asprescribed underrules,andgovermmentinstructions.
xii.TheTechnical Sanctionisnotan approvalforanychange of proposal /componentsw.r.t theAdministratively
ApprovedDPR.
xitt.Itshallbe ensured that the componentswhich at abnormallylowratesare executedongroundas perapproed
are allotted
designandspecifcations.
xiu.The paymenttothecontractor shall be madeasperactual workdoneatsite,.
cU. Expenditure ontheschemeshall only
be incurred afterestablishmentofa sustainablesource.
xui.All otherterms& conditions governing thecontractshall
besameasperE-NIT,SBD andPWD FormNo.25.
The expenditure
be bookedstrictly
as per planprovisions
within
the approved
costof the component,
afterfulfilling
allrequiedcodal
formalities
andfollowing
soundengineering
practice.

/9-96
No:- PHEJ DB/
-
Dated:
Iro6-loy
Copytothe:-
Chie Brgineer
Jglshakti
(PHE)Deartment
1. Superintending
Engineer,
Hydraulic
Circle forinformation
Rajouri,
2. Bxecutive JalShakti
Engineer, (PHE)
Division
Rajouriforinformation

You might also like