Professional Documents
Culture Documents
Spec 2
Spec 2
1.01 GENERAL
B. The list of vendors mentioned in this section is indicative and the Contract
Documents shall be construed as a Vendor Neutral set of requirements. The
Contractor may propose other vendors provided that strict compliance with
Drawings, Specifications and broader Contract Documents is guaranteed by the
Contractor and validated by the Engineer.
Safid. UAE
Trox. UK
Fire and Smoke ALDES MIDDLE EAST UAE
Dampers
Ruskin Mfg. Co. USA
Safid. UAE
Trox. UK
Turning Vanes Anemostat Products Div., USA
Dynamics Corp. of America.