Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GEO BOR UTAMA BH-01 PAGE 2 OF 2

CLIENT : PT. GEOTECHNICAL ENGINEERING CONSULTANT DATE STARTERD : 17 Januari 2022 TOTAL DEPTH : 30 m COORDINATE
PROJECT NAME : GEDUNG KEUSKUPAN DATE COMPLETE : 22 Januari 2022 GWL Av : -2.7 m X : -
LOCATION : Jl. BANDA BANDUNG LOGGED : STEVEN Y : -
DRILLER : IRAWAN Z : -
THICKNEES (m)

SAMPLE TYPE
DEPTH (m)
DEPTH (m)

G.W.L (m)
DATE

SOIL DESCRIPTION SPT N VALUE SPT Curve

N1 N2 N3 N-SPT
20 40 60

Gravelly sand, Homogeneous, dark grey, dense sand,


15-21 moist.
21

21-21.45 SPT-11 10/15 18/15 14/15 32/30

22

23

23-23.45 SPT-12 12/15 19/15 16/15 35/30


20 Januari 2022

24

25
Medium sand to coarse, Homogeneous, dark grey,
21-30 25-25.45 SPT-13 18/15 21/15 16/15 37/30
dense sand, moist.
26

27

27-27.45 SPT-14 16/15 18/15 14/15 32/30

28
22 Januari 2022

29

29-29.45 SPT-15 16/15 19/15 16/15 35/30

30
END OF DRILLING

31

32

33

34

35

36

37

38

39

40

GWL 22-01-2022 LEGEND


PAGI -2.5 m Ground Water Level Disturbed Sample (DS)

SORE -3.2 m Standar Penetration Test (SPT) Pressuremeter Test (PMT)


REMARKS : 0% - 10% : Trace 20% - 35% : Some Undisturbed Sample (UDS)
10% - 20% : Little 35% - 50% : And

You might also like