t'-811
6"
W6 X 25
ASSEMBLY IF REQUIRED
- -1 -
"- -•
I'--6-
l OF FIXED SPLICE ____,,_,___ _
MIN.
1
l OF EXPANSION SPLICE
ASSEMBLY IF REQUIRED ·1· 2'-011
MIN.
-1
n- n-"--,-- - - -
�
lJ - _IJ_ - 00 __ U __I_L _ _ _l_l __ l_J_ _ _
- 17
00
�
1 1 I
L5 X 5 X % � = :: = =:: =
10" X 11/4" X l'-2" RAILING ANGLE "' l1=-=�=_1_1=- = = = 1=4c = J_j
= == =
BASE l
:: : � I
:
'' � SURFACE
''
''
4 - I" DIA. ANCHOR STUDS
WITH 4 HEAVY HEX NUTS
AND 4 FLAT WASHERS EACH � - - ---,'--
- - SEE NOTE "AA"
4 - 1" DIA. ANCHOR STUDS
II II
II II
DESIGNER NOTES:
61/a" NOTE "AA":
l OF ¼" DIA. HOLE� THE MINIMUM DISTANCE FROM THE POST TO AN EXPANSION JOINT
FOR 3/4" DIA. BOLT SHALL BE DETERMINED BY THE MINIMUM EDGE DISTANCE OF 5"
FROM ANY ANCHOR STUD TO THE END OF THE SLAB, OR TO THE
SPRING LOCK WASHER l I IC I
;:L 1
EXPANSION JOINT RECESS POUR, IF ONE IS USED. ON PRESTRESSED
CONCRETE BRIDGES, THE POST SHALL BE LOCATED TO MINIMIZE
HEX NUT 2"x ¾s"X 2" FLAT WASHER
¼" DIA.
l� � - 1r
En
C r-l OF¼" DIA.
HOLES FOR 3/4" BOLTS
ANCHOR PLATE/END BLOCK REINFORCEMENT CONFLICTS. POST
SPACING SHALL BE ADJUSTED ACCORDINGLY.
THE MAXIMUM CENTER TO CENTER SPACING OF RAILING POSTS IS 8'-3".
THESE RAILINGS ARE ADEQUATE FOR A TL-4 <PL-2) SERVICE LEVEL.
LS X 5 X %
I I.
l½s". 31/4'' H11&" RAILS OF RAILING SHALL SPAN A MINIMUM OF THREE POSTS.
FOR SECTIONS A-A & B-B, SEE BD-RS12.
FOR SPLICE DETAILS, SEE BD-RS13.
3" 5"
SECTION C-C
ELEVATION FOR TRANSITION DETAILS, SEE BD-RS3.
NOTES:
SLOTTED ROUND HEAD BOLT
ALL RAILING IS TO BE FABRICATED AND ERECTED ACCORDING TO
RAILING ANGLE DETAILS
SECTION 568 OF THE STANDARD SPECIFICATIONS.
PRIOR TO GALVANIZING THE ASSEMBLED POST, GRIND ALL EDGES TO A
MINIMUM RADIUS OF 1/1&".
BOLTS SHALL BE TORQUED SNUG TIGHT (APPROXIMATELY 100 ft-lb.l.
REVISED
Department of Transportation
Office of Structures
L5 X 5 X %
--=---
1'-8"
00 LJ _I_!_ _ _I!_ _
f--l---=----�-���1�
"'
10"xt¼"x1'- 2" 5"
BASE t - SUTE "AA"
4 - 1" DIA. ANCHOR STUDS ,' ,' TOP OF ROADWAY 4 - 1" DIA. ANCHOR STUDS
WITH 4 HEAVY HEX NUTS SURFACE WITH 4 HEAVY HEX NUTS ELEVATION LA RAILING EXPANSION SPLICE IS REQUIRED
AND 4 FLAT WASHERS EACH � >-
- -....;.,.--,',......,..,: :______ AND 4 FLAT WASHERS EACH IN ANY POST SPACING THAT CONTAINS A
II
II
II
II
SUPERSTRUCTURE EXPANSION JOINT
STEEL BRIDGE RAILING SPLICE DETAIL
(FOUR-RAIL WITH SIDEWALK)
DESIGNER NOTES:
1--- t OF RAILING ANCHORAGE NOTES:
NOTE "AA":
THE MINIMUM DISTANCE FROM THE POST TO AN EXPANSION JOINT ALL RAILING IS TO BE FABRICATED AND ERECTED ACCORDING TO
SHALL BE DETERMINED BY THE MINIMUM EDGE DISTANCE OF 5" SECTION 568 OF THE STANDARD SPECIFICATIONS.
ELEVATION
FROM ANY ANCHOR STUD TO THE END OF THE SLAB, OR TO THE
PRIOR TO GALVANIZING THE ASSEMBLED POST, GRIND ALL EDGES TO A
SECTION
EXPANSION JOINT RECESS POUR, IF ONE IS USED. ON PRESTRESSED
STEEL BRIDGE RAILING CONCRETE BRIDGES, THE POST SHALL BE LOCATED TO MINIMIZE MINIMUM RADIUS OF 1/is".
ANCHOR PLATE/END BLOCK REINFORCEMENT CONFLICTS. POST
SPACING SHALL BE ADJUSTED ACCORDINGLY. BOLTS SHALL BE TORQUED SNUG TIGHT IAPPROXIMATELY 100 ft-lb.).
(FOUR-RAIU WITH SIDEWALK
THE MAXIMUM CENTER TO CENTER SPACING OF RAILING POSTS IS 8'-3".
THESE RAILINGS ARE ADEQUATE FOR A TL-4 IPL- 2) SERVICE LEVEL. REVISED
RAILS OF RAILING SHALL SPAN A MINIMUM OF THREE POSTS.
Department of Transportation
Office of Structures
FOR SECTIONS A-A &. B-B, SEE BD-RS 12.
FOR SPLICE DETAILS, SEE BD-RS13. ERRATA STEEL BRIDGE RAILING
FOR DETAILS OF RAILING ANGLE, SEE BD-RS1. FOUR-RAIL
APPROVED: 05/17/2022 ORIGINAL ISSUED UNDER EB 22-0 29
FOR DETAILS OF SLOTTED ROUND HEAD BOLT, SEE BD-RSt.
FOR TRANSITION DETAILS, SEE BD-RS3. CURRENT ISSUED UNDER EB 22-0 29
1--------------1 EFFECTIVE IMMEDIATELY
DEPUTY CHIEF ENGINEER (STRUCTURES)
611 t'-611 * C.P.G.W. WITH BD-RS3
l OF BRIDGE POST
� : ,. 2'-011 I ,. l OF FIRST
� BACKUP RING 2O22-ROEO
( OF BRIDGE POST----1--2'-_
- 0"-----i----t OF FIRST
�
.. .., ..
1-------'HI-+----,+--+,--,,-'
"'
1-------,-.,:,--------"I' uJ
,
,;, � �
1------+++---,t-t,---.1::i
rc===�:Jyr=l!���
II 1 1 1 ::C
r-c==::::::;!l!::ii:!!=!:tt:!� I 2'-0" I
l OF FIRST
HEAVY POST OR
SPECIAL POST
TURNDOWN DETAIL
"' : : : s.___ HEAVY POST
0''
4½ "
l OF EXPANSION ---- I.- l OF EXPANSION
SPLICE ASSEMBLY 1 SPLICE ASSEMBLY 3/4" ITYP.l
!SECOND & THIRD RAJU
�r
<FIRST RAJU �" x 3" SLOT FOR
1A
·l:
2 3 SPACES 2 " DIA. BOLTS
l OF LAST _ ____ _ '-_ 0_" ______ _ _ _ _ _ ID _ _ '-_0_" _= _ 6'-0_
_ " _ ___,___ _ 4_ S_P_AC_ES_ _ID _ 2_'-_0 '_' =_ _8'_-0__
" _ __.,_,_
___________6_ S_PA_ C_ES_ _ID _ 3'_ -_0'_' =_ _18_'-_ 0_
_" _ _ _ _ _ _ _ _ ___,_PA_ Y_LIM_ IT_ _ FO_ R_BO_X _ B_EA_M_ G_UI_ DE_ /,�-
BRIDGE POST RAIL IN HIGHWAY ESTIMATE t%" DIA. Him
I HEAVY POSTS S3 x 5.7 TRANSITION POST S3 x 5.7 WEAK TRANSITION PO TS FOR ½" BOLTS �
Li
�
..., $-$ -
NOTES:
NOTE "A":
THE COST OF THE POSTS, SPLICE TUBE AND RAIL FOR THE TURNBACK
HEAVY POSTS IS INCLUDED IN THE PRICE BID FOR THE TRANSITION ITEM.
HOLES IN THE POST FOR THE LOWER SHELF
ANGLE MAY BE DRILLED IN THE FIELD TI YP.l
SLOT IN SHELF ANGLE SHALL BE * C.P.G.W.
= COMPLETE PENETRATION GROOVE WELD.
MODIFIED TO ACCEPT ¾" DIA.
SPLICE BOLT AT THIS LOCATION. ANY MODIFICATIONS MADE IN THE FIELD THAT DAMAGES GALVANIZATION
SHALL BE REPAIRED IN ACCORDANCE WITH SUBSECTION 719-01 OF THE
ELEVATION NYS STANDARD SPECIFICATIONS.
REVISED
Department of Transportation
Office of Structures
NO BOLT BETWEEN SECOND AND THIRD BOX \-- t OF FLARE SPLICE ASSEMBLY
BEAMS AND THE BLOCKOUTS ON THIS POST. THE COST OF THIS POST TO BE
� ll OF FLARE SPLICE ASSEMBLY INCLUDED IN THE PRICE BID FOR
..
THE TRANSITION ITEM.
NO BOLT BETWEEN BOX BEAMS AND
THE BLOCKOUTS ON THIS POST. BOTTOM RAIL ONLY ' ' ' ='
= =
1_'_ _J ' L _J l_ _J
PLAN
PAY LIMIT FOR
BRIDGE RAILING
PAY LIMIT FOR TRANSITION - BRIDGE RAILING TO BOX BEAM GUIDE RAIL (BRIDGE ESTIMATE) HIGHWAY POST SPACING
(HIGHWAY ESTIMATE)
2'-0" 3 SPACES ID 2'-0" = 6'-0" 4 SPACES ID 2'-0" = 8'-0" "X" SPACES ID 3'-0" MAX. = X'-X" 8 SPACES ID 3'-0" = 24'-0"
I t.11_1 II I
I Ill I 111
I Iii I
_;__,,µ__;_ '1,-'
ELEVATION
NOTES:
DESIGNER NOTES: NOTE "A":
FOUR-RAIL STEEL BRIDGE RAIL FLARED TRANSITION TO HIGHWAY BOX BEAM THE COST OF THE POSTS, SPLICE TUBE AND RAIL
CHECK THE CLEARANCE FROM THE SUBSTRUCTURE TO THE FIRST HEAVY POST.
THIS POST MAY REQUIRE THE SPECIAL POST DETAIL SHOWN ON BD-RS15.
(SIDEWALK CONTINUES ON APPROACHES) FOR THE TURNBACK IS INCLUDED IN THE PRICE
BID FOR THE TRANSITION ITEM.
THE VALUE OF "X" DEPENDS ON DESIGN SPEED, OFFSET AND VALUES FROM * C.P.G.W. = COMPLETE PENETRATION GROOVE WELD.
TABLE "A". THE DETAILER MUST REPLACE THE VARIABLE "X", AND ANGLE
FROM "TABLE A" WITH ACTUAL VALUES. ANY MODIFICATIONS MADE IN THE FJELD THAT DAMAGES
GALVANIZATION SHALL BE REPAIRED IN ACCORDANCE WITH
ALL DIMENSIONS BETWEEN POSTS ARE MEASURED PARALLEL TO THE ROADWAY. SUBSECTION 719-01 OF THE NYS STANDARD SPECIFICATIONS.
FOR SPLICE ASSEMBLY DETAILS, SEE BD-RSl 3.
REVISED
FOR TRANSITION POST, WEAK TRANSITION POST, AND HEAVY POST DETAILS, Department of Transportation
SEE BD-RS15.
Office of Structures
FOR FLARE SPLICE ASSEMBLY, SEE BD-RSl 4.
FOR TURNBACK SPLICE DETAILS, SEE BD-RS! 4.
STEEL BRIDGE RAILING
ERRATA FOUR-RAIL FLARED TRANSITION
FOR TURNDOWN DETAIL, SEE BD-RS3. TO HIGHWAY BOX BEAM
FOR DETAILS OF SHELF ANGLE, SEE BD-RS3. APPROVED: 05/17/2022 ORIGINAL ISSUED UNDER EB 22-029
CURRENT ISSUED UNDER EB 22-029
1-------------1
DEPUTY CHIEF ENGINEER (STRUCTURES)
EFFECTIVE IMMEDIATELY
BD-RS5
2O22-ROEO
CURB LINE
I rn f . "--- - � S EE DESIGNER NOTE
HSS 6 x 6 x 7fo GALVANIZED BOX BEAM
71/z" !BOTTOM RAJU
SHELF ANGLE CTYP.l
PLAN FACE OF RAIL
� BEGIN PAY LIMIT FOR STONE CURB
!TYPE Al END OF U-WINGWALL OR REAR
FACE OF BACKWALL FOR FLARED WALLS.
' 10'-0" 31'-0" TRANSITION TO MOUNTING HEIGHT BEGIN RUN OF BOX BEAM
PARALLEL TO GRADE
25'-0"
ci�iim� S3 x 5.7 TRANSITION POSTS -- it FIXED SPLICE ASSEMBLY ffOP RAJU
TRANSITION ==_ -- It OF EXPANSION SPLICE ASSEMBLY
;l��;��i=i=
• 5.
==�' ��t\; ==�,�==��
SLOPED TO MEET HWY. 71/z" !BOTTOM RAJU
• J:
1
1 �1...,_:: ---.+]
--
MOUN IN G HEIGHT Hs s 6 x 6 x ¾ GALVANIZ ED B x BEAM
r
\ J� .-SEE NOTE "A"
. I .
d=��k � ��T�����:��;i_J -__,;i_ \ �;������: �::� �o:�:��
I , ,, ---l--f:::::;.;:;;]J=:====J=�.:��--�_,
��'ji�1 -- ; I _J S=»o �
�
��
,
>',
;;,, i
__
,,,... ..
J
__, '' '�
J
+- 1-r:- --1-,-1:1--..../ I� I� /, � =-=2-
I
END CONNECTIONS -
/ HEAVY POSTS----
I} -J-
I
I}
,t
;:.,
I I
�
I
�
I I
-L 9" MEASURED FROM THE ELEVATION
FOR BOX BEAMS � OF THE GROUND AT THE END OF THE
J TOP OF PAVEMENT SHELF ANGLE � SL�T IN SHELF ANGL� SHALL BE FLARED BACK SECTION OF TUBE.
HOLES IN THE POST FOR THE LOWER SHELF OR SHOULDER MODIFIED TO ACC EPT ¾" DIA.
SEE SHOULDER DRAINAGE AND APPROACH DETAIL ANGLE MAY BE DRILLED IN THE FIELD ffYP.l SPLICE BOLT AT THIS LOCATION.
SHEETS FOR ALTERNATE CURB CONFIGURATIONS.
ELEVATION THE %" DIA. HOLE DRILLED IN THE POST
MAY BE FIELD DRILLED.
CONCRETE BARRIER TO BOX BEAM GUIDE RAIL TRANSITION
DESIGNER/DETAILER:
THE DESIGNER SHALL CHECK THE CLEARANCE FROM THE SUBSTRUCTURE TO THE
FIRST HEAVY POST. THIS POST MAY REQUIRE THE SPECIAL POST DETAIL, SEE BD-RS15.
FOR SPLICE ASSEMBLY DETAILS, SEE BD-RSl3. NOTES:
FOR CURB AND SHOULDER TREATMENT DETAILS, SEE CURRENT BD-AD SERIES SHEETS. ANY MODIFICATIONS MADE IN THE FIELD THAT DAMAGES GALVANIZATION
SHALL BE REPAIRED IN ACCORDANCE WITH SUBSECTION 719-01 OF THE
FOR END CONNECTIONS FOR BOX BEAM DETAILS, SEE BD-RSl4. NYS STANDARD SPECIFICATIONS.
FOR SPECIAL POST ELEVATION, BASE PLATE AND ANCHORAGE DETAILS, SEE BD-RS15.
REVISED
FOR DETAILS OF SHELF ANGLE, SEE BD-RS3. Department of Transportation
DESIGNER SHALL CONTACT THE REGION TO DETERMINE THE MATERIAL TO BE USED IN
Office of Structures
THE AREAS UNDER THE RAILING.
BOX BEAM GUIDE RAIL
ERR ATA TRANSITION TO SINGLE SLOPE
(HALF SECTION) CONCRETE BRIDGE BARRIER
APPROVED: 05/17/2022 ORIGINAL ISSUED UNDER EB 22-029
CURRENT ISSUED UNDER EB 22-029
1-------------1
DEPUTY CHIEF ENGINEER !STRUCTURES)
EFFECTIVE IMMEDIATELY
PAY LIMIT FOR VERTICAL 34'-0" PAY LIMIT FOR TRANSITION - CONCRETE BARRIER TO BOX BEAM GUIDE RAIL IN BRIDGE ESTIMATE BD-RS6
FACED CONCRETE PARAPET
2'-0 11
3 SPACES D 2'-0" = 6'-0" 4 SPACES D 2'-0" = 8'-0" 6 SPACES D 3'-0" = 18'-0" PAY LIMIT FOR BOX BEAM GUIDE 2O22-ROEO
RAIL IN HIGHWAY ESTIMATE
HEAVY POST S3 x 5.7 TRANSITION POSTS S3 x5.7 WEAK TRANSITION POSTS
INDICATE EITHER ASPHALT
VEGETATION CONTROL STRIP THE COST OF THIS POST TO BE
WARP SLOPE TO MATCH OR SHOULDER BACKUP MATERIAL, INCLUDED IN THE PRICE BID FOR
WASH AT TOP OF PARAPET COST INCLUDED IN THE HIGHWAY THE TRANSITION ITEM.
SHOULDER ITEM. !SEE DESIGNER NOTE)
PARAPET
DESIGNER/DHAILER:
' =' ' = '
THE DESIGNER SHALL CHECK THE CLEARANCE FROM THE
=
L.'._ _J l_ _J 1_'_ _J
7
IO"xl"x2'-1" LONG
ANCHOR PLATE
r
SEE DETAIL "A" IO"xl"x2'-1" LONG
= � 3" ANCHOR PLATE
IO"xl"x2'-1" LONG
�:
t
l TYP. >--��H
�+-Hr---HSS 6 x6 x;{6 ANCHOR PLATE
GALVANIZED BOX BEAM
r
CONCRETE PARAPET 15'-0" ROADWAYS WITH DESIGN SPEEDS OVER 50 MPH,
t TURNBACK SPLICE
ASSEMBLY (BOTTOM RAIL>
HSS 6x 6x 3/Js t FIXED SPLICE ASSEMBLY
SEE FLARE SHELF ANGLE GALVANIZED BOX BEAM SEE FLARE <TOP RAIL> THE %" DIA. HOLE IN THE
SPLICE ASSEMBLY\ SPLICE ASSEMBLY 7½" POST MAY BE FIELD DRILLED.
\) _ _ , / _
,,, "
,,,
1 I SLOT IN SHELF ANGLE SHALL BE 9" MEASURED FROM THE ELEVATION
HOLES IN THE POST FOR THE LOWER SHELF TOP OF MODIFIED TO ACCEPT 3/4" DIA. OF THE GROUND AT THE END OF THE
ANGLE MAY BE DRILLED IN THE FIELD ffYP.l SIDEWALK SPLICE BOLT AT THIS LOCATION. FLARED BACK SECTION OF TUBE.
HEAVY POSTS S3x 5.7 TRANSITION POSTS S3x 5,7 WEAK TRANSITION POSTS
ELEVATION
BOX BEAM FLARED TRANSITION TO CONCRETE PARAPET
�IDEWALK CONTINUES ON APPROACHES)
NOTES:
NOTE "A":
THE COST OF THE POSTS, SPLICE TUBE AND RAIL FOR THE TURNBACK
IS INCLUDED IN THE PRICE BID FOR THE TRANSITION ITEM.
ANY MODIFICATIONS MADE IN THE FIELD THAT DAMAGES GALVANIZATION
SHALL BE REPAIRED IN ACCORDANCE WITH SUBSECTION 719-01 OF THE
NYS STANDARD SPECIFICATIONS.
REVISED
Department of Transportation
Office of Structures
L
c_ _J l_ _J l_ _J l__J 1_'._ _J T E TRA SITIO ITEM
, ____ 11
ci HSS 6 x 6 x ¾& GALVANIZ ED
HSS 6 x 6 x ¾& GALVANIZ ED BOX BEAM
71/2" TTOM
(BO RAIL>
� SEE DESIGNER NOTE BOX BEAM ffYP.)
PLAN
31'-0" TRANSITION TO MO UNTING HEIGHT G N RUN OF BOX BEAM BE I
PARALLEL TO GRADE
i.----- - - - - - - - - - - - - - -2_5_'-0"
- _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_1------t FIXED SPLICE ASSEMBLY <TOP L>
RAI
�t P N
EX A SIO N SPLICE ASSEMB LY S3 x 5.7 TRANSITION POSTS
t OF TURNBACK SPLICE
"""""""""""""""" 'r""""""""""""
PARAPET
ASSEMBLY (BOTTOM RA IL>
""�i� �������=1}�f;�f;;�iiJ}f't�ftr�:.z-:fff��j�}/f�JJJJJF?J�=-,�!t/:
I
;
HSS 6 x 6 x ¼ NZ D 71/:2" (BO TTOM RAIL l
r
A I E BOX BEAM
2;()}_;\
SEE NOTE "A"
1��
♦ ♦
====�=: �- �;;���;�GiAL;V; ; ; ;;;����========i;=;J.:jj:;�cJ;� �� ���������====�r�=�t=����;;�
♦ ♦
♦ ♦ MO UNTING HEIGHT
1-----------------h','----"-- "+'-l�---++t--
_____:c -t++
- -----',_---f-!+-- +H
- ,f'----f---+f_L__+----llit-- ---t+t-
- - - ---fft
- - -+
- f----l+l- - -
-----=�t-+-- ----+
- 4--¥1-- - -
---14------,.,l'--14- -
ND CONNECTIONS
E -l 9" MEASURED FROM THE ELEVATION
FOR BOX BEAMS OF THE GROUND AT THE END OF THE
TO OP F PAVEMENT TURNBACK SECTION OF TUBE.
COMPLETE PENETRATION GROOVE WELD OR S OH ULDER
THE %" DIA. HOLE IN THE
HOLES IN THE POST FOR THE LOWER SHELF POST MAY BE FIELD DRILLED.
NGLE MAY BE DRILLED IN THE FIELD (TYP.l
A DESIGN/DHAILER:
H U F H F C
T E SE O T E A E MO UNT TRANSITION REQUIRES THE WIDTH OF THE STRUCTURE
ELEVATION TO BE 1'-0" ( " CH
6 EA SI E D ) WIDER THAN WHEN THE TRANSITION IS MOUNTED ON THE
E ND F TH
O E BARRIER .
THE DESIGNER SHALL CHECK THE CLEARANCE FROM SUBSTRUCTURE TO THE
USABLE BRIDGE WITDH 6" 10" FIRST HEAVY POST. THIS POST MAY REQUIRE THE SPECIAL POST DETAIL, SEE BD-RS15.
-
DESIGNER SHALL CONTACT THE REGION T O DETERMINE THE T
MA ERIA L TO BE USED IN
THE AREAS UNDER THE RAILING.
:,::
= <I)
�N..,
-� FOR SPLICE ASSEMB LY DETAILS, SEE B D-RS13.
i-r==:���i:::T�IIIL��:
1" DIA. P.V.C. PIPE OR 1" FOR TURNBACK SPLICE DETAILS, SEE B D-RS14.
HSS 6 x 6 x ¾& � DIA. GALVANIZ ED STEEL PIPE (ASTM
GALVANIZ ED BOX / A53 NPS I" DIA.> THE COST OF FOR TRANSITION POST, WEAK TRANSITION POST, AND HEAVY POST DETAILS, SEE B D-RS15.
BEAM (TYP.l FURNISHING AND PLACING SHALL BE
INCLUDED IN THE CONCRETE FOR TYPICAL RAI L TO WEAK N
TRA SITIO N POST CONNECTION, SEE B D-RS15.
PARAPET ITEM.
FOR SHOULDER TREATMENT DETAILS, SEE CURRENT BD-AD H T .
SERIES S EE S
RE ISE V D
Department of Transportation
Office of Structures
FACE OF RA IL
CURB LINE
_,"'
PLAN
20'-73/4" PAY LIMIT FOR TRANSITION CONCRETE BARRIER TO CORRUGATED BEAM GUIDE RA IL CIN BRIDGE ES TIMATE) PAY LIMIT FOR CORRUGATED BEAM GUIDE ILING
RA
(HIGHWAY ESTIMATE)
5 SPACES II 1'-63/4" = 7'-93/4" 3 SPACES II 3'-1½" = 9'-4½"
10'-0" '- 11 1'-03/4"
I
: : _J
TRANSITION : VEGETATION CONTROL STRIP
OR SHOULDER BACKUP MATERIAL,
""11
I I
I
� L __II COST INCLUDED IN THE HIGHWAY
I
== I s QUARE WASHER
SHOULDER ITEM. CSEE DESIGNER
l OF CORRUGATED
,� � ' :::�::��il' NOTE)
I
i::::J�:�' ::
'
�1 - : �==�s�---�r�
�<... :
C ' u
,_ C '
�s '
c, '
'' = =m ' ==m-==
C '
±=� r"ll"'l"-----1 BEAM GUIDE RAILING
r --s:� 1
J�Ern:j = =� = SECTION A-A
0 01 ' ' ' ' '
r=
���r
.oC : 1 == ' ' = ''' == ' ' ==' ' == ' ' =
: - �·- ,f-
: �§§:::::==,:�:: ;�;: $-+-
:::::�����t�
eo,
C,
o, ' '' '' ' ' ' ' ' POST ELEVATION
... c:
' '
fp
0
j_.,,..o_:::lli==I==:::::;: ::::;�±::;:= =!±:;::=
' ' '
==;::i::;,: ' '
=!=3� �'
' ' '
=;::i=!= :::!
, ________b_t_
;;, � C, C, I I I ' ' ' ''' ' '
'
' ' ' ' =
'
0 : I O I 1
I I
I
o' I :
11 11 I: I 11 11
0 I ' ' ' ' ' ' ' ,.1 I"
_,"' : ~
�
TOP OF N
r
: PAVEMENT
, , ''' '' '' , OR SHOULDERl
,r�
' ' ' '
'''
� -- r= ������ -------+------+---+--�-�'' �' ' --��-��--��--�--���----t-'-• �-+-----��----��� :�+------+j,,-I _ _ _ �
' ' ' '
fF
';J
I
"'
I
0 0 ';J
f
I
';J
I
0 0 0 0 0 0
0 0 0 0 0 0
I I I I
•
0 I 0 0 I 0 0 I 0
0 0 0 0 0 0
0
I ! n r, "'I "'I
\_ 1" x 11/4'" SPLICE 2" MIN.
BOLT SLOT ITYP.l 3/4" x2½
I" SLOTTED HOLES
ID 6'-3" CTRS. ITYP.l END VIEW
TYPICAL THRIE BEAM SECTION END VIEW OF TRANSITION
OF TRANSITION TRANSITION SECTION
���wex 15 we x 15 BLOCKOUT
1½6"
TOP VIEW
SPLICE BOLT HEX NUT
ASTM A3O7, GRADE A ASTM A563 GRADE A OR BETTER
3/4" DIA.
HOLE ffYP.l BEAM SPLICE HARDWARE
11/i&" x 11/i&" SQUARE
HOLE FOR %" DIA.
GALV. STEEL ROUND t OF :¼" DIA.
HEAD SQUARE NECK HOLES FOR 3/4" BOLTS
BOLT IN FRONT FACE
W6x9 POST
;::.. ;::..
(MAX.)
3 11
'' . ..
1'-011 I
8'-
3 11
(MAX.) ',
. ..
'
2'-011
0
1'- 11
"'I l'-8 11
l'-8 11 5"
Jl � �
: : : ::;.---HEAVY POST " COV. <TYP.) INCLUDED IN CURB ITEM
;J
2
ANCHOR l �
I ..
BRUSH CURB � •5(E) STIRRUPS
•5(E) BAR <TYP.)
10 13/i5" .. i ..
OPTIONAL CONSTR. JT.
BRIDGE SUPERSTRUCTURE U-WINGWALL •51E) STIRRUPS
ll OF RAILING ANCHORAGE
SEE
EXPANSION JOINT " COV. ITYP.)
NOTE "AA"
U-WINGWALL WITHOUT CURB
2
OR SIDEWALK 10 1/i&"
1
--�------ IL OF RAILING ANCHORAGE
ELEVATION MATCH A4
THREE-RAIL - BRUSH CURB U-WINGWALL WITH BRUSH CURB
ON U-WINGWALL
*sUlE Eftt:JJr� •--=-�=;i'----;: ---.. •1--��, �- ;3� _;-· +-'-0•--, •1--��, '----;' � :�,· 0"
'_- _ __
., +--1 •1----fprrc::x:::t�g� r•1--�IMAX.>
2
-••+-
1
+--
1
l 11
+-', ---•-'--' ·--- y
* il OF EXPANSION -••t•--=-(M'--N1 O.'---- ••---•
2 8'----'-_3"-+-•-, •1--�8�'-�3•�• 2
+-' ---•-'--' •--- _'-0_ " __
., '",_ _ ll OF EXPANSION
(FIRST RAIU SPLICE ASSEMBLY , IMAX.>' j"' SPLICE ASSEMBLY
SEE TURNDOWN DETAIL (FIRST RAJU
SEE TURNDOWN DETAIL
f,.,., _,�
N
t DESIGNER NOTES:
smo
NOTE "AA":
�J�
I..! L
17
,,, THE MINIMUM DISTANCE FROM THE POST TO AN EXPANSION JOINT
u �
: : : :+-- HEAVY POST �HEAVY POST SHALL BE DETERMINED BY THE MINIMUM EDGE DISTANCE OF 5"
BRIDGE SUPERSTRUCTURE
00 j'L
- � ---¾----
-�'---+- BRIDGE SUPERSTRUCTURE
FROM ANY ANCHOR STUD TO THE END OF THE SLAB, OR TO THE
EXPANSION JOINT RECESS POUR, IF ONE IS USED. ON PRESTRESSED
�
SEE SEE I
CONCRETE BRIDGES, THE POST SHALL BE LOCATED TO MINIMIZE
EXPANSION JOINT U-WINGWALL EXPANSION JOINT U-WINGWALL ANCHOR PLATE/END BLOCK REINFORCEMENT CONFLICTS. POST
NOTE "AA" NOTE "AA" . SPACING SHALL BE ADJUSTED ACCORDINGLY.
NOTES:
* SPLICE NEED NOT BE CENTERED OVER JOINT.
** DIMENSION TO MATCH FASCIA DEPTH ON SUPERSTRUCTURE.
IE) DENOTES EPOXY COATED REBARS.
REVISED
Department of Transportation
Office of Structures
t OF RAILING ANCH ORAGE TH E COST OF ANCH OR l AND (4) I" DIA. STUDS
� 6"---1��1-� -----'--=-----------t---
i---1 ----=- 10" -=-----6" �� I,/
�FULLY T READED OLE
ITYP.) FOR I" DIA. STUD
H H CAST INTO PRESTRESSED CONCRETE UNITS
SH ALL BE INCLUDED IN TH E PRICE BID FOR
BASE l 4-1" DIA. ANCHOR STUDS
WITH 2 HEAVY H EX NUTS �--�------,---,,......-, TH E PRESTRESSED CONCRETE UNIT.
AND 2 FLAT WASH ERS EACH TH E COST OF TH E DECK ANCH OR -�-t----.l--1-
PLATE AND TH E RAILING ANCH OR
STUDS SH ALL BE INCLUDED IN THE �E._
DECK ANCH OR PLATE PRICE BID FOR TH E BRIDGE RAILING
H
' � ,-- I" STEEL PLATE
'<J
4-1" DIA. ANCH OR STUDS
� ----
� 1/4'" MIN. TO 1 1/4'" MAX.
.: I: I :
WITH I H EAVY H EX NUT GALVANIZED I"
AND I FLAT WASH ER EACH LEVELING COURSE - CONCRETE STEEL PLATE I
-----i�--,,
21 1 8 11 2" � ,l I
'
-iii-.. I
:1 0 =
--w----------
1 1
PRESTRESSED UNIT
ANCH OR PLATE , 6" (MAX.i , TOP OF BEAM
I" j - 1 2"1 9" 9"
I 2"1 TH READED H OLE FOR I" DIA.
ANCH OR STUDS (TYP,l
( VOID LINE 1'-611 l'-10"
2½" MIN, ACTUAL DIMENSION 1'-10"
DEPENDS ON OVERH ANG AND
CURVATURE OF RAILING
PRESTRESSED UNIT ANCHOR PLATE
DECK ANCHOR PLATE
STEEL BRIDGE RAILING ANCHORAGE
FOR PRESTRESSED CONCRETE BRIDGE
10"
511
SECTION A-A
SECTION B-B NOTE: ALTERNATE SECTION B-B
TO BE USED IN TH E EVENT OF TH IN
SLABBED DECKS WITH INSUFFICIENT
DESIGNER NOTES: OVERH ANG DEPTH (< 10") FOR
EMBEDMENT OF TH E PLATE.
DESIGNER SH ALL DETAIL ANCH OR PLATE LOCATIONS IN PRESTRESSED
UNITS.
FOR DETAILS OF TH E MODIFIED RAILING BASE PLATE FOR USE WITH
SNOW FENCING AND PEDESTRIAN FENCING, SEE BD-FDI AND BD-FD2.
* A CURVED RAILING LAYOUT ON A STRAIGH T FASCIA SH ALL USE
7%" AS A MINIMUM AND INCREASE PRESTRESS UNIT ANCH OR
PLATE COVER AS REQUIRED.
A MINIMUM EDGE DISTANCE OF 3½" IS REQUIRED FROM ANY SPECIAL
POST ANCH OR STUD. IF TH IS REQUIREMENT CAN'T BE MET AN REVISED
ALTERNATIVE DETAIL WILL BE REQUIRED, ALTERNATIVES TO CONSIDER WYORK Department of Transportation
ARE: USING A DOUBLE RAILING BLOCKOUT OR MODIFYING TH E BACKWALL
TEOF I
PORTUNITY.
Office of Structures
IN TH IS AREA TO MEET TH E EDGE DISTANCE REQUIREMENT.
FOR DETAILS OF SPECIAL POST, SEE BO-RSI5.
FOR LOCATIONS OF SECTIONS A-A AND B-B, SEE BO-RSI AND BD-RS2, ERRATA STEEL BRIDGE RAILING
COMMON DETAILS & TRANSITION
APPROVED: 05/17/2022 ORIGINAL ISSUED UNDER EB 22-029
CURRENT ISSUED UNDER EB 22-029
1-------------1
DEPUTY C IEF ENGINEER (STRUCTURES)
H
EFFECTIVE IMMEDIATELY
BD-RS13
2022-ROEO
2-8 ------'-'1-- -
-----,___... _ llOF 1"x4" SLOTS IN TOP AND
BOTTOM OF HSS 6 x6 x¾; TUBE SEE NOTE "D"
HSS 5 x5 xo/Js 4"x¼"x2'-10" FILL It. ¾; 2-8
Yi
¾&
GALVANIZED TUBE HSS 5 x5 xo/is
GALVANIZED TUBE
4"x¼"x2'-2" FILL It.
' 1t � � 0 f-�r
FIXED SPLICE TU6E
I ½" lTYP.l
I
_J
141 II 4 - 3/4" DIA. BOLTS, 7½" LONG lASTt.4 F3125,
GRADE A325 TYPE !l. 2 FLAT WASHERS AND I HEAVY
HEX NUT ON EACH BOLT. NUT TO BE FINGER �t 2¾" I i ..6"
- 9½"
-1 .. 6" - -1 .. I 2¾ " HSS 6 x6 x¾& TUBE ff 4 - 3/4" DIA. BOLTS, 7½" LONG (ASTM F3125,
GRADE A325 TYPE !l. 2 FLAT WASHERS AND 1
HEAVY HEX NUT ON EACH BOLT. NUT TO BE FINGER
TIGHT AND THE FIRST THREAD BELOW THE NUT '--__
1'-2
___
11
2'-11" TO BE DAMAGED A.O.B.E. 4 BOLTS AT EACH SPLICE. ; PLAN TIGHT AND THE FIRST THREAD BELOW THE NUT
PLAN 2'-3 11
TO BE DAMAGED A.O.B.E. 4 BOLTS AT EACH SPLICE.
4 - ¾" DIA. BOLTS, 4½" LONG lASTM F3125, HSS 5 x3 x1/4 TUBE 4 - 3/4" DIA. BOLTS, 4½" LONG lASTM F315,
GRADE A325 TYPE !l. 2 FLAT WASHERS AND 1 2'-3" GRADE A325 TYPE 1l. 2 FLAT WASHERS AND I
SEE NOTE "D" HEAVY HEX NUT ON EACH BOLT. NUT TO BE FINGER HEAVY HEX NUT ON EACH BOLT, NUT TO BE FINGER
2'-11" TIGHT AND THE FIRST THREAD BELOW THE NUT PLAN TIGHT AND THE FIRST THREAD BELOW THE NUT
TO BE DAMAGED A.O.B.E. 4 BOLTS AT EACH SPLICE. PLAN TO BE DAMAGED A,0,B.E. 4 BOLTS AT EACH SPLICE.
PLAN
PLAN
- --
llOF 1/a" DIA. HOLES------..--------- - -- BOTTOM OF HSS 5 x3 x¼ TUBE
�
�
' ' r(\
-,r-½"
FIXED SPLICE BAR
,t � I [ I I�:-+::r
1 1 1
:::::
A :1:�
::::::1:=1=.,... SEE NOTE "D"
: ==
�:::::::::;=::1:=
4¼"x21/a"x2'-3" GALVANIZED BAR:::::i_J
41/4"X 21/a"x2'-11" GALVANIZED BAR J HSS 5 x3 x¼ TUBE NOTE: THE 51/s" DIMENSION HSS 5 x3 x1/4 TUBE
3
IS SET AT 68 ° F. ELEVATION ELEVATION
ELEVATION
ELEVATION FIXED SPLICE ASSEMBLY
FIXED SPLICE BAR
EXPANSION SPLICE BAR EXPANSION SPLICE ASSEMBLY
¼" CHAMFER ON
� MLmGESnWJ
DESIGNER NOTE:
THE EXPANSION SPLICE ASSEMBLY DETAIL WILL 41/4"
ACCOMMODATE 2" OF EXPANSION OR 4½" OF NOTE "D": PROTRUSIONS CAUSED BY WELDING OR GALVANIZING ARE
CONTRACTION OF THE BRIDGE. IF ADDITIONAL NOT PERMITTED ON THE ADJOINING SURFACES OF THE BOX BEAM RAILS,
H
ro
I
CUT DETAIL - END CONNECTION
r
t OF HOLE
/ SEAL WELD
t �. r�·
THAT REQUIRES THE FLARED TRANSITION SHOWN ON BD-RS4 AND
I,. t I ·��• •I
STEEL BAC UP - BD-RS7.
BAR TO REMAIN 'l...l:,
,,:;;J
t
/
HSS 6x6x ¾; TUBE
f};· - - .
o/16
_j 5'-011 3'-011 I �';},0
,�
8'-0
11 1,6-==
•
ELEVATION 45 °
1"x7" SLOT IN BOTTOM G
END CONNECTION FOR BOX BEAM GUIDE RAIL FILL PLATE AND IN PLAN
HSS 5x 5xo/!6 TUBE
!TOP & BOT.l ffYP.l THIS ANGLE IS
DETERMINED BY
==t' THE 9" MEASUREMENT
"'l 1 1,
,,�=7�1,_,,...,�,..,.. AT THE END OF THE
"ELEVATION
/7 �� T����iTig�.
x
�""=""f--t,:.
ELEVATION
HSS 5x 5xo/is
SPLICE TUBE REVISED
��P�'-cJ'l-=a:,p�.:!..-.4-'�FLARE SPLICE TUBE Department of Transportation
3/4" DIA. H.S. BOLT 17½" LONG) (ASTM F3125, 4"x ¾" X 91/2" FILL t ffYP.) HSS 5x 5x o/J6 SPLICE TUBE
Office of Structures
GRADE A325 TYPE Il, 2 FLAT WASHERS AND
I HEAVY HEX NUT. NUT TO BE FINGER TIGHT, THEN ¾6" 2-6 ffYP.l
END CONNECTION DETAILS TO CONCRETE
THE FIRST THREAD BELOW NUT TO BE DAMAGED ELEVATION ERRATA BARRIER AND SPLICE DETAILS FOR STEEL
ELEVATION A.O.B.E. ffYP.l PLAN BRIDGE RAILINGS & TRANSITIONS
FLARE SPLICE TUBE DETAIL SPLICE DETAIL AT TURNBACK APPROVED: 05/17/2022 ORIGINAL ISSUED UNDER EB 22-029
FLARE SPLICE ASSEMBLY IN LOWER TRANSITION GUIDE RAIL
CURRENT ISSUED UNDER EB 22-029
1------------1 EFFECTIVE IMMEDIATELY
DEPUTY CHIEF ENGINEER (STRUCTURES)
Ll
4"
lOF POST
HSS 8 x6 x1/4 GALVANIZED
BLOCKOUT TUBE 6" LONG
HSS 8 x6 x 1/4 GALVANIZED
BLOCKOUT TUBE 6" LONG ffYP.)
TOPS OF THE TUBES TO BE FLUSH
WITH TOP OF POST ffYP.)
W6 x9 HEAVY POST WITH SOIL PLATE,
¼"J
BD-RS15
2O22-ROEO
,rr
AND LOCK WASHER ffYP.) HEX BOLT (A307, GRADE A)
WITH 1 HEX NUT AND 1 FLAT 2%"
l%" DIA. HOLES WASHER U NEAR SIDE,
i;o
ll------
GALV. BOX BEAM
V'J I-
z HOLES
a,
V'J
_,
Lu
o:!
;!: S3 X 5,7 00
STONE CURB
(TYPE A)
W6 X 9 _ ___,� u.o
l/
4 2 Lu =
%" DIA.
LLI Lu
o
V'J l HOLE 4 - 1" DIA. ANCHOR STUDS
z: (ASTM A449) 1'-0" LONG
WITH 4 HEAVY HEX NUTS
,r AND 2 FLAT WASHERS EACH.
8 11 x1/411 X 2'-011
SOIL PLATE
¼ 2-10 S3 X 5.7 "'_, SEE DESIGNER NOTE\
¼ 2-10
811 X 1/4" X 2'-8 11 SQUARE OFF END
'
NO BOLT IS REQUIRED
·L;;::
SOIL PLATE OF CONCRETE
8 11 X 1/4" X 2'-011 BARRIER ON BRIDGE / / BETWEEN THE BLOCKOUT
AND THE BOX BEAM ON
SOIL PLATE
\
L;;::
8 11 X ¼11 X 2'-011
SOIL PLATE a,
_,
NOTE:
THE COST OF THE POST
·.----�
"'t::
CURB LINE
WITH SOIL PLATE TO BE
INCLUDED IN THE COST OF ¼ 21
�
THE TRANSITION ITEM.
ffYP.)
HEAVY POST DETAIL HEAVY POST ELEVATION TRANSITION POST DETAIL WEAK TRANSITION POST DETAIL SPECIAL POST DETAIL
!CONCRETE BARRIER SHOWN
1" DIA. ANCHOR STUDS FULLY THREADED
HSS 8 x6 x1/4 GALVANIZED STEEL BRIDGE RAILING SIMILAR!
BLOCKOUT TUBE 6" LONG ffYP.)
(A449) 1'-0" LONG WITH FOUR HEAVY HEX
NUTS AND TWO FLAT WASHERS EACH. TOPS OF THE TUBES TO BE FLUSH
<ONE WASHER ON EACH SIDE OF BASE PLATE). HSS 6 x6 x¾& GALVANIZED WITH TOP OF RAIL <TYPICAL)
BOX BEAM
' ====
SHELF ANGLE
�
WHEN A SPECIAL POST IS USED IN THE RAILING
�I ' �� � - [ill - - - ~c;::Il_ L5 x3½ x%
4½" LONG ½" x 3" SLOT IN
SHELF ANGLE
TRANSITION IT REPLACES THE FIRST HEAVY POST.
SPECIAL POST ½" DIA. x I½" LONG
ANCHOR It STANDARD HEX BOLT 1"
- '\ %" DIA. HOLE NOTES:
SPECIAL POST ELEVATION WITH FLAT WASHER
DETAIL "A" AND HEX NUT NOTE "E":
9½" X 1" X 1'-0" it HOLES IN THE POST FOR THE LOWER RAIL MAY BE LOCATED AND
9½" DRILLED IN THE FIELD. IF SO, THE GALVANIZING SHALL BE
lf4" 6" REPAIRED IN ACCORDANCE WITH SUBSECTION 719-01.
(TYP.)
i___ ..--+-----{-
lf4" 6" 9½"x¾"x1'-0" t
ffYP.)
�-----11-©---
ELEVATION SECTION F-F
��
Et) -(±)
-
� r.,
I ....
I
-t:: TYPICAL RAIL TO WEAK TRANSITION POST CONNECTION REVISED
Department of Transportation
Office of Structures
I
½
r.,
4" DIA. HOLE W6 x25 POST
ERRATA COMMON DETAILS FOR BOX BEAM GUIDE
11/s" DIA. HOLE FOR RAIL TRANSITION TO CONCRETE BARRIER
1" DIA. ANCHOR STUD APPROVED: 05/17/2022
11/1&" DIA. HOLE FOR <TYPICAL) ORIGINAL ISSUED UNDER EB 22-029
1" DIA. ANCHOR STUD
<TYPICAL) CURRENT ISSUED UNDER EB 22-029
SPECIAL POST 1--------------1 EFFECTIVE IMMEDIATELY
SPECIAL POST ANCHOR PLATE DETAIL BASE PLATE DETAIL DEPUTY CHIEF ENGINEER (STRUCTURES)