ПОС комплект 08.02.22.ru.en
ПОС комплект 08.02.22.ru.en
com
Project composition
climate
5.Providing quality when performing work 17
6.Security environment 19
7.General requirements for 20
productionsanitation
8. Occupational safety during construction production 22
installation
work
9.Requirements fire safety 25
10. Geodetic support for construction 27
11. Environmental impact assessment 28
12. Determination of the duration of construction of the thirty
facility
13. List of requirements for basic construction machinery, 32
mechanisms and equipment
14. Calculation of the need for energy resources 33
15. Determination of labor requirements 37
16. Need for temporary living quarters 37
17. Technical and economic indicators 38
Blueprints
Cube apartments Stroygenplan of the underground part 39
Stroygenplan. Option 1 40
Stroygenplan. Option 2 41
Stroygenplan. Option 3 42
Section to version 3 43
Explanatory note.
1. Organization of construction
Construction is expected to be carried out by contract.
The contractor will be determined during the tender.
Work at the site is expected to be carried out in two periods - preparatory and main.
Supply of construction materials and structures to the site
supposedcentralized (motor transport).
Centralized preparation of concrete and mortar, delivery to
an objectprovided by special vehicles.
Construction is expected to be carried out using the in-line method.
The construction organization project adopted one and a half shifts
executionconstruction and installation work
from 8-00 to 21-00 in compliance with the requirements of the standard
“Labor safety”, ensuring the completion of construction within the specified time frame.
When performing construction and installation works (especially at night), it is necessary to
control the noise level from construction machines and mechanisms in accordance with the
requirements of the standard
“Protection from noise” and the standard “Ensuring the sanitary and epidemic well-being of the
population”, etc.
All construction work must be carried out in accordance with the work execution project
(WPP), developed by the organizations performing these works (or, upon their order, by other
specialized enterprises that have appropriate certified specialists) on the basis of this PIC.
Agreed:
CUBE Apartments-PZ
date
GIP
01.24 ARHI-LUDY
Developed by
NedoboyChecked
- laying and connecting to the power supply network with installation of a metering unit;
- arrangement of temporary passages;
- arrangement of a station for washing wheels (if necessary);
- arrangement of areas for storing structures;
- arrangement of a temporary lighting network;
- installation of fire protection posts;
- installation of an information board with a passport of the object (if necessary);
- removal of green spaces in accordance with the act;
- dismantling the remains of buildings and structures;
- strengthening existing fences using a spacer system of metal profiles.
Before the start of the main construction and installation work at the site, it is necessary to
carry out preparatory work in accordance with the standard for "Organization of construction
production", namely:
• arrange temporary fencing of the construction site in accordance with the regulations
“Fencing inventory construction sites and areas for construction and installation work” and
installing gates for the entry (exit) of vehicles. Signal painting of fences must be carried out in
accordance with the standard “Fire protection. Safety signs";
• construct temporary roads, driveways and storage areas from 200mm thick limestone or
PD-1 type road slabs. The width of passages is 6.0 m for two-way traffic and 3.5 m for one-way
traffic. When laying out temporary roads, the following conditions must be met:
- the distance between the road and the storage area is at least 1.5 m;
- the distance between the road and the fence enclosing the site is no more than 1 m;
- the distance between the road and the edge of the trench is 1-1.5 m.
• at the exit, install a Karcher circulation high-pressure washer for washing vehicle wheels;
• To provide the construction site with electricity, electrical cables with a voltage of 0.4 kV
are laid according to a temporary scheme. Connect the construction site according to a permanent
Deputy inv.
scheme in accordance with the technical specifications with the installation of a 0.4 kW VRP with
No.
a metering unit and distribution cabinets at the construction site. The work is carried out in
accordance with a separate temporary power supply project;
Signature and date
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
Shee
CUBE Apartments-PZ t
orig.
manually, with loading soil onto dump trucks, the load capacity of which should be justified in the
corresponding PPR (or technical map ) and removal to a temporary dump. Refinement of the
No.
bottom of the pits to the design level should be carried out manually (5-10 cm) immediately
Signature and date
Shee
CUBE Apartments-PZ t
orig.
addresses the issues of the most advantageous distribution of earth masses on the construction
No.
site, the appropriate sequence of excavation work in individual areas and the use of water
reduction methods.
Signature and date
Shee
CUBE Apartments-PZ t
orig.
- tower crane No. 1 type Comansa 10 LC 90, (or with similar characteristics) with a boom of
No.
Shee
CUBE Apartments-PZ t
orig.
structure into which the concrete mixture will be placed either to a concrete pump or an inventory
No.
lifting cranes; concreting can be carried out using a concrete pump truck or tower cranes in
buckets with a volume of 0.5-1.0 m3.
The production of reinforcement spatial and flat frames should be carried out on racks in
prefabricated jigs.
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
heavy slabs.
No.
Backfilling of sinuses is carried out using a JCB 3CX, Hitachi ZX250 excavator (or with
similar characteristics) with bulldozer equipment and manually
Signature and date
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
design strength.
No.
When developing a work project, determine and agree with the Chief Designer the location of
working (cold) concreting joints.
Signature and date
Working joints are made when laying the concrete mixture at the site of a technological break
in concreting during the execution of work.
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
The verticality of the surfaces and corners of stone masonry, the horizontality of its rows must
No.
be checked as the masonry progresses (every 0.5–0.6 m) with the elimination of any detected
deviations within the tier.
Signature and date
After finishing the laying of the floor, an instrumental check of the horizontality and marks of
the top of the masonry should be carried out, regardless of intermediate checks of the
horizontalness of its rows.
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
The movement of materials within the floor is carried out by inventory freight
No.
"rockles".
3.3.2. Installation of facade systems
Signature and date
Work on the installation of enclosing finishing structures of facades is carried out using
hanging cradles and scaffolding.
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
Finishing work inside the premises should be carried out from the inventory of lightweight
No.
finished form.
Staircases are used to lift workers to floors.
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
Shee
CUBE Apartments-PZ t
orig.
The entire length of the route must be fenced on both sides with inventory boards with warning
and safety signs posted on them. In areas of heavy traffic and pedestrian traffic, red lights are
No.
placed on the fence. The fence must be at least 1.2 m in height, solid, painted, with a sign showing
Signature and date
the name of the organization performing the work. To cross the trench, pedestrian bridges with a
width of at least 0.6 m with double-sided railings 1 m high are arranged.
The laying of networks is planned to be carried out in an open way in trenches with slopes
using a JCB 3CX excavator equipped with a backhoe with a bucket with a capacity of 0.5 m3.
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
Taking into account the conditions of the construction site, laying asphalt concrete is carried
No.
out manually and using small-scale mechanization. Asphalt concrete is compacted using self-
propelled rollers - 12 tons.
Signature and date
Paving with figured concrete elements (FEM) is done using small-scale mechanization and
manually.
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
Maintenance of freshly fallen concrete should begin immediately after placing the concrete
No.
mixture and continue until, as a rule, 70% of the design strength is achieved.
During the initial maintenance period, freshly poured concrete mixture must be protected from
Signature and date
dehydration.
There are several ways to protect concrete from drying shrinkage:
- spraying water on the surface of concrete;
- protection of concrete with burlap, which needs to be watered;
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
Shee
CUBE Apartments-PZ t
orig.
- metal structures: acceptance of areas for supporting steel structures on supports, anti-
No.
Shee
CUBE Apartments-PZ t
orig.
6. Environmental protection.
In order to protect the natural environment, during the work it is necessary to take measures to
preserve the plant layer of soil and preserve green spaces.
When removing, storing and storing the plant layer of soil, measures must be taken to prevent
deterioration of its quality (mixing with the underlying soil layer, rocks, polluting liquids and
materials, etc.).
In the summer, water the construction site area systematically, at least once or twice a shift.
When carrying out dismantling work, the requirements for preventing dust and gas
contamination in the air must be met.
It is necessary to install garbage chests for household waste and clean them in a timely manner
in the prescribed manner.
The collection of construction waste must be arranged in designated areas. It is strictly
prohibited to bury waste; it must be regularly removed to designated areas or a landfill.
The construction site must be promptly cleared of debris and dirt.
Temporary excavations, drainage ditches and other similar structures must be made in such a
way as to prevent soil erosion, erosion of slopes, and the formation of ravines. In temporary
reserves and dumps, leaching of both plant and mineral soil must be prevented.
Washing, refueling and maintenance of construction equipment must be carried out at specially
equipped sites, where it is necessary to provide a set of measures to prevent the ingress of
Deputy inv.
contaminated water, fuel residues, etc. into groundwater, natural bodies of water and the location
No.
of existing green spaces. When carrying out work, it is necessary to take measures to
Signature and date
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
provide a signal fence, warning signs and road signs about entering the dangerous zone.
No.
Car routes should be designed as circular routes; if necessary, it is necessary to provide areas
for turning cars. The radius of curvature of temporary tracks is taken to be at least 12.0 m, the
Signature and date
Shee
CUBE Apartments-PZ t
orig.
up to 0.9 of the maximum pressure that is developed by the concrete pump, the concreting process
No.
is stopped and then restored at the minimum speed of supply of the concrete mixture. After the
injection process has stabilized, the feed rates are increased in accordance with the specified
Signature and date
concreting intensity.
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
Empty cylinders must be stored separately from cylinders filled with gas.
Electric tools may only be used in accordance with the requirements specified in the
Signature and date
Shee
CUBE Apartments-PZ t
orig.
and secured.
No.
Weldingdevices and units installed in an open area are protected from precipitation (with
canopies or tarpaulins) and mechanical damage.
Signature and date
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
Safety requirements for electric welding work must be ensured in accordance with the standard
“Occupational Safety Rules for Metal Welding”.
Signature and date
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
The order for the organization appoints those responsible for fire safety at the construction
site, areas responsible for the availability and proper maintenance of fire extinguishing equipment,
Signature and date
and the timely implementation of fire safety measures provided for by the project.
At the stage of preparatory work, an information board on fire safety measures is installed
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
- store flammable and flammable liquids in open containers, pour water over them;
No.
- use flammable and combustible liquids for degreasing building structures and equipment;
Signature and date
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
created signs in the amount of at least four for each axis, as well as transport and engineering on-
No.
site communications;
- benchmarks on the borders and inside the territory, which is being built up at least two near a
Signature and date
separate building.
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
environment: land, flora, fauna. The removal of atmospheric water from the site is assumed to be
No.
through the surface and trays of intra-block driveways with the release of technical specifications
accordingly.
Signature and date
To comply with the requirements and reduce harmful production factors (noise, dust formation
and vibration) on workers and residents of the adjacent territory when performing construction
and installation work, use serviceable construction machines and mechanisms, eliminate idle
operation of internal combustion engines,
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
It is not allowed to demolish trees and shrubs and cover the root collars and trunks of growing
No.
trees with soil that is not provided for in the design documentation.
Signature and date
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
TOeleven– we accept 1.1 (a coefficient that takes into account the complexity of
engineeringgeological conditions);
TO12 – we accept 1.1 (coefficient that takes into account the construction
Vseismically unsafe conditions);
TO13– coefficient that takes into account the level of influence of dense development
conditionsfor the duration of construction and is calculated:
Deputy inv.
P1– we accept 0.06 (the presence of cramped conditions for storing materials);
P2– not taken into account (a coefficient that takes into account the presence at the construction
Signature and date
siteengineering networks);
P3– not taken into account (a coefficient that takes into account traffic intensity vehicles and
pedestrians near the work site);
Then K13= 1.0 + 0.06 = 1.06, henceWe define:
Inventory No.
Shee
CUBE Apartments-PZ t
orig.
13. List of requirements for basic construction machinery, mechanisms and equipment
No Quanti
Name
No.
. ty,
pcs.
Construction equipment
1 Hitachi 250 excavator 2
Signature and
2 Bomag roller 1
3 JCB 3CX backhoe loader 1
4 Concrete pump type Ford Trucks 3542M BST 37 1
date
Krani:
5 Tower crane Lstr = 70.0 m, lifting capacity – 12.0 t 1
Inventory
No. orig.
Sheet
CUBE Apartments- 31
Change Quantity Sheet Signatur date PZ
Doc. No. e
6 Tower crane Lstr = 60.0 m, lifting capacity – 10.0 t 1
7 Truck crane XCMG QY25K5, Lstr = 38.0 m, lifting capacity – 25.0 t 1
8 Truck crane type KTA-18, Lstr= 15.7 m, lifting capacity – 18.0 t 1
Motor transport:
9 Dump truck 4
elev Airborne transport 4
en
12 Long transport 2
13 Compressor 6 – 8 atm. 1
14 Concrete pump Putzmeister 1407 BSA 1
Instrumentation and equipment:
15 Electric welding machine STN - 500 3
16 Step-down transformer IV - 4 1
17 Pneumatic rammers TR-1, IZ-4501 2
18 Hammer – rotary hammer Bosch 6045 S 6
19 Deep vibrator IV – 67 4
20 The same, surface type C – 414, C – 802 1
21 Electric wood saw PFZ 1200 A 2
22 Electric rotary hammer HR 4000C 6
23 Impact electric drill GSB 182RE 2
24 BOSCH angle grinder 4
25 Bucket for supplying concrete 2
26 Tura unified 4
27 Theodolite TL - 5 1
28 Level TD-5 2
29 Scissors for cutting reinforcement (SMZh-172A) 1
When constructing a facility, it is necessary to use sets of manual machines, mechanisms, and
tools that facilitate construction and installation work, as well as improve quality.
The availability of machines and mechanisms is specified in the temporary residence permit by
the contracting organization according to their availability in the construction organization’s fleet.
n=
RL, where:
m is a coefficient that takes into account the luminous efficiency of light sources, the
date
efficiency of floodlights and the coefficient of utilization of the luminous flux, taken according to
the table in Appendix 3 p. 25 – equal to 0.25;
Inventory
No. orig.
D .
o N
c o.
Change Quantity Sheet Signature date
She
CUBE Apartments- et
PZ 32
R l – lamp power, types of spotlights used (100 W);S-
construction site area, m2;
E r – calculated illumination, adopted according to the
formula: E r = K x E n = 1.7 x 0.5 = 0.85
K – safety factor for floodlights with gas-discharge lamps = 1.7 (Table 2, page
12);
E n - standard illumination for security lighting = 0.5 l (general
provisions of clause 1.10 p. 3)
m x Ep xS0.25 x 0.85 x 3775
n == = 8.0 ave.
RL100
The total need for floodlights is 8.0 pcs.
Reduced
Number of Installed Coef. Ʃ use, Ks
No Name of power of
consumers, power,
. consumers consumers,
Signature and
pcs. kWt
kW
1 2 3 5 6
1. Tower crane 2.0 60.0 0.8 96.0
date
Sheet
CUBE Apartments- 33
Change Quantity Sheet Signatur date PZ
Doc. No. e
Vibrators for compacting
3. concrete mixture IV – 66, IV-47 4.0 0.75 0.6 1.8
deep
Scissors for cutting
4. 1.0 3.0 0.5 1.5
reinforcement SMZh-172A
5. Plastering unit PFT G5 2.0 6 0.6 7.2
Other consumers, hand power
6. 25.0 1.0 0.6 15.0
tools
Lighting:
7. - external 8.0 0.1 1.0 0.8
- internal 60.0 0.1 0.9 5.4
Total x 1.1, kW 166.9
Total, kVA 222.5
similar
. consumers expenses requirement
consumers
1 Excavator l/year. 15 5 75
No.
Cars (washing,
2 l/year. 25 6 150
refueling)
Compressor
3 l/year. 10 1 10
station
Signature and
Sheet
D c. o.
Change Quantity Sheet o N
C
Signature date U
B
E
A
p
a
rt
m
e
n
ts
-
P
Z
34
2. Water consumption for household needs.
Water consumption for household needs is determined by the formula:
Q2 = K2 x q2 n2 K2 + Q2 N2
t1 x 3600t2, de:
q2 - specific water consumption for household needs - 15 l;
n2 - number of productionconsumers in the busiest change – 43 people;N2- the number
of workers using the shower (40%) – 43*0.4=17 people;
Q2- water consumption for showering by one employee is 30 l;
K2- coefficient of hourly unevenness of water consumption (equal to 1.50);
t2 – duration of use of the shower unit (45 min.) – 45x220 = 9900 sec.
Q2 = 1.5 x (15 x 43 x 1.5) + 30 x 17 = 0.05 + 0.05 = 0.1 l/s
8 x 36009900
3. Requirement of water for fire extinguishing.
Water consumption indicators for extinguishing a fire at a construction site through hydrants
are determined according to the “Guidelines for the development of construction organization
projects and work projects”
Ql.= 10 l/s.
4. Water requirement for workers' drinking needs
To meet water needs, fountains should be installed at a rate of one per 150 workers at a
distance of no more than 75 m from workplaces. The fountain is installed under a special canopy
or in isolated rooms with the inscription “Drinking Water”.
If it is not possible to organize a centralized water supply for drinking needs, water should be
delivered in special tanks with a volume of 30 liters at the rate of 2 liters per shift per worker.
5.Total water consumption for the needs of the construction site.
The total water consumption for supplying the construction site consists of the total water
consumption for production, economic and domestic needs and fire extinguishing:
Deputy inv.
Sheet
CUBE Apartments- 35
Change Quantity Sheet Signatur date PZ
Doc. No. e
The total demand for compressed air, taking into account the simultaneous operation coefficient of
the mechanisms, is:
E
E = 0.7* = 0.7*6.0 = 4.2 m3/hv,
Power of the compressor unit taking into account the coefficient of air loss in pipelines:
N = 1.3*4.2 = 5.5 m3/hv.
1 mobile compressor type PKS-5.25 is accepted
productivity5.0m3/min.
crane.
Inventory
No. orig.
Sheet
CUBE Apartments- 36
Change Quantity Sheet Signatur date PZ
Doc. No. e
To accommodate administrative, engineering, technical and office personnel, a mobile-type
foreman's office with an area of 18.0 m2 and plan dimensions of 6.0 x 3.0 m is being adopted.
To meet the domestic needs of construction we accept:
- dressing room - mobile shower with an area of 18 m2, dimensions 6.0 x 3.0 m.
- drying and room for heating workers - dimensions in plan 6.0x3.0 m, area
– 18 m2.
Workers and engineers eat meals in household premises, or workers use city canteens and
cafes. It is not planned to install temporary canteens on the territory of the camp.
Calculation of areas of inventory buildings
Normal Effective Required in
No Name of premises and
index, Calculat area, room,
. dimensions in plan m2 per m2 PC.
ion
person
1 2 3 4 5 6
1 Dressing room - shower 0.7 0.7 x 43 30.0 2
2 Shower 0.5 0.5 x 17 8.5 1
3 Drying 0.2 0.2 x 43 8.6 1
4 Room for heating workers 0.1 0.1 x 43 4.3 1
Sheet
CUBE Apartments- 37
Change Quantity Sheet Signatur date PZ
Doc. No. e
U
96.417
9 TE
7. <topToAltvalue> BI 96.649
96.942 5
99.170
NG
0 9
B T 99.170 0 96.44996.746 7.
5
0
0
96.710
99.307
99.717
99.307
S underground part 10
0.0
100.460
0
99.827
099.827
.
100.460
00
Symbols for the construction plan 10
0
97.032
0
0
2.5 97.303 100.440
Temporary fencing
99.750
00 Capture #1 100.440
Load height characteristics of the XCMG QY25K5 crane
100.974
100.021
98.880
Gates Information stand with a
passport of the object 100.148
100.046
99.842 101.42
18 01.428
99.719 98.785
JALAN 99.041
ASPAL 88.9568899..
005342
10
0.0
98.774
00
89.216
88.992 5
89.145
99.979
99.69491.22 Capture #3
9
89.142 -1.200
99.05
102.787
88.769 102.977
99.564 102.977
102.787
98.614
Security
post
-5.900
89.115 94.35
102.611
102.178
98.292
10 102.178 102.611 99.458
2.5
Set warning signs, speed limit sign 9 00
and traffic pattern 89.821 0. 98.331
89.699
0 Vehicle turning 101.663 101.770
98.515
0 102.101
0
point 96.338 97.003
9 10 99.519 100.148
0. 98.008 0.0 100.244
91.202 9 99.547 98.727
0 95.358 00
7.
0 5
99.0
Z7A5gripANo
0 0 98.041
.4
95.198 97.387
0
-5.900
9
Fire shield with fire-fighting equipment. 2.
96.33196.598 98.598
5
92.861 96.73596.735 94.939
97.387 98.778 94.3
0 5
0 95.751
9 95.444 95.595 Склад 98.218
1. fire extinguishers; 5. - 97.499 арматури
2. sand box; 0 98.672
93.093
0 95.237 7.100
3. blanket made of non- 96.811 96.873
9 0 95.195 96.476
97.416 93.15 Capture #7
flammable material - 2x2m; 2.
96.685
98.095
Metal support 100.207
99.990 99.561
100.137 pohon
97.993 100.019
pohon 10 pohon
Subset Layout Number
Symbols for the construction plan
U
Temporary fencing
construction site temporary passages pl. shield fire station
danger zone
boundarypossible fall of a Gallery for the passage of LED spotlight 96.417
load from a building workers to their workplaces 9 TE
7 BI 96.649
N
Departure limit line parking placesvehicles during
96.942 .
99.170
5 G
B T 99.170 9
Crane
tower crane hook unloading and loading shield Tower crane shield
0
0
96.44996.746 7
.
Post location for 5
temporary sites 0
99.30
0
976.710
temporary gate vehicle wheel washing storage of structures and 99.717 99.307
materials 96.879 99.717
96.986
10
Entry - exit direction of movement temporary buildingsAnd 10
0.
99.827
00
S
motor transport structures 0. 100.46099.827
0
00 100.460
4
7
6
5
3
2
1
0 8 97.032
10 91
Technological direction of work 2.
01
11
99.190
98.571
s
1
99.877 98.845
98.704
101.014001.040
101.382
101.382
103.208
100.314
103.208 99.718
100.412 100.298
100.000
88.819 98.822
Option #1 100.021
98.880
Gates Information stand with a
passport of the object 100.148
ASPAL
88.956 20
29
89.032
89.054 Щит 8
кра
s на 10
2 0.
98.774
00
89.216 2 0
88.992 5 27
26
25
42
3
89.145
99.69491.229
99.979
R40
2
22
2 1
10
19
102.787 8
.0
88.769 102.977
99.564 102.977
102.787
Tower crane type 1
98.614
Comansa 10 LC90,
17
16
Burial 15
14
89.115
6.0t, Lpage=50m
102.611 1
12
102.178 11
09
8
98.292
102.171802.61 99.458
10
Set warning signs, speed limit sign 9 2. 1
and traffic pattern 89.821 0 50 98.331
89.699 .
0
Vehicle turning 101.663 101.770 0 7
6
11
П 98.235 12
13
14
1. fire extinguishers; 2222 2
3
15
16
132 2 2 2 72 2 1 1
2. sand box; 9876 5
2 3210 98
0
92
54
99.410 2
8
3. blanket made of non- 2
42
99.301 72
6
flammable material - 2x2m; 32
22
21
99.87046
4. hooks; 01
99.553 99.115 pohon
1 10
Installation location of the
9
81
5. shovels; 1 11111 7 100.020 0.
7 8 91 2 3 4 5 6
123456 01
6. crowbars; concrete mixing unit 100.157 00
0
7. axes; 9 99.228 pohon
7
8. bucket; .
98.095
9. barrel of water. 5 100.207
0
0 99.990 99.561
100.137 s
pohon
97.993
100.019 7
pohon 10
5 0. pohon
00
0
Subset Layout Number
Symbols for the construction plan
U
Temporary fencing
construction site temporary passages pl. shield fire station
danger zone
boundarypossible fall of a Gallery for the passage of LED spotlight 96.417
load from a building workers to their workplaces 9 TE
7 BI 96.649
N
Departure limit line parking placesvehicles during
96.942 .
99.170
5 G
B T 99.170 9
Crane
tower crane hook unloading and loading shield Tower crane shield
0
0
96.44996.746 7
.
Post location for 5
temporary sites 0
99.30
0
976.710
temporary gate vehicle wheel washing storage of structures and 99.717 99.307
materials 96.879 99.717
96.986
10
Entry - exit direction of movement temporary buildingsAnd 10
0.
99.827
00
S
motor transport structures 0. 100.46099.827
0
00 100.460
4
7
6
5
3
2
1
0 8 97.032
10 91
Technological direction of work 2.
01
11
99.190
98.571
s
1
R55
99.877 98.845
98.704
101.014001.040
.0 101.382
101.382
103.208
100.314
103.208 99.718
100.412 100.298
100.000
88.819 98.822
Option No. 2
100.021
98.880
Gates Information stand with a
passport of the object 100.148
100.046
99.842 101.412081.428
3 99.719 98.785
99.041
Tower crane type
32
JALAN 31
ASPAL
88.956 20
29
89.032
89.054
Comansa 11 LC160 s
8
10
Zoomlion 7025 2 98.774 0.
89.216 SYM K30/30 2
00
0
88.992 g/p-10...12.0t 27
26
25
24
5
89.145 Lpage=55...65m 3
99.69491.229
99.979
2
22
2 1
10
19
102.787 8
88.769 102.977
99.564 102.977
102.787
Щит1
кра17
1
98.614
на156
Burial 14
3
post
89.115
102.611 1
12
102.178 11
09
8
98.292
102.171802.61 99.458
10
Set warning signs, speed limit sign 9 2. 1
and traffic pattern 89.821 0 50 98.331
89.699 .
0
Vehicle turning 101.663 101.770 0 7
6
99.200 6
1 2 3 87
Fire shield with fire-fighting equipment. Е 98.105 99.444 91
10
4 5
11
П 98.235 12
13
14
1. fire extinguishers; 2222 2
3
15
16
132 2 2 2 72 2 1 1
2. sand box; 9876 5
2 3210 98
0
92
54
99.410 2
8
3. blanket made of non- 2
42
99.301 72
6
flammable material - 2x2m; 32
22
21
99.87046
4. hooks; 01
99.553 99.115 pohon
1 10
Installation location of the
9
81
5. shovels; 1 11111 7 100.020 0.
7 8 91 2 3 4 5 6
123456 01
6. crowbars; concrete mixing unit 100.157 00
0
7. axes; 9 99.228 pohon
7
8. bucket; .
98.095
9. barrel of water. 5 100.207
0
0 99.990 99.561
100.137 s
pohon
97.993
100.019 7
pohon 10
5 0. pohon
00
0
Subset Layout Number
Symbols for the construction plan
U
Temporary fencing
construction site temporary passages pl. shield fire station
danger zone
boundarypossible fall of a Gallery for the passage of LED spotlight 96.417
load from a building workers to their workplaces 9 TE
7 BI 96.649
N
Departure limit line parking placesvehicles during
96.942 .
99.170
5 G
B T 99.170 9
Crane
tower crane hook unloading and loading shield Tower crane shield
0
0
96.44996.746 7
.
Post location for 5
temporary sites 0
99.30
0
976.710
temporary gate vehicle wheel washing storage of structures and 99.717 99.307
materials 96.879 99.717
96.986
10
Entry - exit direction of movement temporary buildingsAnd 10
0.
99.827
00
S
motor transport structures 0. 100.46099.827
0
00 100.460
4
7
6
5
3
2
1
0 8 97.032
10 91
Technological direction of work 2.
01
11
103.170 103.170
99.190
98.571
Option #3 s
1
100.412
103.208 .0 99.718
100.298
100.000
88.819
Load characteristics of the Potain_Eurogru E42.10 crane 98.822
100.021
98.880
Gates Information stand with a
passport of the object 100.148
100.046
99.842 101.412081.428
3 99.719 98.785
32 99.041
JALAN 31
ASPAL
88.956 20
29
89.032
89.054 8
Щит
s кра 10
на
2 98.774 0.
00
89.216 2 0
88.992 27
2
22
2 1
10
19
102.787 8
88.769 102.977
99.564 102.977
102.787
1
17
16
98.614
Burial 15
14
3
post
89.115
Tower crane type 102.611 1
Potain IGO40 09
8
98.292
102.171802.61 99.458
Set warning signs, speed limit sign 9 Potain GTMR 336B 10
2. 1
and traffic pattern 89.699
89.821 0 SanMarco SMH400 50 98.331
.
0
Vehicle turning g/p-4.0t 101.663 101.770 0 7
6
0 point Lpage=40...43m
96.338 97.003
102.101
102.101
98.515 4
5
0 99.519 100.148 3
10 101.770 1
2
9 0. 100.244
91.202 99.547 100.148 101.663 98.727
0 00
. 98.008
9 95.358 0
0
7 100.244
0
. 97.45298.008 97.949 99.547 99.519 99.075
0
9 5 97.949 95.510
95.19897.387 0 95.394
2 97.452 98.041
. 0 96.331 96.598 98.598
92.861 96.735 94.939 95.403 98.778
5 96.735 95.582
0 95.751 97.387
0 9 95.444 95.595 Склад 98.218
5 97.499 арматури
.
93.093 0 95.237 98.672
9 0 96.811 96.873
95.195 96.476
2 0 97.416
96.685 Щит
. 94.810 95.849 кра 97.411 97.618
5 на 98.474
0 96.685 97.654
0 97.646
96.304 2
1 97.532
3
4
94.838 5
6 97.412
7
8 99.068
91
10
11 97.906
12
95.242 13 98.399
9
14
15 97.858
16
5 7
97.312 98.442
. 97.701 98.569
0 98.261 98.430 98.623
0
0 пож 112222222
97.616
222
789
890123456
. BANGU
NAN 97.842 98.367
щит
99.461
s
4
R40 98.751
99.200
98.526
1 2 3 87
6
П 98.235 12
13
14
1. fire extinguishers; 2222 2
3
15
16
132 2 2 2 72 2 1 1
2. sand box; 9876 5
2 3210 98
0
92
54
99.410 2
8
3. blanket made of non- 2
42
99.301 72
6
flammable material - 2x2m; 32
22
21
99.87046
4. hooks; 01
99.553 99.115 pohon
1 10
Installation location of the
9
81
5. shovels; 1 11111 7 100.020 0.
7 8 91 2 3 4 5 6
123456 01
6. crowbars; concrete mixing unit 100.157 00
0
7. axes; 9 99.228 pohon
7
8. bucket; .
98.095
9. barrel of water. 5 100.207
0
0 99.990 99.561
100.137 s
pohon
97.993
100.019 7
pohon 10
5 0. pohon
00
0
Subset Layout Number
NAMA PROYEK:
CUBE
Apa gtme nt s
LOKASY PROYEK:
Pecatu1-.SouthKuta,
Badung,oalli,lndonesia
PEMILIK PROYEK:
R=40...43.0m {
4.2
'
¼1f-/,J,f,Y/,J,},/,/,/,1 ///,;tt,f/,,;t_ 1,f?./.1f-f/ / , / ,,J,;4;,
,, ;,ofY/ #, fY#f , Y,N J
h;
,I
t 1¼ ' / , / ¾ 1 / - ' ; / / ,'/,Y,;/,J,v;, , ,;1,-.-\'·/f /,f,;,,1//!Mf/,J,f;:,,/:f¼/,/-,, Section 1:300
1
26.1
-
F
D.I.GAMBAR
_,.
_ PENANGGUNGJAWAB PARAF
- 1/,¼f-J/d{, / At f-1///¾ L'! j.1//,J,f-½ / f « - 1 / , / ',1/x½f,Y,)
A.R.S.IT
EKSKA
,7,Y,/-,/ ' NO.
'
1/,,
STRUKTUR:
---;
-
1/,/,Ai(/,7,71,-'/,!,f,Y/,,/Mt,l,lf ",1/,;,;,{1/;,,oAY,/,;f ;,y ,• SKA NO.
;, 1/,1/,
MEP:SK
\
.P P
A NO.
5.17
•
G.
_,L PEMILKI:
'
"71= ""
-
;?,/,/" /.½½/,/',/,U;,' ;/,/',/,
r,r,;,,,,r'v;;/ ,-/'/ ½ Y//,,1,1/,/,,/ /', PERNY ATAAN:
(:1/,;/,,,',/',/,½¼i
//-/
j
:1/,1/,/,/ 1/.½ ¼½7
4.4
1. BERTANGGUNGJAWABPERUHTERH
ADAP BANGUNAIANGTHOSELANBERDINI
BAIKM.E.NYANGKUTKEKUAT AN
KONTRUKSIKEKOKOHAN &KUALITAS
STRUKTURBANGUNANSERT A
KESELA.M.A.TANUMUMDILINGKUNGANSE
KIT ARNY A DARI
KEGAGALANKONTRUKSI
2 BERTANGGUNG JAWAB PERUH TERHADAP
SEGALA DAMPAK YANG TIMBUL AKIBAT
BERDIRINYА BANGUNANTERSEBUT
3.MENYATAKAN BAHWA GAMBAR SESUAI
DENGANKETENTUAN УANG BER.L.A.KU
MENGETAHUI