Download as pdf or txt
Download as pdf or txt
You are on page 1of 19

MINISTRY OF EDUCATION

KABETE NATIONAL POLYTECHNIC


P.O Box 29010 - 00625, Nairobi
TELEPHONE: +254 790 000 001
E-mail: info@kabetepoly.ac.ke Website: www.kabetepoly.ac.ke

TRAINEE'S INDUSTRIAL ATTACHMENT

LOGBOOK

NAME: Muthoni Waweru Irene ADMN NO: ARD/600/S21/001


DEPARTMENT: BUILDING AND CIVIL ENGINEERING CLASS ARD620/S212
COURSE: DIPLOMA IN ARCHITECTURE

INDUSTRIAL TRAINING PERIOD


FROM: 14-Mar-2024 TO: 30-Apr-2024

NAME OF TRAINING COMPANY / INDUSTRY / INSTITUTION AND ADDRESS


1: ERIME CONTRACTORS CO. LTD
2:
3:

OUR MOTTO:

Excel in Skills and Technology


COMMITMENT
ATTACHMENT
KABETE NATIONAL POLYTECHNIC
The trainee agrees to serve the attachment provider during the stipulated period to learn the trade and the
attachment provider will facilitate suitable duties.
WILL:-
TRAINEE
THE
1. Attend to all duties assigned

2. Obey the rules and regulations in the organization without exception

3. Take care of any property under his/her care

4. In case of need to be absent, get permission from the supervisor

5. Not divulge any classified information to outsiders

6. Not engage in any form of personal business during work hours

7. Avail himself/herself for assessment by authorized person as advised by the Industrial Liaison Officer
or supervisor

8. Co-operate with fellow workers

9. Take of Insurance cover

10. Make a written report on attachment as may be required at the end of the attachment period.
WILL:-
PROVIDER
ATTACHMENT
THE
1. Induct and orient the trainee on the organization

2. Place the trainee in diverse tasks that give maximum use of training skills and abilities

3. Place the trainee under a supervisor

4. Endorse logbook on daily basis

5. Ensure security and protection to the trainee while in the course of duty as other employees

6. Liaise with the industrial attachment office on matters of personal conduct of trainee.

7. Make a confidential report on the trainee on the form to be provided by an assessor from the
polytechnic. (Let us collaborate to make the trainee a better employee in the future).
TRAINEE
THE
TO
NOTES
1. Complete all the details required in page 1 and 2.

2. Maintain the logbook every day of the duty by completing the information as required and submitting
to the supervisor at the end of each day endorsement.

3. The log book must be presented to the supervisor or external assessor on request.
4. Contact the industrial liaison officer in case of challenge. The polytechnic shall not be liable for any
money lost by trainee. Please avoid assigning duties involving handling money.

5. Make a report of the attachment using the guide provided in the last pages of the logbook.

6. The logbook must be kept clean and returned to the industrial attachment officer at the end of the
attachment period for further evaluation and provision of certificate.

7. In case of injury while on duty in the industrial attachment the trainee should:

(I). Report the injury to the industrial supervisor/management immediately.

(II). Seek medical attention and keep the treatment records clean and safe.

(III). Communicate about the injury to the institution/ILO within 24 hours


KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 15-Jan- 13:11 PM copying flour plan using aichicard well done
2024

Tue, 16-Jan- 13:11 PM designing a two bedroom house done


2024

Wed, 17-Jan- 13:11 PM learning different plot sizes and shop sizes done
2024

Thu, 18-Jan- 13:11 PM designing bedsitters and front shops done


2024

Fri, 19-Jan- 13:11 PM lean to roof drawing using archicad done


2024

Sat, 20-Jan- 13:08 PM bungalow designing done


2024
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 22-Jan- 13:09 PM bungalow furnishing done
2024

Tue, 23-Jan- 12:17 PM pitched roof editing using archicard done


2024

Wed, 24-Jan- 13:36 PM designing a bungalow given main features done


2024

Thu, 25-Jan- 12:49 PM designing a maisonette done


2024

Fri, 26-Jan- 10:29 flat roof house design done


2024 AM

Sat, 27-Jan- 10:29 two bedroom house design done


2024 AM
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 29-Jan- 10:29 bungalow house design done
2024 AM

Tue, 30-Jan- 13:50 PM maisonnette design using archicard done


2024

Wed, 31-Jan- 11:49 maisonnette design done


2024 AM

Thu, 01-Feb- 11:50 staircase editing done


2024 AM

Fri, 02-Feb- 11:51 designing shops done


2024 AM

Sat, 03-Feb- 14:15 PM maisonette design done


2024
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 05-Feb- 13:49 PM elevations editing done
2024

Tue, 06-Feb- 13:50 PM shops design done


2024

Wed, 07-Feb- 13:35 PM 3bedroom house design given plot size and done
2024 main road

Thu, 08-Feb- 12:47 PM designing shops given a plot of unequal sides done
2024

Fri, 09-Feb- 12:54 PM 4bedroom house design done


2024

Sat, 10-Feb- 14:04 PM school dinning hall design done


2024
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 12-Feb- 14:05 PM chimney design done
2024

Tue, 13-Feb- 13:45 PM site visit done


2024

Wed, 14-Feb- 13:49 PM staffroom design done


2024

Thu, 15-Feb- 13:49 PM staffroom design done


2024

Fri, 16-Feb- 13:55 PM 0ffice block design done


2024

Sat, 17-Feb- 13:55 PM health center design done


2024
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 19-Feb- 13:56 PM health center design done
2024

Tue, 20-Feb- 13:40 PM two bedroom units design done


2024

Wed, 21-Feb- 13:44 PM two bedroom units design done


2024

Thu, 22-Feb- 13:39 PM One bedroom units design done


2024

Fri, 23-Feb- 13:39 PM one bedroom units design done


2024

Sat, 24-Feb- 08:25 health center design done


2024 AM
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 26-Feb- 08:25 health center design done
2024 AM

Tue, 27-Feb- 08:25 health center design done


2024 AM

Wed, 28-Feb- 08:25 health center design done


2024 AM

Thu, 29-Feb- 08:25 health center design done


2024 AM

Fri, 01-Mar- 08:25 health center design done


2024 AM

Sat, 02-Mar- 08:25 hotel design done


2024 AM
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 04-Mar- 08:25 hotel design done
2024 AM

Tue, 05-Mar- 08:25 HOTEL DESIGN done


2024 AM

Wed, 06-Mar- 08:25 HOTEL DESIGN done


2024 AM

Thu, 07-Mar- 08:25 HOTEL DESIGN done


2024 AM

Fri, 08-Mar- 08:25 HOTEL DESIGN done


2024 AM

Sat, 09-Mar- 08:25 HOTEL DESIGN done


2024 AM
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 11-Mar- 08:25 HOTEL DESIGN done
2024 AM

Tue, 12-Mar- 08:25 hotel design done


2024 AM

Wed, 13-Mar- 08:25 hotel design done


2024 AM

Thu, 14-Mar- 08:25 hotel design done


2024 AM

Fri, 15-Mar- 08:25 site visit done


2024 AM

Sat, 16-Mar- 08:25 site visit done


2024 AM
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 18-Mar- 08:25 bungalow design done
2024 AM

Tue, 19-Mar- 08:25 bungalow design done


2024 AM

Wed, 20-Mar- 08:25 bungalow design done


2024 AM

Thu, 21-Mar- 08:25 bungalow design done


2024 AM

Fri, 22-Mar- 08:25 bungalow design done


2024 AM

Sat, 23-Mar- 08:25 bungalow design done


2024 AM
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 25-Mar- 12:48 PM 3bedroom design done
2024

Tue, 26-Mar- 12:49 PM 3bedroom house design done


2024

Wed, 27-Mar- 12:50 PM mansion design done


2024

Thu, 28-Mar- 12:50 PM mansion design done


2024

Fri, 29-Mar- 12:51 PM 2bedroom design done


2024

Sat, 30-Mar- 12:52 PM 2bedroom design done


2024
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 01-Apr- 12:54 PM site visit done
2024

Tue, 02-Apr- 12:54 PM site visit done


2024

Wed, 03-Apr- 12:55 PM site visit done


2024

Thu, 04-Apr- 12:55 PM site visit done


2024

Fri, 05-Apr- 12:56 PM site visit done


2024

Sat, 06-Apr- 12:56 PM site visit done


2024
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 08-Apr- 13:47 PM BQ done
2024

Tue, 09-Apr- 13:47 PM BQ done


2024

Wed, 10-Apr- 13:48 PM BQ done


2024

Thu, 11-Apr- 13:48 PM BQ done


2024

Fri, 12-Apr- 13:49 PM BQ done


2024

Sat, 13-Apr- 13:50 PM BQ done


2024
KABETE NATIONAL POLYTECHNIC
TRAINEE'S INDUSTRIAL TRAINING LOG-BOOK
DAILY TRAINING RECORD

DATE TIME DAY'S ACTIVITIES SUPERVISOR'S


REMARKS
Mon, 15-Apr- 13:51 PM BQ done
2024

Tue, 16-Apr- 13:51 PM BQ done


2024

Wed, 17-Apr- 13:52 PM BQ done


2024

Thu, 18-Apr-
2024

Fri, 19-Apr-
2024

Sat, 20-Apr-
2024
DATE HELPFUL DIAGRAMS / NOTES / CALCULATIONS / SAMPLES SOLUTION

Instructor Feedback
--
NB: Have the supervisor enter a remark daily. A signature is not enough

You might also like