Simplified Key Steps: If 𝐴𝑠 is required with known 𝑀𝑢
1.) Check value for 𝛽1
f’c, MPA β𝟏
17 ≤ f’c ≤ 28 0.85 (a)
28 ≤ f’c ≤ 55 0.05(f’c−28) (b)
0.85 −
7
f’c ≥ 55 0.65 (c)
a
∅Mn = ∅C d −
2
a a
∅Mn = ∅C d − or ∅Mn = ∅T d −
2 2
Given:
𝑏 = 300𝑚𝑚
𝑑 = 500𝑚𝑚
𝐴𝑠 = 3 − 25𝑚𝑚∅
𝑓 ′ 𝑐 = 34.2𝑀𝑝𝑎
𝑓𝑦 = 414𝑀𝑃𝑎
Given:
𝑏 = 300𝑚𝑚 𝐷𝐿 = 20 𝑘𝑁/𝑚
𝑑 = 550𝑚𝑚 𝐿𝐿 = 38 𝑘𝑁/𝑚
𝑙 = 6𝑚 𝑎 = 80𝑚𝑚
𝑓 ′ 𝑐 = 21𝑀𝑝𝑎 𝐴𝑠 = ?
𝑓𝑦 = 312𝑀𝑃𝑎 Load Combination: 1.2DL + 1.6DL
ENGR. M.P. ABACAHIN
Note that the maximum moment for a simply supported beam is
shown in the ff. figure:
Maximum Moment:
𝑊𝑢 𝐿2
𝑀𝑢 =
8