CW (Chun Wo) - MiC - Brochure
CW (Chun Wo) - MiC - Brochure
ONE-STOP SOLUTION CONTROLLED FABRICATION QUALITY ASSURANCE DEDICATED LOGISTICS ON-SITE ASSEMBLY FACTORY FINISHES
MODULAR INTEGRATED CONSTRUCTION We foster a collaborative team environment Our MiC manufacturing partners in Mainland Accredited with ISO9001, Chun Wo fosters a Chun Wo’s 20,000 sq. ft mock-up yard in Yuen Long To ensure speed, quality and precision of on-site n Plumbing and tiling
using BIM from architects to engineers and China specialise in producing and storing culture of high quality and aims for zero defects. is close to China’s border to ensure on-time installation, we deploy well-trained professional n Installation of bathroom units
Chun Wo is at the new age of engineering and construction technology fabricators to explore complex design solutions prefabricated components with a capacity for Construction materials are compliant and certified scheduling for the on-site assembly crew. Our workers and specialists in our unique concrete n Waterproofing works
where it offers prefabrication and modular construction as solutions for future cities and avoid clashes and costly changes. Our BIM 100 volumetric units per week and 85% of the and safely stored to prevent damage from moisture. logistics team is fully engaged in the precise MiC systems. The installation method reduces n Wall finishes and painting
data are handed over to clients for operations, interior finishing and fittings completed off-site. Superior weather protection and waterproofing loading of modules and setting out of the site construction time to mitigate disturbance in the n Installation of electrical outlets
renovations and maintenance to provide long-term Prefabrication enables higher standards of membrane is used for transportation and Radio for efficient assembly. neighborhood. It also reduces debris and n Installation of air-conditioning units
Modular Construction integrates the processes and technologies of design, manufacturing and construction value throughout the building’s life cycle. workmanship with testing and preassembly at Frequency Identification (RFID) systems track and construction traffic and is safer for the on-site team. Installation of kitchen cabinets
CHUN WO
n
to deliver higher-quality buildings in shorter time frames. Chun Wo has a proud legacy in Design for factory, less waste and greater health and safety centralise our inventory. n Doors and frames
Manufacture and Assembly (DfMA), and we have applied our expertise in fabrication, logistics and installation MIC ADVANTAGES for staff. n Installation of flooring
of a building’s components to modular construction.
n Awarded IPA by Buildings Department for MiC
We are the first in the industry to obtain an In-Principal Approval (IPA) from the Buildings Department (RC) System in partnership with the P&T Group
of the HKSAR for our Reinforced Concrete MiC Connections. This authorises us to build up to 40-storey
1st HONG KONG CONCRETE MiC DEVELOP STEEL DfMA VOLUMETRIC OFF-SITE R&D HYBRID IPA FOR MiC PRE-FINISHED & PRE-FABRICATION COMPLETION OF
DEVELOP PRECAST PRECAST MATRIX DECKS PATENT & SUBMISSION STEEL MiC PREFABRICATION FOR THE MiC SYSTEM (REINFORCED CONCRETE) SYSTEM STEEL MODULE CHUN WO INNOBASE
MiC buildings for both the public and private sectors. Patented ‘wall connection system’ jointly developed
STRUCTURAL WALLS SYSTEM
n
health and safety, time and cost to ensure a well coordinated design, manufacture and assembly process. n Mature and experienced BIM team
Chun Wo’s modular systems can offer more complex and detailed designs unlike traditional construction n Profound experience in DfMA
techniques as most of the building will be fabricated off-site in the controlled environment of a
manufacturing facility, allowing for higher quality and consistency. This approach also helps to accelerate
the construction schedule and assist in addressing the shortage of available skilled labour for on-site work
in Hong Kong.
Furthermore, 6% of the floor area built using MiC will be exempted from the calculation of the Gross
Floor Area (GFA)* making this an attractive option to private developers. Our innovations not only provide Chun Wo Concrete MiC
certainty in project completion to meet pressing demands for quality housing, but they also play a role Connection Systems animation
in attracting future generations of professionals to our industry. 2013 2016 2017 2018 2019 2020
*According to the ‘Exemption of Gross Floor Area for Buildings adopting Modular Integrated Construction’ issued
by the Buildings Department.
DESIGN FOR
MANUFACTURE & ASSEMBLY (DfMA)
DfMA is integral to MiC and provides greater ease of manufacturing and efficiency in assembly.
Many of Chun Wo’s projects include elements of DfMA, and we have successfully adopted it in different types of
projects including residential buildings and public facilities.
units per floor The modular components were factory manufactured with designed
n Time savings in formwork 36% connections for ease of on-site fitting.
n Time savings in plastering (tiling and
rendering) 42% 1
n Time savings in scaffolding 62%
Top:
2
1. Greenhill Villa, Housing Society
THE LUNA
Construction using reinforced concrete MiC of 36, 34 and
32-storey residential tower blocks with 1 storey of podium floor 27-STOREY TOWER
and 2 storeys of lower ground floors and external works.
3 4
Top left: City of Dreams Retail Expansion, Macao Above: Show flat built with ‘Chun Wo Concrete MiC Systems’
Below left: Development of Gleneagles Hong Kong Hospital at Nam Fung Path, Hong Kong Below: Patented ‘Wall Connection System’
Right: Liantang / Heung Yuen Wai Boundary Control Point, Site Formation and Infrastructure Works - Contract 3, Hong Kong
Chun Wo aims to deliver the highest quality products We commit to provide a safe and healthy work Chun Wo is committed to contributing a green
to customers and it has formulated an overriding environment to all workers and to maintain an society by preventing environmental pollution,
Quality Policy with the commitment to meet customer's outstanding safety performance. Safety management reducing waste and enhancing waste recycling from
needs, expectations and statutory requirements. In line models ISO 45001:2018 and OHSAS 18001 are our operations. The Group has implemented an
with its formulated Quality Policy, a Quality applied to develop, implement and maintain the 17 Environmental Management System which complies
Management System which complies with ISO 9001 elements of our Safety Management System, based with ISO14001 requirements for the provision of
requirements is implemented within the Group to ensure on the Factories & Industrial Undertakings (Safety design, construction, and installation and maintenance
successful fulfilment of our commitment to quality. Management) Regulations. services to our customers.
YOUR PARTNER IN MODULAR INTEGRATED CONSTRUCTION