SCALE ENGINEERS

303, SPG ECHELON,


OPP. SATYA HEIGHTS,
Nr. TORRENT POWER, MAKARBA,
AHMEDABAD-380051
Email: lalavat4up@gmail.com

APPROACH BRIDGE_MEHARAMA & THAKURGANGATI FULL BLOCK


PROJECT:
COVERAGE

CLIENT: DRINKING WATER SANITATION DEPARTMENT, GOVT. OF JHARKHAND

SUPPLIER/CONTRACT
KALPATARU POWER TRANSMISSION LIMITED
OR:

TITLE: DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH

DATE REV DESCRIPTION DESIGNED CHECKED APPROVED

4-Jun-24 R0 FOR REVIEW GP KP PP

Design Note No: IN-PS-DC-02 (R0)

Pages: 1 + 81 = 82
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
CONTENTS

SR NO SUBJECT
1 Data
2 Load Calculations
3 Summary Of Forces
4 Pier Load Combinations
5 Pier Load Combination (HFL Condition)
6 Foundation Load Combinations
7 Foundation Load Combination (HFL Condition)
8 Pier Design
9 Foundation Design
10 Crack Width Calculations
11 Serviceability Checks

2
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH

STABILITY CHECK & DESIGN FOR PIER FOUNDATION

3
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH

G = Dead Load + SIDL


SIDL2 = Surfacing
Fep = Earth Pressure
Fcp = LL Surcharge
Q = Live Load
Fte = Thermal Loads
W = Wind Force
Fwc = Water Current Force
Gb = Buoyancy Force
EQT = Seismic Force Transverse
EQL = Seismic Force Longitudinal
EQ1 = Seismic Force Component Combination 1
EQ2 = Seismic Force Component Combination 2
EQ3 = Seismic Force Component Combination 3

4
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
1 DATA:
1.1 BRIDGE DATA:
>> LEVELS:
- Road Top RL = 47.000 m - Bottom of Pier = 35.300 m
- Ground Level = 38.650 m - Bottom of Foundation RL = 33.500 m
- Top of Pier Cap RL = 45.750 m - Depth of Found. frm GL = 5.150 m
- Bottom Of Pier Cap RL = 44.950 m
>> GEOMETRY:
- Radius of Super Str. = 0 m
- Skew Angle = 0 °
- No of Lanes = 1 lanes
>> DESIGN:
- Clear Cover to Fdn = 0.075 m
- Clear Cover to Pier = 0.045 m
>> HYDRAULICS:
- HFL = 45.500 m - Velocity of Current = 1.50 m/s
- AHFL = 45.500 m - Angle of Water Strike = 0.00 °
- Scour Level = 35.500 m
1.2 MATERIAL PROPERTIES:
>> GRADE OF CONCRETE: >> Grade of Reinf. Steel = Fe 500
- Pier = M 30 >> Co-eff. of Shrink., αc = 2.00E-04
- Foundation = M 30 >> Co-eff. of Temp., αt = 1.20E-05 per°
>> DENSITY OF CONCRETE: >> Es = 200000 Mpa
- Super Structure = 2.500 t/m3 >> Ecm Pier = 31000 Mpa
- Wearing Coat = 2.200 t/m3 >> Ecm Foundation = 31000 Mpa
>> TEMPERATURE:
- Max. Air Shed = 45.000 °C - Relative Humidity RH = 64.50 %
- Min. Air Shed = 0.000 °C
- Design = 32.50 °C
1.3 PERMISSIBLE STRESSES: (Table 6.5 & Cl. 12.2, IRC:112-2011)
a. LIMIT STATE OF VERIFICATION OF STRUCTURAL STRENGTH:
FOUNDATION: SUB STRUCTURE:
fck = 30 Mpa = 3058.9 t/m2 fck = 30 Mpa = 3058.9 t/m2
2
fcm = 40 Mpa = 4078.6 t/m fcm = 40 Mpa = 4078.6 t/m2
fctm = 2.5 Mpa = 254.9 t/m2 fctm = 2.5 Mpa = 254.9 t/m2
fcd = 13.40 Mpa = 1366.3 t/m2 fcd = 13.40 Mpa = 1366.3 t/m2
Rumax = 0.133 x fck = 406.8 t/m2 Rumax = 0.133 x fck = 406.8 t/m2
fyk = 500 Mpa = 50982.2 t/m2 fyk = 500 Mpa = 50982.2 t/m2
2
fyd = 434.78 Mpa = 44332.3 t/m fyd = 434.78 Mpa = 44332.3 t/m2
b. LIMIT STATE OF SERVICEABILITY:
CONCRETE: STEEL:
2
Pier = 14.40 Mpa = 1468.3 t/m Pier = 400 Mpa = 40785.8 t/m2
Fdn = 14.40 Mpa = 1468.3 t/m2 Fdn = 400 Mpa = 40785.8 t/m2
1.4 TERRAIN & STRUCTURE FEATURES:
>> For Seismic Consideration
- Method of analysis = ESAM
- Seismic Zone = III
- Seismic Class = Important Bridges
- Imp. Factor, I = 1.2
- Res. Red. Factor, R = 3
- Soil Strata = Medium Soil
- LL Consideration = 20 %

5
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
- Incr factor for Foundn = 1.35
>> For Wind Consideration
- Wind Speed = 39 m/s
- Terrain = Plain
- Gust factor = 2.00
- Super str. Type - 1 = Multiple Beam
- Super str. Type - 2 = Beam/Box/Plate Girder
- LL % for Wind = 25 %
- Lift co-efficient, Cl = 0.75
1.5 SPAN DATA:
>> Span: SPAN-1 SPAN-2
- C/c of Pier/EJ = 25.000 m = 25.000 m
- C/c of Bearings = 24.500 m = 24.500 m
- Overhang (LHS) = 0.250 m = 0.250 m
- Overhang (RHS) = 0.250 m = 0.250 m
- Long Eccentricity = 0.250 m = 0.250 m
>> Width:
- Bridge = 7.820 m = 7.820 m
- Carriage Way = 4.300 m = 4.300 m
- Skew Bridge = 7.820 m = 7.820 m
- Skew carriage way = 4.300 m = 4.300 m
>> Eccentricity:
- Carriage Way = 0.000 m = 0.000 m
- Super Structure = 0.000 m = 0.000 m
1.6 SUPER STRUCTURE:
>> TRUSS WEIGHT:
Weight is taken directly from the STAAD modeling = 46.000 t @ 50.000 t
d. Deck Slab & Precast Panel:
- Thk. Of Deck Slab = 0.200 m = 0.200 m
- Thk. Of Precast Panel = 0.046 m = 0.046 m
>> C.G OF ELEMENTS: SPAN-1 SPAN-2
- Crash Barrier-LHS = 0.150 m 0.150 m frm btm of crash barrier
- Crash Barrier-RHS = 0.150 m 0.150 m frm btm of central verge
- Super Structure = 3.075 m 3.075 m frm top of super stru
- Pier cap tapered = 0.590 m frm top of pier cap

1.7 SUPER IMPOSED DEAD LOAD: SPAN-1 SPAN-2


Width Ht./Thk C/S Area eT Width Height C/S Area eT
m m m2 m m m m2 m
Wearing Coat 4.300 0.065 0.280 0.00 4.300 0.065 0.280 0.00
Pipe pedestal (L) 1.200 0.475 0.000 2.98 1.200 0.475 0.000 2.98
Pipe (L) 1.000 0.010 0.063 2.98 1.000 0.010 0.063 2.98
Road kerb (L) 0.150 0.150 0.023 2.15 0.150 0.150 0.023 2.15
Road Kerb (R) 0.150 0.150 0.023 2.15 0.150 0.150 0.023 2.15
Pipe (R) 1.000 0.010 0.063 2.98 1.000 0.010 0.063 2.98
Pipe pedestal (R) 1.200 0.475 0.000 2.98 1.200 0.475 0.000 2.98
1.8 SUBSTRUCTURE:
>> BEARING: L (m) x W (m) x H (m) x Nos
- Type of Bearing (Left) = Elastomeric Bearing
- Material = Elastomer μ = 0.000
- Bearing (Left) = 0.400 x 0.300 x 0.148 x 2
- Shear Modules = 100 t/m2

6
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
- Type of Bearing (Right) = Elastomeric Bearing
- Material = Elastomer μ = 0.000
- Bearing (Right) = 0.400 x 0.300 x 0.148 x 2
- Shear Modules = 100 t/m2
>> Other Components
Nos Length Width Height Projection
m m m m
SPAN-1
>> Pedestal 2 0.700 0.600 0.500
SPAN-2
>> Pedestal 2 0.700 0.600 0.500

>> Pier cap (Straight) 9.200 1.200 0.400


>> Pier cap (Tapered) 0.400
>> Pier With Circle 3.500 0.900 9.650 0.450
>> Pier (Inscribed) 4.136 0.900

PIER GEOMETRY:
Pier Type = Column
Element Area X Y AX AY AX2 AY2 Ixself Iyself
m2 m m m3 m3 m4 m4 m4 m4
1 Circle Left 0.32 0.00 0.26 0.00 0.082 0.0 1.2 0.02 0.00 1
2 Circle Right 0.32 0.00 4.14 0.00 1.3 0.0 1.2 0.02 0.00 1
3 Rectangle 3.15 0.00 2.20 0.00 6.9 0.0 0.0 0.2 3.2 1
TOTAL 3.79 0.00 8.3 0.0 2.4 0.2 3.2
CGX = 0.000 m MIX = 0.245 m4 r trans = 1.218 m
CGY = 2.198 m MIY = 5.621 m4 r long = 0.254 m
1.9 FOUNDATION:
SBC = 13.1 t/m2
Dim along Traffic Dirn = 7.00 m (Longitudinal Direction)
Dim across Traffic Dirn = 9.50 m (Transverse Direction)
Thk @ Face of Pier = 1.80 m
Thk @ edge = 1.00 m
Sitting width = 0.15 m
1.10 LIVE LOAD:
>> GENERAL:
- Intensity of Footpath LL = 0.000 t/m2 - C/C distance between Wheels:
- Speed of Vehicle = 50 kmph CLSA = 1.800 m
- Clear Edge Distance: 70R W = 1.930 m
CLSA = 0.150 m - C/C distance between Adjacent Vehicle:
70RW = 1.200 m CLSA = 1.700 m
LOCATION OF FIRST WHEEL
CLSA LHS = 0.550 m
CLSA RHS = 0.550 m
- Width of Tyre:
CLSA = 0.500 m
70RW = 0.860 m
MAX. REACTION CASE
SR NO LOAD CASES Possibility SPAN-1 SPAN-2 TOTAL
t t t
>> CLSA1L 1 30.00 16.00 46.00

7
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
MAX. MOMENT CASE
SR NO LOAD CASES Possibility SPAN-1 SPAN-2 TOTAL
t t t
>> CLSA1L 1 36.00 0.00 36.00

NOTE: FORCES ARE CALCULATED AT FOLLOWING SECTIONS:


Btm RL of Pier 1 35.300 m
Btm RL of Footing 2 33.500 m

8
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
2 LOAD CALCULATIONS:
2.1 DEAD LOAD:
2.1.1 SUPER STRUCTURE:
i GIRDER:
Nos Length C/S A Vol. Total Wt Eff. Wt eL eT ML' MT'
m m2 m3 t t m m t-m t-m
SPAN 1-Truss girder
SPAN-1 = 50.00 25.00 0.25 0.00 6.25 0.00
SPAN 2-Truss Girder
SPAN-2 = 50.00 25.00 0.25 0.00 6.25 0.00
iii DECK SLAB & PRECAST PANEL:
Length Width Thk. Vol. T. Wt Eff. Wt eL eT ML' MT'
m m m m3 t t m m t-m t-m
SPAN-1
Deck Slab 25.00 4.30 0.20 21.5 53.8 26.9 0.25 0.00 6.72 0.00
Precast Panel 25.00 4.30 0.046 4.9 12.4 6.2 0.25 0.00 1.55 0.00
SPAN-1 = 66.1 33.1 8.26 0.00
SPAN-2
Deck Slab 25.00 4.30 0.20 21.5 53.8 26.9 0.25 0.00 6.72 0.00
Precast Panel 25.00 4.30 0.05 4.9 12.4 6.2 0.25 0.00 1.55 0.00
SPAN-2 = 66.1 33.1 8.26 0.00
iv SIDL:
Length C/S A Vol. Total Wt Eff. Wt eL eT ML' MT'
m m2 m3 t t m m t-m t-m
SPAN-1
Pipe pedestal (L) 25.000 0.000 0.00 1.50 0.75 0.25 2.98 0.19 2.23
Pipe (L)+ Water 25.000 0.063 1.57 25.88 12.94 0.25 2.98 3.24 38.50
Road kerb (L) 25.000 0.023 0.56 1.41 0.70 0.25 2.15 0.18 1.51
Pipe Drag force 25.000 0.300 0.79 5.89 2.95 0.25 2.98 0.74 8.76
Road Kerb (R) 25.000 0.023 0.56 1.41 0.70 0.25 2.15 0.18 1.51
Pipe (R)+ Water 25.000 0.063 1.57 25.88 12.94 0.25 2.98 3.24 38.50
Pipe pedestal (R) 25.000 0.000 0.00 1.50 0.75 0.25 2.98 0.19 2.23
Pipe Drag force 25.000 0.300 0.79 5.89 2.95 0.25 2.98 0.74 8.76
SPAN-1 = 69.36 34.68 8.67 0.00
SPAN-2
Pipe pedestal (L) 25.000 0.000 0.00 1.50 0.75 0.25 2.98 0.19 2.23
Pipe (L)+ Water 25.000 0.063 1.57 25.88 12.94 0.25 2.98 3.24 38.50
Road kerb (L) 25.000 0.023 0.56 1.41 0.70 0.25 2.15 0.18 1.51
Pipe Drag force 25.000 0.300 0.79 5.89 2.95 0.25 2.98 0.74 8.76
Road Kerb (R) 25.000 0.023 0.56 1.41 0.70 0.25 2.15 0.18 1.51
Pipe (R)+ Water 25.000 0.063 1.57 25.88 12.94 0.25 2.98 3.24 38.50
Pipe pedestal (R) 25.000 0.000 0.00 1.50 0.75 0.25 2.98 0.19 2.23
Pipe Drag force 25.000 0.300 0.79 5.89 2.95 0.25 2.98 0.74 8.76
SPAN-2 = 69.36 34.68 8.67 0.00
v SUMMARY OF DEAD LOAD AND SIDL (SUPER STRUCTURE):
ELEMENT P ML' MT' ML MT
t t-m t-m t-m t-m
SPAN-1 DL 58.06 14.52 0.00 14.52 0.00
SPAN-1 SIDL 34.68 8.67 0.00 8.67 0.00
SPAN-2 DL 58.06 14.51 0.00 14.51 0.00
SPAN-2 SIDL 34.68 8.67 0.00 8.67 0.00
Total 185.476 0.00 0.00 0.00 0.00

9
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH

vi ONE SPAN DISLOGGED CONDITION:


ELEMENT P ML' MT' ML MT
t t-m t-m t-m t-m
DL (Span-1) 92.74 23.19 0.00 23.19 0.00
DL (Span-2) 92.74 23.18 0.00 23.18 0.00
MAX Total 92.74 23.19 0.00 23.19 0.00

2.1.2 SUBSTRUCTURE:
Nos Length Width Height Volume Weight
m m m m3 t
>> Pedestal (Span-1) 2 0.70 0.60 0.50 0.42 1.05
>> Pedestal (Span-2) 2 0.70 0.60 0.50 0.42 1.05
>> Pier Cap Str. 9.20 1.20 0.40 4.42 11.04
>> Pier Cap Trap. 9.20 1.20 0.40 3.12 7.80
1.20 3.80
>> Pier upto 38.3 m 3.50 0.90 6.65 25.20 63.01
>> Pier upto 35.3 m 3.50 0.90 9.65 36.57 91.43
>> Pier Upto Scour 9.45 35.82 89.54

>> SUMMARY OF DEAD LOAD (SUB STRUCTURE):


SR RL P eL eT ML MT
NO m t m m t-m t-m
1 35.300 112.37 0.00 0.00 0.00 0.00
2 33.500 112.37 0.00 0.00 0.00 0.00

2.1.3 FOUNDATION:
• Dim along Traffic Dirn = 7.000 m
• Dim across Traffic Dirn = 9.500 m
• Thickness = 1.800 m
• Volume = (7x9.5x1)+(7x9.5+(3.5+0.15x2)x(0.9+0.15x2)+SQRT(7x9.5x(3.5+0.1
5x2)x(0.9+0.15x2)))x(1.8-1)/3
= 90.093 m3
• Weight = 2.5 x 90.093 = 225.23 t

2.1.4 SUMMARY OF DEAD LOAD:


SR RL P ML MT
NO m t t-m t-m
1 35.300 297.85 0.01 0.01
2 33.500 523.08 0.01 0.01
ONE SPAN DISLOGGED
SR RL P ML MT
NO m t t-m t-m
1 35.300 205.11 23.19 0.00
2 33.500 430.34 23.19 0.00

BOTH SPAN DISLOGGED


SR RL P ML MT
NO m t t-m t-m
1 35.300 112.37 0.00 0.00
2 33.500 337.61 0.00 0.00

10
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
2.2 SURFACING
Length Width Thk. Volume Total Wt Eff. Wt
m m m m3 t t
SPAN-1 Wearing Coat 25.000 4.300 0.065 6.99 21.50 7.69
SPAN-2 Wearing Coat 25.000 4.300 0.065 6.99 21.50 7.69
SUMMARY OF SURFACING:
ELEMENT P eL eT ML' MT' ML MT
t m m t-m t-m t-m t-m
SPAN-1 WC 7.686 0.250 0.000 1.92 0.00 1.92 0.00
SPAN-2 WC 7.686 0.250 0.000 1.92 0.00 1.92 0.00
Total 15.37 0.00 0.00

2.3 LIVE LOAD:


2.3.2 VEHICLE LOAD:
>> LONGITUDINAL ANALYSIS: (MAX REACTION CASE)
SR VEHICLES P, Span-1 e1 ML,span-1 P, Span-2 e2 ML,span-2 P ML'
NO t m t-m t m t-m t t-m
1 CLSA1L 30.00 0.25 7.50 16.00 0.25 4.00 46.00 3.50

>> LONGITUDINAL ANALYSIS: (MAX MOMENT CASE)


SR VEHICLES P, span-1 e1 ML,span-1 P, span-2 e2 ML,span-2 P ML'
NO t m t-m t m t-m t t-m
2 CLSA1L 36.00 0.25 9.00 0.00 0.25 0.00 36.0 9.0

>> TRANSVERSE ANALYSIS:


SR VEHICLE TYPE MAX. REACTION CASE LONG. MOMENT CASE
NO eT P MT' P MT'
m t t-m t t-m
1 CLSA1L 0.70 46.0 32.2 36.0 25.2

>> SUMMARY OF LIVE LOAD REACTION AND MOMENT:


>> MAX. REACTION CASE
SR LOAD CASE P ML' MT' ML MT
NO t t-m t-m t-m t-m
1 CLSA1L 46.00 3.5 32.2 3.50 32.2

>> LONG. MOMENT CASE


SR LOAD CASE P ML' MT' ML MT
NO t t-m t-m t-m t-m
2 CLSA1L 36.00 9.0 25.2 9.00 25.2

>> GOVERNING LIVE LOAD CASE


SR LOAD CASE P ML MT
NO t t-m t-m
1 CLSA1L 46.00 3.50 32.20
TOTAL 46.00 3.50 32.20

2.4 BRAKING FORCE:


Span1 = 12.50 m
Span2 = 12.50 m
Total Span Length = 25.00 m
Total Load

11
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
70R W = 100.00 t
Clsa1L = 55.40 t
1 CLASS A:
TRAIN ON SPAN-1
1st Train Clsa1L = 35.00 t x 0.20 = 7.00 t
Succeeding Clsa1L = 0.00 t x 0.10 = 0.00 t = 7.00 t
TRAIN ON SPAN-2
1st Train Clsa1L = 20.40 t x 0.20 = 4.08 t
Succeeding Clsa1L = 0.00 t x 0.10 = 0.00 t = 4.08 t

SR LOAD CASE HL
NO t
1 CLSA1L (7+4.08)x1 11.08
HL = 11.08 t
>> CHANGE IN VERTICAL REACTION:
Moment at Bearing Level = 46.25 m
Lever Arm (Span-1) = 1.950 m
Lever Arm (Span-2) = 1.950 m
HL = 11.08 t
ML = 11.08 x 1.95 For Skew Effect (If exist)
= 21.61 t-m HL = 11.08 t
Rv = 21.606 / 24.5 HT = 0.00 t
= 0.88 t
>> MOMENT DUE TO BRAKING EFFECT:
SR RL LA ML' ML MT P HL HT
NO m m t-m t-m t-m t t t
1 35.30 10.950 121.33 121.33 0.00 -0.88 11.08 0.00
2 33.50 12.750 141.27 141.27 0.00 -0.88 11.08 0.00

2.5 CENTRIFUGAL FORCE:


Speed of Vehicle, V = 50 kmph
Radius of Super Structure, R = 0.0 m
SR RL P HT HT HL CG OF ML MT
NO LOAD
m t t t t m t-m t-m
1 35.30 46.00 0.000 0.0 0.0 12.90 0.00 0.00
2 33.50 46.00 0.000 0.0 0.0 14.70 0.00 0.00

2.6 SUMMARY OF LIVE LOAD (Including Pedestrian, Vehicular, Braking & Centrifugal):
SR RL P ML MT HL HT
NO m t t-m t-m t t
1 35.30 45.12 124.83 32.20 11.08 0.00
2 33.50 45.12 144.77 32.20 11.08 0.00

2.7 TEMPERATURE AND SHRINKAGE FORCES:


Fh = 11.08 t
Acting @ = 46.250 m = 46.250 m
μ,span-1,fx = 0.00 μ,span-2,fx = 0.00
μ,span-1,fr = 0.00 μ,span-2,fr = 0.00
Rg = 100.42 t Rg = 100.42 t
Rq = 30.00 t Rq = 16.00 t

12
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH

(i) FOR ELASTOMERIC BEARING:


Temperature Forces: Shrinkage Forces:
FT = αxLxT Fs = αxL
α = 1.200E-05 per° α = 2.0E-04 per°
t = 32.500 ° L (span-1) = 25.000 m
L (span-1) = 25.000 m L(span-2) = 25.000 m
L(span-2) = 25.000 m
FT(span-1) = α x L(span-1) x T FT(span-1) = α x L(span-1)
= 0.000012 x 25 x 32.5 = 0.0002 x 25
= 0.010 m = 0.005 m
FT(span-2) = α x L(span-2) x T FT(span-2) = α x L(span-1)
= 0.000012 x 25 x 32.5 = 0.0002 x 25
= 0.010 m = 0.005 m
Force Per bearing = Deformation x Area of Bearing x Shear Modules
Thk. Of Elastomer
SPAN-1 SPAN-2
Deformation = 0.0074 m = 0.0074 m
Area of Bearing = 0.120 m2 = 0.120 m2
Thk. Of Bearing = 0.148 m = 0.148 m
Thk. Of Plate = 0.024 m = 0.024 m
Shear Modules = 100.0 t/m2 = 100.0 t/m2
No of Bearings = 2.0 nos. = 2.0 nos.
Force per Bearing = 0.0074 x 0.12 x 100 / 0.124 = 0.0074 x 0.12 x 100 / 0.124
= 0.716 t = 0.716 t
Total Force, HL = 0.716 x 2 = 1.432 t = 0.716 x 2 = 1.432 t
TOTAL HOR. FORCE SPAN-1 SPAN-2
= 1.432 t = 1.432 t
= MAX((1.432 x 1.1-1.432 x 0.9),(1.432 x 0.9-1.432 x 1.1))
= 0.286 t
HL = 0.286 t
HT = 0.000 t
SR RL HL HT LA ML MT
NO m t t m t-m t-m
1 35.30 0.29 0.00 10.95 3.14 0.00
2 33.50 0.29 0.00 12.75 3.65 0.00
SUMMARY:
SR RL P ML MT HL HT
NO m t t-m t-m t t
1 35.30 - 3.14 0.00 0.29 0.00
2 33.50 - 3.65 0.00 0.29 0.00
2.8 WIND LOAD: (DRY CONDITION)
2.8.1 TRANSVERSE WIND LOAD:
b/d, span-1 = 7.82 / ( 6.15 + 0.2 ) = 1.231
b/d, span-2 = 7.82 / ( 6.15 + 0.2 ) = 2.031
Ft = Pz x A1 x G x Cd
Pz = Hourly mean wind pressure
A1 = Solid Area
G = Gust factor = 2.00
Cd span-1 = Drag co-efficient = 2.25
Cd span-2 = Drag co-efficient = 2.25
Cd Live Load = Drag co-efficient = 1.20

13
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
Cd = 2.20
Basic Wind Speed = 39 m/s
Multiplication Factor = 39^2 / 33^2 = 1.397
>> WIND LOAD CALCULATIONS:
SR NO ELEMENT Ht. L AREA Ht. Ps. Ps. WIND F
m m m2 m t/m2 t/m2 HT (t)
1 Railing-1 0.15 12.5 1.88 8.43 0.047 0.066 0.56
2 Deck Slab-1 0.20 12.5 2.50 8.19 0.047 0.066 0.74
3 Truss-1 3.08 12.5 38.44 11.43 0.049 0.068 11.76
4 Pedestal-1 0.50 0.700 0.35 7.35 0.047 0.066 0.10
13.16
5 Railing-2 0.15 12.5 1.88 8.43 0.047 0.066 0.56
6 Deck Slab-2 0.20 12.5 2.50 8.19 0.047 0.066 0.74
7 Truss-2 3.08 12.5 38.44 11.43 0.049 0.068 11.76
8 Pedestal-2 0.50 0.700 0.35 7.35 0.047 0.066 0.10
13.16
9 Pier.Cap Str. 0.40 1.2 0.48 6.90 0.047 0.066 0.139
10 Pier.Cap Tap. 0.40 1.2 0.48 6.50 0.047 0.066 0.139
11 Pier @ 35.3 6.30 0.9 5.67 3.15 0.047 0.066 1.64
12 Pier @ 38.3 6.30 0.9 5.67 3.15 0.047 0.066 1.64
1.92
28.24

>> MOMENT CALCULATIONS:


SR NO ELEMENT RL of Force LA M@ 38.3 LA M@ 35.3 LA M for Fdn
m m t-m m t-m m t-m
1 Railing-1 47.075 8.775 4.89 11.775 6.56 13.575 7.56
2 Deck Slab-1 46.835 8.535 6.34 11.535 8.57 13.335 9.91
3 Truss-1 46.000 7.700 90.57 10.700 125.85 12.500 147.03
4 Pedestal-1 46.000 7.700 0.78 10.700 1.09 12.500 1.27
5 Pier Wall-1 45.750 7.450 0.00 10.450 0.00 12.250 0.00
102.58 142.07 165.76
6 Railing-2 47.075 8.775 4.89 11.775 6.56 13.575 7.56
7 Deck Slab-2 46.835 8.535 6.34 11.535 8.57 13.335 9.91
8 Truss-2 46.000 7.700 90.57 10.700 125.85 12.500 147.03
9 Pedestal-2 46.000 7.700 0.78 10.700 1.09 12.500 1.27
10 Pier Wall-2 45.750 7.450 0.00 10.450 0.00 12.250 0.00
102.58 142.07 165.76
11 Pier.Cap Str. 45.550 7.250 1.01 10.250 1.42 12.050 1.67
12 Pier.Cap Tap. 45.150 6.850 0.95 9.850 1.37 11.650 1.62
13 Pier. Head 44.950 6.650 0.00 9.650 0.00 11.450 0.00
14 Pier @ 35.3 41.800 6.500 10.65 8.300 13.60
15 Pier @ 38.3 41.975 3.675 6.02
7.98 13.43 16.88
TOTAL 213.13 297.57 348.41

SUMMARY OF TRANSVERSE WIND LOAD:


SR RL HT MT
NO m t t-m
1 35.30 28.24 297.57
2 33.50 28.24 348.41

14
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
2.8.2 LONGITUDINAL WIND LOAD: (Cl.209.3.4, IRC:6-2017)
Percentage of Hor. Force = 25.00 %
Percentage of Live Load = 25.00 %
SR RL HL ML
NO m t-m t-m
1 35.30 7.06 74.39
2 33.50 7.06 87.10

2.8.3 VERTICAL WIND LOAD: (Cl.209.3.5, IRC:6-2017)


Fv = Pz x A3 x G x Cl
Ht. from GL = 47 - 38.65 = 8.350 m
Pz = Hourly mean wind pressure = 0.066 t/m2
A3 = Plan Area, m2 = 108 m2
G = Gust factor = 2.00
Cl = Lift co-efficient = 0.75
Fv = 0.066 x 107.5 x 2 x 0.75 = 10.64 t
2.8.4 SUMMARY OF WIND LOAD:
SR RL P ML MT HL HT
NO m t t-m t-m t t
1 35.300 -10.64 74.39 297.57 7.06 28.24
2 33.500 -10.64 87.10 348.41 7.06 28.24
2.9 WIND LOAD: (HFL CONDITION)
2.9.1 TRANSVERSE WIND LOAD:
b/d, span-1 = 7.82 / ( 6.15 + 0.2 ) = 1.231
b/d, span-2 = 7.82 / ( 6.15 + 0.2 ) = 1.231
Ft = Pz x A1 x G x Cd
Pz = Hourly mean wind pressure
A1 = Solid Area
G = Gust factor = 2.000
Cd span-1 = Drag co-efficient = 2.250
Cd span-2 = Drag co-efficient = 2.250
Cd Live Load = Drag co-efficient = 1.200
Cd = 2.20
Basic Wind Speed = 39 m/s
Multiplication Factor = 39^2 / 33^2 = 1.397
>> WIND LOAD CALCULATIONS:
SR NO ELEMENT HEIGHT LENGTH AREA HT FR HFL WIND PS. WIND PS. WIND F
m m m2 m t/m2 t/m2 t
1 Railing-1 0.150 12.500 1.875 1.58 0.047 0.066 0.56
2 Deck Slab-1 0.200 12.500 2.500 1.34 0.047 0.066 0.74
3 Truss-1 3.075 12.500 38.438 4.58 0.047 0.066 11.42
4 Pedestal-1 0.500 0.600 0.300 0.50 0.047 0.066 0.09
5 Pier Wall-1 0.000 0.000 0.000 0.25 0.047 0.066 0.00
12.80
6 Railing-2 0.150 12.500 1.875 1.58 0.047 0.066 0.56
7 Deck Slab-2 0.200 12.500 2.500 1.34 0.047 0.066 0.74
8 Truss-2 3.075 12.500 38.438 4.58 0.047 0.066 11.42
9 Pedestal-2 0.500 0.600 0.300 0.50 0.047 0.066 0.09
10 Pier Wall-2 0.000 0.000 0.000 0.25 0.047 0.066 0.00
12.80
11 Pier.Cap Str. 0.400 1.200 0.480 0.050 0.047 0.066 0.139
12 Pier.Cap Tap. 0.400 1.200 0.480 0.000 0.047 0.066 0.139

15
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
13 Pier. Head 0.000 3.800 0.000 0.000 0.047 0.066 0.00
14 Pier 35.3 0.000 0.900 0.000 0.000 0.047 0.066 0.00
15 Pier 38.3 0.000 0.900 0.000 0.000 0.047 0.066 0.00
0.28
25.89

>> MOMENT CALCULATIONS:


SR NO ELEMENT RL of Force Lever Arm M for Pier Lever Arm M for Pier Lever Arm M for Fdn
m m t-m m t-m m t-m
1 Railing-1 47.075 8.775 4.89 11.775 6.56 13.575 7.56
2 Deck Slab-1 46.835 8.535 6.34 11.535 8.57 13.335 9.91
3 Truss-1 46.000 7.700 87.90 10.700 122.15 12.500 142.70
4 Pedestal-1 46.000 7.700 0.67 10.700 0.93 12.500 1.09
99.80 138.21 161.26
5 Railing-2 47.075 8.775 4.89 11.775 6.56 13.575 7.56
6 Deck Slab-2 46.835 8.535 6.34 11.535 8.57 13.335 9.91
7 Truss-2 46.000 7.700 87.90 10.700 122.15 12.500 142.70
8 Pedestal-2 46.000 7.700 0.67 10.700 0.93 12.500 1.09
99.80 138.21 161.26
9 Pier.Cap Str. 45.550 7.250 1.01 10.250 1.43 12.050 1.68
10 Pier.Cap Tap. 45.150 6.850 0.95 9.850 1.37 11.650 1.62
11 Pier. Head 44.950 6.650 0.00 9.650 0.00 11.450 0.00
12 Pier @ 35.3 41.800 6.500 0.00 8.300 0.00
13 Pier @ 38.3 41.975 3.675 0.00
1.97 2.80 3.30
TOTAL 201.57 279.23 325.82
2.9.2 LONGITUDINAL WIND LOAD: (Cl.209.3.4, IRC:6-2017)
Percentage of Hor. Force = 25.00 %
Percentage of Live Load = 25.00 %
SR RL HL ML
NO m t-m t-m
1 35.30 6.47 69.81
2 33.50 6.47 81.45
2.9.3 VERTICAL WIND LOAD: (Cl.209.3.5, IRC:6-2017)
Fv = Pz x A3 x G x Cl
Ht. from HFL = 47 - 45.5 = 1.50 m
Pz = Hourly mean wind pressure = 0.066 t/m2
2
A3 = Plan Area, m = 108 m2
G = Gust factor = 2.00
Cl = Lift co-efficient = 0.75
Fv = 0.066 x 107.5 x 2 x 0.75 = 10.64 t
2.9.4 SUMMARY OF WIND LOAD:
SR RL P ML MT HL HT
NO m t t-m t-m t t
1 35.300 -10.64 69.81 279.23 6.47 25.89
2 33.500 -10.64 81.45 325.82 6.47 25.89

2.10 SEISMIC LOAD:


2.10.1 SEISMIC LOAD COEFFICIENT:
Zone factor = 0.160 I = 1.200
Soil Strata = Medium Soil R = 3.000 Rtrans = 3.000
The fundamental natural period T = 2 x Sqrt ( D/1000F )

16
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
D = DL + LL
F = Horizontal force required to be applied at the centre of mass
of the superstructure for 1 mm horizontal deflection at the top of the
pier along the considered direction of horizontal force
Deflection = 0.001 m Deflection = 0.001 m
D,Long = 200.85 t D,Trans = 210.05 t
E = 31.00 GPa E = 31.00 GPa
h = 10.450 m h = 10.450 m
MI@Trans = 0.184 m4 (Cracked) MI@Long = 4.216 m4 (Cracked)
F,Long = 1.496 t F,Trans = 34.36 t
T,Long = 2xSQRT(200.85/1000/1.5) T,Trans = 2xSQRT(210.05/1000/34.36)
T,Long = 0.733 sec T,Trans = 0.156 sec
Sa/g, Long = 1.856 Sa/g,Trans = 2.500
Ah, Long = 0.059 Ah, Trans = 0.080

Seismic Force Below Scour Level:


DESCRIPTION RL Ah,Long Ah,Trans
m
Scour 35.500 0.059 0.080
Pier Btm 35.300 0.059 0.080
Founding 33.500 0.057 0.077
30m Below Scour 5.500 0.030 0.040

2.10.2 SEISMIC LOAD TRANSVERSE (DEAD LOAD):


ELEMENT DL SEIS. FORCE C.G. FROM LEVELS MOMENT AT LEVELS
FORCE RL 38.3 35.3 33.5 38.30 35.30 33.50
t t m m m m m t-m t-m
SPAN-1
Railing+Pipe(L) 14.40 1.15 47.075 8.78 11.78 13.58 10.1 13.56 15.63
Railing+Pipe(R) 14.40 1.15 47.075 8.78 11.78 13.58 10.1 13.56 15.63
WC+DS+PANEL 40.74 3.26 46.84 8.54 11.54 13.34 27.8 37.60 43.46
Truss 25.00 2.00 47.00 8.70 11.70 13.50 17.4 23.40 27.00
Pedestal 1.05 0.08 46.00 7.70 10.70 12.50 0.6 0.90 1.05
Pier Wall 0.00 0.00 45.75 7.45 10.45 12.25 0.0 0.00 0.00
SPAN-2
Railing+Pipe(L) 14.40 1.15 47.08 8.78 11.78 13.58 10.1 13.56 15.63
Railing+Pipe(R) 14.40 1.15 47.08 8.78 11.78 13.58 10.1 13.56 15.63
WC+DS+PANEL 40.74 3.26 46.84 8.54 11.54 13.34 27.8 37.60 43.46
Truss 25.00 2.00 47.00 8.70 11.70 13.50 17.4 23.40 27.00
Pedestal 1.05 0.08 46.00 7.70 10.70 12.50 0.6 0.90 1.05
Pier Wall 0.00 0.00 45.75 7.45 10.45 12.25 0.0 0.00 0.00
SUBSTRUCTURE
Pier cap-I 11.0 0.88 45.55 7.25 10.25 12.05 6.4 9.05 10.64
Pier cap-II 7.8 0.62 45.16 6.86 9.86 11.66 4.3 6.15 7.28
Pier Head 0.0 0.00 44.95 6.65 9.65 11.45 0.0 0.00 0.00
Pier
@ 38.30 63.0 5.04 41.625 3.33 16.8
@ 35.50 89.5 7.16 40.23 4.93 6.725 35.28 48.17
@ 35.30 1.9 0.15 35.40 0.10 1.90 0.015 0.29
@ 33.50 225.2 17.42 34.97 1.47 25.69
TOTAL 159.60 228.53 297.63

17
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
2.10.3 SEISMIC LOAD TRANSVERSE (LIVE LOAD):
P SEIS. FORCE C.G. FROM LEVELS MOMENT AT LEVELS
FORCE RL 38.3 35.3 33.5 38.30 35.30 33.50
t t m m m m t-m t-m t-m
CLSA1L 9.20 0.736 48.500 10.20 13.20 15.00 7.51 9.72 11.04

2.10.4 SEISMIC LOAD LONGITUDINAL (DEAD LOAD):


Super structure loads are transferred to bearing top level.
ELEMENT DL SEIS. Force C.G. FROM LEVELS MOMENT AT LEVELS
FORCE RL 38.3 35.3 33.5 38.30 35.30 33.50
t t m m m m t-m t-m t-m
SPAN-1
Railing+Pipe(L) 14.40 0.86 46.250 7.95 10.95 12.75 6.8 9.36 10.90
Railing+Pipe(R) 14.40 0.86 46.250 7.95 10.95 12.75 6.8 9.36 10.90
WC+DS+PANEL 40.7 2.42 46.250 7.95 10.95 12.75 19.2 26.50 30.85
Truss 25.0 1.48 46.250 7.95 10.95 12.75 11.8 16.26 18.93
Pedestal 1.05 0.06 46.00 7.70 10.70 12.50 0.5 0.67 0.78
Pier Wall 0.0 0.00 45.75 7.45 10.45 12.25 0.0 0.00 0.00
SPAN-2
Railing+Pipe(L) 14.4 0.86 46.25 7.95 10.95 12.75 6.8 9.36 10.90
Railing+Pipe(R) 14.4 0.86 46.25 7.95 10.95 12.75 6.8 9.36 10.90
WC+DS+PANEL 40.7 2.42 46.25 7.95 10.95 12.75 19.2 26.50 30.85
Girder+Diaph. 25.0 1.48 46.25 7.95 10.95 12.75 11.8 16.26 18.93
Pedestal 1.1 0.06 46.00 7.70 10.70 12.50 0.5 0.67 0.78
Pier Wall 0.0 0.00 45.75 7.45 10.45 12.25 0.0 0.00 0.00
SUBSTRUCTURE
Pier cap-I 11.0 0.66 45.55 7.25 10.25 12.05 4.8 6.72 7.90
Pier cap-II 7.8 0.46 45.16 6.86 9.86 11.66 3.2 4.57 5.40
Pier Head 0.0 0.00 44.95 6.65 9.65 11.45 0.0 0.00 0.00
Pier 0.0
@ 38.30 63.0 3.74 41.625 3.33 12.4
@ 35.50 89.5 5.32 40.23 4.93 6.725 26.19 35.77
@ 35.30 1.9 0.11 35.40 0.10 1.90 0.011 0.21
@ 33.50 225.2 12.93 34.97 1.47 19.07
TOTAL 212 25.5 110.61 161.79 213.09

>> VERTICAL REACTIONS:


HL HL SKEW LEVER ARM ML Rv
t t m t-m t
SPAN-1
Railing+Pipe(L) 0.86 0.86 0.83 0.71 0.03
Railing+Pipe(R) 0.86 0.86 0.83 0.71 0.03
WC+DS+PANEL 2.42 2.42 0.59 1.42 0.06
Truss 1.48 1.48 0.75 1.11 0.05
SPAN-2
Railing+Pipe(L) 0.86 0.86 0.83 0.71 0.03
Railing+Pipe(R) 0.86 0.86 0.83 0.71 0.03
WC+DS+PANEL 2.42 2.42 0.59 1.42 0.06
Girder+Diaph. 1.48 1.48 0.75 1.11 0.05
-0.3

18
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
2.10.5 VERTICAL SEISMIC FORCE:
Vertical Seismic Force = 0.000 x Hor. Seismic Force
SPAN-1
ELEMENT P eL eT ML MT
t m m t-m t-m
Super Structure 0.00 0.25 0.00 0.00 0.00
Live Load 0.00 0.25 0.00 0.00 0.00

SPAN-2
ELEMENT P eL eT ML MT
t m m t-m t-m
Super Structure 0.00 0.25 0.00 0.00 0.00
Live Load 0.00 0.25 0.00 0.00 0.00
Sub Structure 0.00 0.00 0.00 0.00 0.00
RESULTANT FORCE AND MOMENT: (Due to Vertical Seismic Force)
ELEMENT P ML MT HL HT
t t-m t-m t t
TOTAL 0.00 0.00 0.00 0.00 0.00

SUMMARY OF SEIS. FORCE (TRANS.) (DL+LL) EFFECTS DUE TO SKEW ADDED (IF EXIST)
SR RL MT' HT' ML MT HL HT
NO m t-m t t-m t-m t t
1 35.30 238.25 24.70 0.00 238.25 0.00 24.70
2 33.50 308.67 42.27 0.00 308.67 0.00 42.27

SUMMARY OF SEIS. FORCE (LONG.) (DL) EFFECTS DUE TO SKEW ADDED (IF EXIST)
SR RL ML' HL' ML MT HL HT
NO m t-m t t-m t-m t t
1 35.30 161.79 17.79 161.79 0.00 17.79 0.00
2 33.50 213.09 30.84 213.09 0.00 30.84 0.00

2.10.6 SEISMIC COMB. OF COMPONENTS: 1.00 L + 0.30 T + 0.00 V


SR RL P ML MT HL HT
NO m t t-m t-m t t
1 35.30 -0.32 161.79 71.47 17.79 7.41
2 33.50 -0.32 213.09 92.60 30.84 12.68

2.10.7 SEISMIC COMB. OF COMPONENTS: 0.30 L + 1.00 T + 0.00 V


SR RL P ML MT HL HT
NO m t t-m t-m t t
1 35.30 -0.10 48.54 238.25 5.34 24.70
2 33.50 -0.10 63.93 308.67 9.25 42.27

2.10.8 SEISMIC COMB. OF COMPONENTS: 0.30 L + 0.30 T + 0.00 V


SR RL P ML MT HL HT
NO m t t-m t-m t t
1 35.30 -0.10 48.54 71.47 5.34 7.41
2 33.50 -0.10 63.93 92.60 9.25 12.68

2.10.9 SEISMIC COMB. OF COMPONENTS: 1.00 L + 0.30 T + 0.00 V


SR RL P ML MT HL HT
NO m t t-m t-m t t

19
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
1 35.30 0.32 161.79 71.47 17.79 7.41
2 33.50 0.32 213.09 92.60 30.84 12.68

2.10.10 SEISMIC COMB. OF COMPONENTS: 0.30 L + 1.00 T + 0.00 V


SR RL P ML MT HL HT
NO m t t-m t-m t t
1 35.30 0.10 48.54 238.25 5.34 24.70
2 33.50 0.10 63.93 308.67 9.25 42.27

2.10.11 SEISMIC COMB. OF COMPONENTS: 0.30 L + 0.30 T + 0.00 V


SR RL P ML MT HL HT
NO m t t-m t-m t t
1 35.30 0.10 48.54 71.47 5.34 7.41
2 33.50 0.10 63.93 92.60 9.25 12.68

2.11 WATER CURRENT FORCE:


P = 52 K V2
P = intensity of pressure due to water current, in kg/m2
V1 = Mean velocity of Current = 1.500 m/s
V = As per Cl. 210.3, IRC:6-2017, Max. Velocity = 2.121 m/s
V2 = 2 x v12 = 4.500 m/s
K of Pier Cap = 1.500 4.50
K for Pier Head = 1.500 45.500
K of Pier = 0.660
2.11.1 WATER PRESSURE:
AHFL = 45.500 m
Scour = 35.500 m 35.500 0
2
SR NO ELEMENTS RL1 RL2 HT Width Length K V1 V22 INT. 1 INT. 2
m m m m m t/m2 t/m2
1 Pier Cap 45.500 44.950 0.550 1.20 9.20 1.50 4.50 4.25 0.35 0.33
2 Pier Head 44.950 44.950 0.00 1.20 3.80 1.50 4.25 4.25 0.33 0.33
3 Pier int 44.950 38.300 6.65 0.90 4.40 0.66 4.25 1.26 0.15 0.04
4 Pier 44.950 35.500 9.450 0.90 4.40 0.66 4.25 0.00 0.15 0.00

WATER CURRENT @ 20.00 °


SR NO ELEMENTS HL Ht. LA1 LA@ LA@ 38.30 PIER FOUNDATION
Pier Fdn ML MT ML MT ML MT
t t m m m t-m t-m t-m t-m t-m t-m
1 PierCap 0.27 0.75 6.93 9.93 11.73 1.9 5.2 2.7 7.5 3.2 8.8
2 PierHead 0.00 0.00 6.65 9.65 11.45 0.0 0.0 0.0 0.0 0.0 0.0
3 Pier int 0.51 1.39 3.93 - - 2.0 5.5 - - - -
4 Pier 0.55 1.52 - 6.50 8.30 - - 3.6 9.9 4.6 12.6
TOTAL 3.9 10.7 6.3 17.4 7.8 21.5

SR RL HT HL MT ML
NO m t t t-m t-m
20.00 °
1 35.30 2.28 0.83 17.39 6.328
2 33.50 2.28 0.83 21.49 7.820
2.12 BUYOANCY FORCE: 1
>> Top of Pier Cap RL = 45.750 m
>> Btm of Straight portion of piercap = 45.350 m

20
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
>> Btm of Piercap RL = 44.950 m
>> Length of Piercap = 9.20 m
>> Width of Piercap = 1.20 m
>> Submerged Ht. of Straight Portion = 0.150 m
>> Submerged Ht. of Btm Portion = 0.400 m
>> Volume of Straight portion of Piercap = 1.66 m3
>> Volume of Trap. Portion of Piercap = 4.42 m3
>> HFL = 45.500 m
1 Volume of the displaced Water
1 Pier Cap = 6.072 m3
2 Pier = 3.79 x (45.500 - 35.3) = 38.66 m3
@ 38.300 = 25.20 m3
@ 35.300 = 36.57 m3
Decreased Wt 38.3 = 31.28 t
Decreased Wt for Pier = 42.65 t
Bouyancy Force @ 38.3 = -31.28 t
Bouyancy Force for Pier = -42.65 t
Bouyancy Force for Foundation = -42.65 t
SUMMARY OF WATER CURRENT AND BOUYANCY FORCE:
20.00 ° SR RL P ML MT HL HT
NO m t t-m t-m t t
1 35.30 -42.65 6.33 17.39 0.83 2.28
2 33.50 -42.65 7.82 21.49 0.83 2.28

21
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
3 SUMMARY OF FORCES
3.1 35.300 m RL
SR NO DESCRIPTION P ML MT HL HT
T T-m T-m T T
1 DL 297.85 0.01 0.01 0.00 0.00
2 SURFACING 15.37 0.00 0.00 0.00 0.00
3 LIVE LOAD (INCL. BR., CF) 45.12 124.83 32.20 11.08 0.00
4 WIND FORCE (HFL) -10.64 69.81 279.23 6.47 25.89
5 WIND FORCE (HFL)-2 10.64 69.81 279.23 6.47 25.89
6 WIND FORCE -10.64 74.39 297.57 7.06 28.24
7 WIND FORCE-2 10.64 74.39 297.57 7.06 28.24
8 HYDRAULIC FORCE
Fwc2 @ 20.0 ° 0.00 6.33 17.39 0.83 2.28
9 BUOYANCY -42.65 0.00 0.00 0.00 0.00
10 SEISMIC FORCE
a EQ1 1.0 L + 0.3 T + 0.0 V -0.32 161.79 71.47 17.79 7.41
b EQ2 0.3 L + 1.0 T + 0.0 V -0.10 48.54 238.25 5.34 24.70
c EQ3 0.3 L + 0.3 T + 0.0 V -0.10 48.54 71.47 5.34 7.41
d EQ4 1.0 L + 0.3 T + 0.0 V 0.32 161.79 71.47 17.79 7.41
e EQ5 0.3 L + 1.0 T + 0.0 V 0.10 48.54 238.25 5.34 24.70
f EQ6 0.3 L + 0.3 T + 0.0 V 0.10 48.54 71.47 5.34 7.41
11 HYDRODYNAMIC FORCE (Seismic) 0.00 6.33 17.39 0.83 2.28
12 THERMAL 0.00 3.14 0.00 0.29 0.00
13 One Span Dislogged 205.11 23.19 0.00 0.00 0.00
14 Both Span Dislogged 112.37 0.00 0.00 0.00 0.00

22
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
3.2 33.500 m RL (FOR BASE PRESSURE CHECK)
SR NO DESCRIPTION P ML MT HL HT
T T-m T-m T T
1 DL 523.08 0.01 0.01 0.00 0.00
2 SURFACING 15.37 0.00 0.00 0.00 0.00
3 LIVE LOAD (INCL. BR., CF) 45.12 144.77 32.20 11.08 0.00
4 WIND FORCE (HFL) -10.64 81.45 325.82 6.47 25.89
5 WIND FORCE (HFL)-2 10.64 81.45 325.82 6.47 25.89
6 WIND FORCE -10.64 87.10 348.41 7.06 28.24
7 WIND FORCE-2 10.64 87.10 348.41 7.06 28.24
8 HYDRAULIC FORCE
Fwc2 @ 20.0 ° 0.00 7.82 21.49 0.83 2.28
9 BUOYANCY -42.65 0.00 0.00 0.00 0.00
10 SEISMIC FORCE
a EQ1 1.0 L + 0.3 T + 0.0 V -0.32 213.09 92.60 30.84 12.68
b EQ2 0.3 L + 1.0 T + 0.0 V -0.10 63.93 308.67 9.25 42.27
c EQ3 0.3 L + 0.3 T + 0.0 V -0.10 63.93 92.60 9.25 12.68
d EQ4 1.0 L + 0.3 T + 0.0 V 0.32 213.09 92.60 30.84 12.68
e EQ5 0.3 L + 1.0 T + 0.0 V 0.10 63.93 308.67 9.25 42.27
f EQ6 0.3 L + 0.3 T + 0.0 V 0.10 63.93 92.60 9.25 12.68
11 HYDRODYNAMIC FORCE (Seismic) 0.00 7.82 21.49 0.83 2.28
12 THERMAL 0.00 3.65 0.00 0.29 0.00
13 One Span Dislogged 430.34 23.19 0.00 0.00 0.00
14 Both Span Dislogged 337.61 0.00 0.00 0.00 0.00

3.3 33.50 m RL (FOR FOUNDATION DESIGN & SEISMIC FORCES ARE INCREASED)
SR NO DESCRIPTION P ML MT HL HT
T T-m T-m T T
1 DL 523.08 0.01 0.01 0.00 0.00
2 SURFACING 15.37 0.00 0.00 0.00 0.00
3 LIVE LOAD (INCL. BR., CF) 45.12 144.77 32.20 11.08 0.00
4 WIND FORCE (HFL) -10.64 81.45 325.82 6.47 25.89
5 WIND FORCE (HFL)-2 10.64 81.45 325.82 6.47 25.89
6 WIND FORCE -10.64 87.10 348.41 7.06 28.24
7 WIND FORCE-2 10.64 87.10 348.41 7.06 28.24
8 HYDRAULIC FORCE
Fwc2 @ 20.0 ° 0.00 7.82 21.49 0.83 2.28
9 BUOYANCY -42.65 0.00 0.00 0.00 0.00
10 SEISMIC FORCE
a EQ1 1.0 L + 0.3 T + 0.0 V -0.43 287.68 125.01 41.63 17.12
b EQ2 0.3 L + 1.0 T + 0.0 V -0.13 86.30 416.70 12.49 57.06
c EQ3 0.3 L + 0.3 T + 0.0 V -0.13 86.30 125.01 12.49 17.12
d EQ4 1.0 L + 0.3 T + 0.0 V 0.43 287.68 125.01 41.63 17.12
e EQ5 0.3 L + 1.0 T + 0.0 V 0.13 86.30 416.70 12.49 57.06
f EQ6 0.3 L + 0.3 T + 0.0 V 0.13 86.30 125.01 12.49 17.12
11 HYDRODYNAMIC FORCE (Seismic) 0.00 7.82 21.49 0.83 2.28
12 THERMAL 0.00 3.65 0.00 0.29 0.00
13 One Span Dislogged 430.34 23.19 0.00 0.00 0.00
14 Both Span Dislogged 337.61 0.00 0.00 0.00 0.00

23
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
4 PIER LOAD COMBINATIONS SUMMARY: (NON-HFL)
A COMB. FOR VERIFICATION OF STRUCTURAL STRENGTH:
SR LOAD COMBINATIONS CASE P ML MT HL HT
NO t t-m t-m t t
1 1.35G+1.75SIDL2+1.5Q+0.9W1 Normal 487.1 254.2 316.1 23.0 25.4
2 1.35G+1.75SIDL2+1.5Q+0.9W2 Normal 506.3 254.2 316.1 23.0 25.4
3 1.35G+1.75SIDL2+1.15Q+1.5W1 Wind 464.9 255.2 483.4 23.3 42.4
4 1.35G+1.75SIDL2+1.15Q+1.5W2 Wind 496.8 255.2 483.4 23.3 42.4
5 1.35G+1.75SIDL2+1.5Q+0.9Fte Normal 496.7 190.1 48.3 16.9 0.0
6 1.35G+1.75SIDL2+1.15Q+1.5Fte Thermal 480.9 148.3 37.0 13.2 0.0
7 1.35OSD Construction 303.8 36.0 0.0 0.4 0.0
8 1.35BSD Construction 151.7 0.0 0.0 0.0 0.0
9 1G+1SIDL2+1.5Q+0.9W1 Normal 371.3 254.2 316.1 23.0 25.4
10 1G+1SIDL2+1.5Q+0.9W2 Normal 390.5 254.2 316.1 23.0 25.4
11 1G+1SIDL2+1.15Q+1.5W1 Wind 349.1 255.2 483.4 23.3 42.4
12 1G+1SIDL2+1.15Q+1.5W2 Wind 381.1 255.2 483.4 23.3 42.4
13 1G+1SIDL2+1.5Q+0.9Fte Normal 380.9 190.1 48.3 16.9 0.0
14 1G+1SIDL2+1.15Q+1.5Fte Thermal 365.1 148.3 37.0 13.2 0.0
15 1OSD Construction 220.5 27.9 0.0 0.4 0.0
16 1BSD Construction 112.4 0.0 0.0 0.0 0.0
17 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ1 Seismic 437.5 330.1 113.7 29.0 11.1
18 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ2 Seismic 437.9 99.4 363.8 10.4 37.0
19 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ3 Seismic 437.9 99.4 113.7 10.4 11.1
20 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ4 Seismic 438.5 269.2 113.7 29.0 11.1
21 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ5 Seismic 438.2 99.4 363.8 10.4 37.0
22 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ6 Seismic 438.2 99.4 113.7 10.4 11.1
23 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ1 Seismic 321.8 269.2 113.7 29.0 11.1
24 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ2 Seismic 322.1 99.3 363.8 10.4 37.0
25 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ3 Seismic 322.1 99.3 113.7 10.4 11.1
26 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ4 Seismic 322.7 269.2 113.7 29.0 11.1
27 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ5 Seismic 322.4 99.3 363.8 10.4 37.0
28 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ6 Seismic 322.4 99.3 113.7 10.4 11.1

24
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
B SERVICEABILITY LIMIT STATE:
SR LOAD COMBINATIONS CASE P ML MT HL HT
NO t t-m t-m t t
29 1G+1.2SIDL2+1Q+0.6Fte Rare 361.4 126.7 32.2 11.3 0.0
30 1G+1.2SIDL2+0.75Q+1Fte Rare 350.1 96.8 24.2 8.6 0.0
31 1G+1.2SIDL2+1Q+0.6W1 Rare 355.0 169.5 210.8 15.3 16.9
32 1G+1.2SIDL2+1Q+0.6W2 Rare 367.8 169.5 210.8 15.3 16.9
33 1G+1.2SIDL2+0.75Q+1W1 Rare 339.5 168.0 321.7 15.4 28.2
34 1G+1.2SIDL2+0.75Q+1W2 Rare 360.8 168.0 321.7 15.4 28.2
35 1G+1SIDL2+1Q+0.6Fte Rare 358.3 126.7 32.2 11.3 0.0
36 1G+1SIDL2+0.75Q+1Fte Rare 347.1 96.8 24.2 8.6 0.0
37 1G+1SIDL2+1Q+0.6W1 Rare 352.0 169.5 210.8 15.3 16.9
38 1G+1SIDL2+1Q+0.6W2 Rare 364.7 169.5 210.8 15.3 16.9
39 1G+1SIDL2+0.75Q+1W1 Rare 336.4 168.0 321.7 15.4 28.2
40 1G+1SIDL2+0.75Q+1W2 Rare 357.7 168.0 321.7 15.4 28.2
41 1G+1.2SIDL2+0Q+0.5Fte Quasi 316.3 1.6 0.0 0.1 0.0
42 1G+1SIDL2+0Q+0.5Fte Quasi 313.2 1.6 0.0 0.1 0.0

25
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
5 PIER LOAD COMBINATIONS SUMMARY: (HFL)
A1 COMB. FOR VERIFICATION OF STRUCTURAL STRENGTH: (HFL CASE)
SR LOAD COMBINATIONS CASE P ML MT HL HT
NO t t-m t-m t t
201 1.35G+1.75SIDL2+1.5Q+0.9W1+1Fwc+0.15Gb Normal 480.7 256.4 317.0 23.3 25.6
202 1.35G+1.75SIDL2+1.5Q+0.9W2+1Fwc+0.15Gb Normal 499.9 256.4 317.0 23.3 25.6
203 1.35G+1.75SIDL2+1.15Q+1.5W1+1Fwc+0.15Gb Wind 458.5 254.6 473.3 23.3 41.1
204 1.35G+1.75SIDL2+1.15Q+1.5W2+1Fwc+0.15Gb Wind 490.5 254.6 473.3 23.3 41.1
205 1.35G+1.75SIDL2+1.5Q+0.9Fte+1Fwc+0.15Gb Normal 490.3 196.4 65.7 17.7 2.3
206 1.35G+1.75SIDL2+1.15Q+1.5Fte+1Fwc+0.15Gb Thermal 474.5 154.6 54.4 14.0 2.3
207 1.35OSD+1Fwc+0.15Gb Construction 297.4 42.3 17.4 1.3 2.3
208 1.35BSD+1Fwc+0.15Gb Construction 145.3 6.3 17.4 0.8 2.3
209 1G+1SIDL2+1.5Q+0.9W1+1Fwc+0.15Gb Normal 364.9 256.4 317.0 23.3 25.6
210 1G+1SIDL2+1.5Q+0.9W2+1Fwc+0.15Gb Normal 384.1 256.4 317.0 23.3 25.6
211 1G+1SIDL2+1.15Q+1.5W1+1Fwc+0.15Gb Wind 342.7 254.6 473.3 23.3 41.1
212 1G+1SIDL2+1.15Q+1.5W2+1Fwc+0.15Gb Wind 374.7 254.6 473.3 23.3 41.1
213 1G+1SIDL2+1.5Q+0.9Fte+1Fwc+0.15Gb Normal 374.5 196.4 65.7 17.7 2.3
214 1G+1SIDL2+1.15Q+1.5Fte+1Fwc+0.15Gb Thermal 358.7 154.6 54.4 14.0 2.3
215 1OSD+1Fwc+0.15Gb Construction 214.1 34.2 17.4 1.3 2.3
216 1BSD+1Fwc+0.15Gb Construction 106.0 6.3 17.4 0.8 2.3
217 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ1+1Fwc+1Gb Seismic 394.9 275.6 131.0 29.9 13.4
218 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ2+1Fwc+1Gb Seismic 395.2 105.7 381.2 11.2 39.3
219 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ3+1Fwc+1Gb Seismic 395.2 105.7 131.0 11.2 13.4
220 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ4+1Fwc+1Gb Seismic 395.9 275.6 131.0 29.9 13.4
221 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ5+1Fwc+1Gb Seismic 395.5 105.7 381.2 11.2 39.3
222 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ6+1Fwc+1Gb Seismic 395.5 105.7 131.0 11.2 13.4
223 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ1+1Fwc+1Gb Seismic 279.1 275.6 131.0 29.9 13.4
224 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ2+1Fwc+1Gb Seismic 279.5 105.7 381.2 11.2 39.3
225 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ3+1Fwc+1Gb Seismic 279.5 105.7 131.0 11.2 13.4
226 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ4+1Fwc+1Gb Seismic 280.1 275.6 131.0 29.9 13.4
227 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ5+1Fwc+1Gb Seismic 279.7 105.7 381.2 11.2 39.3
228 1G+1SIDL2+0.2Q+0.5Fte+1.5EQ6+1Fwc+1Gb Seismic 279.7 105.7 131.0 11.2 13.4

26
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
B1 SERVICEABILITY LIMIT STATE: (HFL CASE)
SR LOAD COMBINATIONS CASE P ML MT HL HT
NO t t-m t-m t t
229 1G+1.2SIDL2+1Q+0.6Fte+1Fwc+0.15Gb Rare 355.0 133.0 49.6 12.1 2.3
230 1G+1.2SIDL2+0.75Q+1Fte+1Fwc+0.15Gb Rare 343.7 103.1 41.5 9.4 2.3
231 1G+1.2SIDL2+1Q+0.6W1+1Fwc+0.15Gb Rare 348.6 173.0 217.1 15.8 17.8
232 1G+1.2SIDL2+1Q+0.6W2+1Fwc+0.15Gb Rare 361.4 173.0 217.1 15.8 17.8
233 1G+1.2SIDL2+0.75Q+1W1+1Fwc+0.15Gb Rare 333.1 169.8 320.8 15.6 28.2
234 1G+1.2SIDL2+0.75Q+1W2+1Fwc+0.15Gb Rare 354.4 169.8 320.8 15.6 28.2
235 1G+1SIDL2+1Q+0.6Fte+1Fwc+0.15Gb Rare 351.9 133.0 49.6 12.1 2.3
236 1G+1SIDL2+0.75Q+1Fte+1Fwc+0.15Gb Rare 340.7 103.1 41.5 9.4 2.3
237 1G+1SIDL2+1Q+0.6W1+1Fwc+0.15Gb Rare 345.6 173.0 217.1 15.8 17.8
238 1G+1SIDL2+1Q+0.6W2+1Fwc+0.15Gb Rare 358.3 173.0 217.1 15.8 17.8
239 1G+1SIDL2+0.75Q+1W1+1Fwc+0.15Gb Rare 330.0 169.8 320.8 15.6 28.2
240 1G+1SIDL2+0.75Q+1W2+1Fwc+0.15Gb Rare 351.3 169.8 320.8 15.6 28.2
241 1G+1.2SIDL2+0Q+0.5Fte+1Fwc+0.15Gb Quasi 309.9 7.9 17.4 1.0 2.3
242 1G+1SIDL2+0Q+0.5Fte+1Fwc+0.15Gb Quasi 306.8 7.9 17.4 1.0 2.3

27
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
6 FOUNDATION LOAD COMBINATIONS SUMMARY: (NON-HFL)
A COMB. FOR BASE PRESSURE:
43 1G+1SIDL2 Normal 538.5 0.0 0.0 0.0 0.0
44 1G+1SIDL2+1Fte Normal 538.5 3.7 0.0 0.3 0.0
45 1G+1SIDL2 Normal 538.5 0.0 0.0 0.0 0.0
46 1G+1SIDL2+1Q Normal 583.6 144.8 32.2 11.1 0.0
47 1G+1SIDL2+1Q+1Fte Thermal 583.6 148.4 32.2 11.4 0.0
48 1G+1SIDL2+1Q+1W1 Wind 572.9 231.9 380.6 18.1 28.2
49 1G+1SIDL2+1Q+1W2 Wind 594.2 231.9 380.6 18.1 28.2
50 1G+1SIDL2+0.2Q+1Fte+1EQ1 Seismic 547.2 245.7 99.0 33.3 12.7
51 1G+1SIDL2+0.2Q+1Fte+1EQ2 Seismic 547.4 96.5 315.1 11.8 42.3
52 1G+1SIDL2+0.2Q+1Fte+1EQ3 Seismic 547.4 96.5 99.0 11.8 12.7
53 1G+1SIDL2+0.2Q+1Fte+1EQ4 Seismic 547.8 245.7 99.0 33.3 12.7
54 1G+1SIDL2+0.2Q+1Fte+1EQ5 Seismic 547.6 96.5 315.1 11.8 42.3
55 1G+1SIDL2+0.2Q+1Fte+1EQ6 Seismic 547.6 96.5 99.0 11.8 12.7
56 1OSD Construction 430.3 23.2 0.0 0.0 0.0
57 1BSD Construction 337.6 0.0 0.0 0.0 0.0

B COMBINATION FOR EQUILIBRIUM:


58 1.1G+1.35SIDL2+1.5Q+0.9Fte Normal 663.8 220.5 48.3 16.9 0.0
59 1.1G+1.35SIDL2+1.15Q+1.5Fte Thermal 648.0 172.0 37.0 13.2 0.0
60 1.1G+1.35SIDL2+1.5Q+0.9W1 Normal 654.2 295.6 361.9 23.0 25.4
61 1.1G+1.35SIDL2+1.5Q+0.9W2 Normal 673.4 295.6 361.9 23.0 25.4
62 1.1G+1.35SIDL2+1.15Q+1.5W1 Wind 632.1 297.2 559.7 23.3 42.4
63 1.1G+1.35SIDL2+1.15Q+1.5W2 Wind 664.0 297.2 559.7 23.3 42.4
64 1.1OSD Construction 473.4 25.5 0.0 0.0 0.0
65 1.1BSD Construction 371.4 0.0 0.0 0.0 0.0
66 0.9G+1SIDL2+1.5Q+0.9Fte Normal 553.8 220.5 48.3 16.9 0.0
67 0.9G+1SIDL2+1.15Q+1.5Fte Thermal 538.0 172.0 37.0 13.2 0.0
68 0.9G+1SIDL2+1.5Q+0.9W1 Normal 544.2 295.6 361.9 23.0 25.4
69 0.9G+1SIDL2+1.5Q+0.9W2 Normal 563.4 295.6 361.9 23.0 25.4
70 0.9G+1SIDL2+1.15Q+1.5W1 Wind 522.1 297.1 559.7 23.3 42.4
71 0.9G+1SIDL2+1.15Q+1.5W2 Wind 554.0 297.1 559.7 23.3 42.4

28
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
72 0.9OSD Construction 387.3 20.9 0.0 0.0 0.0
73 0.9BSD Construction 303.8 0.0 0.0 0.0 0.0
74 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ1 Seismic 604.5 462.3 194.0 64.8 25.7
75 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ2 Seismic 605.0 160.2 631.5 21.1 85.6
76 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ3 Seismic 605.0 160.2 194.0 21.1 25.7
77 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ4 Seismic 605.8 462.3 194.0 64.8 25.7
78 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ5 Seismic 605.4 160.2 631.5 21.1 85.6
79 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ6 Seismic 605.4 160.2 194.0 21.1 25.7
80 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ1 Seismic 494.5 462.3 194.0 64.8 25.7
81 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ2 Seismic 495.0 160.2 631.5 21.1 85.6
82 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ3 Seismic 495.0 160.2 194.0 21.1 25.7
83 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ4 Seismic 495.8 462.3 194.0 64.8 25.7
84 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ5 Seismic 495.4 160.2 631.5 21.1 85.6
85 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ6 Seismic 495.4 160.2 194.0 21.1 25.7

C COMB. FOR DESIGN OF FOUNDATION:


86 1.35G+1.75SIDL2+1.5Q+0.9Fte Normal 800.7 220.5 48.3 16.9 0.0
87 1.35G+1.75SIDL2+1.5Q+0.9W1 Normal 791.2 295.6 361.9 23.0 25.4
88 1.35G+1.75SIDL2+1.5Q+0.9W2 Normal 810.3 295.6 361.9 23.0 25.4
89 1.35G+1.75SIDL2+1.15Q+1.5W1 Wind 769.0 297.2 559.7 23.3 42.4
90 1.35G+1.75SIDL2+1.15Q+1.5W2 Wind 800.9 297.2 559.7 23.3 42.4
91 1.35OSD Construction 581.0 31.3 0.0 0.0 0.0
92 1.35BSD Construction 455.8 0.0 0.0 0.0 0.0
93 1.35G+1.75SIDL2+1.5Q+0.9W1 Normal 791.2 295.6 361.9 23.0 25.4
94 1.35G+1.75SIDL2+1.5Q+0.9W2 Normal 810.3 295.6 361.9 23.0 25.4
95 1.35G+1.75SIDL2+1.15Q+1.5W1 Wind 769.0 297.2 559.7 23.3 42.4
96 1OSD Construction 430.3 23.2 0.0 0.0 0.0
97 1BSD Construction 337.6 0.0 0.0 0.0 0.0
98 1G+1SIDL2+1.3Q+0.8Fte Normal 597.1 191.1 41.9 14.6 0.0
99 1G+1SIDL2+1.3Q+0.9W1 Normal 587.5 266.6 355.4 20.8 25.4
100 1G+1SIDL2+1.3Q+0.8W2 Normal 605.6 257.9 320.6 20.1 22.6
101 1G+1SIDL2+1Q+1.3W1 Wind 569.7 258.0 485.1 20.3 36.7
102 1G+1SIDL2+1Q+1.3W2 Wind 597.4 258.0 485.1 20.3 36.7
29
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
103 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ1 Seismic 732.4 433.4 187.5 62.6 25.7
104 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ2 Seismic 732.9 131.3 625.1 18.9 85.6
105 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ3 Seismic 732.9 131.3 187.5 18.9 25.7
106 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ4 Seismic 733.7 433.4 187.5 62.6 25.7
107 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ5 Seismic 733.3 131.3 625.1 18.9 85.6
108 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ6 Seismic 733.3 131.3 187.5 18.9 25.7
109 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ1 Seismic 741.4 462.3 194.0 64.8 25.7
110 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ2 Seismic 741.9 160.2 631.5 21.1 85.6
111 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ3 Seismic 741.9 160.2 194.0 21.1 25.7
112 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ4 Seismic 742.7 462.3 194.0 64.8 25.7
113 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ5 Seismic 742.3 160.2 631.5 21.1 85.6
114 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ6 Seismic 742.3 160.2 194.0 21.1 25.7

D SERVICEABILITY LIMIT STATE:


115 1G+1.2SIDL2+1Q+0.6Fte Rare 586.6 147.0 32.2 11.3 0.0
116 1G+1.2SIDL2+0.75Q+1Fte Rare 575.4 112.2 24.2 8.6 0.0
117 1G+1.2SIDL2+1Q+0.6W1 Rare 580.3 197.0 241.3 15.3 16.9
118 1G+1.2SIDL2+1Q+0.6W2 Rare 593.0 197.0 241.3 15.3 16.9
119 1G+1.2SIDL2+0.75Q+1W1 Rare 564.7 195.7 372.6 15.4 28.2
120 1G+1.2SIDL2+0.75Q+1W2 Rare 586.0 195.7 372.6 15.4 28.2
121 1G+1SIDL2+1Q+0.6Fte Rare 583.6 147.0 32.2 11.3 0.0
122 1G+1SIDL2+0.75Q+1Fte Rare 572.3 112.2 24.2 8.6 0.0
123 1G+1SIDL2+1Q+0.6W1 Rare 577.2 197.0 241.3 15.3 16.9
124 1G+1SIDL2+1Q+0.6W2 Rare 590.0 197.0 241.3 15.3 16.9
125 1G+1SIDL2+0.75Q+1W1 Rare 561.7 195.7 372.6 15.4 28.2
126 1G+1SIDL2+0.75Q+1W1 Rare 561.7 195.7 372.6 15.4 28.2
127 1G+1.2SIDL2+0Q+0.5Fte Quasi 541.5 1.8 0.0 0.1 0.0
128 1G+1SIDL2+0Q+0.5Fte Quasi 538.5 1.8 0.0 0.1 0.0

30
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
7 FOUNDATION LOAD COMBINATIONS SUMMARY: (HFL)
A1 COMB. FOR BASE PRESSURE: (HFL CASE)
243 1G+1SIDL2+1Fwc+1Gb Normal 495.8 7.8 21.5 0.8 2.3
244 1G+1SIDL2+1Fte+1Fwc+1Gb Normal 495.8 11.5 21.5 1.1 2.3
245 1G+1SIDL2+1Fwc+1Gb Normal 495.8 7.8 21.5 0.8 2.3
246 1G+1SIDL2+1Q+1Fwc+1Gb Normal 540.9 152.6 53.7 11.9 2.3
247 1G+1SIDL2+1Q+1Fte+1Fwc+1Gb Thermal 540.9 156.3 53.7 12.2 2.3
248 1G+1SIDL2+1Q+1W1HFL+1Fwc+1Gb Wind 530.3 234.1 379.5 18.4 28.2
249 1G+1SIDL2+1Q+1W2HFL+1Fwc+1Gb Wind 551.6 234.1 379.5 18.4 28.2
250 1G+1SIDL2+0.2Q+1Fte+1EQ1+1Fwc+1Gb Seismic 504.5 253.5 120.5 34.2 15.0
251 1G+1SIDL2+0.2Q+1Fte+1EQ2+1Fwc+1Gb Seismic 504.7 104.4 336.6 12.6 44.5
252 1G+1SIDL2+0.2Q+1Fte+1EQ3+1Fwc+1Gb Seismic 504.7 104.4 120.5 12.6 15.0
253 1G+1SIDL2+0.2Q+1Fte+1EQ4+1Fwc+1Gb Seismic 505.2 253.5 120.5 34.2 15.0
254 1G+1SIDL2+0.2Q+1Fte+1EQ5+1Fwc+1Gb Seismic 504.9 104.4 336.6 12.6 44.5
255 1G+1SIDL2+0.2Q+1Fte+1EQ6+1Fwc+1Gb Seismic 504.9 104.4 120.5 12.6 15.0
256 1OSD+1Fwc+1Gb Construction 387.7 31.0 21.5 0.8 2.3
257 1BSD+1Fwc+1Gb Construction 295.0 7.8 21.5 0.8 2.3

B1 COMB. FOR EQUILIBRIUM: (HFL CASE)


258 1.1G+1.35SIDL2+1.5Q+0.9Fte+1Fwc+1Gb Normal 621.2 228.3 69.8 17.7 2.3
259 1.1G+1.35SIDL2+1.15Q+1.5Fte+1Fwc+1Gb Thermal 605.4 179.8 58.5 14.0 2.3
260 1.1G+1.35SIDL2+1.5Q+0.9W1+1Fwc+1Gb Normal 611.6 298.3 363.0 23.3 25.6
261 1.1G+1.35SIDL2+1.5Q+0.9W2+1Fwc+1Gb Normal 630.8 298.3 363.0 23.3 25.6
262 1.1G+1.35SIDL2+1.15Q+1.5W1+1Fwc+1Gb Wind 589.4 296.5 547.3 23.3 41.1
263 1.1G+1.35SIDL2+1.15Q+1.5W2+1Fwc+1Gb Wind 621.3 296.5 547.3 23.3 41.1
264 1.1OSD+1Fwc+1Gb Construction 430.7 33.3 21.5 0.8 2.3
265 1.1BSD+1Fwc+1Gb Construction 328.7 7.8 21.5 0.8 2.3
266 0.9G+1SIDL2+1.5Q+0.9Fte+1Fwc+1Gb Normal 511.2 228.3 69.8 17.7 2.3
267 0.9G+1SIDL2+1.15Q+1.5Fte+1Fwc+1Gb Thermal 495.4 179.8 58.5 14.0 2.3
268 0.9G+1SIDL2+1.5Q+0.9W1+1Fwc+1Gb Normal 501.6 298.3 363.0 23.3 25.6
269 0.9G+1SIDL2+1.5Q+0.9W2+1Fwc+1Gb Normal 520.8 298.3 363.0 23.3 25.6
270 0.9G+1SIDL2+1.15Q+1.5W1+1Fwc+1Gb Wind 479.4 296.5 547.3 23.3 41.1
271 0.9G+1SIDL2+1.15Q+1.5W2+1Fwc+1Gb Wind 511.4 296.5 547.3 23.3 41.1
31
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
272 0.9OSD+1Fwc+1Gb Construction 344.7 28.7 21.5 0.8 2.3
273 0.9BSD+1Fwc+1Gb Construction 261.2 7.8 21.5 0.8 2.3
274 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ1+1Fwc+1Gb Seismic 561.9 470.1 215.4 65.6 28.0
275 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ2+1Fwc+1Gb Seismic 562.3 168.1 653.0 21.9 87.9
276 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ3+1Fwc+1Gb Seismic 562.3 168.1 215.4 21.9 28.0
277 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ4+1Fwc+1Gb Seismic 563.2 470.1 215.4 65.6 28.0
278 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ5+1Fwc+1Gb Seismic 562.7 168.1 653.0 21.9 87.9
279 1.1G+1.35SIDL2+0.2Q+0.5Fte+1.5EQ6+1Fwc+1Gb Seismic 562.7 168.1 215.4 21.9 28.0
280 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ1+1Fwc+1Gb Seismic 451.9 470.1 215.4 65.6 28.0
281 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ2+1Fwc+1Gb Seismic 452.3 168.1 653.0 21.9 87.9
282 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ3+1Fwc+1Gb Seismic 452.3 168.1 215.4 21.9 28.0
283 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ4+1Fwc+1Gb Seismic 453.2 470.1 215.4 65.6 28.0
284 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ5+1Fwc+1Gb Seismic 452.7 168.1 653.0 21.9 87.9
285 0.9G+1SIDL2+0.2Q+0.5Fte+1.5EQ6+1Fwc+1Gb Seismic 452.7 168.1 215.4 21.9 28.0

C1 COMB. FOR DESIGN OF FOUNDATION: (HFL CASE)


286 1.35G+1.75SIDL2+1.5Q+0.9Fte+1Fwc+0.15Gb Normal 794.3 228.3 69.8 17.7 2.3
287 1.35G+1.75SIDL2+1.5Q+0.9W1+1Fwc+0.15Gb Normal 784.8 298.3 363.0 23.3 25.6
288 1.35G+1.75SIDL2+1.5Q+0.9W2+1Fwc+0.15Gb Normal 803.9 298.3 363.0 23.3 25.6
289 1.35G+1.75SIDL2+1.15Q+1.5W1+1Fwc+0.15Gb Wind 762.6 296.5 547.3 23.3 41.1
290 1.35G+1.75SIDL2+1.15Q+1.5W2+1Fwc+0.15Gb Wind 794.5 296.5 547.3 23.3 41.1
291 1.35OSD+1Fwc+0.15Gb Construction 574.6 39.1 21.5 0.8 2.3
292 1.35BSD+1Fwc+0.15Gb Construction 449.4 7.8 21.5 0.8 2.3
293 1.35G+1.75SIDL2+1.5Q+0.9W1+1Fwc+0.15Gb Normal 784.8 298.3 363.0 23.3 25.6
294 1.35G+1.75SIDL2+1.5Q+0.9W2+1Fwc+0.15Gb Normal 803.9 298.3 363.0 23.3 25.6
295 1.35G+1.75SIDL2+1.15Q+1.5W1+1Fwc+0.15Gb Wind 762.6 296.5 547.3 23.3 41.1
296 1OSD+0SIDL2+0Q+0W2+1Fwc+0.15Gb Construction 423.9 31.0 21.5 0.8 2.3
297 1BSD+0SIDL2+0Q+0Fte+1Fwc+0.15Gb Construction 331.2 7.8 21.5 0.8 2.3
298 1G+1SIDL2+1.3Q+0.8Fte+1Fwc+0.15Gb Normal 590.7 199.0 63.4 15.5 2.3
299 1G+1SIDL2+1.3Q+0.9W1+1Fwc+0.15Gb Normal 581.1 269.3 356.6 21.1 25.6
300 1G+1SIDL2+1.3Q+0.8W2+1Fwc+0.15Gb Normal 599.2 261.2 324.0 20.4 23.0
301 1G+1SIDL2+1Q+1.3W1+1Fwc+0.15Gb Wind 563.3 258.5 477.3 20.3 35.9
302 1G+1SIDL2+1Q+1.3W2+1Fwc+0.15Gb Wind 591.0 258.5 477.3 20.3 35.9
32
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
303 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ1+1Fwc+0.15Gb Seismic 726.0 441.2 209.0 63.4 28.0
304 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ2+1Fwc+0.15Gb Seismic 726.5 139.1 646.5 19.7 87.9
305 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ3+1Fwc+0.15Gb Seismic 726.5 139.1 209.0 19.7 28.0
306 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ4+1Fwc+0.15Gb Seismic 727.3 441.2 209.0 63.4 28.0
307 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ5+1Fwc+0.15Gb Seismic 726.9 139.1 646.5 19.7 87.9
308 1.35G+1.75SIDL2+0Q+0.5Fte+1.5EQ6+1Fwc+0.15Gb Seismic 726.9 139.1 209.0 19.7 28.0
309 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ1+1Fwc+0.15Gb Seismic 735.0 470.1 215.5 65.6 28.0
310 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ2+1Fwc+0.15Gb Seismic 735.5 168.1 653.0 21.9 87.9
311 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ3+1Fwc+0.15Gb Seismic 735.5 168.1 215.5 21.9 28.0
312 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ4+1Fwc+0.15Gb Seismic 736.3 470.1 215.5 65.6 28.0
313 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ5+1Fwc+0.15Gb Seismic 735.9 168.1 653.0 21.9 87.9
314 1.35G+1.75SIDL2+0.2Q+0.5Fte+1.5EQ6+1Fwc+0.15Gb Seismic 735.9 168.1 215.5 21.9 28.0

D1 SERVICEABILITY LIMIT STATE: (FOR FOUNDATION) (HFL CASE)


315 1G+1.2SIDL2+1Q+0.6Fte+1Fwc+0.15Gb Rare 580.3 154.8 53.7 12.1 2.3
316 1G+1.2SIDL2+0.75Q+1Fte+1Fwc+0.15Gb Rare 569.0 120.1 45.6 9.4 2.3
317 1G+1.2SIDL2+1Q+0.6W1+1Fwc+0.15Gb Rare 573.9 201.5 249.2 15.8 17.8
318 1G+1.2SIDL2+1Q+0.6W2+1Fwc+0.15Gb Rare 586.6 201.5 249.2 15.8 17.8
319 1G+1.2SIDL2+0.75Q+1W1+1Fwc+0.15Gb Rare 558.3 197.9 371.5 15.6 28.2
320 1G+1.2SIDL2+0.75Q+1W2+1Fwc+0.15Gb Rare 579.6 197.9 371.5 15.6 28.2
321 1G+1SIDL2+1Q+0.6Fte+1Fwc+0.15Gb Rare 577.2 154.8 53.7 12.1 2.3
322 1G+1SIDL2+0.75Q+1Fte+1Fwc+0.15Gb Rare 565.9 120.1 45.6 9.4 2.3
323 1G+1SIDL2+1Q+0.6W1+1Fwc+0.15Gb Rare 570.8 201.5 249.2 15.8 17.8
324 1G+1SIDL2+1Q+0.6W2+1Fwc+0.15Gb Rare 583.6 201.5 249.2 15.8 17.8
325 1G+1SIDL2+0.75Q+1W1+1Fwc+0.15Gb Rare 555.3 197.9 371.5 15.6 28.2
326 1G+1SIDL2+0.75Q+1W1+1Fwc+0.15Gb Rare 555.3 197.9 371.5 15.6 28.2
327 1G+1.2SIDL2+0Q+0.5Fte+1Fwc+0.15Gb Quasi 535.1 9.7 21.5 1.0 2.3
328 1G+1SIDL2+0Q+0.5Fte+1Fwc+0.15Gb Quasi 532.1 9.7 21.5 1.0 2.3

33
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
8 PIER DESIGN:
Shape of Pier = With Circle Height of Pier = 9.650 m
RH = 64.5 Ned = 506.25 t
SUPPORT CONDITION: fck = 30 Mpa
@ Top = Elastomeric Bearing ftk = 500 Mpa
@ Bottom = Fixed fyd = 434.78 Mpa
Le = 1.3 x L0 fcd = 13.40 Mpa
Le = 12.55 m
Clear Cover = 45 mm

8.1 RECTANGULAR PIER DESIGN:


8.1.1 DATA:
Dim in Trans dirn = 3500 mm MI@Long = 3.216E+12 mm4
Dim in Long. Dirn = 900 mm Rad of Gyrn@Long = 921.11 mm
Clear Cover to steel = 45.0 mm deTrans = 3433 mm
Effective Cover Face1 = 65.0 mm MI@Trans = 2.126E+11 mm4
Effective Cover Face2 = 65.0 mm Rad of Gyrn@Trans = 236.86 mm
Ac = 3790000 mm2 deLong = 835 mm
Perimeter = 8800 mm
Puz = 0.45 x fck x Ac + 0.75 x fy x As = 0.45 x 30 x 3500 x 900 + 0.75 x 500 x 22619.467
= 51007300 N = 5202.7 t
MIN. REINF. REQUIREMENTS:
>> PEDESTAL COLUMN
Ast,min = 0.15 % of Gross C/s Area = 0.15/100 x 3790000.0 = 5685 mm2
>> SHORT COLUMN
2
Ast,min = 0.2 % of Gross C/s Area = 0.2/100 x 3790000.0 = 7580.0 mm
2
Ast,min = 0.10 NED / fyd = 0.1 x 506.25 x 9807.346/(500/1.15) = 1142.0 mm
Ast,min = 7580 mm2
2
Ast,max = 0.04 x Ac = 0.04 x 3.79 x 1000 x 1000 = 151600 mm
DESIGN REINFORCEMENT:
Layers Diameter Nos Ast prov Pt, prov Spac. Prov
2
mm nos mm % mm
Long Face 1 Single 20 28 8796.5 - 124.815
Long Face 3 Single 20 28 8796.5 - 124.815
Short Face 2 Single 20 8 2513.3 - 142.635
Short Face 4 Single 20 8 2513.3 - 142.635
72 22619.5 0.597
TRANSVERSE REINFORCEMENT:
Diameter = 12 mm OK
Spacing = 150 mm OK
Min. Spacing = 12 x min diameter = 12 x 20 = 240 mm
= Lead dimension of col. = 900 mm
= 200 mm
Min. Spacing = 200 mm
CONFINEMENT REINFORCEMENT:
Diameter = 10 mm
Spacing = 150 mm

8.1.2 SLENDERNESS:
1 ALONG LONGITUDINAL DIRECTION (ALONG TRAFFIC DIRECTION)
Slenderness Ratio λ = Le/ i = 12.545 / 0.237 = 52.964 > 51.740
i = 0.237 m Slender Column

34
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
λlim = 20 x A x B x C / (n^0.5) = 20 x 0.991 x 1.178 x 0.7 / SQRT(0.100) = 51.740
A = 1/(1+0.2Φef) = 1 / ( 1 + 0.2x0.047 ) = 0.991
Φef = Φ(∞,t0) x MoEqp/ MoEd = 1.967 x 7.905 / 330.081 = 0.047
MoEqp = First Order BM in quasi permanent load combination in SLS = 7.90 t-m
MoEd = First Order BM in design load combination in ULS = 330.08 t-m
B = (1+2ω)^0.5 = SQRT(1+2 x 0.194) = 1.178
C = 1.7 - rm = 0.7
rm = 1
ω = As x fyd / (Ac x fcd) = 0.194
n = Ned / (Ac x fcd) = 0.100 N
rm = M01/ M02 moment ratio
Φ(∞,t0) = Φ0 x βc(t,t0) = 1.992 x 0.987 = 1.967
Φ0 = ΦRH x β(fcm) x β(t0) = 1.373 x 2.969 x 0.488 = 1.992
ΦRH = 1 + (1-RH/100)/(0.1 x h0^(1/3)) For fcm <= 45 Mpa = 1.373
= [1 + (1-RH/100)/(0.1 x h0^(1/3) x α1) ]α2 For fcm > 45 Mpa = 1.375
ΦRH = 1.3731
RH = 64.5
β(fcm) = 18.78 / (fcm^0.5) = 18.78/SQRT(40) = 2.969
β(t0) = 1 / (0.1 + t0^0.2) = 1/(0.1+28^0.2) = 0.488
h0 = 2 Ac / u = 2x3790000.00/8800.00 = 861.4 mm
βc(t,t0) = ( (t-t0)/(βH + t - t0) )^0.3 = (36472/(1566.34+36472.00))^0.3 = 0.987
t = Age of concrete in days at the moment considered = 36500 days
t0 = Age of concrete at loading in days = 28 days
t-t0 = Non adjusted duration of loading in days = 36472 days
βH = 1.5 x [ 1 + (0.012 RH)^18 ] x h0 + 250 <=1500 for fcm <= 35 Mpa = 1500
= 1.5 x [ 1 + (0.012 RH)^18 ] x h0 + 250 α3 <=1500 α3 for fcm > 35 Mpa = 1566.34
βH = 1566.34
α1 = [ 43.75 / fcm ]^0.7 = (43.75/40)^0.7 = 1.065
α2 = [ 43.75 / fcm ]^0.2 = (43.75/40)^0.2 = 1.018
α3 = [ 43.75 / fcm ]^0.5 = (43.75/40)^0.5 = 1.046
M2 = Ned x e2 = 55.4 t-m
e2 = 1/r x le2/c = 109.46 mm = 0.11 m
le = Effective length = 12545.0 mm
c = 10
1/r = Kr x KΦ x 1/r0 = 1.000 x 1.007 x 0.000 = 6.955E-06
Kr = (nu - n) / (nu-nbal) = (1.194-0.100)/(1.194-0.4) = 1.000
nu = 1+ω = 1.194
nbal = 0.4
KΦ = 1 + β x Φef = 1 + 0.14690 x 0.047 = 1.007
1/r0 = ϵyd/(0.45x d) = 0.002 / (0.45 x 699.363221034187) = 6.908E-06
d = 699 mm
ϵyd = fyd/Es = 434.783/200000 = 0.0022
β = 0.35+ fck/200 - λ/150 = 0.35 + 30/200 - 52.964/150 = 0.1469
λ = 52.964
2 ALONG TRANSVERSE DIRECTION (ACROSS TRAFFIC DIRECTION)
Slenderness Ratio λ = Le/ i = 12.545 / 0.921 = 13.619 < 51.499
i = 0.921 m Normal Column
λlim = 20 x A x B x C / (n^0.5) = 20 x 0.986 x 1.178 x 0.7 / SQRT(0.100) = 51.499
A = 1/(1+0.2Φef) = 1 / ( 1 + 0.2x0.071 ) = 0.986
Φef = Φ(∞,t0) x MoEqp/ MoEd = 1.967 x 17.394 / 483.403 = 0.071
MoEqp = First Order BM in quasi permanent load combination in SLS = 17.39 t-m
MoEd = First Order BM in design load combination in ULS = 483.40 t-m

35
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
B = (1+2ω)^0.5 = SQRT(1+2 x 0.194) = 1.178
C = 1.7 - rm = 0.7
rm = 1
ω = As x fyd / (Ac x fcd) = 0.194
n = Ned / (Ac x fcd) = 0.100 N
rm = M01/ M02 moment ratio
Φ(∞,t0) = Φ0 x βc(t,t0) = 1.992 x 0.987 = 1.967
Φ0 = ΦRH x β(fcm) x β(t0) = 1.373 x 2.969 x 0.488 = 1.992
ΦRH = 1 + (1-RH/100)/(0.1 x h0^(1/3)) For fcm <= 45 Mpa = 1.373
= [1 + (1-RH/100)/(0.1 x h0^(1/3) x α1) ]α2 For fcm > 45 Mpa = 1.375
ΦRH = 1.3731
RH = 64.5
β(fcm) = 18.78 / (fcm^0.5) = 18.78/SQRT(40) = 2.969
β(t0) = 1 / (0.1 + t0^0.2) = 1/(0.1+28^0.2) = 0.488
h0 = 2 Ac / u = 2x3790000.00/8800.00 = 861.36 mm
βc(t,t0) = ( (t-t0)/(βH + t - t0) )^0.3 = ( 36472 / (1566.34 + 36472.00 ) )^0.3 = 0.987
t = Age of concrete in days at the moment considered = 36500 days
t0 = Age of concrete at loading in days = 28 days
t-t0 = Non adjusted duration of loading in days = 36472 days
βH = 1.5x[1+(0.012RH)^18]xh0+250 <=1500 for fcm <= 35 Mpa = 1500
= 1.5x[1+(0.012RH)^18]xh0+250α3 <=1500 α3 for fcm > 35 Mpa = 1566.34
βH = 1566.34
α1 = [ 43.75 / fcm ]^0.7 = (43.75/40)^0.7 = 1.0647
α2 = [ 43.75 / fcm ]^0.2 = (43.75/40)^0.2 = 1.0181
α3 = [ 43.75 / fcm ]^0.5 = (43.75/40)^0.5 = 1.0458
M2 = Ned x e2 = 0.0 t-m
e2 = 1/r x le2/c = 45.57 mm = 0.05 m
le = Effective length = 12545.0 mm
c = 10
1/r = Kr x KΦ x 1/r0 = 1.000 x 1.029 x 0.000 = 2.896E-06
Kr = (nu - n) / (nu-nbal) = (1.194-0.100)/(1.194-0.4) = 1.000
nu = 1+ω = 1.194
nbal = 0.4
KΦ = 1 + β x Φef = 1 + 0.40920 x 0.071 = 1.029
1/r0 = ϵyd/(0.45x d) = 0.002 / (0.45 x 1716.5) = 2.814E-06
d = 1717
ϵyd = fyd/Es = 434.783/200000 = 0.0022
β = 0.35+ fck/200 - λ/150 = 0.35 + 30/200 - 13.619/150 = 0.4092
λ = 13.619

8.1.3 CONFINEMENT REINFORCEMENT:


As the structure fall in seismic zone III Confinement Reinforcement shall be Checked.
Breadth of Pier, D = 3.500 m
Width of Pier, B = 0.900 m
Area of Pier Section, Ac = 3.790 m2
Confined Area of Pier, Acc = 2.762 m2
Clear Cover = 45 mm
Pt of Main Reinf. = 0.597 %
Long. Reinf. Ratio, ρL = 0.00597
Design Axial Load, NED = 506.25 t
Normalized Axial Force, ηk = NED / (Ac x fck) = 506.254 / (3.790 x 30 x 100)
= 0.0445 < 0.064 Confinement is not required.

36
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
8.1.4 PIER DESIGN:
SR CASE P ML MT ML' MT' ML MT αn (ML/ML')αn+(
NO t t-m t-m t-m t-m /ML' /MT' MT/MT')αn
506.3 378.0 483.4 606.2 2483.6 0.741
1 Normal 487.1 307.5 316.1 600.0 2461.8 0.5 0.13 1.0 0.641
2 Normal 506.3 309.6 316.1 606.2 2483.6 0.5 0.13 1.0 0.638
3 Wind 464.9 306.0 483.4 592.6 2436.4 0.5 0.20 1.0 0.715
4 Wind 496.8 309.5 483.4 603.2 2472.9 0.5 0.20 1.0 0.709
5 Normal 496.7 244.4 48.3 603.1 2472.7 0.4 0.02 1.0 0.425
6 Thermal 480.9 200.9 37.0 597.9 2454.8 0.3 0.02 1.0 0.351
7 Construction 303.8 69.3 0.0 536.3 2241.3 0.1 0.00 1.0 0.129
8 Construction 151.7 16.6 0.0 480.4 2041.2 0.0 0.00 1.0 0.035
9 Normal 371.3 294.8 316.1 560.5 2325.2 0.5 0.14 1.0 0.662
10 Normal 390.5 296.9 316.1 567.2 2348.3 0.5 0.13 1.0 0.658
11 Wind 349.1 293.4 483.4 552.6 2298.0 0.5 0.21 1.0 0.741
12 Wind 381.1 296.9 483.4 564.0 2337.0 0.5 0.21 1.0 0.733
13 Normal 380.9 231.8 48.3 563.9 2336.8 0.4 0.02 1.0 0.432
14 Thermal 365.1 188.2 37.0 558.3 2317.6 0.3 0.02 1.0 0.353
15 Construction 220.5 52.0 0.0 505.9 2133.6 0.1 0.00 1.0 0.103
16 Construction 112.4 12.3 0.0 465.7 1987.0 0.0 0.00 1.0 0.026
17 Seismic 437.5 378.0 113.7 583.4 2404.5 0.6 0.05 1.0 0.695
18 Seismic 437.9 147.3 363.8 583.5 2404.9 0.3 0.15 1.0 0.404
19 Seismic 437.9 147.3 113.7 583.5 2404.9 0.3 0.05 1.0 0.300
20 Seismic 438.5 317.2 113.7 583.7 2405.6 0.5 0.05 1.0 0.591
21 Seismic 438.2 147.3 363.8 583.6 2405.2 0.3 0.15 1.0 0.404
22 Seismic 438.2 147.3 113.7 583.6 2405.2 0.3 0.05 1.0 0.300
23 Seismic 321.8 304.5 113.7 542.8 2263.9 0.6 0.05 1.0 0.611
24 Seismic 322.1 134.6 363.8 543.0 2264.4 0.2 0.16 1.0 0.409
25 Seismic 322.1 134.6 113.7 543.0 2264.4 0.2 0.05 1.0 0.298
26 Seismic 322.7 304.6 113.7 543.2 2265.1 0.6 0.05 1.0 0.611
27 Seismic 322.4 134.6 363.8 543.1 2264.7 0.2 0.16 1.0 0.409
28 Seismic 322.4 134.6 113.7 543.1 2264.7 0.2 0.05 1.0 0.298
41 Quasi 316.3 36.2 0.0 540.9 2257.0 0.1 0.00 1.0 0.067
42 Quasi 313.2 35.9 0.0 539.8 2253.2 0.1 0.00 1.0 0.066
201 Normal 480.7 309.0 317.0 597.8 2454.6 0.5 0.13 1.0 0.646
202 Normal 499.9 311.1 317.0 604.2 2476.4 0.5 0.13 1.0 0.643
203 Wind 458.5 304.8 473.3 590.4 2429.0 0.5 0.19 1.0 0.711
204 Wind 490.5 308.3 473.3 601.1 2465.6 0.5 0.19 1.0 0.705
205 Normal 490.3 250.1 65.7 601.0 2465.5 0.4 0.03 1.0 0.443
206 Thermal 474.5 206.5 54.4 595.8 2447.5 0.3 0.02 1.0 0.369
207 Construction 297.4 74.9 17.4 534.0 2233.2 0.1 0.01 1.0 0.148
208 Construction 145.3 22.2 17.4 478.1 2032.4 0.0 0.01 1.0 0.055
209 Normal 364.9 296.3 317.0 558.2 2317.4 0.5 0.14 1.0 0.668
210 Normal 384.1 298.4 317.0 565.0 2340.6 0.5 0.14 1.0 0.664
211 Wind 342.7 292.1 473.3 550.4 2290.1 0.5 0.21 1.0 0.737
212 Wind 374.7 295.6 473.3 561.7 2329.2 0.5 0.20 1.0 0.729
213 Normal 374.5 237.4 65.7 561.6 2329.0 0.4 0.03 1.0 0.451
214 Thermal 358.7 193.9 54.4 556.0 2309.9 0.3 0.02 1.0 0.372
215 Construction 214.1 57.7 17.4 503.6 2125.2 0.1 0.01 1.0 0.123
216 Construction 106.0 17.9 17.4 463.3 1978.1 0.0 0.01 1.0 0.047
217 Seismic 394.9 318.8 131.0 568.7 2353.6 0.6 0.06 1.0 0.616
218 Seismic 395.2 148.9 381.2 568.9 2354.0 0.3 0.16 1.0 0.424

37
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
219 Seismic 395.2 148.9 131.0 568.9 2354.0 0.3 0.06 1.0 0.317
220 Seismic 395.9 318.9 131.0 569.1 2354.8 0.6 0.06 1.0 0.616
221 Seismic 395.5 149.0 381.2 569.0 2354.4 0.3 0.16 1.0 0.424
222 Seismic 395.5 149.0 131.0 569.0 2354.4 0.3 0.06 1.0 0.317
223 Seismic 279.1 306.1 131.0 527.4 2209.9 0.6 0.06 1.0 0.640
224 Seismic 279.5 136.3 381.2 527.5 2210.3 0.3 0.17 1.0 0.431
225 Seismic 279.5 136.3 131.0 527.5 2210.3 0.3 0.06 1.0 0.318
226 Seismic 280.1 306.2 131.0 527.8 2211.1 0.6 0.06 1.0 0.639
227 Seismic 279.7 136.3 381.2 527.6 2210.7 0.3 0.17 1.0 0.431
228 Seismic 279.7 136.3 131.0 527.6 2210.7 0.3 0.06 1.0 0.318
241 Quasi 309.9 41.8 17.4 538.6 2249.0 0.1 0.01 1.0 0.085
242 Quasi 306.8 41.5 17.4 537.4 2245.1 0.1 0.01 1.0 0.085

8.1.5 SERVICEABILITY STRESS:


Stresses are checked as per Principles of Reinforced Concrete Construction L
by F.E.Turnequre & E.R. Maurer
Width of section (in Trans dir) = b = 4136 mm
Depth of section (in Long dir) = h = 900 mm b
Clear Cover = 45 mm MT
Cover to the reinforcement = dc = 55.00 mm T T
Modular Ratio = n = 6.45 ML
Grade of Concrete = Fck = 30 Mpa
Grade of Reinforcement Steel = Fy = 500 Mpa

h
L
REINFORCEMENT DETAILS:
Layers Diameter Nos Ast prov Pt, prov Spac. Prov
mm nos mm2 % mm
Long Face 1 Single 20 28 8796 - 125
Short Face 2 Single 20 8 2513 - 143
22619 0.597

DESIGN FOR LONGITUDINAL DIRECTION:


Provide 20 mm dia bar 28 Nos. of Bar on each face
Area on one Face resisting longitudinal moment of Section = 8796.5 mm2 = 0.0088 m2
percentage of steel pt = Ast / ( b x h ) = 0.0023631 %
dc/h = 0.061
Distance from steel to centre of section for a = ( h - 2 x dc ) / 2 = 395 mm
DESIGN FOR TRANSVERSE DIRECTION:
Provide 20 mm dia bar 8 Nos. of Bar on each face
Area on one Face resisting longitudinal moment of Section = 2513.27 mm2 = 0.0025 m2
percentage of steel pt = Ast / (b x h) = 0.00068 %
dc/b = 0.013
Distance from steel to centre of section for a = ( b - 2 x dc ) / 2 = 2013 mm

LOAD CASES:
SR LOAD COMBINATIONS P ML MT
NO t t-m t-m
29 1G+1.2SIDL2+1Q+0.6Fte Rare 361.41 126.72 32.21
30 1G+1.2SIDL2+0.75Q+1Fte Rare 350.14 96.77 24.16

38
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
31 1G+1.2SIDL2+1Q+0.6W1 Rare 355.03 169.47 210.75
32 1G+1.2SIDL2+1Q+0.6W2 Rare 367.80 169.47 210.75
33 1G+1.2SIDL2+0.75Q+1W1 Rare 339.49 168.02 321.73
34 1G+1.2SIDL2+0.75Q+1W2 Rare 360.78 168.02 321.73
35 1G+1SIDL2+1Q+0.6Fte Rare 358.34 126.72 32.21
36 1G+1SIDL2+0.75Q+1Fte Rare 347.06 96.77 24.16
37 1G+1SIDL2+1Q+0.6W1 Rare 351.95 169.47 210.75
38 1G+1SIDL2+1Q+0.6W2 Rare 364.73 169.47 210.75
39 1G+1SIDL2+0.75Q+1W1 Rare 336.42 168.02 321.73
40 1G+1SIDL2+0.75Q+1W2 Rare 357.70 168.02 321.73
41 1G+1.2SIDL2+0Q+0.5Fte Quasi 316.30 1.58 0.01
42 1G+1SIDL2+0Q+0.5Fte Quasi 313.22 1.58 0.01
229 1G+1.2SIDL2+1Q+0.6Fte+1Fwc+0.15Gb Rare 355.02 133.05 49.60
230 1G+1.2SIDL2+0.75Q+1Fte+1Fwc+0.15Gb Rare 343.74 103.09 41.54
231 1G+1.2SIDL2+1Q+0.6W1+1Fwc+0.15Gb Rare 348.63 173.05 217.13
232 1G+1.2SIDL2+1Q+0.6W2+1Fwc+0.15Gb Rare 361.40 173.05 217.13
233 1G+1.2SIDL2+0.75Q+1W1+1Fwc+0.15Gb Rare 333.10 169.76 320.77
234 1G+1.2SIDL2+0.75Q+1W2+1Fwc+0.15Gb Rare 354.38 169.76 320.77
235 1G+1SIDL2+1Q+0.6Fte+1Fwc+0.15Gb Rare 351.94 133.05 49.59
236 1G+1SIDL2+0.75Q+1Fte+1Fwc+0.15Gb Rare 340.66 103.09 41.54
237 1G+1SIDL2+1Q+0.6W1+1Fwc+0.15Gb Rare 345.56 173.05 217.13
238 1G+1SIDL2+1Q+0.6W2+1Fwc+0.15Gb Rare 358.33 173.05 217.13
239 1G+1SIDL2+0.75Q+1W1+1Fwc+0.15Gb Rare 330.02 169.76 320.77
240 1G+1SIDL2+0.75Q+1W2+1Fwc+0.15Gb Rare 351.31 169.76 320.77
241 1G+1.2SIDL2+0Q+0.5Fte+1Fwc+0.15Gb Quasi 309.90 7.90 17.39
242 1G+1SIDL2+0Q+0.5Fte+1Fwc+0.15Gb Quasi 306.83 7.90 17.39

LONGITUDINAL DIRECTION (TRAFFIC DIRECTION)


SR e=M/P (e/h)1 (e/h)2 Case e/h k Cc fc fs fs'
NO t/m2 t/m2 t/m2
29 350.62 0.39 0.17 2 0.390 0.49 10.61 401.43 2412.87 2264.28
30 276.36 0.31 0.17 2 0.307 0.64 9.90 285.97 844.16 1669.96
31 477.35 0.53 0.17 2 0.530 0.34 12.02 608.23 6852.40 3222.64
32 460.77 0.51 0.17 2 0.512 0.35 11.87 600.65 6397.74 3206.48
33 494.92 0.55 0.17 2 0.550 0.33 12.17 610.37 7257.25 3209.16
34 465.72 0.52 0.17 2 0.517 0.35 11.92 597.82 6479.00 3184.14
35 353.62 0.39 0.17 2 0.393 0.48 10.65 402.85 2475.55 2268.72
36 278.81 0.31 0.17 2 0.310 0.64 9.91 286.36 871.45 1670.52
37 481.52 0.54 0.17 2 0.535 0.34 12.06 610.04 6964.71 3226.27
38 464.66 0.52 0.17 2 0.516 0.35 11.91 602.48 6505.41 3210.52
39 499.45 0.55 0.17 2 0.555 0.33 12.21 612.15 7373.93 3212.34
40 469.73 0.52 0.17 2 0.522 0.35 11.96 599.64 6588.11 3188.06
41 4.98 0.01 0.17 1 0.006 16.13 1.00 85.09 517.04 546.92
42 5.03 0.01 0.17 1 0.006 15.98 1.00 84.29 511.87 541.75
229 374.76 0.42 0.17 2 0.416 0.45 10.92 433.56 3076.13 2414.86
230 299.92 0.33 0.17 2 0.333 0.59 10.07 309.80 1197.71 1790.66
231 496.36 0.55 0.17 2 0.552 0.33 12.18 629.21 7512.69 3306.21
232 478.82 0.53 0.17 2 0.532 0.34 12.04 621.73 7037.71 3291.98
233 509.66 0.57 0.17 2 0.566 0.32 12.28 622.42 7712.44 3252.22
234 479.04 0.53 0.17 2 0.532 0.34 12.04 610.02 6910.09 3229.69
235 378.03 0.42 0.17 2 0.420 0.44 10.96 435.19 3151.31 2419.82
236 302.62 0.34 0.17 2 0.336 0.58 10.09 310.54 1234.64 1792.69

39
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
237 500.78 0.56 0.17 2 0.556 0.33 12.22 630.99 7629.69 3309.34
238 482.93 0.54 0.17 2 0.537 0.34 12.07 623.54 7150.40 3295.57
239 514.40 0.57 0.17 2 0.572 0.32 12.32 624.17 7832.39 3255.00
240 483.24 0.54 0.17 2 0.537 0.34 12.07 611.83 7022.85 3233.28
241 25.51 0.03 0.17 1 0.028 3.55 1.13 94.01 446.33 596.12
242 25.76 0.03 0.17 1 0.029 3.52 1.13 93.21 441.16 590.94

TRANSVERSE DIRECTION (ACROSS TRAFFIC DIRECTION)


SR e=M/P (e/h)1 (e/h)2 Case e/h k Cc fc fs fs'
NO t/m2 t/m2 t/m2
29 89.12 0.02 0.17 1 0.022 4.43 1.1 109 544 698
30 69.00 0.02 0.17 1 0.017 5.57 1.1 102 544 659
31 593.62 0.14 0.17 1 0.144 1.09 1.8 175 107 1113
32 573.01 0.14 0.17 1 0.139 1.11 1.8 178 129 1135
33 947.69 0.23 0.17 2 0.229 0.84 10.5 220 246 1399
34 891.78 0.22 0.17 2 0.216 0.88 10.7 224 178 1422
35 89.88 0.02 0.17 1 0.022 4.40 1.1 108 539 693
36 69.61 0.02 0.17 1 0.017 5.53 1.1 102 539 654
37 598.81 0.14 0.17 1 0.145 1.08 1.8 174 101 1108
38 577.84 0.14 0.17 1 0.140 1.11 1.8 177 123 1130
39 956.35 0.23 0.17 2 0.231 0.84 10.5 220 257 1397
40 899.44 0.22 0.17 2 0.217 0.87 10.7 223 187 1419
41 0.02 0.00 0.17 1 0.000 15983 1.0 84 543 543
42 0.02 0.00 0.17 1 0.000 16027 1.0 83 538 538
229 139.70 0.03 0.17 1 0.034 3.01 1.2 113 492 728
230 120.86 0.03 0.17 1 0.029 3.40 1.2 107 491 690
231 622.81 0.15 0.17 1 0.151 1.06 1.9 175 80 1118
232 600.80 0.15 0.17 1 0.145 1.08 1.8 179 102 1140
233 963.00 0.23 0.17 2 0.233 0.83 10.5 219 263 1391
234 905.16 0.22 0.17 2 0.219 0.87 10.7 222 192 1413
235 140.92 0.03 0.17 1 0.034 2.98 1.2 113 486 723
236 121.95 0.03 0.17 1 0.029 3.37 1.2 107 486 685
237 628.35 0.15 0.17 1 0.152 1.06 1.9 175 75 1112
238 605.95 0.15 0.17 1 0.147 1.08 1.8 178 97 1134
239 971.97 0.24 0.17 2 0.235 0.82 10.5 219 277 1388
240 913.08 0.22 0.17 2 0.221 0.87 10.6 222 201 1409
241 56.13 0.01 0.17 1 0.014 6.74 1.1 89 491 574
242 56.69 0.01 0.17 1 0.014 6.68 1.1 88 486 569

SR P ML MT fc fs fs'
NO t t-m t-m t/m2 t/m2 t/m2
29 Rare 361.4 126.7 32.2 509.9 2956.9 2962.2
30 Rare 350.1 96.8 24.2 388.4 1388.1 2329.3
31 Rare 355.0 169.5 210.8 782.9 6959.1 4336.0
32 Rare 367.8 169.5 210.8 778.7 6526.4 4341.8
33 Rare 339.5 168.0 321.7 830.8 7503.2 4608.6
34 Rare 360.8 168.0 321.7 821.7 6657.3 4606.4
35 Rare 358.3 126.7 32.2 510.5 3014.3 2961.4
36 Rare 347.1 96.8 24.2 388.0 1410.1 2324.5
37 Rare 352.0 169.5 210.8 783.9 7066.1 4334.3
38 Rare 364.7 169.5 210.8 779.8 6628.7 4340.5
39 Rare 336.4 168.0 321.7 832.1 7630.4 4609.0

40
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
40 Rare 357.7 168.0 321.7 822.9 6775.3 4606.8
41 Quasi 316.3 1.6 0.0 169.3 1060.5 1090.4
42 Quasi 313.2 1.6 0.0 167.7 1050.0 1079.9
229 Rare 355.0 133.0 49.6 547.0 3567.7 3143.3
230 Rare 343.7 103.1 41.5 417.1 1689.1 2480.5
231 Rare 348.6 173.0 217.1 804.6 7593.1 4423.8
232 Rare 361.4 173.0 217.1 800.6 7140.1 4431.5
233 Rare 333.1 169.8 320.8 841.5 7975.3 4642.9
234 Rare 354.4 169.8 320.8 832.4 7101.8 4642.3
235 Rare 351.9 133.0 49.6 547.8 3637.6 3143.0
236 Rare 340.7 103.1 41.5 417.1 1720.8 2477.2
237 Rare 345.6 173.0 217.1 805.6 7704.9 4421.7
238 Rare 358.3 173.0 217.1 801.5 7247.5 4429.8
239 Rare 330.0 169.8 320.8 842.8 8109.0 4642.5
240 Rare 351.3 169.8 320.8 833.7 7224.1 4642.4
241 Quasi 309.9 7.9 17.4 183.2 937.3 1170.1
242 Quasi 306.8 7.9 17.4 181.5 926.8 1159.7

41
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
9 FOUNDATION DESIGN:
9.1 DATA:
i PIER DATA:
Type Breadth Width Height Projection
With Circle 3.500 0.900 9.650 0.450
Inscribed Dimensions 4.136 0.900
ii MATERIALS: MT

-0.32

-0.32
Grade of Concrete = M 30

3.00

4.14

3.00
Grade of Steel = Fe 500 ML
SBC = 13.1 t/m2 2 1
Clear Cover = 0.075 m 3.050
μ = 0.500 0.000
iii GEOMETRY: 0.900

7.00
eL = 0.00 m
eT = 0.00 m 0.000
L 3.050
3 9.50 4
T
Traffic Direction
iv SIZE OF FOUNDATION: Effective Projection
Projection @ Top (In Long) = 3.050 m 3.050 m
Projection @ Btm. (In Long) = 3.050 m 3.050 m
Projection Left (In Trans) = 3.000 m 2.682 m
Projection Right (In Trans) = 3.000 m 2.682 m
Thk of Base Slab = 1.800 m
Thk of Slab at End = 1.000 m
Lf,Trans x Lf,Long x D
Size of Footing = 9.50 x 7.00 x 1.800
Area Provided = 66.50 m2
Z@LL = 7 x 9.5^2 /6 = 105.29 m3
Z@TT = 9.5 x 7^2 /6 = 77.58 m3
v FACTORS IN ANALYSIS AND DESIGN:
SR LOAD COMB RISE IN SBC FOS ALLOW. BASE AREA
NO FACTOR SBC OVERTURN SLIDE % AREA
(t/m2) (m2)
1 Normal 1.00 13.1 1.00 1.00 0 0.00
2 Wind 1.25 16.4 1.00 1.00 0 0.00
3 Seismic 1.25 16.4 1.00 1.00 0 0.00
4 Thermal 1.00 13.1 1.00 1.00 0 0.00
5 Construction 1.00 13.1 1.00 1.00 0 0.00

9.2 DESIGN:
Ltf = 9.50 m Llf = 7.00 m
D = 1.80 m deff, L = 1.715 m
Cover = 0.075 m
deff, T = 1.695 m
Fck = 30 N/mm2 = 3058.9 t/m2
Fyk = 500 N/mm2 = 50982.2 t/m2
Rumax = 0.133 x fck = 3.99 N/mm2 = 406.84 t/m2
fctm = 2.5 N/mm2 = 254.91 t/m2 (Table 6.5, IRC:112-2011)

42
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH

9.3 A BASE PRESSURE:


A-1 LOADS:
SR CASE P ML MT HL HT
NO t t-m t-m t t
43 Normal 538.45 0.01 0.01 0.00 0.00
44 Normal 538.45 3.66 0.01 0.29 0.00
45 Normal 538.45 0.01 0.01 0.00 0.00
46 Normal 583.57 144.78 32.21 11.08 0.00
47 Thermal 583.57 148.43 32.21 11.37 0.00
48 Wind 572.93 231.88 380.62 18.14 28.24
49 Wind 594.22 231.88 380.62 18.14 28.24
50 Seismic 547.16 245.71 99.05 33.34 12.68
51 Seismic 547.38 96.54 315.11 11.75 42.27
52 Seismic 547.38 96.54 99.05 11.75 12.68
53 Seismic 547.80 245.71 99.05 33.34 12.68
54 Seismic 547.57 96.54 315.11 11.75 42.27
55 Seismic 547.57 96.54 99.05 11.75 12.68
56 Construction 430.34 23.19 0.00 0.00 0.00
57 Construction 337.61 0.00 0.00 0.00 0.00

A-2 NET UPWARD PRESSURES:


SR P ML MT P1 P2 P3 P4
NO t t-m t-m t/m t/m t/m t/m
43 538.45 0.01 0.01 8.10 8.10 8.10 8.10
44 538.45 3.66 0.01 8.15 8.15 8.05 8.05
45 538.45 0.01 0.01 8.10 8.10 8.10 8.10
46 583.57 144.78 32.21 10.95 10.34 6.61 7.22
47 583.57 148.43 32.21 11.00 10.39 6.56 7.17
48 572.93 231.88 380.62 15.22 7.99 2.02 9.25
49 594.22 231.88 380.62 15.54 8.31 2.34 9.57
50 547.16 245.71 99.05 12.34 10.46 4.13 6.01
51 547.38 96.54 315.11 12.47 6.49 4.00 9.98
52 547.38 96.54 99.05 10.42 8.54 6.05 7.93
53 547.80 245.71 99.05 12.35 10.47 4.13 6.02
54 547.57 96.54 315.11 12.48 6.49 4.00 9.99
55 547.57 96.54 99.05 10.42 8.54 6.05 7.94
56 430.34 23.19 0.00 6.78 6.78 6.18 6.18
57 337.61 0.00 0.00 5.08 5.08 5.08 5.08

A-3 DISTANCE FROM CORNERS TO ZERO PRESSURE & CALCULATION FOR REDUCED AREA:
SR TYPE 12 21 23 32 34 43 41 14 A in T Red. A %
NO m m m m m m m m m2 m2
43 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
44 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
45 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
46 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
47 Thermal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
48 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
49 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
50 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100

43
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
51 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
52 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
53 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
54 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
55 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
56 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
57 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100

A-4
CORRECTED NET UPWARD PRESSURES:
SR CASE P1 P2 P3 P4
NO t/m t/m t/m t/m
43 Normal 8.10 8.10 8.10 8.10
44 Normal 8.15 8.15 8.05 8.05
45 Normal 8.10 8.10 8.10 8.10
46 Normal 10.95 10.34 6.61 7.22
47 Thermal 11.00 10.39 6.56 7.17
48 Wind 15.22 7.99 2.02 9.25
49 Wind 15.54 8.31 2.34 9.57
50 Seismic 12.34 10.46 4.13 6.01
51 Seismic 12.47 6.49 4.00 9.98
52 Seismic 10.42 8.54 6.05 7.93
53 Seismic 12.35 10.47 4.13 6.02
54 Seismic 12.48 6.49 4.00 9.99
55 Seismic 10.42 8.54 6.05 7.94
56 Construction 6.78 6.78 6.18 6.18
57 Construction 5.08 5.08 5.08 5.08
Max Base pressure (Normal Case) = 11.00 t/m2 < 13.1 t/m2 OK
Max Base pressure (Wind Case) = 15.54 t/m2 < 16.4 t/m2 OK
Max Base pressure (Seismic Case) = 12.48 t/m2 < 16.4 t/m2 OK

9.4 B EQUILIBRIUM:
B-1 LOADS:
SR CASE P ML MT HL HT
NO t t-m t-m t t
58 Normal 663.82 220.45 48.31 16.88 0.00
59 Thermal 648.03 171.97 37.04 13.17 0.00
60 Normal 654.24 295.56 361.88 22.97 25.42
61 Normal 673.40 295.56 361.88 22.97 25.42
62 Wind 632.07 297.15 559.66 23.33 42.36
63 Wind 663.99 297.15 559.66 23.33 42.36
64 Construction 473.38 25.51 0.01 0.00 0.00
65 Construction 371.37 0.00 0.00 0.00 0.00
66 Normal 553.82 220.45 48.31 16.88 0.00
67 Thermal 538.03 171.97 37.04 13.17 0.00
68 Normal 544.25 295.56 361.88 22.97 25.42
69 Normal 563.40 295.56 361.88 22.97 25.42
70 Wind 522.07 297.15 559.66 23.33 42.36
71 Wind 554.00 297.15 559.66 23.33 42.36
72 Construction 387.31 20.87 0.00 0.00 0.00
73 Construction 303.85 0.00 0.00 0.00 0.00
74 Seismic 604.52 462.30 193.96 64.80 25.68

44
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
75 Seismic 604.97 160.24 631.50 21.09 85.59
76 Seismic 604.97 160.24 193.96 21.09 25.68
77 Seismic 605.82 462.30 193.96 64.80 25.68
78 Seismic 605.36 160.24 631.50 21.09 85.59
79 Seismic 605.36 160.24 193.96 21.09 25.68
80 Seismic 494.52 462.30 193.96 64.80 25.68
81 Seismic 494.97 160.24 631.50 21.09 85.59
82 Seismic 494.97 160.24 193.96 21.09 25.68
83 Seismic 495.82 462.30 193.96 64.80 25.68
84 Seismic 495.37 160.24 631.50 21.09 85.59
85 Seismic 495.37 160.24 193.96 21.09 25.68

B-2 BASE PRESSURE:


LS CS

3.050 3.050 2.682 2.682


1.800

1.800

1.800

1.800
1.000

1.350

1.350

1.000
1.000

1.294

1.294

1.000
1,2 7.00 3,4 2,3 9.50 1,4

1.34 1.72 0.90 1.72 1.34 0.99 1.70 4.14 1.70 0.99
1.876 1.876 1.876 1.876

Pmax PL1 PL3 PL4 PL6 Pmin PT1 PT3 PT4 PT6

B-3 NET UPWARD PRESSURES:


SR P ML MT P1 P2 P3 P4
NO t t-m t-m t/m t/m t/m t/m
58 663.82 220.45 48.31 13.29 12.37 6.69 7.60
59 648.03 171.97 37.04 12.32 11.61 7.18 7.89
60 654.24 295.56 361.88 17.09 10.22 2.60 9.47
61 673.40 295.56 361.88 17.38 10.50 2.88 9.76
62 632.07 297.15 559.66 18.66 8.02 0.36 11.00
63 663.99 297.15 559.66 19.14 8.50 0.84 11.48
64 473.38 25.51 0.01 7.45 7.45 6.79 6.79
65 371.37 0.00 0.00 5.59 5.59 5.59 5.59
66 553.82 220.45 48.31 11.63 10.72 5.03 5.95
67 538.03 171.97 37.04 10.66 9.96 5.53 6.23
68 544.25 295.56 361.88 15.44 8.56 0.94 7.82
69 563.40 295.56 361.88 15.72 8.85 1.23 8.10
70 522.07 297.15 559.66 17.00 6.37 -1.30 9.34
71 554.00 297.15 559.66 17.48 6.85 -0.82 9.82
72 387.31 20.87 0.00 6.10 6.10 5.56 5.56

45
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
73 303.85 0.00 0.00 4.57 4.57 4.57 4.57
74 604.52 462.30 193.96 16.90 13.21 1.29 4.98
75 604.97 160.24 631.50 17.17 5.17 1.04 13.03
76 604.97 160.24 193.96 13.01 9.33 5.19 8.88
77 605.82 462.30 193.96 16.92 13.23 1.31 5.00
78 605.36 160.24 631.50 17.17 5.18 1.05 13.04
79 605.36 160.24 193.96 13.02 9.33 5.20 8.88
80 494.52 462.30 193.96 15.24 11.56 -0.37 3.32
81 494.97 160.24 631.50 15.51 3.52 -0.62 11.38
82 494.97 160.24 193.96 11.36 7.67 3.54 7.22
83 495.82 462.30 193.96 15.26 11.58 -0.35 3.34
84 495.37 160.24 631.50 15.52 3.52 -0.62 11.39
85 495.37 160.24 193.96 11.36 7.68 3.55 7.23
DISTANCE FROM CORNERS TO ZERO PRESSURE & CALCULATION FOR REDUCED AREA:
SR TYPE 12 21 23 32 34 43 41 14 A in T Red. A %
NO m m m m m m m m m2 m2
58 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
59 Thermal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
60 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
61 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
62 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
63 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
64 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
65 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
66 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
67 Thermal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
68 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
69 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
70 Wind 0.00 0.00 5.81 1.19 1.16 8.34 0.00 0.00 0.7 65.8 99.0
71 Wind 0.00 0.00 6.25 0.75 0.73 8.77 0.00 0.00 0.3 66.2 99.6
72 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
73 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
74 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
75 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
76 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
77 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
78 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
79 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
80 Seismic 0.00 0.00 6.78 0.22 0.95 8.55 0.00 0.00 0.1 66.4 99.8
81 Seismic 0.00 0.00 5.95 1.05 0.49 9.01 0.00 0.00 0.3 66.2 99.6
82 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
83 Seismic 0.00 0.00 6.79 0.21 0.90 8.60 0.00 0.00 0.1 66.4 99.9
84 Seismic 0.00 0.00 5.95 1.05 0.49 9.01 0.00 0.00 0.3 66.2 99.6
85 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0

B-4 CORRECTED NET UPWARD PRESSURES:


SR CASE P1 P2 P3 P4
NO t/m t/m t/m t/m
58 Normal 13.29 12.37 6.69 7.60
59 Thermal 12.32 11.61 7.18 7.89
60 Normal 17.09 10.22 2.60 9.47

46
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
61 Normal 17.38 10.50 2.88 9.76
62 Wind 18.66 8.02 0.36 11.00
63 Wind 19.14 8.50 0.84 11.48
64 Construction 7.45 7.45 6.79 6.79
65 Construction 5.59 5.59 5.59 5.59
66 Normal 11.63 10.72 5.03 5.95
67 Thermal 10.66 9.96 5.53 6.23
68 Normal 15.44 8.56 0.94 7.82
69 Normal 15.72 8.85 1.23 8.10
70 Wind 17.08 6.45 -1.22 9.42
71 Wind 17.52 6.89 -0.79 9.86
72 Construction 6.10 6.10 5.56 5.56
73 Construction 4.57 4.57 4.57 4.57
74 Seismic 16.90 13.21 1.29 4.98
75 Seismic 17.17 5.17 1.04 13.03
76 Seismic 13.01 9.33 5.19 8.88
77 Seismic 16.92 13.23 1.31 5.00
78 Seismic 17.17 5.18 1.05 13.04
79 Seismic 13.02 9.33 5.20 8.88
80 Seismic 15.25 11.57 -0.36 3.34
81 Seismic 15.54 3.54 -0.60 11.41
82 Seismic 11.36 7.67 3.54 7.22
83 Seismic 15.27 11.59 -0.34 3.35
84 Seismic 15.55 3.55 -0.59 11.42
85 Seismic 11.36 7.68 3.55 7.23

B-5 OVERTURNING:
SR CASE ML MT MLR MTR MLR/ML MLT/MT
NO t-m t-m t-m t-m
58 Normal 220.5 48.3 2323.4 3153.1 10.54 65.27
59 Thermal 172.0 37.0 2268.1 3078.1 13.19 83.10
60 Normal 295.6 361.9 2289.8 3107.7 7.75 8.59
61 Normal 295.6 361.9 2356.9 3198.6 7.97 8.84
62 Wind 297.2 559.7 2212.2 3002.3 7.44 5.36
63 Wind 297.2 559.7 2324.0 3154.0 7.82 5.64
64 Construction 25.5 0.0 1656.8 2248.5 64.95 224854.8
65 Construction 0.0 0.0 1299.8 1764.0 100.00 1000.00
66 Normal 220.5 48.3 1938.4 2630.7 8.79 54.45
67 Thermal 172.0 37.0 1883.1 2555.7 10.95 69.00
68 Normal 295.6 361.9 1904.9 2585.2 6.44 7.14
69 Normal 295.6 361.9 1971.9 2676.2 6.67 7.40
70 Wind 297.2 559.7 1827.2 2479.8 6.15 4.43
71 Wind 297.2 559.7 1939.0 2631.5 6.53 4.70
72 Construction 20.9 0.0 1355.6 1839.7 64.95 1000.00
73 Construction 0.0 0.0 1063.5 1443.3 100.00 1000.00
74 Seismic 462.3 194.0 2115.8 2871.4 4.58 14.80
75 Seismic 160.2 631.5 2117.4 2873.6 13.21 4.55
76 Seismic 160.2 194.0 2117.4 2873.6 13.21 14.82
77 Seismic 462.3 194.0 2120.4 2877.6 4.59 14.84
78 Seismic 160.2 631.5 2118.8 2875.5 13.22 4.55
79 Seismic 160.2 194.0 2118.8 2875.5 13.22 14.83

47
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
80 Seismic 462.3 194.0 1730.8 2349.0 3.74 12.11
81 Seismic 160.2 631.5 1732.4 2351.1 10.81 3.72
82 Seismic 160.2 194.0 1732.4 2351.1 10.81 12.12
83 Seismic 462.3 194.0 1735.4 2355.2 3.75 12.14
84 Seismic 160.2 631.5 1733.8 2353.0 10.82 3.73
85 Seismic 160.2 194.0 1733.8 2353.0 10.82 12.13
B-6 SLIDING:
SR CASE P μP HL HT H μP/H
NO t t t t t
58 Normal 663.8 331.9 16.9 0.0 16.9 19.7
59 Thermal 648.0 324.0 13.2 0.0 13.2 24.6
60 Normal 654.2 327.1 23.0 25.4 34.3 9.5
61 Normal 673.4 336.7 23.0 25.4 34.3 9.8
62 Wind 632.1 316.0 23.3 42.4 48.4 6.5
63 Wind 664.0 332.0 23.3 42.4 48.4 6.9
64 Construction 473.4 236.7 0.0 0.0 0.0 1000.0
65 Construction 371.4 185.7 0.0 0.0 0.0 1000.0
66 Normal 553.8 276.9 16.9 0.0 16.9 16.4
67 Thermal 538.0 269.0 13.2 0.0 13.2 20.4
68 Normal 544.3 272.1 23.0 25.4 34.3 7.9
69 Normal 563.4 281.7 23.0 25.4 34.3 8.2
70 Wind 522.1 261.0 23.3 42.4 48.4 5.4
71 Wind 554.0 277.0 23.3 42.4 48.4 5.7
72 Construction 387.3 193.7 0.0 0.0 0.0 1000.0
73 Construction 303.9 151.9 0.0 0.0 0.0 1000.0
74 Seismic 604.5 302.3 64.8 25.7 69.7 4.3
75 Seismic 605.0 302.5 21.1 85.6 88.2 3.4
76 Seismic 605.0 302.5 21.1 25.7 33.2 9.1
77 Seismic 605.8 302.9 64.8 25.7 69.7 4.3
78 Seismic 605.4 302.7 21.1 85.6 88.2 3.4
79 Seismic 605.4 302.7 21.1 25.7 33.2 9.1
80 Seismic 494.5 247.3 64.8 25.7 69.7 3.5
81 Seismic 495.0 247.5 21.1 85.6 88.2 2.8
82 Seismic 495.0 247.5 21.1 25.7 33.2 7.4
83 Seismic 495.8 247.9 64.8 25.7 69.7 3.6
84 Seismic 495.4 247.7 21.1 85.6 88.2 2.8
85 Seismic 495.4 247.7 21.1 25.7 33.2 7.5

9.5 C STRUCTURE DESIGN:


C-1 LOADS:
SR CASE P ML MT HL HT
NO t t-m t-m t t
86 Normal 800.74 220.45 48.31 16.88 0.00
87 Normal 791.16 295.56 361.88 22.97 25.42
88 Normal 810.32 295.56 361.88 22.97 25.42
89 Wind 768.98 297.15 559.66 23.33 42.36
90 Wind 800.91 297.15 559.66 23.33 42.36
91 Construction 580.96 31.31 0.01 0.00 0.00
92 Construction 455.77 0.00 0.00 0.00 0.00
93 Normal 791.16 295.56 361.88 22.97 25.42
94 Normal 810.32 295.56 361.88 22.97 25.42

48
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
95 Wind 768.98 297.15 559.66 23.33 42.36
96 Construction 430.34 23.19 0.00 0.00 0.00
97 Construction 337.61 0.00 0.00 0.00 0.00
98 Normal 597.11 191.13 41.87 14.63 0.00
99 Normal 587.53 266.60 355.44 20.76 25.42
100 Normal 605.62 257.89 320.60 20.05 22.59
101 Wind 569.74 258.01 485.14 20.26 36.72
102 Wind 597.41 258.01 485.14 20.26 36.72
103 Seismic 732.41 433.35 187.53 62.59 25.68
104 Seismic 732.87 131.29 625.06 18.88 85.59
105 Seismic 732.87 131.29 187.53 18.88 25.68
106 Seismic 733.71 433.35 187.53 62.59 25.68
107 Seismic 733.26 131.29 625.06 18.88 85.59
108 Seismic 733.26 131.29 187.53 18.88 25.68
109 Seismic 741.44 462.30 193.97 64.80 25.68
110 Seismic 741.89 160.25 631.50 21.09 85.59
111 Seismic 741.89 160.25 193.97 21.09 25.68
112 Seismic 742.74 462.30 193.97 64.80 25.68
113 Seismic 742.28 160.25 631.50 21.09 85.59
114 Seismic 742.28 160.25 193.97 21.09 25.68

C-2 NET UPWARD PRESSURES:


SR P ML MT P1 P2 P3 P4
NO t t-m t-m t/m t/m t/m t/m
86 800.74 220.45 48.31 15.35 14.43 8.75 9.66
87 791.16 295.56 361.88 19.15 12.27 4.66 11.53
88 810.32 295.56 361.88 19.44 12.56 4.94 11.82
89 768.98 297.15 559.66 20.71 10.08 2.42 13.05
90 800.91 297.15 559.66 21.19 10.56 2.90 13.53
91 580.96 31.31 0.01 9.14 9.14 8.34 8.34
92 455.77 0.00 0.00 6.86 6.86 6.86 6.86
93 791.16 295.56 361.88 19.15 12.27 4.66 11.53
94 810.32 295.56 361.88 19.44 12.56 4.94 11.82
95 768.98 297.15 559.66 20.71 10.08 2.42 13.05
96 430.34 23.19 0.00 6.78 6.78 6.18 6.18
97 337.61 0.00 0.00 5.08 5.08 5.08 5.08
98 597.11 191.13 41.87 11.85 11.05 6.12 6.92
99 587.53 266.60 355.44 15.65 8.90 2.03 8.78
100 605.62 257.89 320.60 15.48 9.39 2.74 8.83
101 569.74 258.01 485.14 16.51 7.29 0.64 9.85
102 597.41 258.01 485.14 16.92 7.71 1.06 10.27
103 732.41 433.35 187.53 18.39 14.82 3.65 7.21
104 732.87 131.29 625.06 18.65 6.78 3.40 15.27
105 732.87 131.29 187.53 14.50 10.94 7.55 11.11
106 733.71 433.35 187.53 18.40 14.84 3.67 7.23
107 733.26 131.29 625.06 18.66 6.79 3.40 15.28
108 733.26 131.29 187.53 14.50 10.94 7.56 11.12
109 741.44 462.30 193.97 18.96 15.27 3.35 7.04
110 741.89 160.25 631.50 19.22 7.23 3.10 15.09
111 741.89 160.25 193.97 15.07 11.38 7.25 10.94
112 742.74 462.30 193.97 18.98 15.29 3.37 7.06

49
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
113 742.28 160.25 631.50 19.23 7.24 3.10 15.10
114 742.28 160.25 193.97 15.07 11.39 7.26 10.94

C-3 DISTANCE FROM CORNERS TO ZERO PRESSURE & CALCULATION FOR REDUCED AREA:
SR TYPE 12 21 23 32 34 43 41 14 A in T Red. A %
NO m m m m m m m m m2 m2
86 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
87 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
88 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
89 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
90 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
91 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
92 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
93 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
94 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
95 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
96 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
97 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
98 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
99 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
100 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
101 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
102 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
103 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
104 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
105 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
106 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
107 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
108 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
109 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
110 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
111 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
112 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
113 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
114 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0

C-4 CORRECTED NET UPWARD PRESSURES:


SR CASE P1 P2 P3 P4
NO t/m t/m t/m t/m
86 Normal 15.35 14.43 8.75 9.66
87 Normal 19.15 12.27 4.66 11.53
88 Normal 19.44 12.56 4.94 11.82
89 Wind 20.71 10.08 2.42 13.05
90 Wind 21.19 10.56 2.90 13.53
91 Construction 9.14 9.14 8.34 8.34
92 Construction 6.86 6.86 6.86 6.86
93 Normal 19.15 12.27 4.66 11.53
94 Normal 19.44 12.56 4.94 11.82
95 Wind 20.71 10.08 2.42 13.05
96 Construction 6.78 6.78 6.18 6.18
97 Construction 5.08 5.08 5.08 5.08

50
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
98 Normal 11.85 11.05 6.12 6.92
99 Normal 15.65 8.90 2.03 8.78
100 Normal 15.48 9.39 2.74 8.83
101 Wind 16.51 7.29 0.64 9.85
102 Wind 16.92 7.71 1.06 10.27
103 Seismic 18.39 14.82 3.65 7.21
104 Seismic 18.65 6.78 3.40 15.27
105 Seismic 14.50 10.94 7.55 11.11
106 Seismic 18.40 14.84 3.67 7.23
107 Seismic 18.66 6.79 3.40 15.28
108 Seismic 14.50 10.94 7.56 11.12
109 Seismic 18.96 15.27 3.35 7.04
110 Seismic 19.22 7.23 3.10 15.09
111 Seismic 15.07 11.38 7.25 10.94
112 Seismic 18.98 15.29 3.37 7.06
113 Seismic 19.23 7.24 3.10 15.10
114 Seismic 15.07 11.39 7.26 10.94
Moment Due to Self Wt.
ML1 = 1 x 2.5 x (3.05^2)/2+0.5 x (1.8-1) x 3.05 x 2.5 x 3.05/3 = 14.729 t-m
ML2 = 1 x 2.5 x (3.05^2)/2+0.5 x (1.8-1) x 3.05 x 2.5 x 3.05/3 = 14.729 t-m
MT1 = 1 x 2.5 x (2.682^2)/2+0.5 x (1.8-1) x 2.682 x 2.5 x 2.682/3 = 11.389 t-m
MT2 = 1 x 2.5 x (2.682^2)/2+0.5 x (1.8-1) x 2.682 x 2.5 x 2.682/3 = 11.389 t-m
C-5 LONGITUDINAL PRESSURE DISTRIBUTION:
SR CASE Pmax PL1 PL3 PL4 PL6 Pmin PLCP1 PLCP2
NO t/m2 t/m2 t/m2 t/m2 t/m2 t/m2 1.88 1.88
86 Normal 14.89 13.81 12.41 11.68 10.29 9.21 13.9 10.2
87 Normal 15.71 14.26 12.39 11.41 9.55 8.10 14.4 9.4
88 Normal 16.00 14.55 12.68 11.7 9.83 8.38 14.7 9.7
89 Wind 15.40 13.93 12.06 11.07 9.20 7.74 14.1 9.0
90 Wind 15.88 14.41 12.54 11.55 9.68 8.22 14.6 9.5
91 Construction 9.14 8.99 8.79 8.69 8.49 8.34 9.0 8.5
92 Construction 6.86 6.86 6.86 6.86 6.86 6.86 6.9 6.9
93 Normal 15.71 14.26 12.39 11.41 9.55 8.10 14.4 9.4
94 Normal 16.00 14.55 12.68 11.7 9.83 8.38 14.7 9.7
95 Wind 15.40 13.93 12.06 11.07 9.20 7.74 14.1 9.0
96 Construction 6.78 6.67 6.52 6.44 6.29 6.18 6.7 6.3
97 Construction 5.08 5.08 5.08 5.08 5.08 5.08 5.1 5.1
98 Normal 11.45 10.51 9.3 8.67 7.46 6.52 10.6 7.3
99 Normal 12.28 10.96 9.28 8.4 6.72 5.41 11.1 6.6
100 Normal 12.44 11.17 9.54 8.68 7.05 5.79 11.3 6.9
101 Wind 11.90 10.63 9 8.14 6.51 5.25 10.8 6.4
102 Wind 12.32 11.05 9.42 8.56 6.93 5.67 11.2 6.8
103 Seismic 16.61 14.47 11.74 10.3 7.56 5.43 14.7 7.3
104 Seismic 12.72 12.07 11.24 10.81 9.98 9.34 12.1 9.9
105 Seismic 12.72 12.07 11.24 10.81 9.98 9.33 12.2 9.9
106 Seismic 16.62 14.49 11.75 10.32 7.58 5.45 14.7 7.3
107 Seismic 12.73 12.08 11.25 10.81 9.99 9.34 12.2 9.9
108 Seismic 12.72 12.08 11.25 10.81 9.98 9.34 12.2 9.9
109 Seismic 17.12 14.84 11.92 10.39 7.47 5.20 15.1 7.2
110 Seismic 13.23 12.44 11.43 10.89 9.88 9.10 12.5 9.8
111 Seismic 13.23 12.44 11.43 10.89 9.88 9.10 12.5 9.8

51
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
112 Seismic 17.14 14.86 11.94 10.41 7.49 5.22 15.1 7.2
113 Seismic 13.24 12.45 11.43 10.9 9.89 9.10 12.5 9.8
114 Seismic 13.23 12.44 11.43 10.9 9.89 9.10 12.5 9.8

C-6 TRANSVERSE PRESSURE DISTRIBUTION:


SR TYPE Pmax PT1 PT3 PT4 PT6 Pmin PTCP1 PTCP2
NO t/m2 t/m2 t/m2 t/m2 t/m2 t/m2 1.876 1.876
86 Normal 12.51 12.4 12.3 11.9 11.7 11.59 12.4 11.7
87 Normal 15.34 14.6 13.4 10.4 9.2 8.47 14.6 9.2
88 Normal 15.63 14.9 13.7 10.7 9.5 8.75 14.9 9.5
89 Wind 16.88 15.8 13.9 9.3 7.4 6.25 15.8 7.4
90 Wind 17.36 16.3 14.4 9.7 7.8 6.73 16.2 7.9
91 Construction 8.74 8.7 8.7 8.7 8.7 8.74 8.7 8.7
92 Construction 6.86 6.9 6.9 6.9 6.9 6.86 6.9 6.9
93 Normal 15.34 14.6 13.4 10.4 9.2 8.47 14.6 9.2
94 Normal 15.63 14.9 13.7 10.7 9.5 8.75 14.9 9.5
95 Wind 16.88 15.8 13.9 9.3 7.4 6.25 15.8 7.4
96 Construction 6.48 6.5 6.5 6.5 6.5 6.48 6.5 6.5
97 Construction 5.08 5.1 5.1 5.1 5.1 5.08 5.1 5.1
98 Normal 9.39 9.3 9.2 8.8 8.7 8.59 9.3 8.7
99 Normal 12.22 11.5 10.3 7.4 6.2 5.47 11.5 6.2
100 Normal 12.16 11.5 10.4 7.8 6.7 6.07 11.5 6.7
101 Wind 13.18 12.2 10.6 6.6 4.9 3.97 12.2 5.0
102 Wind 13.60 12.6 11.0 7.0 5.3 4.39 12.6 5.4
103 Seismic 12.80 12.4 11.8 10.2 9.6 9.24 12.4 9.6
104 Seismic 16.96 15.7 13.6 8.4 6.3 5.09 15.7 6.4
105 Seismic 12.81 12.4 11.8 10.3 9.6 9.25 12.4 9.6
106 Seismic 12.82 12.5 11.8 10.3 9.6 9.26 12.4 9.6
107 Seismic 16.97 15.7 13.6 8.5 6.3 5.10 15.7 6.4
108 Seismic 12.81 12.4 11.8 10.3 9.6 9.25 12.4 9.6
109 Seismic 13.00 12.6 12.0 10.4 9.7 9.31 12.6 9.7
110 Seismic 17.16 15.9 13.8 8.6 6.4 5.17 15.9 6.5
111 Seismic 13.01 12.6 12.0 10.4 9.7 9.32 12.6 9.7
112 Seismic 13.02 12.6 12.0 10.4 9.7 9.33 12.6 9.7
113 Seismic 17.17 15.9 13.8 8.6 6.4 5.17 15.9 6.5
114 Seismic 13.01 12.6 12.0 10.4 9.7 9.33 12.6 9.7

C-7 MOMENT DUE TO BASE PRESSURE: (TRANS. AND LONG. DIRECTION)


SR ML1 ML2 MT1 MT2 ML1 ML2 MT1 MT2
NO t-m t-m t-m t-m t-m t-m t-m t-m
86 65.41 46.65 44.67 42.00 50.68 31.92 33.28 30.61
87 67.92 42.79 52.85 32.78 53.19 28.06 41.46 21.39
88 69.27 44.12 53.89 33.80 54.54 29.40 42.50 22.41
89 66.44 41.15 57.11 26.08 51.71 26.42 45.72 14.69
90 68.67 43.38 58.84 27.80 53.94 28.65 47.45 16.41
91 41.97 39.33 31.43 31.43 27.24 24.61 20.04 20.04
92 31.91 31.91 24.67 24.67 17.18 17.18 13.28 13.28
93 67.92 42.79 52.85 32.78 53.19 28.06 41.46 21.39
94 69.27 44.12 53.89 33.80 54.54 29.40 42.50 22.41
95 66.44 41.15 57.11 26.08 51.71 26.42 45.72 14.69
96 31.13 29.15 23.31 23.31 16.40 14.42 11.92 11.92

52
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
97 23.63 23.63 18.27 18.27 8.90 8.90 6.88 6.88
98 49.92 33.66 33.48 31.15 35.19 18.93 22.09 19.76
99 52.45 29.78 41.65 21.94 37.72 15.05 30.26 10.55
100 53.35 31.40 41.66 23.87 38.62 16.67 30.27 12.48
101 50.85 28.88 44.29 17.38 36.12 14.16 32.90 5.99
102 52.79 30.84 45.77 18.89 38.06 16.11 34.38 7.50
103 69.69 32.81 44.83 34.42 54.96 18.08 33.44 23.03
104 56.85 45.71 56.98 22.32 42.12 30.98 45.59 10.93
105 56.87 45.69 44.85 34.46 42.14 30.96 33.46 23.07
106 69.75 32.90 44.89 34.49 55.02 18.17 33.50 23.10
107 56.90 45.72 57.02 22.35 42.17 30.99 45.63 10.96
108 56.88 45.72 44.86 34.48 42.16 30.99 33.47 23.09
109 71.55 32.22 45.51 34.73 56.82 17.49 34.12 23.34
110 58.73 45.09 57.64 22.63 44.00 30.36 46.25 11.25
111 58.73 45.09 45.52 34.75 44.00 30.36 34.13 23.37
112 71.64 32.31 45.58 34.80 56.92 17.58 34.19 23.41
113 58.76 45.12 57.68 22.66 44.03 30.39 46.29 11.27
114 58.75 45.12 45.53 34.78 44.02 30.39 34.14 23.39

C-8 LONGITUDINAL DESIGN:


FLEXURAL DESIGN:
dprov = 1.715 m
dreq = 0.374 m OK
Astmin = 0.26 x fctm x bt x d / fyk
= 0.26 x 254.911 x 1 x 1.715 / 50982.1905 x 1000 x 1000 = 2229.5 mm2
Astmin = 0.0013 x b x d
= 0.0013 x 1 x 1.715 x 1000 x 1000 = 2229.5 mm2
2
Astmin = 2229.5 mm
Ast req = 754.1 mm2
Ast req = 2229.5 mm2
Spac. Req. = 141 mm
Provide 20 mm dia bars @ 125 mm c/c OK
2
Ast prov = 2513.3 mm
pt, prov = 0.147 %
SHEAR DESIGN: (SECTION 10, IRC:112-2011)
Ved = 17.43 t
d,prov = 1265 mm
σcp = 0.00
ρ1 = Asl / (bw d) = 0.0015
K = 1 + sqrt (200/d) = 1.398
i WITHOUT SHEAR REINFORCEMENT:
Vmin = 0.031 x K^1.5 x fck^0.5 = 0.031 x 1.398^1.5 x SQRT( 30 ) = 0.281
Vrd.c = [0.12 x K x ( 80 x ρ1 x fck )^0.33 + 0.15 x σcp] x bw x d
= (0.12 x 1.398 x (80 x 0.00147 x 30)^0.33 + 0.15 x 0 ) x 1000 x 1265.16393442623
= 321751 N
= 32.819 t
Vrd.c min = (vmin + 0.15 x σcp) x bw x d
Vrd.c min = ( 0.281 + 0.15 x 0 ) x 1000 x 1265.16393442623= 355511 N
Vrd.c min = 355511 N = 36.26 t
Vrd = 36.262 t > 17.435 t
No Shear Reinforcement Required.

53
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH

C-9 TRANSVERSE DESIGN:


FLEXURAL DESIGN:
dprov = 1.695 m
dreq = 0.342 m OK
Astmin = 0.26 x fctm x bt x d / fyk = 0.26 x 254.911 x 1 x 1.695 / 50982.1905 x 1000 x 1000
= 2203.5 mm2
Astmin = 0.0013 x b x d = 0.0013 x 1 x 1.695 x 1000 x 1000
= 2203.5 mm2
Astmin = 2203.5 mm2
Ast req = 635.4 mm2
Ast req = 2203.5 mm2
Spac. Req = 142.57 mm
Provide 20 mm dia bars @ 125 mm c/c.
2
Ast prov = 2513.3 mm OK
pt, prov = 0.148 %
SHEAR DESIGN: (SECTION 10, IRC:112-2011)
Ved = 14.124 t
d,prov = 1189 mm
σcp = 0.00
ρ1 = Asl / (bw d) = 0.0015
K = 1 + sqrt (200/d) = 1.410
i WITHOUT SHEAR REINFORCEMENT:
Vmin = 0.031 x K^1.5 x fck^0.5 = 0.031x1.41^1.5xSQRT(30) = 0.284
Vrd.c = [0.12 x K x ( 80 x ρ1 x fck )^0.33 + 0.15 x σcp] x bw x d
= (0.12x1.41x(80x0.00148x30)^0.33+0.15x0)x1000x1189.407
= 305764 N
= 31.188 t
Vrd.c min = (vmin + 0.15 x σcp) x bw x d
Vrd.c min = (0.284+0.15x0)x1000x1189.407 = 337792 N
Vrd.c min = 337792 N = 34.455 t
Vrd = 34.455 t > 14.124 t
No Shear Reinforcement Required.
C-10 PUNCHING SHEAR
Pier Dim in Trans. Direction bT = 4.136 m
Pier Dim in Long. Direction bL = 0.900 m
γc = 1.50
σcp = 0.00
d = 1.705 m
k = 1.342
vmin = 26.40 t/m2 v = 0.542
V Rd.c = 0.18 x γ ( K ( 80 x ρl x fck)^ 0.333 + ( 0.1 x σcp )
AT PIER PERIMETER:
u1 = 2 x 4.136 + 2 x 0.9
= 10.072 m
bL = 0.900 m
bT = 4.136 m
fcd = 13.400 Mpa
vRd.max = 0.5 x v x fcd (Eq. 10.43, IRC:112-2011)
= 0.5 x 0.542 x 13.400 x 101.964381
= 370.23 t/m2

54
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH

SR P ΔVed Ved ML MT eL eT β ved


NO t t t t-m t-m m m t/m2
86 800.7 44.8 755.9 220.5 48.3 0.28 0.06 1.170 51.50
87 791.2 44.3 746.9 295.6 361.9 0.37 0.46 1.929 83.90
88 810.3 45.4 764.9 295.6 361.9 0.36 0.45 1.907 84.95
89 769.0 43.0 725.9 297.2 559.7 0.39 0.73 2.465 104.21
90 800.9 44.8 756.1 297.2 559.7 0.37 0.70 2.407 105.97
91 581.0 32.5 548.4 31.3 0.0 0.05 0.00 1.023 32.69
92 455.8 25.5 430.2 0.0 0.0 0.00 0.00 1.000 25.05
93 791.2 44.3 746.9 295.6 361.9 0.37 0.46 1.929 83.90
94 810.3 45.4 764.9 295.6 361.9 0.36 0.45 1.907 84.95
95 769.0 43.0 725.9 297.2 559.7 0.39 0.73 2.465 104.21
96 430.3 24.1 406.2 23.2 0.0 0.05 0.00 1.023 24.21
97 337.6 18.9 318.7 0.0 0.0 0.00 0.00 1.000 18.56
98 597.1 33.4 563.7 191.1 41.9 0.32 0.07 1.198 39.31
99 587.5 32.9 554.6 266.6 355.4 0.45 0.60 2.226 71.89
100 605.6 33.9 571.7 257.9 320.6 0.43 0.53 2.075 69.07
101 569.7 31.9 537.8 258.0 485.1 0.45 0.85 2.714 85.01
102 597.4 33.5 563.9 258.0 485.1 0.43 0.81 2.635 86.53
103 732.4 41.0 691.4 433.4 187.5 0.59 0.26 1.573 63.34
104 732.9 41.0 691.8 131.3 625.1 0.18 0.85 2.708 109.08
105 732.9 41.0 691.8 131.3 187.5 0.18 0.26 1.518 61.14
106 733.7 41.1 692.6 433.4 187.5 0.59 0.26 1.572 63.41
107 733.3 41.1 692.2 131.3 625.1 0.18 0.85 2.707 109.10
108 733.3 41.1 692.2 131.3 187.5 0.18 0.26 1.517 61.16
109 741.4 41.5 699.9 462.3 194.0 0.62 0.26 1.589 64.78
110 741.9 41.5 700.3 160.2 631.5 0.22 0.85 2.705 110.32
111 741.9 41.5 700.3 160.2 194.0 0.22 0.26 1.531 62.45
112 742.7 41.6 701.1 462.3 194.0 0.62 0.26 1.588 64.85
113 742.3 41.6 700.7 160.2 631.5 0.22 0.85 2.704 110.34
114 742.28 41.6 700.7 160.25 193.97 0.22 0.26 1.531 62.47

AT CONTROL PERIMETER
Control Perimeter @ 1.1 x d = 1.876 m
Transverse = 7.887 m OK
Longitudinal = 4.651 m OK
ρt = 0.0015
ρl = 0.0015
u1 = (7.887) x 2+(4.651) x 2 = 25.08 m
ρ1 = SQRT( ρt x ρl ) = 0.001
vRd.c = 0.18/γc x K x ( 80 x ρ1 x fck )^(1/3)
= 0.18/1.5x1.342x(80x0.00147x30)^(1/3)
= 0.245 Mpa
= 24.997 t/m2
Punching Shear Resistance,
vRd = 0.12 x K x ( 80 x ρ1 x fck )^(1/3) x 2 x d / a (Eq. 10.40, IRC:112-2011)
= 0.12x1.342x(80x0.00147x30)^(1/3)x(2x1.705/1.8755)x101.964381
= 45.45 t/m2
vmin = 0.031x1.342^(1.5)xSQRT(30)x101.964381
= 26.915 t/m2

55
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
vmin x 2 x d/a = 48.94 t/m2
vRd = 48.94 t/m2
SR P ΔVed Ved ML MT eL eT β ved
NO t t t t-m t-m m m t/m2
86 800.7 442.0 358.8 220.5 48.3 0.28 0.06 1.067 8.95
87 791.2 436.8 354.4 295.6 361.9 0.37 0.46 1.196 9.92
88 810.3 447.3 363.0 295.6 361.9 0.36 0.45 1.192 10.12
89 769.0 424.5 344.5 297.2 559.7 0.39 0.73 1.295 10.43
90 800.9 442.1 358.8 297.2 559.7 0.37 0.70 1.283 10.77
91 581.0 320.6 260.4 31.3 0.0 0.05 0.00 1.012 6.16
92 455.8 251.6 204.1 0.0 0.0 0.00 0.00 1.000 4.77
93 791.2 436.8 354.4 295.6 361.9 0.37 0.46 1.196 9.92
94 810.3 447.3 363.0 295.6 361.9 0.36 0.45 1.192 10.12
95 769.0 424.5 344.5 297.2 559.7 0.39 0.73 1.295 10.43
96 430.3 237.7 192.6 23.2 0.0 0.05 0.00 1.012 4.56
97 337.6 186.3 151.3 0.0 0.0 0.00 0.00 1.000 3.54
98 597.1 329.6 267.5 191.1 41.9 0.32 0.07 1.078 6.74
99 587.5 324.5 263.1 266.6 355.4 0.45 0.60 1.256 7.73
100 605.6 334.3 271.3 257.9 320.6 0.43 0.53 1.227 7.78
101 569.7 314.7 255.0 258.0 485.1 0.45 0.85 1.345 8.03
102 597.4 330.0 267.4 258.0 485.1 0.43 0.81 1.329 8.31
103 732.4 404.2 328.2 433.4 187.5 0.59 0.26 1.167 8.96
104 732.9 404.7 328.1 131.3 625.1 0.18 0.85 1.333 10.23
105 732.9 404.5 328.3 131.3 187.5 0.18 0.26 1.107 8.50
106 733.7 404.9 328.8 433.4 187.5 0.59 0.26 1.167 8.98
107 733.3 405.0 328.2 131.3 625.1 0.18 0.85 1.332 10.23
108 733.3 404.7 328.6 131.3 187.5 0.18 0.26 1.107 8.51
109 741.4 409.3 332.1 462.3 194.0 0.62 0.26 1.175 9.13
110 741.9 409.7 332.2 160.2 631.5 0.22 0.85 1.333 10.36
111 741.9 409.5 332.4 160.2 194.0 0.22 0.26 1.113 8.65
112 742.7 410.0 332.7 462.3 194.0 0.62 0.26 1.174 9.14
113 742.3 410.0 332.3 160.2 631.5 0.22 0.85 1.333 10.36
114 742.3 409.7 332.6 160.2 194.0 0.22 0.26 1.112 8.66

9.6 D SERVICEABILITY:
D-1 LOADS:
SR CASE P ML MT HL HT
NO t t-m t-m t t
115 Rare 586.65 146.97 32.21 11.25 0.00
116 Rare 575.37 112.24 24.16 8.60 0.00
117 Rare 580.26 197.04 241.26 15.32 16.95
118 Rare 593.03 197.04 241.26 15.32 16.95
119 Rare 564.73 195.69 372.57 15.37 28.24
120 Rare 586.01 195.69 372.57 15.37 28.24
121 Rare 583.57 146.97 32.21 11.25 0.00
122 Rare 572.29 112.24 24.16 8.60 0.00
123 Rare 577.19 197.04 241.26 15.32 16.95
124 Rare 589.96 197.04 241.26 15.32 16.95
125 Rare 561.65 195.69 372.57 15.37 28.24
126 Rare 561.65 195.69 372.57 15.37 28.24
127 Quasi 541.53 1.83 0.01 0.14 0.00

56
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
128 Quasi 538.45 1.83 0.01 0.14 0.00

D-2 NET UPWARD PRESSURES:


SR P ML MT P1 P2 P3 P4
NO t t-m t-m t/m t/m t/m t/m
115 586.65 146.97 32.21 11.03 10.42 6.63 7.24
116 575.37 112.24 24.16 10.33 9.87 6.98 7.44
117 580.26 197.04 241.26 13.56 8.98 3.90 8.48
118 593.03 197.04 241.26 13.75 9.17 4.09 8.67
119 564.73 195.69 372.57 14.56 7.48 2.44 9.51
120 586.01 195.69 372.57 14.88 7.80 2.76 9.83
121 583.57 146.97 32.21 10.98 10.37 6.58 7.19
122 572.29 112.24 24.16 10.29 9.83 6.93 7.39
123 577.19 197.04 241.26 13.52 8.93 3.85 8.44
124 589.96 197.04 241.26 13.71 9.12 4.05 8.63
125 561.65 195.69 372.57 14.51 7.43 2.39 9.47
126 561.65 195.69 372.57 14.51 7.43 2.39 9.47
127 541.53 1.83 0.01 8.17 8.17 8.12 8.12
128 538.45 1.83 0.01 8.13 8.13 8.08 8.08

D-3 DISTANCE FROM CORNERS TO ZERO PRESSURE & CALCULATION FOR REDUCED AREA:
SR TYPE 12 21 23 32 34 43 41 14 A in T Red. A %
NO m m m m m m m m m2 m2
115 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
116 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
117 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
118 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
119 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
120 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
121 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
122 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
123 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
124 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
125 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
126 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
127 Quasi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
128 Quasi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100

D-4 CORRECTED NET UPWARD PRESSURES:


SR CASE P1 P2 P3 P4
NO t/m t/m t/m t/m
115 Rare 11.03 10.42 6.63 7.24
116 Rare 10.33 9.87 6.98 7.44
117 Rare 13.56 8.98 3.90 8.48
118 Rare 13.75 9.17 4.09 8.67
119 Rare 14.56 7.48 2.44 9.51
120 Rare 14.88 7.80 2.76 9.83
121 Rare 10.98 10.37 6.58 7.19
122 Rare 10.29 9.83 6.93 7.39
123 Rare 13.52 8.93 3.85 8.44
124 Rare 13.71 9.12 4.05 8.63

57
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
125 Rare 14.51 7.43 2.39 9.47
126 Rare 14.51 7.43 2.39 9.47
127 Quasi 8.17 8.17 8.12 8.12
128 Quasi 8.13 8.13 8.08 8.08

D-5 LONGITUDINAL PRESSURE DISTRIBUTION:


SR CASE Pmax PL1 PL3 PL4 PL6 Pmin
NO t/m2 t/m2 t/m2 t/m2 t/m2 t/m2
115 Rare 10.73 10 9.07 8.59 7.66 6.94
116 Rare 10.10 9.55 8.84 8.47 7.76 7.21
117 Rare 11.27 10.3 9.06 8.4 7.16 6.19
118 Rare 11.46 10.49 9.25 8.59 7.35 6.38
119 Rare 11.02 10.06 8.82 8.17 6.94 5.98
120 Rare 11.34 10.38 9.14 8.49 7.26 6.30
121 Rare 10.68 9.95 9.02 8.54 7.61 6.89
122 Rare 10.06 9.51 8.8 8.42 7.71 7.16
123 Rare 11.23 10.26 9.01 8.36 7.11 6.15
124 Rare 11.42 10.45 9.2 8.55 7.31 6.34
125 Rare 10.97 10.01 8.77 8.13 6.89 5.93
126 Rare 10.97 10.01 8.77 8.13 6.89 5.93
127 Quasi 8.17 8.16 8.15 8.14 8.13 8.12
128 Quasi 8.13 8.12 8.11 8.1 8.09 8.08

D-6 TRANSVERSE PRESSURE DISTRIBUTION:


SR TYPE Pmax PT1 PT3 PT4 PT6 Pmin
NO t/m2 t/m2 t/m2 t/m2 t/m2 t/m2
115 Rare 9.14 9.1 9.0 8.7 8.6 8.53
116 Rare 8.89 8.8 8.8 8.6 8.5 8.43
117 Rare 11.02 10.5 9.7 7.7 6.9 6.44
118 Rare 11.21 10.7 9.9 7.9 7.1 6.63
119 Rare 12.04 11.3 10.0 7.0 5.7 4.96
120 Rare 12.36 11.6 10.4 7.3 6.0 5.28
121 Rare 9.09 9.0 8.9 8.7 8.5 8.48
122 Rare 8.84 8.8 8.7 8.5 8.4 8.38
123 Rare 10.98 10.5 9.7 7.7 6.9 6.39
124 Rare 11.17 10.7 9.9 7.9 7.1 6.59
125 Rare 11.99 11.3 10.0 6.9 5.7 4.91
126 Rare 11.99 11.3 10.0 6.9 5.7 4.91
127 Quasi 8.15 8.2 8.2 8.2 8.2 8.15
128 Quasi 8.11 8.1 8.1 8.1 8.1 8.11

D-7 MOMENT DUE TO BASE PRESSURE: (TRANS. AND LONG. DIRECTION)


SR ML1 ML2 MT1 MT2 ML1 ML2 MT1 MT2
NO t-m t-m t-m t-m t-m t-m t-m t-m
115 47.32 34.82 32.64 30.87 32.59 20.09 21.26 19.48
116 45.02 35.49 31.81 30.45 30.30 20.76 20.42 19.06
117 48.99 32.22 38.09 24.71 34.26 17.49 26.70 13.32
118 49.88 33.10 38.77 25.39 35.15 18.37 27.38 14.00
119 47.85 31.19 40.89 20.24 33.12 16.47 29.50 8.85
120 49.33 32.68 42.04 21.39 34.61 17.95 30.65 10.00
121 47.09 34.59 32.46 30.69 32.36 19.86 21.08 19.30

58
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
122 44.84 35.26 31.64 30.30 30.11 20.53 20.25 18.91
123 48.78 32.02 37.93 24.54 34.05 17.29 26.54 13.15
124 49.66 32.92 38.63 25.24 34.93 18.19 27.24 13.85
125 47.61 30.99 40.73 20.06 32.88 16.26 29.34 8.67
126 47.61 30.99 40.73 20.06 32.88 16.26 29.34 8.67
127 37.97 37.80 29.30 29.30 23.24 23.07 17.91 17.91
128 37.78 37.61 29.16 29.16 23.05 22.88 17.77 17.77

D-8 FLEXURAL DESIGN (IN LONGITUDINAL DIRECTION)


SR LOAD ML dreq Ast req Spac. req Ast prov SF1 SF2 Ved
NO CASE t-m m mm2 mm mm2 t t t
115 Rare 32.590 0.2830 2229.5 140.9 2513.3 9.91 5.82 9.91
116 Rare 30.295 0.2729 2229.5 140.9 2513.3 9.19 6.07 9.19
117 Rare 34.264 0.2902 2229.5 140.9 2513.3 10.48 4.99 10.48
118 Rare 35.148 0.2939 2229.5 140.9 2513.3 10.73 5.24 10.73
119 Rare 33.117 0.2853 2229.5 140.9 2513.3 10.15 4.70 10.15
120 Rare 34.605 0.2916 2229.5 140.9 2513.3 10.58 5.13 10.58
121 Rare 32.357 0.2820 2229.5 140.9 2513.3 9.85 5.75 9.85
122 Rare 30.109 0.2720 2229.5 140.9 2513.3 9.14 6.00 9.14
123 Rare 34.047 0.2893 2229.5 140.9 2513.3 10.42 4.93 10.42
124 Rare 34.931 0.2930 2229.5 140.9 2513.3 10.67 5.19 10.67
125 Rare 32.884 0.2843 2229.5 140.9 2513.3 10.08 4.64 10.08
126 Rare 32.884 0.2843 2229.5 140.9 2513.3 10.08 4.64 10.08
127 Quasi 23.241 0.2390 2229.5 140.9 2513.3 6.98 6.93 6.98
128 Quasi 23.055 0.2381 2229.5 140.9 2513.3 6.93 6.87 6.93

D-9 FLEXURAL DESIGN (IN TRANSVERSE DIRECTION)


SR LOAD MT dreq Ast req Spac. req Ast prov SF1 SF2 Ved
NO CASE t-m m mm2 mm mm2 t t t
115 Rare 21.256 0.229 2203.5 142.6 2513.3 6.52 5.98 6.52
116 Rare 20.416 0.224 2203.5 142.6 2513.3 6.28 5.87 6.28
117 Rare 26.698 0.256 2203.5 142.6 2513.3 8.17 4.13 8.17
118 Rare 27.382 0.259 2203.5 142.6 2513.3 8.36 4.31 8.36
119 Rare 29.504 0.269 2203.5 142.6 2513.3 9.05 2.79 9.05
120 Rare 30.655 0.274 2203.5 142.6 2513.3 9.36 3.11 9.36
121 Rare 21.076 0.228 2203.5 142.6 2513.3 6.47 5.93 6.47
122 Rare 20.249 0.223 2203.5 142.6 2513.3 6.23 5.83 6.23
123 Rare 26.543 0.255 2203.5 142.6 2513.3 8.13 4.08 8.13
124 Rare 27.238 0.259 2203.5 142.6 2513.3 8.32 4.27 8.32
125 Rare 29.336 0.269 2203.5 142.6 2513.3 9.00 2.74 9.00
126 Rare 29.336 0.269 2203.5 142.6 2513.3 9.00 2.74 9.00
127 Quasi 17.911 0.210 2203.5 142.6 2513.3 5.57 5.57 5.57
128 Quasi 17.767 0.209 2203.5 142.6 2513.3 5.53 5.53 5.53

HFL CASE:
9.7 A BASE PRESSURE: (HFL CASE)
A-1 LOADS:
SR CASE P ML MT HL HT
NO t t-m t-m t t
243 Normal 495.81 7.83 21.49 0.83 2.28
244 Normal 495.81 11.48 21.49 1.12 2.28

59
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
245 Normal 495.81 7.83 21.49 0.83 2.28
246 Normal 540.93 152.60 53.69 11.91 2.28
247 Thermal 540.93 156.25 53.69 12.20 2.28
248 Wind 530.28 234.05 379.51 18.38 28.16
249 Wind 551.57 234.05 379.51 18.38 28.16
250 Seismic 504.51 253.53 120.53 34.17 14.96
251 Seismic 504.74 104.36 336.60 12.58 44.55
252 Seismic 504.74 104.36 120.53 12.58 14.96
253 Seismic 505.15 253.53 120.53 34.17 14.96
254 Seismic 504.93 104.36 336.60 12.58 44.55
255 Seismic 504.93 104.36 120.53 12.58 14.96
256 Construction 387.70 31.01 21.49 0.83 2.28
257 Construction 294.96 7.82 21.49 0.83 2.28

A-2 NET UPWARD PRESSURES:


SR P ML MT P1 P2 P3 P4
NO t t-m t-m t/m t/m t/m t/m
243 495.81 7.83 21.49 7.77 7.36 7.16 7.56
244 495.81 11.48 21.49 7.81 7.40 7.11 7.52
245 495.81 7.83 21.49 7.77 7.36 7.16 7.56
246 540.93 152.60 53.69 10.62 9.60 5.66 6.68
247 540.93 156.25 53.69 10.66 9.64 5.62 6.64
248 530.28 234.05 379.51 14.60 7.39 1.36 8.57
249 551.57 234.05 379.51 14.92 7.71 1.68 8.89
250 504.51 253.53 120.53 12.00 9.71 3.18 5.47
251 504.74 104.36 336.60 12.14 5.74 3.05 9.45
252 504.74 104.36 120.53 10.08 7.80 5.11 7.39
253 505.15 253.53 120.53 12.01 9.72 3.19 5.48
254 504.93 104.36 336.60 12.14 5.75 3.06 9.45
255 504.93 104.36 120.53 10.09 7.80 5.11 7.40
256 387.70 31.01 21.49 6.44 6.03 5.23 5.64
257 294.96 7.82 21.49 4.75 4.34 4.14 4.54

A-3 DISTANCE FROM CORNERS TO ZERO PRESSURE & CALCULATION FOR REDUCED AREA:
SR TYPE 12 21 23 32 34 43 41 14 A in T Red. A %
NO m m m m m m m m m2 m2
243 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
244 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
245 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
246 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
247 Thermal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
248 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.5 100.0
249 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
250 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
251 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
252 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
253 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.5 100.0
254 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
255 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
256 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
257 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0

60
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH

A-4 CORRECTED NET UPWARD PRESSURES:


SR CASE P1 P2 P3 P4
NO t/m t/m t/m t/m
243 Normal 7.77 7.36 7.16 7.56
244 Normal 7.81 7.40 7.11 7.52
245 Normal 7.77 7.36 7.16 7.56
246 Normal 10.62 9.60 5.66 6.68
247 Thermal 10.66 9.64 5.62 6.64
248 Wind 14.60 7.39 1.36 8.57
249 Wind 14.92 7.71 1.68 8.89
250 Seismic 12.00 9.71 3.18 5.47
251 Seismic 12.14 5.74 3.05 9.45
252 Seismic 10.08 7.80 5.11 7.39
253 Seismic 12.01 9.72 3.19 5.48
254 Seismic 12.14 5.75 3.06 9.45
255 Seismic 10.09 7.80 5.11 7.40
256 Construction 6.44 6.03 5.23 5.64
257 Construction 4.75 4.34 4.14 4.54
Max Base pressure (Normal Case) = 10.66 t/m2 < 13.1 t/m2 OK
Max Base pressure (Wind Case) = 14.92 t/m2 < 16.4 t/m2 OK
Max Base pressure (Seismic Case) = 12.14 t/m2 < 16.4 t/m2 OK
9.8 B EQUILIBRIUM: (HFL CASE)
B-1 LOADS:
SR CASE P ML MT HL HT
NO t t-m t-m t t
258 Normal 621.17 228.27 69.80 17.71 2.28
259 Thermal 605.38 179.79 58.52 14.00 2.28
260 Normal 611.60 298.30 363.03 23.27 25.57
261 Normal 630.75 298.30 363.03 23.27 25.57
262 Wind 589.42 296.50 547.25 23.28 41.10
263 Wind 621.35 296.50 547.25 23.28 41.10
264 Construction 430.73 33.33 21.49 0.83 2.28
265 Construction 328.72 7.82 21.49 0.83 2.28
266 Normal 511.18 228.27 69.79 17.71 2.28
267 Thermal 495.39 179.79 58.52 14.00 2.28
268 Normal 501.60 298.29 363.03 23.27 25.57
269 Normal 520.76 298.29 363.03 23.27 25.57
270 Wind 479.42 296.50 547.25 23.28 41.10
271 Wind 511.35 296.50 547.25 23.28 41.10
272 Construction 344.66 28.69 21.49 0.83 2.28
273 Construction 261.20 7.82 21.49 0.83 2.28
274 Seismic 561.87 470.12 215.45 65.63 27.96
275 Seismic 562.33 168.06 652.99 21.92 87.87
276 Seismic 562.33 168.06 215.45 21.92 27.96
277 Seismic 563.17 470.12 215.45 65.63 27.96
278 Seismic 562.72 168.06 652.99 21.92 87.87
279 Seismic 562.72 168.06 215.45 21.92 27.96
280 Seismic 451.87 470.12 215.45 65.63 27.96
281 Seismic 452.33 168.06 652.98 21.92 87.87
282 Seismic 452.33 168.06 215.45 21.92 27.96

61
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
283 Seismic 453.18 470.12 215.45 65.63 27.96
284 Seismic 452.72 168.06 652.98 21.92 87.87
285 Seismic 452.72 168.06 215.45 21.92 27.96

B-2 NET UPWARD PRESSURES:


SR P ML MT P1 P2 P3 P4
NO t t-m t-m t/m t/m t/m t/m
258 621.17 228.27 69.80 12.95 11.63 5.74 7.07
259 605.38 179.79 58.52 11.98 10.87 6.24 7.35
260 611.60 298.30 363.03 16.49 9.60 1.91 8.80
261 630.75 298.30 363.03 16.78 9.89 2.20 9.09
262 589.42 296.50 547.25 17.89 7.49 -0.16 10.24
263 621.35 296.50 547.25 18.37 7.97 0.33 10.72
264 430.73 33.33 21.49 7.12 6.71 5.85 6.26
265 328.72 7.82 21.49 5.25 4.84 4.64 5.05
266 511.18 228.27 69.79 11.30 9.97 4.09 5.41
267 495.39 179.79 58.52 10.33 9.22 4.58 5.69
268 501.60 298.29 363.03 14.84 7.94 0.26 7.15
269 520.76 298.29 363.03 15.13 8.23 0.54 7.44
270 479.42 296.50 547.25 16.23 5.84 -1.81 8.59
271 511.35 296.50 547.25 16.71 6.32 -1.33 9.07
272 344.66 28.69 21.49 5.76 5.35 4.61 5.02
273 261.20 7.82 21.49 4.24 3.83 3.63 4.04
274 561.87 470.12 215.45 16.56 12.47 0.35 4.44
275 562.33 168.06 652.99 16.83 4.43 0.09 12.50
276 562.33 168.06 215.45 12.67 8.58 4.25 8.34
277 563.17 470.12 215.45 16.58 12.49 0.37 4.46
278 562.72 168.06 652.99 16.83 4.43 0.10 12.50
279 562.72 168.06 215.45 12.68 8.59 4.25 8.35
280 451.87 470.12 215.45 14.91 10.81 -1.32 2.79
281 452.33 168.06 652.98 15.17 2.77 -1.57 10.84
282 452.33 168.06 215.45 11.02 6.93 2.59 6.69
283 453.18 470.12 215.45 14.93 10.83 -1.30 2.81
284 452.72 168.06 652.98 15.18 2.78 -1.56 10.85
285 452.72 168.06 215.45 11.03 6.93 2.60 6.69
DISTANCE FROM CORNERS TO ZERO PRESSURE & CALCULATION FOR REDUCED AREA:
SR TYPE 12 21 23 32 34 43 41 14 A in T Red. A %
NO m m m m m m m m m2 m2
258 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
259 Thermal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
260 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
261 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
262 Wind 0.00 0.00 6.85 0.15 0.15 9.35 0.00 0.00 0.0 66.5 100.0
263 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
264 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
265 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
266 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
267 Thermal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
268 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
269 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
270 Wind 0.00 0.00 5.34 1.66 1.65 7.85 0.00 0.00 1.4 65.1 97.9

62
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
271 Wind 0.00 0.00 5.78 1.22 1.21 8.29 0.00 0.00 0.7 65.8 98.9
272 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
273 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
274 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
275 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
276 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
277 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
278 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
279 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
280 Seismic 0.00 0.00 6.24 0.76 3.05 6.45 0.00 0.00 1.2 65.3 98.3
281 Seismic 0.00 0.00 4.47 2.53 1.20 8.30 0.00 0.00 1.5 65.0 97.7
282 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
283 Seismic 0.00 0.00 6.25 0.75 3.00 6.50 0.00 0.00 1.1 65.4 98.3
284 Seismic 0.00 0.00 4.48 2.52 1.19 8.31 0.00 0.00 1.5 65.0 97.7
285 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0

B-3 CORRECTED NET UPWARD PRESSURES:


SR CASE P1 P2 P3 P4
NO t/m t/m t/m t/m
258 Normal 12.95 11.63 5.74 7.07
259 Thermal 11.98 10.87 6.24 7.35
260 Normal 16.49 9.60 1.91 8.80
261 Normal 16.78 9.89 2.20 9.09
262 Wind 17.89 7.49 -0.16 10.25
263 Wind 18.37 7.97 0.33 10.72
264 Construction 7.12 6.71 5.85 6.26
265 Construction 5.25 4.84 4.64 5.05
266 Normal 11.30 9.97 4.09 5.41
267 Thermal 10.33 9.22 4.58 5.69
268 Normal 14.84 7.94 0.26 7.15
269 Normal 15.13 8.23 0.54 7.44
270 Wind 16.39 5.99 -1.66 8.74
271 Wind 16.80 6.41 -1.25 9.16
272 Construction 5.76 5.35 4.61 5.02
273 Construction 4.24 3.83 3.63 4.04
274 Seismic 16.56 12.47 0.35 4.44
275 Seismic 16.83 4.43 0.09 12.50
276 Seismic 12.67 8.58 4.25 8.34
277 Seismic 16.58 12.49 0.37 4.46
278 Seismic 16.83 4.43 0.10 12.50
279 Seismic 12.68 8.59 4.25 8.35
280 Seismic 15.03 10.93 -1.19 2.91
281 Seismic 15.33 2.93 -1.41 11.00
282 Seismic 11.02 6.93 2.59 6.69
283 Seismic 15.04 10.95 -1.18 2.92
284 Seismic 15.34 2.93 -1.41 11.01
285 Seismic 11.03 6.93 2.60 6.69

B-4 OVERTURNING:
SR CASE ML MT MLR MTR MLR/ML MLT/MT
NO t-m t-m t-m t-m

63
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
258 Normal 228.3 69.8 2174.1 2950.6 9.52 42.27
259 Thermal 179.8 58.5 2118.8 2875.6 11.79 49.14
260 Normal 298.3 363.0 2140.6 2905.1 7.18 8.00
261 Normal 298.3 363.0 2207.6 2996.1 7.40 8.25
262 Wind 296.5 547.3 2063.0 2799.7 6.96 5.12
263 Wind 296.5 547.3 2174.7 2951.4 7.33 5.39
264 Construction 33.3 21.5 1507.6 2046.0 45.23 95.21
265 Construction 7.8 21.5 1150.5 1561.4 147.13 72.66
266 Normal 228.3 69.8 1789.1 2428.1 7.84 34.79
267 Thermal 179.8 58.5 1733.9 2353.1 9.64 40.21
268 Normal 298.3 363.0 1755.6 2382.6 5.89 6.56
269 Normal 298.3 363.0 1822.6 2473.6 6.11 6.81
270 Wind 296.5 547.3 1678.0 2277.3 5.66 4.16
271 Wind 296.5 547.3 1789.7 2428.9 6.04 4.44
272 Construction 28.7 21.5 1206.3 1637.2 42.05 76.18
273 Construction 7.8 21.5 914.2 1240.7 116.91 57.73
274 Seismic 470.1 215.5 1966.5 2668.9 4.18 12.39
275 Seismic 168.1 653.0 1968.1 2671.0 11.71 4.09
276 Seismic 168.1 215.5 1968.1 2671.0 11.71 12.40
277 Seismic 470.1 215.5 1971.1 2675.1 4.19 12.42
278 Seismic 168.1 653.0 1969.5 2672.9 11.72 4.09
279 Seismic 168.1 215.5 1969.5 2672.9 11.72 12.41
280 Seismic 470.1 215.5 1581.6 2146.4 3.36 9.96
281 Seismic 168.1 653.0 1583.2 2148.6 9.42 3.29
282 Seismic 168.1 215.5 1583.2 2148.6 9.42 9.97
283 Seismic 470.1 215.5 1586.1 2152.6 3.37 9.99
284 Seismic 168.1 653.0 1584.5 2150.4 9.43 3.29
285 Seismic 168.1 215.5 1584.5 2150.4 9.43 9.98

B-5 SLIDING:
SR CASE P μP HL HT H μP/H
NO t t t t t
258 Normal 621.2 310.6 17.7 2.3 17.9 17.40
259 Thermal 605.4 302.7 14.0 2.3 14.2 21.34
260 Normal 611.6 305.8 23.3 25.6 34.6 8.84
261 Normal 630.8 315.4 23.3 25.6 34.6 9.12
262 Wind 589.4 294.7 23.3 41.1 47.2 6.24
263 Wind 621.4 310.7 23.3 41.1 47.2 6.58
264 Construction 430.7 215.4 0.8 2.3 2.4 88.87
265 Construction 328.7 164.4 0.8 2.3 2.4 67.82
266 Normal 511.2 255.6 17.7 2.3 17.9 14.32
267 Thermal 495.4 247.7 14.0 2.3 14.2 17.46
268 Normal 501.6 250.8 23.3 25.6 34.6 7.25
269 Normal 520.8 260.4 23.3 25.6 34.6 7.53
270 Wind 479.4 239.7 23.3 41.1 47.2 5.07
271 Wind 511.4 255.7 23.3 41.1 47.2 5.41
272 Construction 344.7 172.3 0.8 2.3 2.4 71.11
273 Construction 261.2 130.6 0.8 2.3 2.4 53.89
274 Seismic 561.9 280.9 65.6 28.0 71.3 3.94
275 Seismic 562.3 281.2 21.9 87.9 90.6 3.10
276 Seismic 562.3 281.2 21.9 28.0 35.5 7.91

64
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
277 Seismic 563.2 281.6 65.6 28.0 71.3 3.95
278 Seismic 562.7 281.4 21.9 87.9 90.6 3.11
279 Seismic 562.7 281.4 21.9 28.0 35.5 7.92
280 Seismic 451.9 225.9 65.6 28.0 71.3 3.17
281 Seismic 452.3 226.2 21.9 87.9 90.6 2.50
282 Seismic 452.3 226.2 21.9 28.0 35.5 6.37
283 Seismic 453.2 226.6 65.6 28.0 71.3 3.18
284 Seismic 452.7 226.4 21.9 87.9 90.6 2.50
285 Seismic 452.7 226.4 21.9 28.0 35.5 6.37

9.9 C STRUCTURE DESIGN: (HFL CASE)


C-1 LOADS:
SR CASE P ML MT HL HT
NO t t-m t-m t t
286 Normal 794.34 228.28 69.80 17.71 2.28
287 Normal 784.76 298.30 363.04 23.27 25.57
288 Normal 803.92 298.30 363.04 23.27 25.57
289 Wind 762.59 296.50 547.26 23.28 41.10
290 Wind 794.52 296.50 547.26 23.28 41.10
291 Construction 574.57 39.13 21.49 0.83 2.28
292 Construction 449.37 7.82 21.49 0.83 2.28
293 Normal 784.76 298.30 363.04 23.27 25.57
294 Normal 803.92 298.30 363.04 23.27 25.57
295 Wind 762.59 296.50 547.26 23.28 41.10
296 Construction 423.95 31.01 21.49 0.83 2.28
297 Construction 331.21 7.82 21.49 0.83 2.28
298 Normal 590.71 198.95 63.35 15.46 2.28
299 Normal 581.13 269.34 356.59 21.06 25.57
300 Normal 599.23 261.20 324.01 20.41 22.99
301 Wind 563.34 258.49 477.26 20.32 35.93
302 Wind 591.01 258.49 477.26 20.32 35.93
303 Seismic 726.01 441.17 209.01 63.41 27.96
304 Seismic 726.47 139.11 646.55 19.70 87.87
305 Seismic 726.47 139.11 209.01 19.70 27.96
306 Seismic 727.32 441.17 209.01 63.41 27.96
307 Seismic 726.86 139.11 646.55 19.70 87.87
308 Seismic 726.86 139.11 209.01 19.70 27.96
309 Seismic 735.04 470.12 215.45 65.63 27.96
310 Seismic 735.49 168.07 652.99 21.92 87.87
311 Seismic 735.49 168.07 215.45 21.92 27.96
312 Seismic 736.34 470.12 215.45 65.63 27.96
313 Seismic 735.88 168.07 652.99 21.92 87.87
314 Seismic 735.88 168.07 215.45 21.92 27.96

C-2 NET UPWARD PRESSURES:


SR P ML MT P1 P2 P3 P4
NO t t-m t-m t/m t/m t/m t/m
286 794.34 228.28 69.80 15.56 14.23 8.34 9.67
287 784.76 298.30 363.04 19.10 12.20 4.51 11.41
288 803.92 298.30 363.04 19.39 12.49 4.80 11.70
289 762.59 296.50 547.26 20.49 10.10 2.45 12.85

65
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
290 794.52 296.50 547.26 20.97 10.58 2.93 13.33
291 574.57 39.13 21.49 9.35 8.95 7.94 8.34
292 449.37 7.82 21.49 7.07 6.66 6.46 6.87
293 784.76 298.30 363.04 19.10 12.20 4.51 11.41
294 803.92 298.30 363.04 19.39 12.49 4.80 11.70
295 762.59 296.50 547.26 20.49 10.10 2.45 12.85
296 423.95 31.01 21.49 6.98 6.58 5.78 6.18
297 331.21 7.82 21.49 5.29 4.88 4.68 5.09
298 590.71 198.95 63.35 12.05 10.85 5.72 6.93
299 581.13 269.34 356.59 15.60 8.83 1.89 8.66
300 599.23 261.20 324.01 15.46 9.31 2.57 8.73
301 563.34 258.49 477.26 16.34 7.28 0.61 9.68
302 591.01 258.49 477.26 16.76 7.69 1.03 10.09
303 726.01 441.17 209.01 18.59 14.62 3.25 7.22
304 726.47 139.11 646.55 18.86 6.58 3.00 15.28
305 726.47 139.11 209.01 14.71 10.74 7.15 11.12
306 727.32 441.17 209.01 18.61 14.64 3.27 7.24
307 726.86 139.11 646.55 18.87 6.59 3.00 15.28
308 726.86 139.11 209.01 14.71 10.74 7.16 11.13
309 735.04 470.12 215.45 19.16 15.07 2.95 7.04
310 735.49 168.07 652.99 19.43 7.03 2.70 15.10
311 735.49 168.07 215.45 15.28 11.19 6.85 10.94
312 736.34 470.12 215.45 19.18 15.09 2.97 7.06
313 735.88 168.07 652.99 19.44 7.04 2.70 15.11
314 735.88 168.07 215.45 15.28 11.19 6.86 10.95
C-3 DISTANCE FROM CORNERS TO ZERO PRESSURE & CALCULATION FOR REDUCED AREA:
SR TYPE 12 21 23 32 34 43 41 14 A in T Red. A %
NO m m m m m m m m m2 m2
286 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
287 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
288 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
289 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
290 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
291 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
292 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
293 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
294 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
295 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
296 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
297 Construction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
298 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
299 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
300 Normal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
301 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
302 Wind 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
303 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
304 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
305 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
306 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
307 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
308 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0

66
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
309 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
310 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
311 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
312 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
313 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0
314 Seismic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100.0

C-4 CORRECTED NET UPWARD PRESSURES:


SR CASE P1 P2 P3 P4
NO t/m t/m t/m t/m
286 Normal 15.56 14.23 8.34 9.67
287 Normal 19.10 12.20 4.51 11.41
288 Normal 19.39 12.49 4.80 11.70
289 Wind 20.49 10.10 2.45 12.85
290 Wind 20.97 10.58 2.93 13.33
291 Construction 9.35 8.95 7.94 8.34
292 Construction 7.07 6.66 6.46 6.87
293 Normal 19.10 12.20 4.51 11.41
294 Normal 19.39 12.49 4.80 11.70
295 Wind 20.49 10.10 2.45 12.85
296 Construction 6.98 6.58 5.78 6.18
297 Construction 5.29 4.88 4.68 5.09
298 Normal 12.05 10.85 5.72 6.93
299 Normal 15.60 8.83 1.89 8.66
300 Normal 15.46 9.31 2.57 8.73
301 Wind 16.34 7.28 0.61 9.68
302 Wind 16.76 7.69 1.03 10.09
303 Seismic 18.59 14.62 3.25 7.22
304 Seismic 18.86 6.58 3.00 15.28
305 Seismic 14.71 10.74 7.15 11.12
306 Seismic 18.61 14.64 3.27 7.24
307 Seismic 18.87 6.59 3.00 15.28
308 Seismic 14.71 10.74 7.16 11.13
309 Seismic 19.16 15.07 2.95 7.04
310 Seismic 19.43 7.03 2.70 15.10
311 Seismic 15.28 11.19 6.85 10.94
312 Seismic 19.18 15.09 2.97 7.06
313 Seismic 19.44 7.04 2.70 15.11
314 Seismic 15.28 11.19 6.86 10.95

C-5 LONGITUDINAL PRESSURE DISTRIBUTION:


SR TYPE Pmax PL1 PL3 PL4 PL6 Pmin PLCP1 PLCP2
NO t/m2 t/m2 t/m2 t/m2 t/m2 t/m2 1.876 1.876
286 Normal 14.9 13.8 12.3 11.6 10.1 9.0 13.9 10.0
287 Normal 15.7 14.2 12.3 11.3 9.4 8.0 14.4 9.3
288 Normal 15.9 14.5 12.6 11.6 9.7 8.3 14.6 9.5
289 Wind 15.3 13.8 12.0 11.0 9.1 7.7 14.0 8.9
290 Wind 15.8 14.3 12.4 11.5 9.6 8.1 14.5 9.4
291 Construction 9.2 9.0 8.7 8.6 8.3 8.1 9.0 8.3
292 Construction 6.9 6.8 6.8 6.8 6.7 6.7 6.8 6.7
293 Normal 15.7 14.2 12.3 11.3 9.4 8.0 14.4 9.3

67
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
294 Normal 15.9 14.5 12.6 11.6 9.7 8.3 14.6 9.5
295 Wind 15.3 13.8 12.0 11.0 9.1 7.7 14.0 8.9
296 Construction 6.8 6.6 6.4 6.3 6.1 6.0 6.6 6.1
297 Construction 5.1 5.1 5.0 5.0 4.9 4.9 5.1 4.9
298 Normal 11.5 10.5 9.2 8.6 7.3 6.3 10.6 7.2
299 Normal 12.2 10.9 9.2 8.3 6.6 5.3 11.1 6.4
300 Normal 12.4 11.1 9.5 8.6 6.9 5.7 11.3 6.8
301 Wind 11.8 10.5 8.9 8.1 6.4 5.1 10.7 6.3
302 Wind 12.2 11.0 9.3 8.5 6.8 5.6 11.1 6.7
303 Seismic 16.6 14.4 11.7 10.2 7.4 5.2 14.7 7.1
304 Seismic 12.7 12.0 11.2 10.7 9.8 9.1 12.1 9.7
305 Seismic 12.7 12.0 11.2 10.7 9.8 9.1 12.1 9.7
306 Seismic 16.6 14.5 11.7 10.2 7.4 5.3 14.7 7.2
307 Seismic 12.7 12.1 11.2 10.7 9.8 9.1 12.1 9.7
308 Seismic 12.7 12.0 11.2 10.7 9.8 9.1 12.1 9.7
309 Seismic 17.1 14.8 11.8 10.3 7.3 5.0 15.1 7.0
310 Seismic 13.2 12.4 11.3 10.8 9.7 8.9 12.5 9.6
311 Seismic 13.2 12.4 11.3 10.8 9.7 8.9 12.5 9.6
312 Seismic 17.1 14.8 11.9 10.3 7.3 5.0 15.1 7.1
313 Seismic 13.2 12.4 11.4 10.8 9.7 8.9 12.5 9.6
314 Seismic 13.2 12.4 11.4 10.8 9.7 8.9 12.5 9.6

C-6 TRANSVERSE PRESSURE DISTRIBUTION:


SR TYPE Pmax PT1 PT3 PT4 PT6 Pmin PTCP1 PTCP2
NO t/m2 t/m2 t/m2 t/m2 t/m2 t/m2 1.876 1.876
286 Normal 12.6 12.5 12.2 11.7 11.4 11.3 12.5 11.4
287 Normal 15.3 14.5 13.3 10.3 9.1 8.4 14.5 9.1
288 Normal 15.5 14.8 13.6 10.6 9.4 8.6 14.8 9.4
289 Wind 16.7 15.6 13.7 9.2 7.4 6.3 15.6 7.4
290 Wind 17.2 16.1 14.2 9.7 7.8 6.8 16.1 7.9
291 Construction 8.8 8.8 8.7 8.6 8.5 8.4 8.8 8.5
292 Construction 7.0 6.9 6.9 6.7 6.6 6.6 6.9 6.6
293 Normal 15.3 14.5 13.3 10.3 9.1 8.4 14.5 9.1
294 Normal 15.5 14.8 13.6 10.6 9.4 8.6 14.8 9.4
295 Wind 16.7 15.6 13.7 9.2 7.4 6.3 15.6 7.4
296 Construction 6.6 6.5 6.5 6.3 6.2 6.2 6.5 6.2
297 Construction 5.2 5.2 5.1 4.9 4.8 4.8 5.1 4.8
298 Normal 9.5 9.4 9.2 8.6 8.4 8.3 9.4 8.4
299 Normal 12.1 11.4 10.2 7.3 6.1 5.4 11.4 6.1
300 Normal 12.1 11.5 10.4 7.7 6.6 5.9 11.4 6.6
301 Wind 13.0 12.1 10.5 6.5 4.9 3.9 12.1 4.9
302 Wind 13.4 12.5 10.9 6.9 5.3 4.4 12.5 5.3
303 Seismic 12.9 12.5 11.8 10.1 9.4 8.9 12.5 9.4
304 Seismic 17.1 15.8 13.6 8.3 6.1 4.8 15.8 6.1
305 Seismic 12.9 12.5 11.8 10.1 9.4 8.9 12.5 9.4
306 Seismic 12.9 12.5 11.8 10.1 9.4 9.0 12.5 9.4
307 Seismic 17.1 15.8 13.6 8.3 6.1 4.8 15.8 6.1
308 Seismic 12.9 12.5 11.8 10.1 9.4 9.0 12.5 9.4
309 Seismic 13.1 12.7 12.0 10.2 9.4 9.0 12.7 9.5
310 Seismic 17.3 16.0 13.8 8.4 6.2 4.9 16.0 6.2
311 Seismic 13.1 12.7 12.0 10.2 9.4 9.0 12.7 9.5

68
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
312 Seismic 13.1 12.7 12.0 10.2 9.5 9.0 12.7 9.5
313 Seismic 17.3 16.0 13.8 8.4 6.2 4.9 16.0 6.2
314 Seismic 13.1 12.7 12.0 10.2 9.5 9.0 12.7 9.5

C-7 MOMENT DUE TO BASE PRESSURE: (TRANS. AND LONG. DIRECTION)


SR ML1 ML2 MT1 MT2 ML1 ML2 MT1 MT2
NO t-m t-m t-m t-m t-m t-m t-m t-m
286 65.30 45.86 44.92 41.04 50.57 31.13 33.53 29.65
287 67.60 42.22 52.53 32.38 52.87 27.49 41.14 20.99
288 68.95 43.57 53.58 33.42 54.22 28.84 42.19 22.03
289 65.97 40.74 56.44 26.09 51.24 26.02 45.05 14.70
290 68.20 42.98 58.17 27.81 53.47 28.25 46.78 16.42
291 41.88 38.54 31.67 30.51 27.15 23.81 20.28 19.12
292 31.80 31.13 24.92 23.74 17.07 16.40 13.54 12.35
293 67.60 42.22 52.53 32.38 52.87 27.49 41.14 20.99
294 68.95 43.57 53.58 33.42 54.22 28.84 42.19 22.03
295 65.97 40.74 56.44 26.09 51.24 26.02 45.05 14.70
296 30.99 28.36 23.53 22.36 16.26 13.63 12.14 10.97
297 23.52 22.85 18.52 17.34 8.79 8.12 7.13 5.95
298 49.80 32.88 33.72 30.21 35.07 18.16 22.33 18.82
299 52.13 29.23 41.34 21.57 37.40 14.50 29.95 10.18
300 53.06 30.82 41.42 23.45 38.33 16.09 30.03 12.06
301 50.44 28.43 43.72 17.25 35.71 13.71 32.33 5.86
302 52.36 30.36 45.22 18.75 37.63 15.63 33.83 7.36
303 69.55 32.03 45.06 33.48 54.82 17.30 33.68 22.09
304 56.75 44.93 57.23 21.39 42.02 30.20 45.84 10.00
305 56.76 44.92 45.10 33.52 42.03 30.19 33.71 22.13
306 69.64 32.12 45.14 33.56 54.92 17.40 33.75 22.17
307 56.79 44.93 57.26 21.40 42.06 30.20 45.87 10.01
308 56.78 44.95 45.12 33.53 42.05 30.22 33.74 22.14
309 71.41 31.43 45.74 33.78 56.68 16.70 34.35 22.39
310 58.61 44.33 57.89 21.70 43.88 29.60 46.50 10.31
311 58.62 44.31 45.77 33.82 43.89 29.58 34.38 22.43
312 71.51 31.52 45.81 33.86 56.78 16.79 34.42 22.47
313 58.65 44.34 57.93 21.71 43.92 29.61 46.54 10.32
314 58.64 44.34 45.78 33.84 43.91 29.61 34.40 22.45

C-8 LONGITUDINAL DESIGN (HFL CASE):


FLEXURAL DESIGN:
dprov = 1.7150 m
dreq = 0.374 m OK
Astmin = 0.26 x fctm x bt x d / fyk = 0.26 x 254.911 x 1 x 1.715 / 50982.1905 x 1000 x 1000
= 2229.50 mm2
Astmin = 0.0013 x b x d = 0.0013 x 1 x 1.715 x 1000 x 1000
= 2229.5 mm2
Astmin = 2229.5 mm2
Ast req = 752 mm2
Ast req = 2229.5 mm2
Spac. Req. = 141 mm
Provide 20 mm dia bars @ 125 mm c/c. OK
2
Ast prov = 2513.27 mm

69
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
pt, prov = 0.147 %
SHEAR DESIGN: (SECTION 10, IRC:112-2011)
Ved = 17.408 t
d,prov = 1265 mm
σcp = 0.00
ρ1 = Asl / (bw d) = 0.0015
K = 1 + sqrt (200/d) = 1.398
i WITHOUT SHEAR REINFORCEMENT:
Vmin = 0.031 x K^1.5 x fck^0.5 = 0.031 x 1.398^1.5 x SQRT( 30 ) = 0.281
Vrd.c = [0.12 x K x ( 80 x ρ1 x fck )^0.33 + 0.15 x σcp] x bw x d
= (0.12 x 1.398 x (80 x 0.00147 x 30)^0.33 + 0.15 x 0 ) x 1000 x 1265.16393442623
= 321751 N
= 32.819 t
Vrd.c min = (vmin + 0.15 x σcp) x bw x d
Vrd.c min = (0.281+0.15x0)x1000x1265.16393442623 = 355511 N
Vrd.c min = 355511 N = 36.262 t
Vrd = 36.262 t > 17.408 t
No Shear Reinforcement Required.

C-9 TRANSVERSE DESIGN (HFL CASE):


FLEXURAL DESIGN:
dprov = 1.695 m
dreq = 0.339 m OK
Astmin = 0.26 x fctm x bt x d / fyk = 0.26 x 254.911 x 1 x 1.695 / 50982.1905 x 1000 x 1000
= 2203.5 mm2
Astmin = 0.0013 x b x d = 0.0013 x 1 x 1.695 x 1000 x 1000
= 2203.5 mm2
Astmin = 2203.5 mm2
Ast req = 626.4 mm1
Ast req = 2203.5 mm2
Spac. Req = 142.57 mm
Provide 20 mm dia bars @ 125 mm c/c.
2
Ast prov = 2513.3 mm
pt, prov = 0.148 %
SHEAR DESIGN: (SECTION 10, IRC:112-2011)
Ved = 13.949 t
d,prov = 1189 mm
σcp = Ned / Ac = 0.00
ρ1 = Asl / (bw d) = 0.0015
K = 1 + sqrt (200/d) = 1.410
i WITHOUT SHEAR REINFORCEMENT:
Vmin = 0.031 x K^1.5 x fck^0.5 = 0.031 x 1.41^1.5 x SQRT( 30 ) = 0.284
Vrd.c = [0.12 x K x ( 80 x ρ1 x fck )^0.33 + 0.15 x σcp] x bw x d
= (0.12 x 1.41 x (80 x 0.00148 x 30)^0.33 + 0.15 x 0 ) x 1000 x 1189.407
= 305764 N
= 31.188 t
Vrd.c min = (vmin + 0.15 x σcp) x bw x d
Vrd.c min = ( 0.284 + 0.15 x 0 ) x 1000 x 1189.407 = 337792 N
Vrd.c min = 337792 N = 34.455 t
Vrd = 34.455 t > 13.949 t
No Shear Reinforcement Required.

70
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH

C-10 PUNCHING SHEAR


Pier Dim in Trans. Direction bT = 4.136 m
Pier Dim in Long. Direction bL = 0.900 m
γc = 1.50
σcp = 0.00
d = 1.705 m v = 0.542
k = 1.342
vmin = 26.40 t/m2
V Rd.c = 0.18 x γ ( K ( 80 x ρl x fck)^ 0.333 + ( 0.1 x σcp )
AT PIER PERIMETER:
u1 = 2 x 4.136 + 2 x 0.9
= 10.072 m
fcd = 13.400 Mpa
vRd.max = 0.5 x v x fcd (Eq. 10.43, IRC:112-2011)
= 0.5 x 0.542 x 13.400 x 101.964381
= 370.23 t/m2

SR P ΔVed Ved ML MT eL eT β ved


NO t t t t-m t-m m m t/m2
286 794.34 44.48 749.86 228.28 69.80 0.29 0.09 1.216 53.08
287 784.76 43.94 740.82 298.30 363.04 0.38 0.46 1.940 83.69
288 803.92 45.02 758.90 298.30 363.04 0.37 0.45 1.917 84.74
289 762.59 42.71 719.88 296.50 547.26 0.39 0.72 2.445 102.50
290 794.52 44.49 750.03 296.50 547.26 0.37 0.69 2.387 104.26
291 574.57 32.18 542.39 39.13 21.49 0.07 0.04 1.080 34.13
292 449.37 25.18 424.19 7.82 21.49 0.02 0.05 1.096 27.07
293 784.76 43.94 740.82 298.30 363.04 0.38 0.46 1.940 83.69
294 803.92 45.02 758.90 298.30 363.04 0.37 0.45 1.917 84.74
295 762.59 42.71 719.88 296.50 547.26 0.39 0.72 2.445 102.50
296 423.95 23.75 400.20 31.01 21.49 0.07 0.05 1.106 25.78
297 331.21 18.56 312.65 7.82 21.49 0.02 0.06 1.130 20.58
298 590.71 33.09 557.62 198.95 63.35 0.34 0.11 1.260 40.91
299 581.13 32.55 548.58 269.34 356.59 0.46 0.61 2.244 71.67
300 599.23 33.57 565.66 261.20 324.01 0.44 0.54 2.098 69.11
301 563.34 31.56 531.78 258.49 477.26 0.46 0.85 2.706 83.80
302 591.01 33.10 557.91 258.49 477.26 0.44 0.81 2.626 85.32
303 726.01 40.65 685.36 441.17 209.01 0.61 0.29 1.634 65.20
304 726.47 40.69 685.78 139.11 646.55 0.19 0.89 2.782 111.09
305 726.47 40.69 685.78 139.11 209.01 0.19 0.29 1.581 63.15
306 727.32 40.72 686.60 441.17 209.01 0.61 0.29 1.632 65.27
307 726.86 40.70 686.16 139.11 646.55 0.19 0.89 2.781 111.12
308 726.86 40.70 686.16 139.11 209.01 0.19 0.29 1.581 63.17
309 735.04 41.15 693.89 470.12 215.45 0.64 0.29 1.649 66.63
310 735.49 41.19 694.30 168.07 652.99 0.23 0.89 2.778 112.33
311 735.49 41.19 694.30 168.07 215.45 0.23 0.29 1.594 64.46
312 736.34 41.23 695.11 470.12 215.45 0.64 0.29 1.648 66.70
313 735.88 41.21 694.67 168.07 652.99 0.23 0.89 2.778 112.36
314 735.88 41.21 694.67 168.07 215.45 0.23 0.29 1.594 64.48

71
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
AT CONTROL PERIMETER
Control Perimeter @ 1.1 x d = 1.876 m
Transverse = 7.887 m OK
Longitudinal = 4.651 m OK
ρt = 0.0015
ρl = 0.0015
u1 = (7.887) x 2+(4.651) x 2
= 25.076 m
ρ1 = SQRT( ρt x ρl ) = 0.00147 OK
vRd.c = 0.18/γc x K x ( 80 x ρ1 x fck )^(1/3)
= 0.18/1.5 x 1.342 x ( 80 x 0.00147 x 30 )^(1/3)
= 0.245 Mpa
= 24.997 t/m2
Punching Shear Resistance,
vRd = 0.12 x K x ( 80 x ρ1 x fck )^(1/3) x 2 x d / a (Eq. 10.40, IRC:112-2011)
= 0.12x1.342x(80x0.00147x30)^(1/3)x(2x1.705/1.8755)x101.964381
= 45.45 t/m2
vmin = 0.031 x 1.342^(1.5) x SQRT(30) x 101.964381
= 26.915 t/m2
vmin x 2 x d/a = 48.94 t/m2
vRd = 48.94 t/m2
SR P ΔVed Ved ML MT eL eT β ved
NO t t t t-m t-m m m t/m2
286 794.34 438.39 355.95 228.28 69.80 0.29 0.09 1.074 8.94
287 784.76 433.22 351.54 298.30 363.04 0.38 0.46 1.199 9.86
288 803.92 443.86 360.06 298.30 363.04 0.37 0.45 1.194 10.06
289 762.59 421.11 341.48 296.50 547.26 0.39 0.72 1.292 10.32
290 794.52 438.72 355.80 296.50 547.26 0.37 0.69 1.280 10.65
291 574.57 317.13 257.44 39.13 21.49 0.07 0.04 1.021 6.15
292 449.37 248.17 201.20 7.82 21.49 0.02 0.05 1.019 4.80
293 784.76 433.22 351.54 298.30 363.04 0.38 0.46 1.199 9.86
294 803.92 443.86 360.06 298.30 363.04 0.37 0.45 1.194 10.06
295 762.59 421.11 341.48 296.50 547.26 0.39 0.72 1.292 10.32
296 423.95 234.04 189.91 31.01 21.49 0.07 0.05 1.026 4.56
297 331.21 182.87 148.34 7.82 21.49 0.02 0.06 1.026 3.56
298 590.71 326.08 264.63 198.95 63.35 0.34 0.11 1.087 6.73
299 581.13 320.97 260.16 269.34 356.59 0.46 0.61 1.260 7.67
300 599.23 330.95 268.28 261.20 324.01 0.44 0.54 1.232 7.73
301 563.34 311.22 252.12 258.49 477.26 0.46 0.85 1.344 7.93
302 591.01 326.44 264.57 258.49 477.26 0.44 0.81 1.328 8.22
303 726.01 400.68 325.33 441.17 209.01 0.61 0.29 1.178 8.96
304 726.47 401.27 325.20 139.11 646.55 0.19 0.89 1.347 10.25
305 726.47 401.04 325.43 139.11 209.01 0.19 0.29 1.120 8.52
306 727.32 401.41 325.91 441.17 209.01 0.61 0.29 1.178 8.98
307 726.86 401.45 325.41 139.11 646.55 0.19 0.89 1.347 10.25
308 726.86 401.23 325.63 139.11 209.01 0.19 0.29 1.120 8.53
309 735.04 405.63 329.41 470.12 215.45 0.64 0.29 1.185 9.13
310 735.49 406.22 329.27 168.07 652.99 0.23 0.89 1.348 10.38
311 735.49 406.00 329.49 168.07 215.45 0.23 0.29 1.125 8.67
312 736.34 406.37 329.97 470.12 215.45 0.64 0.29 1.185 9.14
313 735.88 406.46 329.42 168.07 652.99 0.23 0.89 1.347 10.38

72
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
314 735.88 406.18 329.70 168.07 215.45 0.23 0.29 1.125 8.67

9.10 D SERVICEABILITY:
D-1 LOADS:
SR CASE P ML MT HL HT
NO t t-m t-m t t
315 Rare 580.25 154.79 53.69 12.08 2.28
316 Rare 568.97 120.06 45.64 9.43 2.28
317 Rare 573.86 201.47 249.19 15.79 17.81
318 Rare 586.64 201.47 249.19 15.79 17.81
319 Rare 558.33 197.86 371.46 15.61 28.16
320 Rare 579.61 197.86 371.46 15.61 28.16
321 Rare 577.18 154.79 53.69 12.08 2.28
322 Rare 565.90 120.06 45.64 9.43 2.28
323 Rare 570.79 201.47 249.19 15.79 17.81
324 Rare 583.56 201.47 249.19 15.79 17.81
325 Rare 555.25 197.86 371.46 15.61 28.16
326 Rare 555.25 197.86 371.46 15.61 28.16
327 Quasi 535.13 9.65 21.49 0.97 2.28
328 Quasi 532.06 9.65 21.49 0.97 2.28

D-2 NET UPWARD PRESSURES:


SR P ML MT P1 P2 P3 P4
NO t t-m t-m t/m t/m t/m t/m
315 580.25 154.79 53.69 11.24 10.22 6.23 7.25
316 568.97 120.06 45.64 10.54 9.67 6.58 7.45
317 573.86 201.47 249.19 13.60 8.86 3.67 8.40
318 586.64 201.47 249.19 13.79 9.06 3.86 8.60
319 558.33 197.86 371.46 14.48 7.42 2.32 9.38
320 579.61 197.86 371.46 14.80 7.74 2.64 9.70
321 577.18 154.79 53.69 11.19 10.17 6.18 7.20
322 565.90 120.06 45.64 10.50 9.63 6.53 7.40
323 570.79 201.47 249.19 13.55 8.82 3.62 8.36
324 583.56 201.47 249.19 13.74 9.01 3.82 8.55
325 555.25 197.86 371.46 14.43 7.38 2.28 9.33
326 555.25 197.86 371.46 14.43 7.38 2.28 9.33
327 535.13 9.65 21.49 8.38 7.97 7.72 8.13
328 532.06 9.65 21.49 8.33 7.93 7.68 8.09

D-3 DISTANCE FROM CORNERS TO ZERO PRESSURE & CALCULATION FOR REDUCED AREA:
SR TYPE 12 21 23 32 34 43 41 14 A in T Red. A %
NO m m m m m m m m m2 m2
315 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
316 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
317 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
318 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
319 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
320 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
321 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
322 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
323 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100

73
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
324 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
325 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
326 Rare 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
327 Quasi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100
328 Quasi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 66.5 100

D-4 CORRECTED NET UPWARD PRESSURES:


SR TYPE P1 P2 P3 P4
NO t/m t/m t/m t/m
315 Rare 11.24 10.22 6.23 7.25
316 Rare 10.54 9.67 6.58 7.45
317 Rare 13.60 8.86 3.67 8.40
318 Rare 13.79 9.06 3.86 8.60
319 Rare 14.48 7.42 2.32 9.38
320 Rare 14.80 7.74 2.64 9.70
321 Rare 11.19 10.17 6.18 7.20
322 Rare 10.50 9.63 6.53 7.40
323 Rare 13.55 8.82 3.62 8.36
324 Rare 13.74 9.01 3.82 8.55
325 Rare 14.43 7.38 2.28 9.33
326 Rare 14.43 7.38 2.28 9.33
327 Quasi 8.38 7.97 7.72 8.13
328 Quasi 8.33 7.93 7.68 8.09

D-5 LONGITUDINAL PRESSURE DISTRIBUTION:


SR TYPE Pmax PL1 PL3 PL4 PL6 Pmin
NO t/m2 t/m2 t/m2 t/m2 t/m2 t/m2
315 Rare 10.73 9.97 8.99 8.48 7.50 6.74
316 Rare 10.11 9.52 8.76 8.36 7.60 7.02
317 Rare 11.23 10.24 8.97 8.3 7.03 6.04
318 Rare 11.43 10.43 9.16 8.49 7.22 6.23
319 Rare 10.95 9.98 8.73 8.07 6.82 5.85
320 Rare 11.27 10.3 9.05 8.39 7.14 6.17
321 Rare 10.68 9.92 8.94 8.43 7.45 6.69
322 Rare 10.07 9.47 8.71 8.32 7.56 6.97
323 Rare 11.19 10.19 8.92 8.25 6.98 5.99
324 Rare 11.38 10.39 9.11 8.45 7.17 6.19
325 Rare 10.91 9.93 8.68 8.03 6.78 5.81
326 Rare 10.91 9.93 8.68 8.03 6.78 5.81
327 Quasi 8.18 8.13 8.07 8.03 7.97 7.93
328 Quasi 8.13 8.08 8.02 7.99 7.93 7.89

D-6 TRANSVERSE PRESSURE DISTRIBUTION:


SR TYPE Pmax PT1 PT3 PT4 PT6 Pmin
NO t/m2 t/m2 t/m2 t/m2 t/m2 t/m2
315 Rare 9.25 9.1 9.0 8.5 8.3 8.23
316 Rare 9.00 8.9 8.8 8.4 8.2 8.13
317 Rare 11.00 10.5 9.7 7.6 6.8 6.27
318 Rare 11.20 10.7 9.9 7.8 7.0 6.46
319 Rare 11.93 11.2 9.9 6.9 5.6 4.87
320 Rare 12.25 11.5 10.3 7.2 5.9 5.19

74
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
321 Rare 9.20 9.1 8.9 8.5 8.3 8.18
322 Rare 8.95 8.9 8.7 8.3 8.2 8.08
323 Rare 10.96 10.5 9.6 7.6 6.7 6.22
324 Rare 11.15 10.7 9.8 7.8 6.9 6.42
325 Rare 11.88 11.2 9.9 6.8 5.6 4.83
326 Rare 11.88 11.2 9.9 6.8 5.6 4.83
327 Quasi 8.26 8.2 8.1 8.0 7.9 7.85
328 Quasi 8.21 8.2 8.1 7.9 7.9 7.81

D-7 MOMENT DUE TO BASE PRESSURE: (TRANS. AND LONG. DIRECTION)


SR ML1 ML2 MT1 MT2 ML1 ML2 MT1 MT2
NO t-m t-m t-m t-m t-m t-m t-m t-m
315 47.21 34.05 32.91 29.92 32.48 19.32 21.52 18.53
316 44.92 34.71 32.06 29.52 30.19 19.98 20.67 18.13
317 48.73 31.58 37.96 24.13 34.00 16.85 26.57 12.74
318 49.63 32.48 38.66 24.84 34.90 17.75 27.27 13.45
319 47.49 30.65 40.52 19.90 32.76 15.92 29.13 8.51
320 48.98 32.14 41.67 21.05 34.25 17.41 30.28 9.66
321 46.98 33.81 32.73 29.74 32.25 19.09 21.34 18.35
322 44.71 34.50 31.89 29.36 29.99 19.77 20.50 17.97
323 48.51 31.36 37.80 23.98 33.78 16.64 26.41 12.59
324 49.40 32.28 38.48 24.67 34.67 17.55 27.09 13.28
325 47.27 30.45 40.34 19.76 32.54 15.72 28.95 8.37
326 47.27 30.45 40.34 19.76 32.54 15.72 28.95 8.37
327 37.86 37.02 29.55 28.35 23.13 22.29 18.16 16.96
328 37.64 36.84 29.40 28.21 22.92 22.11 18.01 16.82

D-8 FLEXURAL DESIGN (IN LONGITUDINAL DIRECTION)


SR LOAD ML dreq Ast req Spac. req Ast prov SF1 SF2 Ved
NO CASE t-m m mm2 mm mm2 t t t
315 Rare 32.48 0.283 2229.5 140.9 2513.3 9.90 5.58 9.90
316 Rare 30.19 0.272 2229.5 140.9 2513.3 9.18 5.83 9.18
317 Rare 34.00 0.289 2229.5 140.9 2513.3 10.41 4.80 10.41
318 Rare 34.90 0.293 2229.5 140.9 2513.3 10.67 5.06 10.67
319 Rare 32.76 0.284 2229.5 140.9 2513.3 10.05 4.54 10.05
320 Rare 34.25 0.290 2229.5 140.9 2513.3 10.48 4.96 10.48
321 Rare 32.25 0.282 2229.5 140.9 2513.3 9.83 5.52 9.83
322 Rare 29.99 0.271 2229.5 140.9 2513.3 9.12 5.77 9.12
323 Rare 33.78 0.288 2229.5 140.9 2513.3 10.35 4.74 10.35
324 Rare 34.67 0.292 2229.5 140.9 2513.3 10.61 4.99 10.61
325 Rare 32.54 0.283 2229.5 140.9 2513.3 9.99 4.48 9.99
326 Rare 32.54 0.283 2229.5 140.9 2513.3 9.99 4.48 9.99
327 Quasi 23.13 0.238 2229.5 140.9 2513.3 6.96 6.69 6.96
328 Quasi 22.92 0.237 2229.5 140.9 2513.3 6.90 6.63 6.90

D-9 FLEXURAL DESIGN (IN TRANSVERSE DIRECTION)


SR LOAD MT dreq Ast req Spac. req Ast prov SF1 SF2 Ved
NO CASE t-m m mm2 mm mm2 t t t
315 Rare 21.52 0.230 2203.5 142.6 2513.3 6.61 5.70 6.61
316 Rare 20.67 0.225 2203.5 142.6 2513.3 6.36 5.60 6.36
317 Rare 26.57 0.256 2203.5 142.6 2513.3 8.15 3.96 8.15

75
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
318 Rare 27.27 0.259 2203.5 142.6 2513.3 8.34 4.15 8.34
319 Rare 29.13 0.268 2203.5 142.6 2513.3 8.95 2.70 8.95
320 Rare 30.28 0.273 2203.5 142.6 2513.3 9.26 3.02 9.26
321 Rare 21.34 0.229 2203.5 142.6 2513.3 6.56 5.65 6.56
322 Rare 20.50 0.224 2203.5 142.6 2513.3 6.32 5.55 6.32
323 Rare 26.41 0.255 2203.5 142.6 2513.3 8.10 3.91 8.10
324 Rare 27.09 0.258 2203.5 142.6 2513.3 8.29 4.11 8.29
325 Rare 28.95 0.267 2203.5 142.6 2513.3 8.90 2.66 8.90
326 Rare 28.95 0.267 2203.5 142.6 2513.3 8.90 2.66 8.90
327 Quasi 18.16 0.211 2203.5 142.6 2513.3 5.66 5.30 5.66
328 Quasi 18.01 0.210 2203.5 142.6 2513.3 5.62 5.26 5.62

76
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
10 CRACK WIDTH:
Wk = Sr,max (εsm - εcm)
Sr,max = Maximum crack spacing = (3.4 c + 0.17 Ø) /ρp.eff
ρ p.eff = As / Ac.eff (Eq 12.7, IRC:112-2011)
Ac.eff = Eff. Area of concrete surrounding reinforcement Minimum of,
>> 2.5 x (h-d) ,(h-x)/3, h/2
εsm = Mean strain in reinforcement
εsm = Mean strain in concrete between cracks
f
σ sc - k t ct,eff (1+α e ρ p.eff )
(ε sm -ε cm ) = ρ p.eff ≥ 0.6 x σsc / Es
Es
kt = Factor dependant on duration of load
fct,eff = fctm
αe = Es / Ecm

10.1 FOUNDATION:
Fck = 30 Mpa Fctm = 2.5 Mpa
Fy = 500 Mpa Es = 200000 Mpa
c = 75 mm Ecm = 31000 Mpa
I LONGITUDINAL DIRECTION
1 DATA:
Depth of Section, h = 1800 mm Dia. Of Bar, Ø = 20 mm
Width of Section, b = 1000 mm A of Reinf. As = 2513 mm2
Eff. Depth, d = 1715 mm Bending Moment = 23.2 t-m
Xu = (-m x As + SQRT ( (m x As)^2 - 4 x b/2 x - m x As x d )) / (2 x b/2)
= (-6.452x2513.27+SQRT((6.452x2513.27)^2-4x1000/2 x -6.452x2513.27x1715))/(2x1000/2)
= 220.18 mm
2 CRACK WIDTH:
Ac.eff = 212500 mm2
2
>> 2.5 x (h-d) = 2.5 x ( 1800 - 1715 ) x 1000 = 212500 mm
2
>> (h-x)/3 = ( 1800 - 220.179 ) / 3 x 1000 = 526607 mm
2
>> h/2 = 1800 / 2 x 1000 = 900000 mm
ρ p.eff = 2513.27 / 212500 = 0.012
Sr,max = 3.4 x 50 + (( 0.17 x 20 ) / 0.01183) = 457.41 mm
σsc = M/(deff-xu/3)/astprov
2
= 23.241 / (1.715-0.073) / (0.00251327) = 5633.1 t/m
kt = 0.5
2
fct,eff = fctm = 2.5 Mpa = 254.911 t/m
αe = Es / Ecm = 200000 / 31000 = 6.452
0.6 x σsc / Es = 0.6 x 5633.087 / 20392876.2 = 0.00017
(ε sm -ε cm ) = ( 5633.087 - ( 0.5 x ( 254.911 / 0.01183 ) x ( 1 + 6.452 x 0.01183 ))) / ( 20392876.2 )
= -0.00029 >= 0.00017
(ε sm -ε cm ) = 0.00017
Wk = r,max (εsm - εcm)
S = 457.405 x 0.00017
= 0.078 mm < 0.300 mm OK

II TRANSVERSE DIRECTION:
1 DATA:
Depth of Section, h = 1800 mm Dia. Of Bar, Ø = 20 mm
Width of Section, b = 1000 mm A of Reinf. As = 2513 mm2
Eff. Depth, d = 1695 mm Bending Moment = 18.2 t-m

77
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
Xu = (-m x As + SQRT ( (m x As)^2 - 4 x b/2 x - m x As x d )) / (2 x b/2)
= (-6.452x2513.27+SQRT((6.452x2513.27)^2-4x1000/2 x -6.452x2513.27x1695))/(2x1000/2)
= 218.80 mm
2 CRACK WIDTH:
2
Ac.eff = 262500 mm
2
>> 2.5 x (h-d) = 2.5 x ( 1800 - 1695 ) x 1000 = 262500 mm
2
>> (h-x)/3 = ( 1800 - 218.803 ) / 3 x 1000 = 527066 mm
2
>> h/2 = 1800 / 2 x 1000 = 900000 mm
ρ p.eff = 2513.27 / 262500 = 0.010
Sr,max = 3.4 x 50 + (( 0.17 x 20 ) / 0.00957) = 525.28 mm
σsc = M/(deff-xu/3)/astprov
2
= 18.16 / (1.695 - 0.073) / (0.00251327) = 4454.6 t/m
kt = Factor dependant on duration of load = 0.5
2
fct,eff = fctm = 2.5 Mpa = 254.911 t/m
αe = Es / Ecm = 200000 / 31000 = 6.452
0.6 x σsc / Es = 0.6 x 4454.595 / 20392876.2 = 0.00013
(ε sm -ε cm ) = ( 4454.595 - ( 0.5 x ( 254.911 / 0.00957 ) x ( 1 + 6.452 x 0.00957 ))) / ( 20392876.2 )
= -0.00047 >= 0.00013
(ε sm -ε cm ) = 0.00013
Wk = Sr,max (εsm - εcm) = 525.277 x 0.00013
= 0.068 mm < 0.300 mm OK

10.2 PIER:
Fck = 30 Mpa Fctm = 2.5 Mpa
Fy = 500 Mpa Es = 200000 Mpa
c = 45 mm Ecm = 31000 Mpa
I ALONG TRAFFIC DIRECTION:
1 DATA:
Depth of Section, h = 900 mm Dia. Of Bar, Ø = 20 mm
Width of Section, b = 4136 mm A of Reinf. As = 8796 mm2
Eff. Depth, d = 845 mm ML = 7.9 t-m
Xu = (-m x As + SQRT ( (m x As)^2 - 4 x b/2 x - m x As x d )) / (2 x b/2)
= (-6.452x8796.45943005142+SQRT((6.452x8796.45943005142)^2-4x4136/2 x -6.452x8796.45943005142x845))/(2
= 139.18 mm
2 CRACK WIDTH:
2
Ac.eff = 568700 mm
2
>> 2.5 x (h-d) = 2.5 x ( 900 - 845 ) x 4136 = 568700 mm
2
>> (h-x)/3 = ( 900 - 139.179 ) / 3 x 4136 = 1048919 mm
2
>> h/2 = 900 / 2 x 4136 = 1861200 mm
ρ p.eff = 8796.45943005142 / 568700 = 0.015
Sr,max = 3.4 x 45 + (( 0.17 x 20 ) / 0.01547) = 372.78 mm
σsc = M/(deff-xu/3)/astprov
2
= 7.9 / (0.845-0.046) / (0.00879645943005142) = 1124.6 t/m
kt = Factor dependant on duration of load = 0.5
2
fct,eff = fctm = 2.5 Mpa = 254.911 t/m
αe = Es / Ecm = 200000 / 31000 = 6.452
0.6 x σsc / Es = 0.6 x 1124.569 / 20392876.2 = 0.00003
(ε sm -ε cm ) = ( 1124.569 - ( 0.5 x ( 254.911 / 0.01547 ) x ( 1 + 6.452 x 0.01547 ))) / ( 20392876.2 )
= -0.00039 >= 0.00003
(ε sm -ε cm ) = 0.00003

78
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
Wk = Sr,max (εsm - εcm) = 372.78 x 0.00003
= 0.0112 mm < 0.300 mm OK

II ACROSS TRAFFIC DIRECTION:


1 DATA:
Depth of Section, h = 4136 mm Dia. Of Bar, Ø = 20 mm
Width of Section, b = 900 mm A of Reinf. As = 2513 mm2
Eff. Depth, d = 4081 mm MT = 17.4 t-m
Xu = (-m x As + SQRT ( (m x As)^2 - 4 x b/2 x - m x As x d )) / (2 x b/2)
= (-6.452x2513.27412287183+SQRT((6.452x2513.27412287183)^2-4x900/2 x -6.452x2513.27412287183x4081))/(2
= 365.89 mm
2 CRACK WIDTH:
2
Ac.eff = 123750 mm
2
>> 2.5 x (h-d) = 2.5 x ( 4136 - 4081 ) x 900 = 123750 mm
2
>> (h-x)/3 = ( 4136 - 365.887 ) / 3 x 900 = 1131034 mm
2
>> h/2 = 4136 / 2 x 900 = 1861200 mm
ρ p.eff = 2513.27412287183 / 123750 = 0.020
Sr,max = 3.4 x 45 + (( 0.17 x 20 ) / 0.02031) = 320.41 mm
σsc = M/(deff-xu/3)/astprov
2
= 17.39 / (4.081-0.122) / (0.00251327412287183) = 1747.7 t/m
kt = Factor dependant on duration of load = 0.5
2
fct,eff = fctm = 2.5 Mpa = 254.911 t/m
αe = Es / Ecm = 200000 / 31000 = 6.452
0.6 x σsc / Es = 0.6 x 1747.713 / 20392876.2 = 0.00005
(ε sm -ε cm ) = ( 1747.713 - ( 0.5 x ( 254.911 / 0.02031 ) x ( 1 + 6.452 x 0.02031 ))) / ( 20392876.2 )
= -0.00026 >= 0.00005
(ε sm -ε cm ) = 0.00005
Wk = Sr,max (εsm - εcm) = 320.405 x 0.00005
= 0.016 mm < 0.300 mm OK

79
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
11 SERVICEABILITY CHECKS
11.1 PIER:
Permissible Stress in Concrete = 0.48 fck
= 0.48 x 30 = 14.40 Mpa = 1468.3 t/m2
Permissible Stress in Steel = 0.8 fy
= 0.8 x 500 = 400.00 Mpa
= 400.00 Mpa = 40785.8 t/m2
SR CASE P ML MT Str in Conc Str in Steel
NO t t-m t-m t/m2 t/m2
COMBINATION FOR STRESS
29 Rare 361.41 126.72 32.21 509.9 2956.9
30 Rare 350.14 96.77 24.16 388.4 1388.1
31 Rare 355.03 169.47 210.75 782.9 6959.1
32 Rare 367.80 169.47 210.75 778.7 6526.4
33 Rare 339.49 168.02 321.73 830.8 7503.2
34 Rare 360.78 168.02 321.73 821.7 6657.3
35 Rare 358.34 126.72 32.21 510.5 3014.3
36 Rare 347.06 96.77 24.16 388.0 1410.1
37 Rare 351.95 169.47 210.75 783.9 7066.1
38 Rare 364.73 169.47 210.75 779.8 6628.7
39 Rare 336.42 168.02 321.73 832.1 7630.4
40 Rare 357.70 168.02 321.73 822.9 6775.3
41 Quasi 316.30 1.58 0.01 169.3 1060.5
42 Quasi 313.22 1.58 0.01 167.7 1050.0
229 Rare 355.02 133.05 49.60 547.0 3567.7
230 Rare 343.74 103.09 41.54 417.1 1689.1
231 Rare 348.63 173.05 217.13 804.6 7593.1
232 Rare 361.40 173.05 217.13 800.6 7140.1
233 Rare 333.10 169.76 320.77 841.5 7975.3
234 Rare 354.38 169.76 320.77 832.4 7101.8
235 Rare 351.94 133.05 49.59 547.8 3637.6
236 Rare 340.66 103.09 41.54 417.1 1720.8
237 Rare 345.56 173.05 217.13 805.6 7704.9
238 Rare 358.33 173.05 217.13 801.5 7247.5
239 Rare 330.02 169.76 320.77 842.8 8109.0
240 Rare 351.31 169.76 320.77 833.7 7224.1
241 Quasi 309.90 7.90 17.39 183.2 937.3
242 Quasi 306.83 7.90 17.39 181.5 926.8

11.2 FOUNDATION:
Width in Trans. Direction = 1000 mm
Width in Long. Direction = 1000 mm
m = 6.45
Permissible Stress in Concrete = 0.48 fck = 0.48 x 30 = 14.40 Mpa
Permissible Stress in Steel = 0.8 fy
= 0.8 x 500 = 400.00 Mpa = 300.00 Mpa

80
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH
>> LONGITUDINAL DIRECTION: (Footing)
SR CASE M, Net d,eff Ast, Pro. N-A Icr Str in Conc Str in Steel
NO t-m mm mm2 mm mm4 Mpa Mpa
115 Rare 32.59 1715 2513 220.17 3.98E+10 1.77 77.47
116 Rare 30.30 1715 2513 220.17 3.98E+10 1.64 72.01
117 Rare 34.26 1715 2513 220.17 3.98E+10 1.86 81.45
118 Rare 35.15 1715 2513 220.17 3.98E+10 1.91 83.55
119 Rare 33.12 1715 2513 220.17 3.98E+10 1.80 78.72
120 Rare 34.61 1715 2513 220.17 3.98E+10 1.88 82.26
121 Rare 32.36 1715 2513 220.17 3.98E+10 1.76 76.92
122 Rare 30.11 1715 2513 220.17 3.98E+10 1.63 71.57
123 Rare 34.05 1715 2513 220.17 3.98E+10 1.85 80.93
124 Rare 34.93 1715 2513 220.17 3.98E+10 1.90 83.03
125 Rare 32.88 1715 2513 220.17 3.98E+10 1.78 78.17
126 Rare 32.88 1715 2513 220.17 3.98E+10 1.78 78.17
127 Quasi 23.24 1715 2513 220.17 3.98E+10 1.26 55.24
128 Quasi 23.05 1715 2513 220.17 3.98E+10 1.25 54.80
315 Rare 32.48 1715 2513 220.17 3.98E+10 1.76 77.21
316 Rare 30.19 1715 2513 220.17 3.98E+10 1.64 71.76
317 Rare 34.00 1715 2513 220.17 3.98E+10 1.85 80.82
318 Rare 34.90 1715 2513 220.17 3.98E+10 1.89 82.96
319 Rare 32.76 1715 2513 220.17 3.98E+10 1.78 77.87
320 Rare 34.25 1715 2513 220.17 3.98E+10 1.86 81.41
321 Rare 32.25 1715 2513 220.17 3.98E+10 1.75 76.66
322 Rare 29.99 1715 2513 220.17 3.98E+10 1.63 71.28
323 Rare 33.78 1715 2513 220.17 3.98E+10 1.83 80.31
324 Rare 34.67 1715 2513 220.17 3.98E+10 1.88 82.41
325 Rare 32.54 1715 2513 220.17 3.98E+10 1.77 77.36
326 Rare 32.54 1715 2513 220.17 3.98E+10 1.77 77.36
327 Quasi 23.13 1715 2513 220.17 3.98E+10 1.26 54.99
328 Quasi 22.92 1715 2513 220.17 3.98E+10 1.24 54.47

81
IN-PS-DC-02 (R0)

DESIGN OF PIER (P1,P2 & P3) & FOUNDATION FOR INTAKE APPROACH

>> TRANSVERSE DIRECTION: (Footing)


SR CASE M, Net d,eff Ast, Pro. N-A Icr Str in Conc Str in Steel
NO t-m mm mm2 mm mm4 Mpa Mpa
115 Rare 21.26 1695.0 2513.3 218.80 3.9.E+10 1.17 51.13
116 Rare 20.42 1695.0 2513.3 218.80 3.9.E+10 1.13 49.12
117 Rare 26.70 1695.0 2513.3 218.80 3.9.E+10 1.48 64.23
118 Rare 27.38 1695.0 2513.3 218.80 3.9.E+10 1.51 65.87
119 Rare 29.50 1695.0 2513.3 218.80 3.9.E+10 1.63 70.98
120 Rare 30.65 1695.0 2513.3 218.80 3.9.E+10 1.69 73.75
121 Rare 21.08 1695.0 2513.3 218.80 3.9.E+10 1.16 50.70
122 Rare 20.25 1695.0 2513.3 218.80 3.9.E+10 1.12 48.71
123 Rare 26.54 1695.0 2513.3 218.80 3.9.E+10 1.47 63.85
124 Rare 27.24 1695.0 2513.3 218.80 3.9.E+10 1.51 65.53
125 Rare 29.34 1695.0 2513.3 218.80 3.9.E+10 1.62 70.57
126 Rare 29.34 1695.0 2513.3 218.80 3.9.E+10 1.62 70.57
127 Quasi 17.91 1695.0 2513.3 218.80 3.9.E+10 0.99 43.09
128 Quasi 17.77 1695.0 2513.3 218.80 3.9.E+10 0.98 42.74
315 Rare 21.52 1695.0 2513.3 218.80 3.9.E+10 1.19 51.77
316 Rare 20.67 1695.0 2513.3 218.80 3.9.E+10 1.14 49.72
317 Rare 26.57 1695.0 2513.3 218.80 3.9.E+10 1.47 63.91
318 Rare 27.27 1695.0 2513.3 218.80 3.9.E+10 1.51 65.61
319 Rare 29.13 1695.0 2513.3 218.80 3.9.E+10 1.61 70.08
320 Rare 30.28 1695.0 2513.3 218.80 3.9.E+10 1.67 72.85
321 Rare 21.34 1695.0 2513.3 218.80 3.9.E+10 1.18 51.34
322 Rare 20.50 1695.0 2513.3 218.80 3.9.E+10 1.13 49.32
323 Rare 26.41 1695.0 2513.3 218.80 3.9.E+10 1.46 63.54
324 Rare 27.09 1695.0 2513.3 218.80 3.9.E+10 1.50 65.18
325 Rare 28.95 1695.0 2513.3 218.80 3.9.E+10 1.60 69.65
326 Rare 28.95 1695.0 2513.3 218.80 3.9.E+10 1.60 69.65
327 Quasi 18.16 1695.0 2513.3 218.80 3.9.E+10 1.00 43.69
328 Quasi 18.01 1695.0 2513.3 218.80 3.9.E+10 1.00 43.32

82

You might also like