LABORATORY WORKSHEET 1

Instructions:

1. Redraw the floor plans (2D) given in CAD for plumbing layout planning.
2. Design a Plumbing Layout (Drainage and Storm Drain) from the given Four - Storey Floor Plans.
Included are the following:
> Septic Tank.
> Catch Basins for storm drain.
> Cistern Tank/s for rain water recovery and drainage

3. Required Drawings:
> CAD 3D plumbing layout.
> Printed water line layout plans per storey.
> Printed isometric water line layout (line diagram).

4. Follow the given hints:


> Apply DWC for sewer and drainage layout.
> Cistern Tank 1 (storm drains) located at the back of the building
> Catch basin at every column distance.
> Septic Tank at the back of the CR location
> Floor Drains and lavatories direct to Cistern Tank 2 (drainage).
> Urinals and Water Closets direct to Septic Tank.

REMARKS: RATING: TITLE:


HIGH-RISE BUILDING PLUMBING
C A S N P
DESIGN LAYOUT
40 20 15 15 10
35 18 12 12 8 SCALE: MAY VARY DATE: 12/04/2024
30 16 9 10 6 PREPARED BY: KENT B. SENO
25 14 6 8 4
20 12 3 6 2 CHECKED BY: JIVULTER C. MANGUBAT