Professional Documents
Culture Documents
w1 Plumbing Final 1
w1 Plumbing Final 1
Instructions:
1. Redraw the floor plans (2D) given in CAD for plumbing layout planning.
2. Design a Plumbing Layout (Drainage and Storm Drain) from the given Four - Storey Floor Plans.
Included are the following:
> Septic Tank.
> Catch Basins for storm drain.
> Cistern Tank/s for rain water recovery and drainage
3. Required Drawings:
> CAD 3D plumbing layout.
> Printed water line layout plans per storey.
> Printed isometric water line layout (line diagram).