Sheet 2 Bosh

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Date 26/11/2022

Time 11:00 AM
Location: Batangas State University Alangilan Campus

Unsafe Act
This scaffolding structure lacks safety support and the worker has no harness and PPE.This falls under the ergonomic
hazards.
Unsafe Condition

The worker does not follow the proper safety measures while working on a scaffold. While working on a scaffold, it is
CAUSE/REASON a must that all of the control measures will be applied. Additionally, the worker does not have a proper PPE, safety
harness and having a lack of guardrails which will prevent him from falling.

TYPE OF HAZARD
Physical
Chemical
Biological
Ergonomic
IMAGE

PHYSICAL HAZARD
As shown in the figure, there is a
high risk of falling while CHEMICAL HAZARD
working at height since the Too much exposure to paintings
worker doesn’t have any given that there is also lack of
protective equipment such as proper usage of desired PPE, paints
safety harness and other PPE and lacquers an cause irritation and
needed for this kind of activity. you can put 1 or 2 ACTUAL pictures damage to eyes and mucous
membranes, to the respiratory and
digestive tracts, and to the skin.
ERGONOMIC HAZARD
The scaffold structure has a loose
and weak planks which will break
easily and possibly cause the
worker fall from height.

TYPE OF CONTROL
Elimination

picture (It can be actual picture, can be through online, can be photo edited)
What actions will be taken to
eliminate future accident or
incident?(you must put all
applicable controls if necessary)
Explanation (explain thoroughly)

Substitution

What actions will be taken to


eliminate future accident or
incident?

A new scaffolding should be replaced with a safe space above for the workers to have a rest and a fence to avoid from
slipping or falling down. This way, the risk of falling will be mitigated and addressed witb additional requirement of
PPE's for the workers
Engineering

What actions will be taken to


eliminate future accident or
incident?

The purpose of the engineering controls is to provide built-in harness on the scaffold to prevent the risk of workings
not wearing inappropriate PPE.

Administrative

picture

What actions will be taken to


eliminate future accident or
incident?

Traning should be required to the workers before working in scaffolding or construction. Signages should also be
placed around na workspace area to present a reminder to the people. Lastly, the workers should have a safety
certificate such as BOSH or COSH for them to be able to properly work and.

Personal Protective Equipment

picture

What actions will be taken to


eliminate future accident or
incident?

Since the proposed engineering controls have built-in harness, the PPE that should be worn are gloves, working shirt
and pants, dust mask and respirators, eye protector and also faceshield.

Prepared by: Checked by:


Kryss Daniella B. Bravo Karen Argente
IE 3104 BOSH Instructor
Date: 05-Dec-22 Date: