1190 1180 1170 1160 1150 1140 1130 1120 1110 1100 1090 1080 1070 1060 1050 1040 1030 1020 1010 1000 990 980 970 960 950 940 930 920 910 900 890 880 870 860 850 840 830 820 810 800 790 780 770 760 750 740 730 720 710 700 690 680 670 660 650 640 630 620 610 600 590 580 570 560 550 540 530 520 510 500 490 480 470 460 450 440 430 420 410 400 390 380 370 360 350 340 330 320 310 300 290 280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 -10
SHIP-SHORE POWER
SHIP-SHORE POWER
SHIP-SHORE POWER
SHIP-SHORE POWER
SHIP-SHORE POWER
SHIP-SHORE POWER
SHIP-SHORE POWER
SHIP-SHORE POWER
SHIP-SHORE POWER
SHIP-SHORE POWER
SHIP-SHORE POWER
SHIP-SHORE POWER
WATER-BALLAST WATER VAULT WATER-BALLAST WATER VAULT WATER-BALLAST WATER VAULT WATER-BALLAST WATER VAULT BUNKER WATER-BALLAST WATER VAULT WATER-BALLAST WATER VAULT WATER-BALLAST WATER VAULT BUNKER WATER-BALLAST WATER VAULT WATER VAULT WATER-BALLAST WATER-BALLAST WATER VAULT BUNKER WATER-BALLAST WATER VAULT WATER-BALLAST WATER VAULT
BUNKER FUNNEL PIT FUNNEL PIT FUNNEL PIT FUNNEL PIT FUNNEL PIT
FUNNEL PIT FUNNEL PIT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
eEJT
1
2
2
3
3
4
4
C1 - 371 TGS B1 - 371 TGS A1 - 371 TGS
N
29 29
A C3 - 273 TGS
C4 - 273 TGS
RF - 70 TGS
RF - 70 TGS
19
19
20
20
B3 - 273 TGS
B4 - 273 TGS
RF - 70 TGS
RF - 70 TGS
19
19
20
20
20
20
RF - 70 TGS
RF - 70 TGS
19
19
A3 - 273 TGS
A4 - 273 TGS
WE, [CHEC], VERIFY THAT THIS CONTRACTOR'S DOCUMENT A
30 C5 - 371 TGS 29 B5 - 371 TGS A5 - 371 TGS 29
E5 - 526 TGS
C8 - 371 TGS
E1 - 526 TGS
B8 - 371 TGS A8 - 371 TGS
GATE
E2 - 632 TGS E4 - 632 TGS
LANE 7
·
OVERSIZE
IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
E7 - 950 TGS
OOG
06
OVERSIZE
05
15
04
03
16
02
01
STOP
BUS
13 01 / 02 08 11 06
E8 - 1001 TGS
01
23
02
22
03
17
04
TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
10
20% SLOPE
18
RAMP UP
D02
05
07
DIESEL PUMP 280 US GALLON
DIESEL TANK
06
24 24
PG PG
JOCKEY PUMP
PG
LANE 7
OVERSIZE
OVERSIZE
PG PG
OOG
RAMPSLOPE
20% UP
EMERGENCY EMERGENCY 09 23
GATE GATE
RADAR
SHELTER
FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED
KEY PLAN FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:
NOTES:
B 1. ALL DIMENSIONS IN MILLIMETERS UNLESS
B
OTHERWISE NOTED.
2. ALL LEVELS ARE IN METERS CORRESPONDS TO ABU
DHABI DATUM(ADD) . OTHER RELATED LETTERS / RFI WHICH DOCUMENT
3. COORDINATE SYSTEM BASED ON KPIZ(IRTF2000), CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
WGS 84 ZONE 40N.
LISTED BELOW:
Legends:
SYMBOL DESCRIPTION
C ZHANG XL
__________ __________ 08-Dec-22
________
GATE VALVE (IV)
PRINT NAME SIGNATURE DATE
WATER METER DOCUMENT STATUS STAMP
PRESSURE REDUCING VALVE (PRV)
CODE 1 WORK MAY PROCEED
BACK FLOW PREVENTER (BF)
PRV TERMINAL SUBSTATION TRANSFORMER ROOM LV ROOM UPS ROOM BATTERY ROOM IT ROOM Rev Date Description Drawn Chkd Appr
GROUND FLOOR IV HB Drawn by / Date Checked by / Date Approved by / Date
IV SD 08-Dec-22 MS 08-Dec-22 AP 08-Dec-22
G Client
G
0.35 L/S
25Ø FROM EXTERNAL
CWS WATER NETWORK
REFER TO DRW
Contract No. & Project Title
2101-297-VW-7110-02032
H SHAMAL DEVELOPMENT TOPSIDES H
AND INFRASTRUCTURE WORKS
CONTRACT NO. 2101-297
Independent Checking Engineer
Signature
Contractor
J J
DO NOT SCALE FROM THIS DRAWING
Consultant
K K
Halcrow International Partnership
P.O.Box 360, Dubai, U.A.E.
www.jacobs.com
Drawing Title
1 OF 1 N.T.S A1
Drawing Status
Dec 14, 2022 - 3:13pm DASS2 File Location: C:\Users\dass2\ACCDocs\Jacobs\AE AE326PMD-Shamal-CT3\Project Files\30 Design WIP\05 Building\13 11kV Substations MS1\02 DWG\2101-297-VW-8510-02221.dwg