Download as pdf or txt
Download as pdf or txt
You are on page 1of 31

Rowners is the combination of professionals with over 35 years of experience in

international logistics and project management. We are specialized in the design


and execution of complex movements, heavy weight transport and lifting of over
sized loads including transport from factory up to final destination.
WHO ARE WE

Juan Andres Turner Director and partner of Rowners


International Trade Bachelor. Forth generation in the shipping business who started
his great grand father back in 1878 with the ship agency J E Turner. As from 1988
Juan Turner works in this business in which he played directive roles in J E Turner, C
Steinweg, and Altius for whom he established the Latam network. In 2015 he
started Rowners SA, specialized in international logistics for project cargo. This firm
is already a market leader in this sector.

Pablo Palicio Operations Manager at Rowners

International Trade Bachelor and Custom Broker. As from 1996 leading operations
in various freight forwarders. He is responsible for the conventional freight
forwarding division coping ocean, road and air transportation. He also supervise
our custom clearance operations. Very well known by colleagues, suppliers and
customers as a reference in follow up and executions of operations with the
highest performance.
Federico Alemandi Project Cargo Manager at Rowners

Industrial engineer. Bounded to international trade as from 2000. He was


responsible for Cargill’s flour export division, manager for Maruba and CMA CGM’s
offices at Rosario.
As from Rowners beginning he is the responsible for project cargo operations
leading different type of logistics in various industries widening the quantity of
services rendered year by year.

Luciano Grattone Operations Analyst at Rowners

Industrial engineer. He is an analyst for the conventional freight forwarding division


coping ocean, road and air transportation. Coming from the automotive parts
industry and specialized in quality management systems.
Andrea Rodriguez Partner. Administration and Finance Manager at
Rowners
As from 1993 she started as accountant auditor in Price Waterhouse Coopers,
PWC, leading auditing teams in industrial and service provider customers. She
afterwards leaded consulting teams in IBM specialized in SAP for local and
worldwide customers.
In 2015 she established Rowners with Juan Turner in Argentina, Uruguay and USA.
Under her custody, administration and finance of all the firms under her umbrella
are profiting for the benefit of suppliers, customers, employes and shareholders.

Marisa Rodriguez Administrative Accounting Analist


Marketing Bachelor. She works in commercial administration as from 2005 in EAN
and as from 2022 she joined to Rowners administration’s team.
SERVICES

 Door to door International logistics


 Ocean, land and air national and International transportation
 In House customs brokerage
 Engineering and magement of projects
 Projects feasebility studies, roud surveys, lifting manouvres análisis and special cargoes
handling.
 Lifting manouvres execution with heavy and médium size cranes, gantry cranes and special
jacking and slidding movements.
 Special and oversized transport using mechanic, hydraulic trailers, beams spreader up to 500
tons and self propelled trailers.
 Tailer made dedicated Logistics, yard management, wharehousing, transport and packaging.
EXPERIENCE

Wood pulp mil


Period: June 2016
Location: From Piracicaba, SP, Brazil to Capitan Bermudez,
Santa Fe.
Cargo: Road transportation of two evaporators.

Generator
Period: June 2016 / Aug 2016
Location: Ocean transportation from FCA Albany up to
Buenos Aires including discharge on to storage
area at site.

Cargo: GE 303 tons Generator and 71 tons rotor.


Dam
Period: Aug 2016 / Jul 2017
Location: From Campos Novos, SC, Brazil to Ramallo,
Buenos Aires.
Cargo: Road transportation of a complete fabrication
line comprising 369 cbms.

Power Generation Plant


Period: Oct 2016 / Apr 2017
Location: Reception at Zarate from various origins.
Project site at Caimancito, Jujuy.
Cargo: 5 engines with 210 tons each, 6240 cbms,
generators and other components plus 121
containers.

Wood Pulp Plant


Period: Oct 2016
Location: From Piraciacaba, SP, Brazil to Capitan
Bermudez, Santa Fe.
Project site at Caimancito, Jujuy.
Cargo: Road transportation of a heat intercooler.
Hardboard Plant
Period: Nov 2016
Location: From Campos Novos, SC, Brazil to Ramallo,
Buenos Aires.
Cargo: Road transportation of a complete
fabrication line comprising 369 cbms.

Power Generation Plant


Period: Nov 2016 / Apr 2017
Location: Reception at Zarate from various origins. Site
based at Cañada de Gomez, Santa Fe.
Cargo: 4 engines with 293 tons each, 4500 cbms,
generators and other components plus 60
containers.

Power Generation Plant


Period: Nov 2016 / Mar 2017
Location: Reception at Zarate from various origins. Project
site at Perez, Santa Fe.
Cargo: 8 engines with 143 tons each, 3600 cbms,
generators and other components plus 86
containers.
Power Generation Plant
Period: Nov 2016 / Mar 2017
Location: Reception at Zarate from various origins. Project
location at Villa Ocampo, Santa Fe.
Cargo: 5 engines with 143 tons each, 3700 cbms,
generators and other components plus 68
containers.

Crane
Period: Dec 2016
Location: Services from FCA up to FOB Rotterdam for
further transport to Campana, Buenos Aires.
Cargo: 1 used Terex Crawler Crane with 2683 cbms.

Crane
Period: Dec 2016 / Jan 2017
Location: Maritime transportation from FCA Antwerp,
Belgium to Zarate.
Cargo: 2 new roro self-propelled Liebherr cranes, 414
cbms.
Power Generation Plant
Period: Feb 2017
Location: Transportation from FCA Antwerp up to FOT
Buenos Aires port terminal.
Cargo: GE Turbo Group components for about 4200
cbms and 16 containers.

Hardboard plant
Period: Mar / Apr 2017
Location: From Campos Novos, SC, Brazil to Ramallo,
Buenos Aires.
Cargo: Woodchipper plant transported by road.

Power Generation Plant


Period: Dec 2016 / Jul 2017
Location: Cargo reception at Zarate from various origins,
storage, road transportation and discharge at
site located in Pilar, Buenos Aires.
Cargo: Service included skidding inside engine hall and
mounting of 6 engines with 292 tons each and
6 generators of 72 tons each. Total 8.027 cbms
plus 197 containers.
Power Generation Plant
Period: Mar / Jul 2017
Location: Cargo reception at Zarate, storage and road
transportation up to Anchoris, Mendoza.
Cargo: Service included skidding inside engine hall and
discharge of 4 engines with 139 tons each up to
working position. Total cargo 1431 cbms plus 81
containers.

Power Generation Plant


Period: Mar / Aug 2017
Location: Cargo reception at Bahia Blanca, storage, road
transportation up to Ingeniero White, skidding,
and discharge onto their bases in working
position.
Cargo: 6 engines with 295 tons each, total 7752 cbms
plus 181 SOC containers.
Power Generation Plant
Period: Feb 2018
Location: Cargo reception at Hamburg, storage and
ocean transportation up to Zarate. Project
based at Timbues, Santa Fe.
Cargo: More than 600 cbms of general and oversized
cargo.

Motorboat
Period: Jul 2018
Location: Cargo reception at Buenos Aires, storage at
port, unstuffing and delivery to customer's
premises.
Cargo: 40 ft Flat rack

Power Generation Plant


Period: Apr 2018
Location: Cargo reception at Humen, China, storage and
ocean transportation up to Zarate. Project
located at Timbues, Santa Fe.
Cargo: More than 2600 cbms of general and oversized
cargo.
Power Generation Plant
Period: May / Dec 2018
Location: Loading and road transportation from Zarate
and Buenos Aires ports up to site at Timbues,
Santa Fe.
Cargo: More than 3200 cbms of general and oversized
cargo.

Power Generation Plant


Period: Dec 2018
Location: Girder beams road transportation from Buenos
Aires customer’s site across Buenos Aires
city up to Timbues, Santa Fe site for
further discharge onto foundations using
Mega Lift crane.
Cargo: Siemens 300 tons Turbine and 300 tons
Generator plus 207 cbms of accessories.
Power Generation Plant

Period: Feb / Apr 2019


Location: Transportation from Zarate up to site at Timbues,
Santa Fe.
Cargo: HRSG with more than 5500 cbms of general and
oversized cargo.

Tyre manufacturer

Period: Aug 2019


Location: Ocean transportation from Antwerp to Zarate,
Buenos Aires.
Cargo: Oversized machinery in mafi trailers.
Paper Mill
Period: Feb / Apr 2019
Location: Reception from hook and road transportation from
Zarate to San Andrés de Giles, Buenos Aires.
Cargo: 83 containers and a yankee dryer of 83 tons.

Paper Mill
Period: Mar / Sep 2019
Location: Reception from hook, storage at port and road
transportation from Zarate to adjacent Industrial Park
including discharge of yankee dryer at site.
Cargo: 206 containers and a yankee dryer of 149 tons.
Aluminum smelter plant
Period: Aug 2020
Location: Pre-carriage, stuffing and ocean transportation from
New York up to Puerto Madryn, Chubut.
Cargo: Machinery stuffed in 4 x 40 OT.

Windmill Gear Box


Period: May 2021
Location: Ocean transportation from Melbourne to Buenos Aires.
Cargo: Windmill gear box replacement loading in 1 x 40 flat
rack with over dimensions.
Engineering Company
Period: Oct 2021
Location: Pre-carriage, stuffing and ocean
transportation from Tianjin, China to Buenos
Aires.
Cargo: Stainless steel pipes and parts stuffed in 8 x
40 HC.

Aluminum Smelter Plant


Period: Nov 2021
Location: From Antwerp to Zarate .
Cargo: Shipped one roro feeder truck from Antwerp
to Zarate
Aluminum Smelter Plant
Period: Mar 2022
Location: From EXW Canada to Puerto Madryn, Chubut.
Cargo: Aluminum pipes.

Aluminum Smelter Plant


Period: Apr 2022
Location: From EXW US to Buenos Aires.
Cargo: Machinery in 40 flat rack with OOG.
Engineering Company

Period: Jun 2022


Location: Road transportation from Uruguay to Chile
crossing Cordillera de los Andes during winter
season.
Cargo: RORO used crane on tracks.

Rigger

Period: Jul 2022


Location: Ocean transportation from Zarate to
Cartagena, Colombia of crane parts stuffed in
4 mafi trailers.
Cargo: RORO used crane parts.
RORO multipurpose operator

Period: Jul 2022


Location: RORO discharge of a 161 tons transformer performed at
Zarate using special mafi trailer.
Cargo: new transformer
Rigger

Period: Jan 2023


Location: From Zarate to Antwerp
Cargo: Ocean transportation of a Terex HC110 and it’s parts

Aluminium smelter plant

Period: Feb 2023


Location: From Baltimore to Zarate
Cargo: FOB delivery and ocean transportation of a suction
tube
Tyre manufacturer

Period: Mar 2023


Location: From Hamburg to Buenos Aires
Cargo: Measurement machine shipment shipped in flat
rack oog

Flight simulator seller

Period: May 2023


Location: From Buenos Aires to Shanghai of a Boing 737
flight simulator.
Cargo: Rigging, packing, FOB delivery and ocean
transportation
Oil and Gas

Period: Jul 2023


Location: From Terminal Zarate up to Punta Quilla, Santa
Cruz, AR
Cargo: Port services and road transportation of a
spooling machine

Engineering Company

Period: Jul 2023 to Dec 2023


Location: Salta. Argentina
Service: Crane rental of two cranes, 400 and 130 tons
lifting capacity at a lithium project
Flight simulation seller

Period: Jul 2023


Location: Buenos Aires. Argentina
Cargo: Port, transport and rigging of a Boing 737
flight simulation delivered at Ezeiza airport

Steel products manufacturer

Period: Ago 2023


Location: Buenos Aires. Argentina
Service: Road transportation of a 107 tons transformer
from two Buenos Aires locations including
manual discharge at site.
Engineering company

Period: Ago 2023


Location: From China to Buenos Aires
Cargo: 50 tons of valves transported by air shipment

Power generator

Period: Sep 2023


Location: Santa Fe. Argentina
Service: Road transport from Zarate to thermal power
station located at Santa Fe province. 1100
cbms transported in low bed and standard
trailers.
Windmill manufacturer

Period: Sep 2023


Location: From Bahia Blanca to Zarate
Cargo: Transport and port delivery of 4 gearboxes

Aluminium smelter plant

Period: Sep 2023


Location: From Hamburgu to Puerto Madryn in OT with
over height.
Service: Linde forklifts shipments
Juice Evaporator

Period: Oct 2023


Location: From EX Santa Fe (Agentina) to Port
Elizabeth (Sourt Africa
Cargo: Load, Land and Ocean Transportation

Petroleum Company

Period: Nov 2023


Location: From Terminal Zarate up to Punta Quilla, Santa
Cruz, AR
Cargo: Port services and road transportation of vaious
materials for offshore platforms
Flight simulation seller

Period: Jan 2024


Location: Buenos Aires. Argentina
Cargo: Airbus 330 flight simulator upgrade kit ad tools
shipment back from Ezeiza Airport to
Netherlands

Petroleum Company

Period: Feb 2024


Location: From Punta Quilla, AR to erminal Zarate
Cargo: Underwater Cutting Tool Land Transportation
Petroleum Company

Period: Apr 2024


Location: From Punta Quilla, AR to erminal Zarate
Cargo: OOG Spooling Machine Land
Transportation
thanks, and at your disposal!

PILAR ROSARIO
Edificio Paralelo 50 Norte, Suite 326, Av Pellegrini 1950, 1st floor,
(1629) Pilar, Buenos Aires, Argentina (2000) Rosario, Santa Fe, Argentina

Local member of

www.rowners.com

You might also like