Form No: QEF 0004-1A
Quality Control Plan
Product No: FH501XX series Document No: YDC QAP005
1. Purpose
This document provides the quality guideline for inspection and test for the product ---- Gladiator
Will implement to the incoming quality control, in-process quality control, outgoing quality control.
2. Scope
To outline responsibility and inspection points for performance, reliability test and in process, outgoing quality control.
3. Reference
WI, PDS, BOM
4. Definition
QC: Quality control IQC: Incoming quality control IPQC: In process quality control
OQC: Outgoing quality control WI : working instruction MRB: Material review bill
PPS: Product Specification PQC= Patrol Quality Control
AQL=Acceptance quality level Type A=New model Type B: New version based on old model
5.2 Prod dept produce product and conduct full check on product function ,performance, cosmetic,
5.5 ME conduct analysis & improvement action on line, PQE handle quality abnormal issues happen in production line.
Form No.:YDCQUAF019A
Form No: QEF 0004-2A
Form No.:YDCQUAF019A
Quality Control Plan
Product No: FH501XX series Document No: YDC QAP005
Product Name: Gladiator Revision: E
7.0 In-Process Quality Control
Process Checking Responsed
Process Description Check Criteria Frequence Record
No. Tool/Method By
Check the air pressure:0.5--0.7MPA Pressure meter 2times/day IPQC inspector IPQC data sheet
1) Power cord word is clear, mark on the cord close to the cord
coat.Cord coat is not damaged Visual 100% Operator N/A
105 Fix the power cord 2) Cord box fitting is ok, not any inteference .
1) Screw torque 7.2-8.8kgf.cm Torque meter 3pcs/4hrs IPQC inspector IPQC data sheet
Tie the motor lead wire and pass 1) Lead wire is not damaged,
120 Visual 100% Operator N/A
through the motor cover 2) Motor cover free of damage or short material , deformation
1) The lower motor seal rubber ok, no damage or short material. Fit ok
,no inteference
Torque meter 3pcs/4hrs IPQC inspector IPQC data sheet
Fit the motor cover ass'y& acrew 2) Motor cover assembly fit ok, no inteference
130 3) No miss the screw or loose the screw
bump assembly
Screw torque 7.2-8.8kgf.cm Torque meter 3pcs/4hrs IPQC inspector IPQC data sheet
Motor cover fit well, no missed screw or screw loose Visual 100% Operator N/A
135 Screw motor cover assembly
Screw torque 7.2-8.8kgf.cm Torque meter 3pcs/4hrs IPQC inspector IPQC data sheet
Force : 5kg min Force meter 3pcs/4hrs IPQC inspector IPQC data sheet
Inspect the grounded wire Clip the power cord grounded terminal , another touch the motor steel
Visual 100% Inspector IPQC data sheet
connection plate or fan , the light have be on , testing is passed or reject
500
Layout wires 1) Wire can not be pinched, wire layout is same as WI.
Fit the wire cover Visual 100% Operator N/A
2) Wire cover fit ok , no inteference
Screw wireing cover ok , no miss screw or loose Visual 100% Operator N/A
145 1) Screw the wiring cover, and fit
the turbine ass'y
Screw torque 7.2-8.8kgf.cm Torque meter 3pcs/4hrs IPQC inspector IPQC data sheet
1) Screw bump, no miss screw or loose
2) Rod function ok, the turbine door can close or open Visual 100% Operator N/A
1) Screw the turbine ass'y
150
2) Fit the rod and spring
Screw torque 7.2-8.8kgf.cm Torque meter 3pcs/4hrs IPQC inspector IPQC data sheet
Screw torque 7.2-8.8kgf.cm Torque meter 3pcs/4hrs IPQC inspector IPQC data sheet
1) Back panel is not damaged, short material ,flash on the hole round
the tank rubber seal or silkscreen poor .
Fit the solution tank rubber seal,
175 2) Pedal color is ok, is not broken on fitting , function ok, no missed Visual 100% Operator N/A
release pedal
spring
3) Rubber fitting ok, no damaged or short material
Screw torque 7.2-8.8kgf.cm Torque meter 3pcs/4hrs IPQC inspector IPQC data sheet
Screw torque 7.2-8.8kgf.cm Torque meter 3pcs/4hrs IPQC inspector IPQC data sheet
Stick rating label & AT label 1) Lables ok, no wrong or pelled off Visual 100% Operator N/A
Handle into bag, unit packed by 1) All parts free of damage or dirt
700 Visual 100% Operator N/A
faom 2) Unit pack ok , no inteference
Put the detergent, turbine in the 1) Detergent QTY ok, detergent no leakage , its packing is ok
710 Visual 100% Operator N/A
upper foam 2) Turbine /maunal is not missed
720 Put the tool into bag 1) Tool is not damage or missed, weight ok Visual 100% Operator N/A
1). Weight ok, green On, seal the box then put the board
Visual 100% Operator N/A
2). Board is not damaged
Scale the unit /put the unit to
740--750
board
Update spec: Record 10datas and update spec Scale 1time/2hrs IPQC inspector IPQC data sheet
150 Quick connection valve inspection 1) Put part on the fixture, ,keep pressure 30--40PSI/5s , no leakage . Visual 100% Inspector IPQC data sheet
Check pressure: 0.5--0.7MPA Pressure meter 2times/day IPQC inspector IPQC data sheet
Screw torque :7.2-8.8kgf.cm Torque meter 3pcs/4hrs IPQC inspector IPQC data sheet
500 Inspect the bump seal function Keep pressure 7-10kpa/5s, no leakage, detail refer to WI Visual 100% Inspector IPQC data sheet
510 Inspect the bump flow rate Suction17.5Kpa, flow rate :≥0.4L/min. detail refer to WI Visual 100% Inspector IPQC data sheet
1)Temp setting same WI, water tube fitting ok , water tube fitting well
Insert the water tube/check the
520 2) Valve no crack , bump inlet seal no missed Visual 100% Operator N/A
bump
3) Packing same as on the packing instruction
Check pressure: 0.5--0.7MPA Pressure meter 2times/day IPQC inspector IPQC data sheet
Press the bearing assemby to Bear fitting is in proper position Visual 100% Operator N/A
middle housing
110
Press the idler gear shaft to
middle housing
Check pressure: 0.5--0.7MPA Pressure meter 2times/day IPQC inspector IPQC data sheet
Check pressure: 0.5--0.7MPA Pressure meter 2times/day IPQC inspector IPQC data sheet
18.9V,13Kpa input suction , meet with the loading speed 575 RPM min
500 Check the turbine loading speed Visual 100% Inspector IPQC data sheet
, details refer to WI
1) All parts free of damage , short material . Distributor hole is not flash
2) Welding is ok, no step , melt time: 0.69s, sold time 0.38s , detail
Welding the distributor lower to
100 refer to WI Visual 100% Operator N/A
turbine housing lower
3) Distributor hole inspection : Make sure all the hole is smooth, and
water can flow from holes
Cut the welding position, welding ok, all welding position melt well Visual First samples IPQC inspector IPQC data sheet
Keep pressure 6.9---15 Kpa , keep for 6s, the leakage 160 pa max,
500 Inspect the tank seal function Visual 100% Inspector N/A
other detail refer to WI
Screw torque :7.6-8.3kgf.cm Torque meter 3pcs/4hrs IPQC inspector IPQC data sheet
150 Stick the labels Labels free of daamge or peel off Visual 100% Operator N/A
1) Cut off the welding section, all welding area connection ok Visual First samples IPQC inspector IPQC data sheet
Keep pressure 6.9---15 Kpa , keep for 5s, the leakage 500 pa max,
500 Welding sealing test Visual 100% Inspector IPQC data sheet
other detail refer to WI
Check the welding position : use the gauge check Visual First samples IPQC inspector IPQC data sheet
1.The carton shall be free from any damage, crack, deformation, etc.
2.The content of each carton is correct and all accessories are correct per BOM and
Packing material packing sample or packing information.
1 Visual 5pcs/2Hrs OQC data sheet
Check 3.The manual, record envelope,consumer response wrap,and quick start sheet are
correct and legible.
4.All label is correct and legible.
2.Rating ,model number&serial number and the country of origin are correctly marked on
Visual 5pcs/2Hrs OQC data sheet
the rating label.
3.Date code&serial number location and formate are correctly marked. Visual 5pcs/2Hrs OQC data sheet
4.No foreign material or loose part exist inside of the housing. Visual 5pcs/2Hrs OQC data sheet
5.Gap between mating plastic part need not worse than golden samples, no sharp edge Visual 5pcs/2Hrs OQC data sheet
6.All screws must be in place and tightened per YDC requirement. Torque driver 5pcs/2Hrs OQC data sheet
Appearance and
2
fitting check 7.Hose grip assembly.
-The control lever is presented correctly and spring correct.
Visual 5pcs/2Hrs OQC data sheet
- The hose connector fit to hose correctly and no falling off by slightly pull.
-Tank latch fitting ok, its spring is in right position, mating wiht unit ok,
11.Nozzle assembly.
2 Appearance Check -Squeegee no deformation severely and assembled well on nozzle. Visual 5pcs/2Hrs OQC data sheet
-Nozzle assembled well with nozzle tube cover by UV glue.
12.Handle assembly.
-Control rod is assembled well onto handle, not any ineference
-Cord clip function ok, no loose Visual 5pcs/2Hrs OQC data sheet
-Trigger funciton ok
4. Unit & Solution standing test : No water leakage after 2hrs on the paper cut
Verify 1pcs /2Hrs OQC data sheet
Functional&Perform 6. The unit shall not generate abnormal noise,intermittent noise,or excessive vibration
3 during running and motor spinning slow down after power off. Verify 5pcs/2Hrs OQC data sheet
ance Check
8. Check the float function: float shut off while water in the recovery tank reach 75% . Verify 2pcs/day OQC data sheet
1. For new project production, 3pcs run the test about every 5000 units, it the reliability tests are positive when production quantity is accumulated to
2. Reliability Test
10000 units, will draw the testing sample by below 2nd plan
2. For the normal production units, 3 samples have to be drawn about every 10000 units to perform below each test group.
Moving bed
1.Input 120VAC/60Hz voltage,cycling test with 8 min ON and 2 min OFF on carpet( Test procedure :FCTP-0502r)
Item A
2. Test spec : 150hrs min
4
ABR test
Item B Test procedure : FCTP-0500r
Specification: 100 floors
Unit drop
ItemC Refer to test procedure:(refer to FCTP-0600A)
Specification: No crack