Professional Documents
Culture Documents
A Line History Card
A Line History Card
A Line History Card
sl.no MAKE MACHINE DAY MONTH YEAR ISSUE ACTION USING SPARES REMARKS
1 WOOJIN A01 30 NOVEMBER 2015 PILOT VALVE PROBLEM PILOT VALVE CHANGED PILOT VALVE CHANGED
4 WOOJIN A01 30 SEPTEMBER 2017 SCREW TIP PROBLEM SCREW TIP PROBLEM/CHANGED SCREW TIP - DIA 65 MM
6 WOOJIN A01 10 AUGUST 2018 CORE OIL LEAKAGE PROBLEM WITHOUT QRC , DIRECT COUPLING PROVIDED CONNECTORS AND HOSE
7 WOOJIN A01 3 SEPTEMBER 2018 BARELL TEMPERATURE PROBLEM THERMOCOUPLE CHANGED SPRING LOAD THERMOCOUPLE
8 YUSHIN A01 3 SEPTEMBER 2018 NEW ROBOT FIXED SC 350 DLL MODEL ROBO FIXED -
9 MORETTO A01 8 SEPTEMBER 2018 HOPPER DISPLAY BOARD PROBLEM DISPLAY BOARD CHANGED DISPLAY BOARD
10 WOOJIN A01 14 OCTOBER 2018 NOZZLE BLOCK NOZZLE AREA MATERIAL BLOCK CLEANED -
11 WOOJIN A01 13 NOVEMBER 2018 NOZZLE BLOCK REMOVE NOZZLE CHANGE SPARE NOZZLE -
13 YUSHIN A01 18 JANUARY 2019 SERVO AMPLIFIER REMOVED FROM SUB ARM SO SERVO AMP REPLACE TO B03 FOR RUNNING
15 WOOJIN A01 11 APRIL 2019 PUMP & HEATER OFF DURING RUNNING TIME INSIDE PANEL MCB TRIPPED . CORRECTED
16 WOOJIN A01 13 MAY 2019 NOZZLE BLOCK REMOVE NOZZLE CHANGE SPARE NOZZLE
18 WOOJIN A01 19 MAY 2019 LAYOUT TO BE CHANGE LAYOUT CHANGED, POSITIONED, LEVELING CHECKED
19 WOOJIN A01 27 MAY 2019 MATERIAL LEAK PROBLEM SHORT NOZZLE CHANGED, HEATER CHANGED HEATER CHANGED
20 WOOJIN A01 8 JULY 2019 SCREW TIP BROKEN NEW SCREW ASSEMBLED, BUT OLD SCREW TIP ASSEMBLE DIA 65 SCREW
21 WOOJIN A01 12 DECEMBER 2019 NOZZLE LEAK PROBLEM NOZZLE HEATER FAILURE HEATER 40 * 60 MICA (FANUC)
22 WOOJIN A01 14 DECEMBER 2019 PM TO BE CARRIED PM WORK DONE , MTC MANIFOLD FIXED 10*3/8 ONE TOUCH NIPPLE
23 WOOJIN A01 29 DECEMBER 2019 INJECTION HYD HOSE OIL LEAK PROBLEM MANIFOLD AREA TIG WELDING WORK DONE
24 WOOJIN A01 JANUARY 2020 LONG NOZZLE HEATER FAILURE NEW HEATER CHANGED HEATER 110*40 MICA
27 WOOJIN A01 19 FEBRUARY 2020 NOZZLE LEAK HEATER FAILURE NOZZLE RADIUS PROVIDED, HEATER CHANGED MICA HEATER 40*40 , 60*60
28 WOOJIN A01 19 MARCH 2020 NOZZLE BLOCK REMOVED NOZZLE AND CLEANED THEN OK
29 WOOJIN A01 18 MAY 2020 LUMPS LEAKAGE PROBLEM NOZZLE HEATER CHANEGD MICA HEATER 40*40
30 WOOJIN A01 1 JUNE 2020 ABNORMAL SOUND PROBLEM PUMP CATRIDGE NEED TO REPLACE
31 WOOJIN A01 17 JUNE 2020 OLD HYDRAULIC OIL REMOVE AND TANK CLEANED NEW HYDRAULIC OIL FILLED 46 GRADE
32 TOOL TEMP A01 25 JUNE 2020 MTC HEATER FAILURE NEW HEATER CHANGED AND CHECKRD MTC HEATER BIG CHANGED
MTC HEATER FAILURE DUE TO WATER OUT AND IN NEW HEATER FAILURE DUE TO MOULD GOING WATER IN AND
33 TOOL TEMP A01 26 JUNE 2020 SPARE HEATER CHANGED
VALVE CLOSED CONDITION OUT VALVE CLOSED CONDITION
OPERATING POWER NOT TURNED ON ALARM EMERGENGY SAFETY RELAY FAILURE NOW TEMPERAVERY
36 WOOJIN A01 1 JULY 2020
CAME AND HEATER AND PUMP NOT ON BYPASSED THE RELAY
38 WOOJIN A01 10 AUGUST 2020 OIL LEAK PROBLEM TWO HYDRAULIC CYCLINDER SEAL CHANGED ON HEAD SEAL SET - 2 QTY
39 WOOJIN A01 7 SEPTEMBER 2020 MOLD CLOSE TIME SENSOR ALARM SENSOR WIRING CECKED CORRECTED
40 WOOJIN A01 1 OCTOBER 2020 OIL LEAK PROBLEM OIL LEAK ARRESTED
RUNNING TIME LOCK FRWD AND BACKWARD DISPLY BACK SIDE COMMUNICATION CABLE CHANGED LOCK COMMUNICATION CABLE CONNECTOR
43 WOOJIN A01 16 OCTOBER 2020
ALARME CAME 4TH FORWARD SENSOR FAILURE NEW SENSOR CHANGED . AND PROXIMITY SENSOR
45 WOOJIN A01 18 NOVEMBER 2020 TEMP VARIATION PROBLEM TEMP MODULE REMOVED , CLEANED THERMOCOULE (SPRING LOADED)
46 WOOJIN A01 23 NOVEMBER 2020 OIL LEVEL LOW TOPUP NEWOIL 30LTS 46 GRADE
47 WOOJIN A01 28 DECEMBER 2020 NOZZLE TEMPERATURE PROBLEM HEATER FAILURE NEW HEATER CHANGED. D60*L60
48 WOOJIN A01 7 JANUARY 2021 RUNNING TIME CORE SIGNAL NOT MADE CHECKING OIL LEVEL LOW . TO PROVIDE 50LTRS OIL TOP UP OK HYDRUALIC OIL
53 WOOJIN A01 20 AUGUST 2021 NOZZLE AREA MATERIAL LEAK PROBLEM TWO HEATER UNIT REPLACED , MATERIAL CLEANED
Checked and found cover was bend so bend removed and fixed
54 WOOJIN A01 7 APRIL 2022 Abnormal sound during refilling
after ok
55 WOOJIN A01 25.04.22 APRIL 2022 PM WORK TO BE CARRIED PM work done Hari
Checked and found the screw tip was broken so new tip
57 WOOJIN A01 5/9/2022 MAY 2022 Backflow issue
changed then ok
58 WOOJIN A01 13.05.22 MAY 2022 PM WORK TO BE CARRIED PM work done Hari
61 WOOJIN A01 5/23/2022 MAY 2022 Nozzle contact force not building Checked and found oil leak in valve so waiting for valve spare
63 WOOJIN A01 05.06.22 JUNE 2022 Water outlet mould water hose water leakage MTC water hoses removed and reconnected done
LUBRICATION PROBLEM
ROBOT INTERCHANGE
CUSHION PROBLEM
BARREL CHECKING
PM TO BE CARRIED
LAYOUT TO BE CHANGE
NOZZLE BLOCK
REFILL PROBLEM
A16 TO A09
PM WORK DONE
CENTER ADJUSTED
CHECK AND HEATER WIRE CORRECT AND SSR NEW ONE CHANGE ,
NOZZLE HEATER CHANGE
Screw removed and checked. Ringplunger wrouneout new ring
plunger changed
CHANGE THE NEW BARREL AND SCREW HEAD SET
DOC NO: MR0121
REV NO: 0
REV DATE: 15.03.2018
CURRENT MONTH/YEAR:
- -
GREASE CATRIDGE 1 NO
- -
SCREW TIP NEW CHANGED DIA 50 , SPACER NEW
CHANGED, CHECK RING RE WORK 1 +1
- -
MICA HEATER 2 NO
LIMIT SWITCH
330uF 450V DC 1 NO
1.5V(PANASONIC) 3NOS
FUSE 100AMPS,330MFD 440V 2 NOS
1 NO
50 dia
Preventive maintenance
System error
Preventive maintenance
System error
Preventive maintenance
cushion not maintain
Preventive maintenance
Preventive maintenance
Preventive maintenance
cushion not maintain
Preventive maintenance
Preventive maintenance
RY CARD
ACTION
Quaerterly PM done
Amplifier failure
Monthly PM done
Amplifier Corrected
Monthly PM done
New ring plunger changed and old screw changed
Quaerterly PM done
Monthly PM done
Monthly PM done
New ring plunger changed and old screw changed
Annual pm done
Annual pm done
DOC NO: MR0121
REV NO: 0
REV DATE: 15.03.2018
CURRENT MONTH/YEAR:
dia 60 1
dia 60 1
MACHINE HISTOR
sl.no MAKE MACHINE DAY MONTH YEAR
SOFTWARE UPDATION
NOZZLE BLOCK
NOZZLE BLOCK
MATERIAL LEAK
MATERIAL LEAK
NOZZLE BLOCK
ROBOT INTERCHANGE
CUSHION PROBLEM
NOZZLE LEAK
NOZZLE BLOCK
CUSHION PROBLEM
NOZZLE BLOCK
CENTER PROBLEM
PM TO BE CARRIED
LAYOUT TO BE CHANGE
PM TO BE CARRIED
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
PM WORK DONE
Servo error
SOFTWARE UPDATION
CENTERING CHECKED
A09 TO B03
CENTER ADJUSTED
PM WORK DONE
NEW NOZZLE HEATER CHANGED AND 10A FUSE AND SSR CHANGED
PM WORK DONE
Checked and power circuit module removed and serviced then found
ok
Robot guid rods are cleaned and lubrication grease applied done.
- -
- -
- -
- -
- -
DRYER FILTER 1 NO
- -
- -
- -
- -
- -
THERMOSTAT 170 A
HEATER 40 * 60 MICA 1
HEATER 40 * 60 MICA (FANUC) 1
1.5V(PANASONIC) 4NOS
D40 L 80 300W 1
read switch 1 NO
43
44
45
HINE HISTORY CARD
ISSUE
TEMP PROBLEM
NOZZLE LEAK
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
LAYOUT TO BE CHANGE
NOZZLE BLOCK
DRYER PM
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE LEAK PROBLEM
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
PM WORK DONE
System error
System error
SSR CHANGED
PM WORK DONE
Checked and found Inside one drive was not on so control fuse failed
(3.2A) so replaced and drive removed and checked found IGBT was
failed so changed IGBT then assembled and checked found same
issue . Under maintenance
Checked and found Inside one drive was not on so control fuse failed
(3.2A) so replaced and drive removed and checked found IGBT was
failed so changed IGBT then assembled and checked found same
issue . Under maintenance
cooling fan again changed from C10
Power pcb serviced then fix ahain fuse fialure.finally fanuc service
persons new drive changed then ok
DOC NO: MR0121
REV NO: 0
REV DATE: 15.03.2018
CURRENT MONTH/YEAR:
SSR 1 NO
- -
- -
- -
MICA HEATER 1 NO
1
MACHINE HISTOR
sl.no MAKE MACHINE DAY MONTH YEAR
10
HINE HISTORY CARD
ISSUE
NOZZLE BLOCK
NOZZLE BLOCK
24vdc 4nos
MACHINE HISTOR
sl.no MAKE MACHINE DAY MONTH YEAR
5
HINE HISTORY CARD
ISSUE
PM WORK
RY CARD
ACTION
PM WORK DONE
DOC NO: MR0121
REV NO: 0
REV DATE: 15.03.2018
CURRENT MONTH/YEAR:
10
38
39
40
41
42
43
44
45
HINE HISTORY CARD
ISSUE
REFILLING PROBLEM
NOZZLE BLOCK
PM WORK
PM WORK DONE
Machine movement work so power cable , water hoses and air hoses
removed and insulated
HYD hose damaged so PU hose changed then ok
Outsource person came for machine movement and moved the m/c as
per marking
Machine movement completed so power line , air line and water line
connection work done
DOC NO: MR0121
REV NO: 0
REV DATE: 15.03.2018
CURRENT MONTH/YEAR:
S8M 1280 1
MACHINE HISTOR
sl.no MAKE MACHINE DAY MONTH YEAR
PM WORK
PM WORK DONE
Machine movement work so power cable , water hoses and air hoses
removed and insulated
Outsource person came for machine movement and moved the m/c as
per marking
Machine movement completed so power line , air line and water line
connection work done
New touch and display changed by fanuc
DOC NO: MR0121
REV NO: 0
REV DATE: 15.03.2018
CURRENT MONTH/YEAR:
CUSHION PROBLEM
CUSHION PROBLEM
LAYOUT TO BE CHANGE
CUSHION PROBLEM
CUSHION PROBLEM
CUSHION PROBLEM
System error
HEATER CHANGED
Checked and found alarm not reset so drive interchanged from A11
m/c then also same issue so old drive fixed and calibration error alarm
came so calibration done after ok
Machine movement work so power cable , water hoses and air hoses
removed and insulated
Outsource person came for machine movement and moved the m/c as
per marking
Machine movement completed so power line , air line and water line
connection work done
Spare drive card changed to A10 drive then ok.( But that card alredy
removed from A10)
Checked robo pendant issue so ribbon cable need to purchase
1.5V(PANASONIC) 4NOS
3.6V BATTERY 1
fan replaced from old failure drive
1.5V(PANASONIC) 1
MACHINE HISTORY
sl.no MAKE MACHINE DAY MONTH YEAR
SOFTWARE UPDATION
NOZZLE BLOCK
PM TO BE CARRIED
LAYOUT TO BE CHANGE
CUSHION PROBLEM
CUSHION PROBLEM
RY CARD
REV NO:
REV DATE:
CURRENT MONTH/YEAR:
SOFTWARE UPDATION -
PM WORK DONE
REMARKS
1 NO
4
4NOS
1 NOS
1 NOS
MACHINE HISTOR
sl.no MAKE MACHINE DAY MONTH YEAR
49 YUSHIN
A12 28.07.20 JULY 2022
50 FANUC
A12 ### AUGUST 2022
FANUC A12 ### 10.30 AM 11.30 AM
ROBOT INTERCHANGE
CUSHION PROBLEM
CUSHION PROBLEM
CUSHION PROBLEM
CUSHION PROBLEM
PM TO BE CARRIED
LAYOUT TO BE CHANGE
LOW VOLT ALARM
CARTRIDGE GREASE LEVEL LOW
NOZZLE BLOCK
CUSHION PROBLEM
CUSHION PROBLEM
BATTERY CHANGING WORK
SERVO ALARM
NOZZLE BLOCK
DRYER RECEIVER NEED TO REPLACE
PM WORK DONE
HRS temperature not rising
PM WORK
SERVO ALARM
Refilling not working
cusion problem
RY CARD
ACTION
MATERIAL CLEANED
A01 TO D03
PM WORK DONE
LAYOUT CHANGED, POSITIONED, LEVELING CHECKED
BATTERY CHANGED
NEW GREASE CARTRIDGE CHANGE
REMOVE NOZZLE CHANGE SPARE NOZZLE
RING PLUNGER SET NEW ONE CHANGED
SCREW + SCREW SET CHANGED
NEW BATTERY CHANGED
TRANSFORMER INSIDE TERMINAL LOOSE CONTACT. REPLACE NEW
LEG AND TIGHT.
NEW TOSHIBA 3.6V BATTERY CHANGED
- -
- -
- -
BATTERY 4
FS2-7 GREASE CATRIDGE 1
3.6V BATTERY 1
1 NOS
RYT401D5-LS2-Z25 1
24VDC 1
SOFTWARE UPDATION
ROBOT INTERCHANGE
CUSHION PROBLEM
CUSHION PROBLEM
CUSHION PROBLEM
NOZZLE BLOCK
PM TO BE CARRIED
LAYOUT TO BE CHANGE
MTC BOARD PROBLEM
NOZZLE BLOCK
SCREW REMOVED , CLEANED
NOZZLE BLOCK
CARTRIDGE GREASE LEVEL LOW
FAN BLOWER NOT WORKIMG
SOFTWARE UPDATION
A03 TO D04
PM WORK DONE
- -
- -
- -
1.5V(PANASONIC) 4NOS
3.6V BATTERY 1
FLAP 1 NOS
MACHINE HISTOR
sl.no MAKE MACHINE DAY MONTH YEAR
19.07.22
83 FANUC A14 ### AUGUST 2022
HINE HISTORY CARD
ISSUE
ROBOT INTERCHANGE
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK
NOZZLE BLOCK PROBLEM
NOZZLE BLOCK PROBLEM
NOZZLE BLOCK PROBLEM
NOZZLE BLOCK PROBLEM
NOZZLE BLOCK PROBLEM
NOZZLE BLOCK PROBLEM
NOZZLE BLOCK PROBLEM
NOZZLE BLOCK
ROBOT SERVO AMP PROBLEM
ROBOT SERVO AMP 400W PROBLEM
NOZZLE BLOCK
ROBOT SERVO AMP 400W PROBLEM
ROBOT SERVO AMP 400WATTS PROBLEM
ROBOT SERVO AMP 400W PROBLEM
ROBOT SERVO AMP 400W PROBLEM
NOZZLE BLOCK
RY CARD
ACTION
A02 TO B04
- -
DIA 40 * 60 1
SCRUB SCREW 1 NO
- -
- -
DIA 40 * 80MM 1
- -
- -
BATTERY 4
1.5V(PANASONIC) 4NOS
SERVO AMPLIFIER 1 NO
1 NO
GMCL-55 SEAL 1 NO 1 NO
NOZZLE HEAD 1
PROGRAM ERROR
CALIBRATION PROBLEM
HOPPER
NOZZLE BLOCK
NOZZLE BLOCK
MAIN ARM BUSH CHANGED
BATTERY PROBLEM
ROBOT BATTERY PROBLEM
TIE BAR PROBLEM
NOZZLE ZONE TEMP PROBLEM
DIEHEIGHT PROBLEM CHECKING TIME TIEBAR
BROKEN , TOGGLE ,PIN BUSH CHANGE TRIAL
CHECKING TIME PROBLEM TIME NOT SLOVED AFER
THAN PURCHASE END PLATEN
PM WORK
Robot up / down bearing changing
Machine movement work
PROGRAM RE INSTALLED
CALIBRATION DONE
MOTOR CHANGED
CLAMP BUSH 1 NO
TIE BAR 1 NO
- -
- -
TIE BAR 1 NO
MOTOR 1 NO
TIE BAR 1 NO
- -
COVEYING FILLTER 1
40.50.6 / 25.33.8
32DIA 1 NO
PNP SENSOR 1NO
Bearing set
DIA 36 1SET
MACHINE HISTOR
sl.no MAKE MACHINE DAY MONTH YEAR
PM TO BE CARRIED
BATTERY PROBLEM
DRYER PROBLEM
PM TO BE CARRIED
SERVOMOTOR UNABLE TO ON
SERVOMOTOR UNABLE TO ON
SERVOMOTOR UNABLE TO ON
GREASE CATRIDGE CHANGED
NOZZLE CARAIGE CYCLINDER PRESSURE DROP
NOZZLE TEMPERURE PROBLEM ,LUMBS LEAK
Refilling issue
PM WORK DONE
BATTERY CHANGED
DRYER BLOWER MOTOR FAILURE NOW TEMPERAVERY AIR USED THEN
OK
BUSH BEARING CHANGED
PM WORK DONE
PM WORK DONE
Checked and found the screw tip was broken so changed then ok
BEARING 4
FAN BLOWER 1
SERVO AMPLIFIER 1
FS-1 catridge
16 sq
calibration done
17.03.2023
MACHINE HISTOR
sl.no MAKE MACHINE DAY MONTH YEAR
29
30
31
32
33
34
81
HINE HISTORY CARD
ISSUE
Machine movement work so power cable , water hoses and air hoses
removed and insulated
Outsource person came for machine movement and moved the m/c as
per marking
Machine movement completed so power line , air line and water line
connection work done
Chekced and new pendant changed after found communicatin error so
cable changed after ok
Machine movement work so power cable , water hoses and air hoses
removed and insulated
Outsource person came for machine movement and moved the m/c as
per marking
Machine movement completed so power line , air line and water line
connection work done
Chekced and new pendant changed after found communicatin error so
cable changed after ok
DOC NO: MR0121
REV NO: 0
REV DATE: 15.03.2018
CURRENT MONTH/YEAR:
K-TYPE THERMOCOUPLE 1 NO
PROXIMITY SENSOR 1
PROXIMITY SWITCH
PROXIMITY SENSOR 1
PROXIMITY SWITCH
Yushin robo pendant and pendant cable Each 1 no
MACHINE HISTOR
sl.no MAKE MACHINE DAY MONTH YEAR
23
24
25
26
27
28
29
30
31
32
33
34
81
HINE HISTORY CARD
ISSUE
NOZZLE BLOCK
NOZZLE BLOCK
BOOTING PROBLEM
REFILLING PROBLEM
NOZZLE BLOCK
BEARING 4
3V - CR2477N 1
BATTERY 3 V 1
UHS 40 50 6 2
16 sq
DIA 32 1