PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)

CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC


MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

1 SH108424 7-Dec-19 89211 TOWER CRANE FOUNDATION - TC 7 18,030.43

2 SH108425 7-Dec-19 89211 1st BASEMENT SUMP PIT @GRID 3/KK(POUR -01)REINF 8,863.62

3 SH108426 7-Dec-19 89211 1st BASEMENT SUMP PIT & SAND TRAP @GRID 3/EE(POUR-01)REINF 10,913.57

4 SH108501 8-Dec-19 74831 LIFT PIT(TH4)FOUNDATION (POUR-01)GRID(CC-BB)(2-3)(1/3) 15,410.55

5 SH108498 8-Dec-19 74831 1ST BASEMENT SUMP PIT & SAND TRAP@GRID 6/DD(POUR-01)REINF 10,868.64

6 SH108497 8-Dec-19 74831 1ST BASEMENT SUMP PIT & SAND TRAP@GRID 1/AA(POUR-01)REINF 13,025.56

7 SH108499 8-Dec-19 69118 LIFT PIT(TH4)FOUNDATION (POUR-01)(GRID (CC-BB)/(2-3))(3/3) 37,460.13

8 SH108500 8-Dec-19 74831 REBAR STEEL FOR TESTING 96.70

9 SH108590 9-Dec-19 75789 LIFT PIT(TH4)FOUNDATION (POUR-01)(GRID(CC/BB)/(2-3))(2/3) 37,753.27

10 SH108631 10-Dec-19 66583 1ST BASEMENT RAFT SLAB B1(POUR-01)(3/3) 51,118.72

11 SH108632 10-Dec-19 25829 1ST BASEMENT RAFT SLAB B1 LAYER.REINF(POUR-01)(2/3) 51,287.30

12 SH108610 9-Dec-19 32027 1ST BASEMENT RAFT SLAB B1 LAYER.REINF(POUR-01)(1/3) 51,288.57

13 SH108630 10-Dec-19 37297 1ST BASEMENT RAFT SLAB B2 LAYER REINF(POUR-01)(1/4) 47,481.47

14 SH108633 10-Dec-19 91740 CORE WALL STARTER {POUR-01(GRID(CC-BB)/(2-3) 11,858.14

15 SH108634 10-Dec-19 91740 CORE WALL STARTER {POUR-01(GRID(NN-MM)/(2-3)&(BB-CC)/(6-7) 13,215.20

16 SH108669 10-Dec-19 91740 TOWER CRANE FOUNDATION-TC-8(7800x7800) 13,409.17

17 SH108668 10-Dec-19 91740 1ST BASEMENT CHAIR REINF(POUR-01) 163.79

18 SH108713 11-Dec-19 37962 1ST BASEMENT RAFT SLAB B2 LAYER REINF(POUR-01)(2/4) 47,489.88

19 SH108712 11-Dec-19 19740 1ST BASEMENT RAFT SLAB B2 LAYER REINF(POUR-01)(3/4) 47,499.19

20 SH108747 11-Dec-19 39312 1ST BASEMENT RAFT SLAB B2 LAYER REINF(POUR-01)(4/4) 22,915.25

21 SH108748 11-Dec-19 39312 1ST BASEMENT RAFT SLAB SIDE BAR REINF.(POUR-01) 6,628.37

22 SH108749 11-Dec-19 39312 1ST BASEMENT RAFT SLAB RAMP STARTER REINF.(POUR-01) 331.80

23 SH108750 11-Dec-19 39312 1ST BASEMENT RAFT SLAB STAIR STARTER REINF.(POUR-01) 130.82

24 SH108774 12-Dec-19 98764 1ST BASEMENT RAFT SLAB B3,B4 ADDL LAYER REINF(POUR-01)(3/3) 51,851.02

25 SH108773 12-Dec-19 74831 1ST BASEMENT RAFT SLAB B2 LAYER REINF (POUR -01) 24,487.35

26 SH108776 12-Dec-19 37076 1ST BASEMENT RAFT SLAB B3,B4 ADDL LAYER REINF(POUR-01)(1/3) 51,997.03

27 SH108775 12-Dec-19 66583 2nd BASEMENT RAFT SLAB B3,B4 ADDL LAYER REINF(POUR-01)(2/3) 51,996.37
1ST BASEMENT RETAINING WALL STARTER & FOLDING BEAM
28 SH108953 15-Dec-19 74831 30,987.78
(POUR-01)(2/3)
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

29 SH108952 15-Dec-19 74831 ADDL STRAIGHT BARS 8,027.69

30 SH108951 15-Dec-19 74831 1ST BASEMENT SUMP PIT@ GRID 3/KK (POUR-01) REINF. 5,365.06

31 SH108950 15-Dec-19 74831 1ST BASEMENT (POUR-01) SUMP PIT & SAND TRAP @ GRID 3/EE 5,313.35

32 SH108973 15-Dec-19 47878 1ST BASEMENT LEVEL COLUMN & WALL STARTER REINF. (POUR-01) 2,868.36

33 SH108971 15-Dec-19 47878 1ST BASEMENT LEVEL COLUMN & WALL STARTER REINF. (POUR-01) 4,706.37

34 SH108970 15-Dec-19 47878 1ST BASEMENT LEVEL COLUMN & WALL STARTER REINF. (POUR-01) 7,523.44

35 SH108969 15-Dec-19 47878 1ST BASEMENT LEVEL COLUMN & WALL STARTER REINF. (POUR-01) 3,219.86
1ST BASEMENT LEVEL WATER TANK STARTER HOR BAR REINF.
36 SH108968 15-Dec-19 47878 2,248.70
(POUR-01)
1ST BASEMENT LEVEL WATER TANK STARTER VER BAR REINF.
37 SH108967 15-Dec-19 47878 14,031.27
(POUR-01)
38 SH108982 16-Dec-19 75789 1ST BASEMENT WALL STARTER & FOLDING BEAM (POUR-01)(1/3) 31,611.82

39 SH108983 16-Dec-19 37729 1ST BASEMENT WALL STARTER & FOLDING BEAM (POUR-01)(3/3) 28,543.91

40 SH109077 17-Dec-19 69118 LIFT PIT (TH4)FOUDATION (GRID(CC-BB)/(12-13))(POUR -02)(2/2) 44,463.20

41 SH109078 17-Dec-19 32076 LIFT PIT (TH4)FOUDATION (GRID(CC-BB)/(12-13))(POUR -02)(1/2) 45,401.60

42 SH109221 19-Dec-19 72160 ADDL STRAIGHT BARS 12,013.71

43 SH109222 19-Dec-19 72160 CORE WALL STARTER (GRID(NN-MM)/(12-13)7(BB-CC)/(8-9))(POUR-02) 12,789.34

44 SH109223 19-Dec-19 72160 CORE WALL STARTER (GRID (CC-BB)/(2-3))(POUR-02) 5,616.79

45 SH109218 19-Dec-19 71166 1ST BASEMENT SUMP PIT &SAND TRAP @GRID 1/AA (POUR -01) 6,646.13

46 SH109219 19-Dec-19 71166 1ST BASEMENT SUMP PIT &SAND TRAP @GRID 6/DD (POUR -01) 5,418.02

47 SH109220 19-Dec-19 71166 CORE WALL STARTER (POUR-01)GRID(CC-BB)/(2/3) 11,446.42

48 SH109327 21-Dec-19 82882 1ST BASEMENT RAFT SLAB T3,T4ADDL LAYER (POUR-01)(1/3) 42,088.98

49 SH109324 21-Dec-19 19957 CORE WALL STARTER (GRID(CC-BB)/(2-3))(POUR-02) 11,161.58

50 SH109325 21-Dec-19 19957 1ST BASEMENT SUMP PIT -05@GRID 12 /DD(POUR-02) 19,029.57

51 SH109326 21-Dec-19 72160 1ST BASEMENT RAFT SLAB T3,T4ADDL LAYER (POUR-01)(2/3) 42,086.14

52 SH109364 21-Dec-19 39312 1ST BASEMENT RAFT SLAB T3,T4ADDL LAYER (POUR-01)(3/3) 41,946.15

53 SH109365 21-Dec-19 47878 1ST BASEMENT RAFT SLAB T2 LAYER (POUR-01)(3/3) 43,691.29

54 SH109366 21-Dec-19 76469 1ST BASEMENT RAFT SLAB T2 LAYER (POUR-01)(2/3) 43,686.63

55 SH109401 22-Dec-19 32076 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-01)(1/3) 46,488.68

56 SH109402 22-Dec-19 72406 1ST BASEMENT RAFT SLAB T2 LAYER (POUR-01)(3/3) 43,596.30
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

57 SH109444 22-Dec-19 75789 1ST BASEMENT RAFT SLAB B1 LAYER (POUR-02)(1/3) 47,489.37

58 SH109445 22-Dec-19 37962 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-01)(3/3) 46,238.59

59 SH109446 22-Dec-19 97237 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-01)(2/3) 46,468.75

60 SH109472 23-Dec-19 26811 1ST BASEMENT RAFT SLAB B1 LAYER (POUR-02)(3/3) 47,058.05

61 SH109473 23-Dec-19 66583 1ST BASEMENT RAFT SLAB B1 LAYER (POUR-02)(2/3) 47,494.00

62 SH109499 23-Dec-19 78044 1ST BASEMENT RAFT SLAB B2 LAYER (POUR-02)(1/5) 41,844.01

63 SH109500 23-Dec-19 69118 1ST BASEMENT RAFT SLAB B2 LAYER (POUR-02)(2/5) 46,414.69

64 SH109501 23-Dec-19 39312 1ST BASEMENT RAFT SLAB B2 LAYER (POUR-02)(3/5) 46,412.14

65 SH109576 24-Dec-19 66583 1ST BASEMENT RAFT SLAB BOTTOM ADDL LAYER (POUR-02)(1/4) 48,878.91

66 SH109577 24-Dec-19 92373 1ST BASEMENT RAFT SLAB B2 LAYER (POUR-02)(5/5) 40,214.56

67 SH109578 24-Dec-19 75789 1ST BASEMENT RAFT SLAB B2 LAYER (POUR-02)(4/5) 46,359.95
1ST BASEMENT RETAINING WALL STARTER & FOLDING BEAM (POUR-02)
68 SH109644 25-Dec-19 39312 37,794.96
(1/2)
1ST BASEMENT RETAINING WALL STARTER & FOLDING BEAM (POUR-02)
69 SH109645 25-Dec-19 91799 36,412.86
(2/2)
70 SH109729 26-Dec-19 75789 1ST BASEMENT RAFT SLAB BOTTOM ADDL LAYER (POUR-02)(2/4) 48,892.87

71 SH109728 26-Dec-19 26811 1ST BASEMENT RAFT SLAB BOTTOM ADDL LAYER (POUR-02)(3/4) 48,883.88

72 SH109968 29-Dec-19 47878 1ST BASEMENT RAFT SLAB BOTTOM ADDL LAYER (POUR-02)(4/4) 48,839.92

73 SH109974 30-Dec-19 25283 1ST BASEMENT LEVEL COLUMN & WALL STARTER (POUR-02) 6,525.37

74 SH109973 30-Dec-19 25283 1ST BASEMENT LEVEL COLUMN & WALL STARTER (POUR-02) 4,269.29

75 SH109975 30-Dec-19 25283 1ST BASEMENT LEVEL COLUMN & WALL STARTER (POUR-02) 8,051.57

76 SH109976 30-Dec-19 25283 1ST BASEMENT LEVEL COLUMN & WALL STARTER (POUR-01) 4,014.31

77 SH109977 30-Dec-19 25283 1ST BASEMENT RAFT SLAB SIDE BAR (POUR-02) 10,077.16

78 SH110056 30-Dec-19 91799 ADDL STRAIGHT BARS 10,015.78

79 SH110057 30-Dec-19 91799 1ST BASEMENT RAFT SLAB B2 LAYER(POR-01)REINF 3,083.20

80 SH110058 31-Dec-19 91799 TOWER CRANE TC-6 (7100x7100) REINF. 9,049.96

81 SH110059 30-Dec-19 91799 TOWERCRANE FOUNDATION TC-5(7800X7800)REINF 13,409.17

82 SH110206 4-Jan-20 72160 1ST BASEMENT RAFT SLAB T3,T4 ADDL LAYER(POUR-02)(2/2) 45,390.02

83 SH110205 4-Jan-20 74831 1ST BASEMENT RAFT SLAB T3,T4 ADDL LAYER (POUR-02)(1/2) 45,488.56

84 SH110314 5-Jan-20 32084 1ST BASEMENT RAFT SLAB T2 LAYER(POUR-02)(2/3) 46,724.16


PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

85 SH110313 5-Jan-20 22435 1ST BASEMENT RAFT SLAB T2 LAYER (POUR-02) (1/3) 46,689.03

86 SH110328 5-Jan-20 47878 1ST BASEMENT RAFT SLAB T2 LAYER (POUR-02)(3/3) 46,775.53

87 SH110360 6-Jan-20 74831 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-02)(1/3) 45,393.38

88 SH110361 6-Jan-20 76469 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-02)(2/3) 45,381.81

89 SH110443 6-Jan-20 66675 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-02)(3/3) 45,440.75

90 SH110625 9-Jan-20 66675 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR-01)REINF(1/5) 35,199.05

91 SH110626 9-Jan-20 66675 ADDITIONAL STRAIGHT BARS REINF 8,089.34

92 SH110695 11-Jan-20 91799 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR -01)REINF-(2/5) 35,196.68

93 SH110694 11-Jan-20 91740 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR -01)REINF-(3/5) 35,188.15

94 SH110717 12-Jan-20 69118 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR -01)REINF-(5/5) 34,666.64

95 SH110727 12-Jan-20 69118 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR -01)REINF 10,976.10

96 SH110718 12-Jan-20 66675 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR -01)REINF.(4/5) 35,196.20

97 SH111039 16-Jan-20 75789 ADDITIONAL STRAIGHT BARS REINF 50,094.48

98 SH111268 20-Jan-20 74831 1ST BASEMENT TO LOWER GROUND-RW1(POUR-02) (1/2) 33,881.48

99 SH111267 20-Jan-20 74831 1ST BASEMENT TO LOWER GROUND RW1(POUR -02)(2/2) 17,547.31

100 SH111248 20-Jan-20 66675 1ST BASEMENT TOWER CRANE&DEWATERING REINF 4,670.47

101 SH111249 20-Jan-20 66675 LOWER GROUND LEVEL SUMP PIT-06 REINF(POUR-03) 19,712.94

102 SH111250 20-Jan-20 66675 LOWER GROUND LEVEL SUMP PIT-07 REINF(POUR-03) 12,016.85

103 SH111310 21-Jan-20 47878 LIFT PIT(TH4)FOUNDATION (GRID(B-C)(12-13)-POUR-03(1/3) 30,187.34

104 SH111325 21-Jan-20 33987 LIFT PIT(TH4)FOUNDATION (GRID(B-C)(12-13)-POUR-03(3/3) 32,905.71

105 SH111324 21-Jan-20 39312 LIFT PIT(TH4)FOUNDATION (GRID(B-C)(12-13)-POUR-03(2/3) 36,260.21

106 SH111323 21-Jan-20 39312 1ST BASEMENT TO LOWER GROUND VERTICAL(POUR-01)- REINF 1,285.72

107 SH111513 23-Jan-20 74831 BASEMENT-01 TO LOWER GROUND LEVEL COLUMN & WALL (POUR-02) 16,864.85
BASEMENT-01 TO LOWER GROUND CORE WALL (POUR-02) (GRID(NN-
108 SH111514 23-Jan-20 74831 11,298.74
MM)/(12-13))
COREWALL BASEMENT-1 TO LOWER GROUND
109 SH111515 23-Jan-20 74831 15,893.85
(POUR-02)(GRID(CC-BB)/(12-13))
110 SH111516 23-Jan-20 74831 1ST BASEMENT TO LOWER GROUND W.T WALL (RW3) (P-02) 10,221.46

111 SH111511 23-Jan-20 72406 BASEMENT-01 TO LOWER GROUND LEVEL COLUMN & WALL (POUR-02) 29,956.26

112 SH111509 23-Jan-20 72406 BASEMENT-1 TO LOWER GROUND STAIR-03 CW (POUR-02) 13,271.48
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

113 SH111510 23-Jan-20 72406 BASEMENT-01 LOWER GROUND LEVEL COLUMN & WALL (POUR-02) 5,484.76

114 SH111581 25-Jan-20 91740 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-03) 6,103.25

115 SH111583 25-Jan-20 91740 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-03) 8,159.49

116 SH111580 25-Jan-20 91740 LOWER GROUND LEVEL RETAINING WALL STARTER (POUR-03) 16,574.72

117 SH111597 25-Jan-20 91740 TOWER CRANE FOUNDATION TC-2(7100x7100) REINF 10,508.14

118 SH111582 25-Jan-20 42080 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-03) 6,713.44

119 SH111584 25-Jan-20 42080 CORE WALL STARTER (GRID(M-N)/(12-13)&(B&C)/(8-9)) REINF (POUR-03) 13,332.28

120 SH111585 25-Jan-20 42080 CORE WALL STARTER (GRID(B-C)/(12-13)) REINF (POUR-03) 17,880.78

121 SH111846 28-Jan-20 53002 LOWER GF RAFT SLAB B1 LAYER (POUR-03) REINF (1/3) 50,598.34

122 SH111847 28-Jan-20 92371 LOWER GF RAFT SLAB B1 LAYER (POUR-03) REINF (2/3) 50,582.36

123 SH111848 28-Jan-20 72406 LOWER GF RAFT SLAB B1 LAYER (POUR-03) REINF (3/3) 50,581.82

124 SH111967 29-Jan-20 84195 1ST BASEMENT TO LOWER GROUND W.T WALL (HOOKS) 876.90

125 SH111919 29-Jan-20 84195 LOWER GF RAFT SLAB B2 LAYER (POUR-03) REINF (1/4) 48,068.82
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

126 SH111918 29-Jan-20 17962 LOWER GF RAFT SLAB B2 LAYER (POUR-03) REINF (2/4) 48,072.87

127 SH112027 30-Jan-20 17035 LOWER GF RAFT SLAB B2 LAYER (POUR-03) REINF (3/4) 48,088.13

128 SH112026 30-Jan-20 93483 LOWER GF RAFT SLAB B2 LAYER (POUR-03) REINF (4/4) 47,814.44

129 SH111994 30-Jan-20 47878 LOWER GF RAFT SLAB BOTTOM ADDL (POUR-03) REINF (1/3) 46,690.95

130 SH111995 30-Jan-20 72160 LOWER GF RAFT SLAB BOTTOM ADDL (POUR-03) REINF (2/3) 46,692.05

131 SH111996 30-Jan-20 32027 LOWER GF RAFT SLAB BOTTOM ADDL (POUR-03) REINF (3/3) 46,534.59

132 SH112090 30-Jan-20 26811 LOWER GF RAFT SLAB T2 LAYER (POUR-03) REINF (3/3) 43,307.72

133 SH112091 30-Jan-20 42080 LOWER GF RAFT SLAB T2 LAYER (POUR-03) REINF (2/3) 43,594.89

134 SH112087 30-Jan-20 47878 LOWER GF RAFT SLAB FOLDING BEAM & UPSTAND (POUR-03) REINF 12,677.43

135 SH112093 30-Jan-20 47878 LOWER GF RAFT SLAB T3,T4,T5,T6 LAYER (POUR-03) REINF (2/3) 38,180.00

136 SH112094 30-Jan-20 76469 LOWER GF RAFT SLAB T3,T4, T5, T6 LAYER (POUR-03) REINF (1/3) 38,184.60

137 SH112088 30-Jan-20 76469 LOWER GF RAFT SLAB SIDE BAR (POUR-03) REINF 9,424.33

138 SH112092 30-Jan-20 30316 LOWER GF RAFT SLAB T2 LAYER (POUR-03) REINF (1/3) 43,572.07

139 SH112175 2-Feb-20 72406 LOWER GF RAFT SLAB T1 LAYER (POUR-03) REINF (1/3) 48,060.94

140 SH112177 2-Feb-20 76469 LOWER GF RAFT SLAB T1 LAYER (POUR-03) REINF (3/3) 47,857.85

141 SH112176 2-Feb-20 72160 LOWER GF RAFT SLAB T1 LAYER (POUR-03) REINF (2/3) 48,082.84

142 SH112253 3-Feb-20 25283 LOWER GF RAFT SLAB T3,T4,T5,T6 LAYER (POUR-03) REINF (3/3) 37,995.52

143 SH112508 8-Feb-20 18169 LOWER GROUND RAFT SLAB B1 LAYER (POUR-04) REINF (1/3) 47,083.12

144 SH112509 8-Feb-20 26848 LOWER GROUND RAFT SLAB B1 LAYER (POUR-04) REINF (2/3) 47,097.99

145 SH12510 8-Feb-20 82488 LOWER GROUND RAFT SLAB B2 LAYER (POUR-04) REINF (1/3) 49,959.50

146 SH12511 8-Feb-20 26714 ADDITIONAL STRAIGHT BARS 44,106.94

147 SH112551 8-Feb-20 33987 BASEMENT-1 TO LOWER GROUND RAMP SLAB & UPSTAND REINF 17,442.28

148 SH112552 8-Feb-20 33987 LOWER GROUND RAFT SLAB SIDE BAR (POUR-04) REINF 8,158.85

149 SH112561 8-Feb-20 47878 ADDITIONAL STRAIGHT BARS (1/2) 45,164.40

150 SH112584 8-Feb-20 78044 ADDITIONAL STRAIGHT BARS (1/2) 44,857.92

151 SH112625 9-Feb-20 26811 LOWER GROUND RAFT SLAB B2 LAYER (POUR-04) REINF (3/3) 48,832.17

152 SH112626 9-Feb-20 26811 LOWER GROUND RAFT SLAB B2 LAYER (POUR-04) REINF (2/3) 49,934.31

153 SH112627 9-Feb-20 88436 LOWER GROUND RAFT SLAB B1 LAYER (POUR-04) REINF(3/3) 46,935.45
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

154 SH112733 11-Feb-20 80791 TOWER CRANE FOUNDATION TC-4 (7100 X 7100) 10,508.14

155 SH112734 11-Feb-20 80791 LOWER GROUND RAFT SLAB T1 LAYER (POUR-04) REINF (1/3) 43,658.11

156 SH112766 11-Feb-20 88436 LOWER GROUND RAFT SLAB BOT ADDL (POUR-04) REINF (3/3) 47,753.08

157 SH112767 11-Feb-20 80661 LOWER GROUND RAFT SLAB BOT ADDL (POUR-04) REINF (2/3) 47,986.39

158 SH112768 11-Feb-20 72406 LOWER GROUND RAFT SLAB BOT ADDL (POUR-04) REINF(1/3) 47,982.77

159 SH112780 11-Feb-20 72406 ADDITIIONAL SPIRAL 3,193.90

160 SH112806 12-Feb-20 74831 LOWER GROUND RAFT SLAB TOP ADDL (POUR-04) REINF (1/2) 46,151.87

161 SH112805 12-Feb-20 98764 LOWER GROUND RAFT SLAB TOP ADDL (POUR-04) REINF (2/2) 46,099.57

162 SH112822 12-Feb-20 69118 LOWER GROUND RAFT SLAB T2 LAYER (POUR-04) REINF(1/3) 45,893.43

163 SH112823 12-Feb-20 72406 LOWER GROUND RAFT SLAB T2 LAYER (POUR-04) REINF(2/3) 45,883.68

164 SH112824 12-Feb-20 30316 LOWER GROUND RAFT SLAB T2 LAYER (POUR-04) REINF (3/3) 45,635.25

165 SH112825 12-Feb-20 99250 LG PT SLAB ADDL LAYER,LIVE, DEAD END & PANS (P-01) 5,932.51
LOWER GROUND FLR PT SLAB POUR STRIP BAR & TRIMMER BAR (POUR-
166 SH112826 12-Feb-20 99250 13,372.96
01)
167 SH112827 12-Feb-20 99250 LG LEVEL PT SLAB PUNCHING SHEAR (POUR-01) 2,112.24

168 SH112865 13-Feb-20 78044 LOWER GROUND RAFT SLAB T1 LAYER (POUR-04) REINF (2/3) 43,688.94

169 SH112866 13-Feb-20 88436 LOWER GROUND RAFT SLAB T1 LAYER (POUR-04) REINF (3/3) 43,485.09

170 SH112914 13-Feb-20 17035 ADDITIONAL STRAIGHT BARS (3/3) 40,066.56

171 SH112917 13-Feb-20 72406 ADDITIONAL STRAIGHT BARS (1/3) 44,979.30

172 SH112863 13-Feb-20 34422 LG LEVEL RC SLAB B2, T2 LAYER & PUNCHING SHEAR (P-02) 20,638.00

173 SH112864 13-Feb-20 34422 LG RC SLAB B1, T1 LAYER TRIMMER BAR, TOWER CRANE & BEAM (P-02) 17,881.34

174 SH112916 13-Feb-20 18492 ADDITIONAL STRAIGHT BARS (2/3) 44,979.30

175 SH112927 13-Feb-20 73173 LG PT SLAB X-DIR ADDL, LIVE, DEAD END & PAN (P-02)3 4,628.71

176 SH112928 13-Feb-20 73173 LOWER GROUND FLOOR PT SLAB POUR STRIP BOTTOM LAYER (POUR-02) 7,163.36

177 SH112926 13-Feb-20 73173 LGF PT SLAB ADDL LAYER & TRIMMER BAR (POUR-02) 9,340.01
LGF PT SLAB POUR STRIP TOP LAYER & COREWALL CORNER BAR (POUR-
178 SH112929 13-Feb-20 73173 6,448.78
02)
179 SH112930 13-Feb-20 73173 LG LEVEL PT SLAB PUNCHING SHEAR (POUR-02) 1,803.70

180 SH112931 13-Feb-20 73173 LG LEVEL PT SLAB PUNCHING SHEAR (POUR-02) 3,184.26

181 SH113002 15-Feb-20 26811 ADDITIONAL STRAIGHT BARS 30,175.20


PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

182 SH113023 16-Feb-20 19957 LIFT PIT (TH4) FOUNDATION (GRID (B-C)/((2-3)) (POUR-04) REINF (2/3) 39,094.63

183 SH113024 16-Feb-20 76469 LIFT PIT (TH4) FOUNDATION (GRID (B-C)/((2-3)) (POUR-04) REINF (1/3) 39,075.17

184 SH113025 16-Feb-20 76469 TOWER CRANE FOUNDATION TC-1 (7100 x 7100) REINF 10,508.14

185 SH113035 16-Feb-20 26811 LG RC SLAB B1, B2, T1 & T2 LAYER & PUNCHING SHEAR REINF 15,021.22

186 SH113036 16-Feb-20 26811 CORE WALL STARTER (GRID(B-C)/(2-3)) (POUR-04) REINF 17,261.95

187 SH113037 16-Feb-20 26811 CORE WALL STARTER (GRID(M-N)/(2-3)&(B&C)/(6-7)) REINF (POUR-04) 13,539.28

188 SH113038 16-Feb-20 34422 LIFT PIT (TH4) FOUNDATION (GRID(B-C)/(2-3)) (POUR-04) REINF (3/3) 38,863.64

189 SH113083 17-Feb-20 26848 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-04) REINF 6,955.74

190 SH113084 17-Feb-20 26848 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-04) REINF 5,666.24

191 SH113085 17-Feb-20 26848 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-04) REINF 6,609.99

192 SH113087 17-Feb-20 26848 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-04) REINF 3,478.87

193 SH113088 17-Feb-20 26848 LOWER GROUND LEVEL RETAINING WALL STARTER (POUR-04) REINF 19,093.58

194 SH113132 17-Feb-20 33987 LOWER GROUND LEVEL TO GROUND LEVEL COLUMN (POUR-03) 12,108.13

195 SH113133 17-Feb-20 33987 LOWER GROUND TO GROUND FLOOR (POUR-03) (GRID(C-B)/(12-13)) 19,466.86

196 SH113161 18-Feb-20 73173 LOWER GROUND TO GROUND FLOOR RW1 (POUR-03) 31,614.91

197 SH113163 18-Feb-20 91799 LOWER GROUND LEVEL TO GROUND LEVEL (POUR-03) 11,844.24

198 SH113174 18-Feb-20 91799 LOWER GROUND LEVEL TO GROUND LEVEL COLUMN & WALL (POUR-03) 19,386.95

199 SH113184 18-Feb-20 76469 LGF-GF COLUMN & WALL (POUR-04) REINF 11,648.97

200 SH113185 18-Feb-20 47878 LGF-GF COLUMN & WALL (POUR-04) REINF 19,881.54

201 SH113186 18-Feb-20 76469 LGF-GF (POUR-04) REINF 18,630.53

202 SH113187 18-Feb-20 47878 LGF-GF WALL (POUR-04) REINF 12,409.18

203 SH113188 18-Feb-20 91740 LGF-GF (GRID (B-C)/(2-3)0(POUR-04) REINF 18,810.64

204 SH113189 18-Feb-20 91740 LGF-GF CORE WALL (POUR-04) (GRID(N-M)(2-3)) REINF 12,854.07

205 SH113232 19-Feb-20 39312 LOWER GF LEVEL TO GF COLUMN & WALL (PART B) 13,286.21

206 SH113231 19-Feb-20 39312 LOWER GF TO GROUND LEVEL COLUMN & WALL (PART B) 14,617.93

207 SH113230 19-Feb-20 39312 LOWER GF TO GROUND FLOOR COLUMN (PART B) 7,087.39

208 SH113229 19-Feb-20 39312 LOWER GF TO GROUND LWEVEL COLUMN & WALL PART B 8,082.68

209 SH113248 19-Feb-20 37729 LGF~GF COLUMN & WALL PART C 6,548.46
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

210 SH113247 19-Feb-20 37729 COLUMN & WALL LGF~GF PART C 7,299.25

211 SH113246 19-Feb-20 37729 CORE WALL LGF~GF PART C GRID CC-BB/12-13 17,015.76

212 SH113245 19-Feb-20 73173 LOWER GROUND LEVEL TO GROUND FLOOR PART B 11,800.84
LOWER GROUND TO GROUND FLOOR CORE WALL (PART B) (GRID (NN-
213 SH113244 19-Feb-20 73173 10,781.80
MM)/(2-3))
CORE WALL LOWER GROUND TO GROUND FLOOR
214 SH113243 19-Feb-20 73173 16,687.47
(PART-B)(GRID(CC-BB)/(2/3))
215 SH113277 19-Feb-20 6975 COLUMN LGF-GF (PART-C) (GRID(CC-BB)/(12-13)) 17,149.75

216 SH113278 19-Feb-20 6975 LGF~GF COLUMN & WALL PART C 14,594.94

217 SH113299 20-Feb-20 47878 LG PT SLAB PUNCHING SHEAR (P-04) 2,270.73

218 SH113300 20-Feb-20 47878 LG PT SLAB PUNCHING SHEAR (P-04) 2,115.17

219 SH113301 20-Feb-20 47878 LG PT SLAB POUR STRIP TOP BAR, TC &TRIMMER BAR (P-4) 7,839.30

220 SH113302 20-Feb-20 47878 LG PT SLAB POUR STRIP BOTTOM BAR & TRIMMER BAR (P-04) 9,785.57

221 SH113303 20-Feb-20 47878 LG PT SLAB ADDL,LIVE,DEAD END & PAN (P-04) 13,935.39

222 SH113304 20-Feb-20 47878 LG LEVEL PT SLAB PUNCHING SHEAR (POUR 03) 1,475.63

223 SH113305 20-Feb-20 47878 LG PT SLAB POUR STRIP BAR & TRIMMER BAR (POUR 03) 7,945.54

224 SH113306 20-Feb-20 47878 LG PT SLAB ADDL,BEAM & LIVE, DEAD END & PAN (P-03) 6,040.32

225 SH113399 22-Feb-20 26811 ADDITIONAL STRAIGHT BARS 26,107.58

226 SH113923 3-Mar-20 89265 LOWER GROUND FLOOR (PART-B)(GRID(NN-MM)/(2-3) 10,781.80

227 SH113924 3-Mar-20 89265 LOWER GROUND LEVEL TO GROUND FLOOR PART B 11,799.83

228 SH113925 3-Mar-20 89265 LOWER GROUND LEVEL TO GROUND LEVEL RW1 (PART-C) 19,441.33

229 SH114102 7-Mar-20 25283 LGF (PART B) RETAINING WALL & WALL & UPSTAND 13,654.90

230 SH114101 7-Mar-20 25283 ADDITIONAL REINF(2/2), B BLOCK 9,995.40

231 SH114111 7-Mar-20 34422 ADDITIONAL REINF, B BLOCK 39,981.60

232 SH114169 8-Mar-20 75381 ADDITIONAL REINF, B BLOCK 50,083.20

233 SH114254 9-Mar-20 75469 ADDITIONAL REINF, C BLOCK 50,083.20

234 SH114298 10-Mar-20 28985 LOWER GROUND TO GROUND FLOOR RW1 (PART A) 13,052.31

235 SH114299 10-Mar-20 28985 LOWER GROUND LEVEL (PART A) RW & UPSTAND 17,101.86

236 SH114312 10-Mar-20 69118 ADDITIONAL REINF, D BLOCK 50,255.04

237 SH114324 10-Mar-20 62737 LGF~(PART c)RETAINING WALL & UPSTAND 4,214.49
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

238 SH114325 10-Mar-20 62737 ADDITIONAL REINF, C BLOCK 50,083.20

239 SH114427 12-Mar-20 28985 ADDITIONAL REINF, D BLOCK 50,083.20

240 SH114428 12-Mar-20 78044 ADDITIONAL REIF, D BLOCK 30,175.20

241 SH114429 12-Mar-20 78044 LG PT SLAB LIVE & DEAD END REIF (SPIRAL & CHAIR FOR BLOCK B,C,&D) 15,719.12

242 SH114446 12-Mar-20 53002 ADDITIONAL REIF ( C BLOCK) 50,164.80

243 SH114451 12-Mar-20 81734 ADDITIONAL REIF ( B BLOCK) 50,316.00

244 SH114452 12-Mar-20 82488 ADDITIONAL REIF ( B BLOCK) 25,041.60

245 SH114453 12-Mar-20 82488 ADDITIONAL REIF ( D BLOCK) 25,041.60

246 SH114454 12-Mar-20 91527 ADDITIONAL REIF ( D BLOCK) 50,398.56

247 SH114589 16-Mar-20 34422 CHAIR REINFORCEMENT 1,358.64

248 SH114596 16-Mar-20 34422 CHAIR REINFORCEMENT 6,793.20

249 SH114600 16-Mar-20 34422 STRAIGHT BARS(BLOCK-A) 27,153.69

250 SH114601 16-Mar-20 47878 GF VERT.REIF (BLOCK-A) 28,242.67

251 SH114602 16-Mar-20 47878 GF VERT.REIF (BLOCK-B) 23,614.35

252 SH114603 16-Mar-20 51776 GF VERT.REIF (BLOCK-C) 28,838.05

253 SH114604 16-Mar-20 82601 GF VERT.REIF (BLOCK-D) 28,242.67

254 SH114668 18-Mar-20 73173 GF TO 1ST FLOOR CORE WALL (PART B)@((CC-BB)/(2-3) 23,134.31

255 SH114669 18-Mar-20 73173 GF TO FF COLUMN (PART-B) 4,203.85

256 SH114667 18-Mar-20 25829 GF TO FF STAIR-01 COREWALL(PART-B)@(NN-MM)/(2-3) 16,975.66

257 SH114670 18-Mar-20 25829 GF TO FF COLUMN & WALL (PART-B) 6,396.74

258 SH114671 18-Mar-20 25829 GF TO FF COLUMN & WALL (PART-B) 4,782.94

259 SH114672 18-Mar-20 25829 GF TO FF COLUMN & WALL (PART-B) 3,472.23

260 SH114706 18-Mar-20 37729 STRAIGHT BARS 32,307.07

261 SH114717 19-Mar-20 69118 GF LEVEL TO FIRST FLOOR COLUMN & WALL (PART-C) 4,096.63

262 SH114718 19-Mar-20 69118 GF TO FF COREWALL (PART-C)@GRID (CC-BB)/(12-13) 23,521.74

263 SH114720 19-Mar-20 91799 GF TO FIRST FLOOR COLUMN & WALL (PART-C) 5,301.02

264 SH114721 19-Mar-20 91799 GF TO FF ST-03 COREWALL(PART-C)@(BB-CC)/(8-9) 17,837.10

265 SH114722 19-Mar-20 91799 GF TO FIRST FLOOR COLUMN & WALL (PART-C) 2,164.93
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

266 SH114723 19-Mar-20 91799 GF LEVEL TO FIRST FLOOR LEVEL COLUMN (PART-C) 3,344.57

267 SH114727 19-Mar-20 69118 GF LEVEL TO FIRST FLOOR LEVEL COLUMN & WALL(PART-C) 3,992.29

268 SH114754 21-Mar-20 33987 GF TO FF STAIR-04 COREWALL (PART-C)@(NN-MM)/(12-13) 15,600.06

269 SH114755 21-Mar-20 33987 GF LEVEL TO FIRST FLOOR LEVEL COLUMN & WALL (PART-D) 16,761.08

270 SH114796 22-Mar-20 33987 LOWER GROUND TO GROUND RAMP SLAB & UPSTAND 23,002.47

271 SH114797 22-Mar-20 33987 STRAIGHT BAR (BLOCK B & C) 20,155.20

272 SH114800 22-Mar-20 33987 STRAIGHT BAR (BLOCK A) 50,083.20

273 SH114996 26-Mar-20 89211 FIRST FLOOR TO SECOND STAIR -06 CW(PART D) 21,289.22

274 SH114998 26-Mar-20 17035 GF~1F CORE WALL (PART D)GRID(C-B)/(12-13))REIF 25,798.35

275 SH114999 26-Mar-20 89211 GF~1F ST-05 CORE WALL (PART D)(GRID(N-M)/(12-13))REIF 19,510.37

276 SH115046 26-Mar-20 19957 GROUND FLOOR SLAB ADDITIONAL LAYER (POUR-A1) 35,472.89

277 SH115047 26-Mar-20 76469 TRIMMER BAR,LIVE END,DEAD END &PAN BOX(P-A1) 7,233.12

278 SH115048 26-Mar-20 76469 G.FLOOR (PART A)(POUR-A1)UPSTAND WALL & BEAMS 6,308.49

279 SH115049 26-Mar-20 76469 GF PT SLAB PUNCHING SHEAR (POUR-A1)REIF 2,669.65

280 SH115050 26-Mar-20 76469 GF PT SLAB PUNCHING SHEAR (POUR-A1)REIF 2,123.33

281 SH115051 26-Mar-20 76469 GF TO 1ST FLOOR-02 CW@(BB-CC)/(7-8) PART-B 17,750.63

282 SH115212 31-Mar-20 27744 GF TO FIRST FLOOR LEVEL COLUMN & WALL (PART-A) 6,114.84

283 SH115214 31-Mar-20 27744 GF TO FIRST FLOOR LIFT COREWALL (PART-A)(GRID(B-C)/(2-3)) 25,509.89

284 SH115209 31-Mar-20 76774 GF TO FIRST FLOOR COLUMN & WALL (PART-A) 4,031.92

285 SH115210 31-Mar-20 76774 GF LEVEL TO FIRST FLOOR COLUMN (PART-A) 6,467.89

286 SH115211 31-Mar-20 76774 GF LEVEL TO FIRST FLOOR COLUMN (PART-A) 3,102.90

287 SH115213 31-Mar-20 76774 GF TO FIRST FLOOR STAIR-7 COREWALL @ (B-C)/(6-7)(PART-A) 20,305.82

288 SH115333 4-Apr-20 39312 1st TO 2ND FLOOR (PART-D)(GRID(C-B)/(12-13)) 19,574.49

289 SH115334 4-Apr-20 39312 FF TO SF ST-05 COREWALL (PART-D)(GRID(N-M)/(12-13)) 11,833.14

290 SH115335 4-Apr-20 39312 FF TO SF ST-06 COREWALL (PART-D)(B-C)(8-9) 13,367.66

291 SH115336 4-Apr-20 42080 FF TO SF COREWALL(PART-C)@ GRID(CC-BB)/(12-13)) 16,586.86

292 SH115337 4-Apr-20 42080 FF TO SF ST-03 COREWALL (PART-C)(BB-CC)(8-9) 9,869.62

293 SH115338 4-Apr-20 42080 FF TO SF ST-04 COREWALL (PART-C)(NN-MM)(12-13) 8,810.25


PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

294 SH115339 4-Apr-20 61004 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART C) 14,669.40

295 SH115340 4-Apr-20 61004 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART C) 14,436.88

296 SH115348 5-Apr-20 34422 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART D) 21,009.33

297 SH115349 5-Apr-20 34422 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART D) 9,151.84

298 SH115352 5-Apr-20 78044 F FLOOR TO SECOND FLOOR COREWALL (PART B) @ ((CC-BB)/(2-3)) 7,316.68
F FLOOR TO SECOND FLOOR STAIR-01 COREWALL (PART B) @
299 SH115353 5-Apr-20 78044 8,966.63
((NN-MM)/(2-3))
F FLOOR TO SECOND FLOOR STAIR-02 COREWALL (PART B) @
300 SH115354 5-Apr-20 78044 9,769.64
((BB-CC)/(6-7))
301 SH115355 5-Apr-20 26811 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART B) 8,566.51

302 SH115356 5-Apr-20 26811 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART B) 12,725.50

303 SH115357 5-Apr-20 26811 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART B) 16,586.86

304 SH115523 8-Apr-20 89211 LOWER GROUND RAFT SLAB B1 LAYER (POUR 05)REIF(1/2) 43,428.73

305 SH115524 8-Apr-20 39312 LOWER GROUND RAFT SLAB B1 LAYER (POUR 05)REIF(1/2) 9,548.24

306 SH115525 8-Apr-20 39312 LOWER GROUND RAFT SLAB BOT(B3&B5) ADD'L LAYER (POUR 05)REIF 34,573.02

307 SH115565 9-Apr-20 69118 ADDITIONAL REIF 14,108.64

308 SH115566 9-Apr-20 69118 LOWER GROUND RAFT SLAB BOT(B4)ADD'L LAYER (POUR-05) REIF 15,027.93

309 SH115567 9-Apr-20 69118 LOWER GROUND RAFT SLAB B2 L LAYER (POUR-05) REIF(2/2) 8,784.01

310 SH115568 9-Apr-20 47878 LOWER GROUND RAFT SLAB B2 L LAYER (POUR-05) REIF(1/2) 44,240.24

311 SH115577 11-Apr-20 10581 ADDITIONAL REIF 41,993.42

312 SH115578 11-Apr-20 25283 BLOCK B POUR 1 FIRST FLOOR BEAM REIF 1,150.46

313 SH115579 11-Apr-20 25283 BLOCK B POUR 1 FIRST FLOOR UPSTAND REIF 7,917.83

314 SH115580 11-Apr-20 25283 BLOCK B POUR 1 FIRST FLOOR SLAB REIF 8,403.26

315 SH115581 11-Apr-20 25283 BLOCK B POUR 1 FIRST FLOOR SLAB REIF 12,352.80

316 SH115582 11-Apr-20 33987 BLOCK B POUR 2 FIRST FLOOR BEAM REIF 3,010.63

317 SH115583 11-Apr-20 33987 BLOCK B POUR 2 FIRST FLOOR SLAB UPSTAND REIF 10,145.35

318 SH115584 11-Apr-20 33987 BLOCK B POUR 2 FIRST FLOOR SLAB REIF 26,650.04

319 SH115605 11-Apr-20 34422 LOWER GROUND RAFT SLAB SUMP PI,SIDE BAR & SECTION (POUR 5) REIF 8,811.98
LOWER GROUND RAFT SLAB SUMP PIT,SIDE BAR & SECTION (POUR 5)
320 SH115606 11-Apr-20 34422 5,242.96
REIF
321 SH115607 11-Apr-20 34422 LOWER GROUND RAFT SLAB TOP(T3&T4)ADDL LAYER (POUR 5) REIF 18,673.24
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

322 SH115608 11-Apr-20 32084 LOWER GROUND RAFT SLAB TOP T2 LAYER (POUR 5) REIF 48,505.30

323 SH115622 12-Apr-20 37939 LOWER GROUND RAFT SLAB T1 LAYER (POUR 5) REIF 44,458.99

324 SH115625 12-Apr-20 91740 BLOCK B & C ATTIC SLAB REIF 8,013.31

325 SH115627 12-Apr-20 25283 BLOCK A FIRST FLOOR SLAB MESH REIF 35,983.44

326 SH115628 12-Apr-20 91740 BLOCK D FIRST FLOOR SLAB MESH REIF 35,983.44

327 SH115661 13-Apr-20 18169 BLOCK C FIRST FLOOR SLAB MESH REIF 35,983.44

328 SH115701 14-Apr-20 72882 BLOCK C POUR 2 FIRST FLOOR BEAM REIF 5,978.98

329 SH115702 14-Apr-20 81734 BLOCK C POUR C1 FIRST FLOOR SLAB REIF 22,597.74

330 SH115703 14-Apr-20 72882 BLOCK C POUR 2 FIRST FLOOR SLAB REIF 29,159.06

331 SH115739 15-Apr-20 74831 LOWER GOUND RAFT SLAB B2 LAYER (POUR-06) REINF .(1/2) 45,393.44

332 SH115740 15-Apr-20 69118 LOWER GOUND RAFT SLAB B1 LAYER (POUR-06) REINF 46,908.08

333 SH115741 15-Apr-20 37962 LOWER GROUD RAFT SLAB B2 LAYER (POUR-06) REINF (2/2) 18,172.88

334 SH115742 15-Apr-20 37962 LOWER GROUND RAFT SLAB B3 ADD'L LAYER (POUR-06) REINF 6,377.98

335 SH115743 15-Apr-20 37962 LOWER GROUND RAFT SLAB B4& T4 ADD'L LAYER (POUR-06)REINF 5,408.76

336 SH115744 15-Apr-20 37962 LOWER GOUND RAFT SLAB SIDE BAR (POUR-06) REINF 10,909.57

337 SH115778 15-Apr-20 78044 LOWER GROUND RAFT SLAB T1 LAYER (POUR-06) REINF 41,822.08

338 SH115787 16-Apr-20 75789 CHAIR REINFORCEMENT FOR B & C 18,892.20

339 SH115788 16-Apr-20 75789 FIRST FLOOR PUNCHING SHEAR DETAILS (PART-D) (POUR-D1) REINF 2,276.75

340 SH115789 16-Apr-20 75789 FIRST FLOOR PT BEAMS PART-D (POUR-D1) REINF 2,579.11

341 SH115790 16-Apr-20 75789 FIRST FLOOR PART-D PT SLAB TRIMMAR BAR DETAILS (POUR-D1) REINF 3,345.32

342 SH115791 16-Apr-20 75789 FIRST FLOOR PT SLAB (PART-D) (POUR-D1) REINF 10,726.69

343 SH115792 16-Apr-20 34422 LOWER GROUND RAFT SLAB T2 LAYER (POUR-06) REINF 36,211.10

344 SH115954 21-Apr-20 28985 FIRST FLOOR PART D POUR D2 B1 & T1 ADDL LAYERS 8,048.01

345 SH115955 21-Apr-20 28985 FIRST FLOOR PT SLAB POUR D-2,PART D B2 & T2 ADD'L LAYERS 10,455.40

346 SH115956 21-Apr-20 28985 FIRST FLOOR PT SLAB POUR D-TRIMMER BARS POUR D2 1,097.54
FIRST FLOOR PT SLAB POUR D-TRIMMER BARS & CW CORNER BAR
347 SH115957 21-Apr-20 28985 1,934.73
DETAILSPOUR D2
348 SH115958 21-Apr-20 28985 FIRST FLOOR PT SLAB PUNCHING SHEAR POUR D2 2,625.59
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

349 SH115959 21-Apr-20 28985 FIRST FLOOR PT BEAMS POUR D2 5,625.64

350 SH115962 21-Apr-20 66583 LOWER GROUND LEVEL COLUMN STARTER POUR 5 REIF 8,032.14

351 SH115963 21-Apr-20 66583 LOWERGROUND LEVEL COLUMN STARTER POUR 05 REIF 15,402.62

352 SH115964 21-Apr-20 66583 LOWERGROUND LEVEL COLUMN STARTER POUR 06 REIF 22,300.16

353 SH115965 21-Apr-20 61004 LOWERGROUND LEVEL COLUMN STARTER POUR 06 REIF 26,823.92

354 SH115966 21-Apr-20 61004 LOWERGROUND SWIMMING POOL WALL STARTER (POUR-05) 8,028.68

355 SH115984 21-Apr-20 91740 ADDITIONAL BARS 32,059.80

356 SH115985 21-Apr-20 91740 FIRST LEVEL TO SECOND FLOOR LEVEL COLUMN 11,285.84

357 SH115986 21-Apr-20 91740 FIRST LEVEL TO SECOND FLOOR LEVEL COLUMN & WALL 2,002.89

358 SH116000 22-Apr-20 91799 FIRST FLOOR SECOND FLOOR STAIR 07 CORE WALL @(B-C)/(6-7) 13,252.29

359 SH116006 22-Apr-20 91799 ADDITIONAL REIF 8,039.04

360 SH116007 22-Apr-20 91799 FIRST FLOOR SECOND FLOOR LIFT CORE WALL GRID (B-C)/(2-3) 19,596.72

361 SH116070 25-Apr-20 89211 BLOCK A POUR 02 FIRST FLOOR UPSTAND REIF 10,268.26

362 SH116071 25-Apr-20 89211 BLOCK A POUR 02 FIRST FLOOR SLAB REIF 24,244.61

363 SH116072 25-Apr-20 89211 BLOCK A POUR 02 FIRST FLOOR BEAM REIF 3,708.70

364 SH116144 27-Apr-20 91740 BLOCK BADDITIONAL REIF 34,983.90

365 SH116152 27-Apr-20 72160 SECOND FLOOR PART B AREA PT BEAMS (POUR B1) REIF 1,101.05

366 SH116153 27-Apr-20 72160 SECOND FLOOR PT SLAB ADDL LAYERS (POUR B1) (PART-B) REIF 12,989.13

367 SH116154 27-Apr-20 72160 SECOND FLOOR PT SLAB POUR STRIP BAR & TRIMMER BAR (P-B1) REIF 8,573.74

368 SH116155 27-Apr-20 72160 2ND FLOOR SLAB PUNCHING SHEAR (POUR-B1) REIF 1,891.35

369 SH116163 27-Apr-20 72160 REBAR STEEL FOR TESTING 59.35

370 SH116181 28-Apr-20 91799 BLOCK C ADIITIONAL REIF 34,983.90

371 SH116182 28-Apr-20 74831 SECOND FLOOR PUNCHING SHEAR POUR C1 REIF 2,002.83

372 SH116183 28-Apr-20 74831 SECOND FLOOR POUR STRIP BAR TRIMMER BAR (P-C1) REIF 8,138.26

373 SH116184 28-Apr-20 74831 SECOND FLOOR PT SLAB ADDL PART C(POUR C1) REIF 14,392.95

374 SH116185 28-Apr-20 74831 SECOND FLOOR BEAM ADDL PART C(POUR C1) REIF 1,444.69

375 SH116211 28-Apr-20 72406 ADDITIONAL BARS 34,983.90

376 SH116201 28-Apr-20 25283 SECOND FLOOR BEAMS PART D (POUR D1)REIF 3,859.32
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

377 SH116202 28-Apr-20 25283 SECOND FLOOR SLAB TRIMMER BAR PART D (POUR D1)REIF 3,765.72

378 SH116203 28-Apr-20 25283 SECOND FLOOR PART D POUR STRIP, CORNER BAR REIF 2,645.57

379 SH116204 28-Apr-20 25283 SECOND FLOOR PUNCHING SHEAR DETAILS PART D POUR D1 REIF 1,622.07

380 SH116212 28-Apr-20 25283 SECOND FLOOR PT SLAB PART D POUR D1 ADDL LSYERS REIF 17,923.02

381 SH116264 30-Apr-20 47878 SECOND FLOOR BEAMS PART B (POUR B2) REIF 4,221.36

382 SH116265 30-Apr-20 47878 SECOND FLOOR PT SLAB PART B (POUR B1) ADDL LAYERS REIF 18,100.20

383 SH116266 30-Apr-20 47878 SECOND FLOOR PT SLAB TRIMMER BAR POUR B2 (PART B) REIF 8,601.44

384 SH116267 30-Apr-20 47878 SECOND FLOOR PT SLAB PUNCHING SHEAR (POUR B2)(PART B)REIF 2,040.12

385 SH116268 30-Apr-20 91799 SECOND FLOOR BEAMS (POUR-C2) REIF 3,922.60

386 SH116269 30-Apr-20 91799 SECOND FLOOR PT SLAB ADDL LAYER PART C (POUR C2) REIF 17,685.15

387 SH116270 30-Apr-20 91799 SF PT SLAB TRIMMER BAR (POUR-C2) REIF 8,422.10

388 SH116271 30-Apr-20 91799 SECOND FLOOR PUNCHING SHEAR (POUR-C2) REIF 1,846.78

389 SH116263 30-Apr-20 42080 BLOCK D & A CHAIR REIF 16,428.00

390 SH116272 30-Apr-20 42080 SECOND FLOOR BEAMS (POUR-D2) REIF 1,384.10

391 SH116274 30-Apr-20 42080 SECOND FLOOR SLAB TRIMMER BAR PART D (POUR D2)REIF 3,974.50

392 SH116275 30-Apr-20 42080 SF PT SLAB CORNER BAR, TENDON, POUR STIP BAR (POUR-D2) REIF 2,495.77

393 SH116276 30-Apr-20 42080 SECOND FLOOR PUNCHING SHEAR DETAILS (PART D) POUR D2 REIF 1,984.96

394 SH116273 30-Apr-20 42080 SECOND FLOOR PT SLAB (POUR-D2) ADDL LAYERS REIF 13,303.60

395 SH116321 4-May-20 27744 SF TO 3RD FLOOR ST-05 CW (PART-D) GRID(N-M)/(12-13)) REIF 9,738.47

396 SH116322 4-May-20 27744 2ND FLOOR 3RD FLOOR STAIR 06 COREWALL (B-C)(8-9) REIF 11,310.61

397 SH116304 4-May-20 39312 SF TO TF CORE WALL @GRID (CC-BB)/(12-13)) REIF 13,288.30

398 SH116305 4-May-20 39312 SF TO TF STAIR-03 COREWALL (BB-CC)/(8-9) REIF 8,720.89

399 SH116306 4-May-20 39312 SF TO THIRD FLOOR COLUMN & WALL REIF 5,551.60

400 SH116307 4-May-20 39312 SF TO THIRD FLOOR COLUMN & WALL REIF 8,499.40

401 SH116308 4-May-20 73173 SF TO THIRD FLOOR COREWALL @ ((CC-BB)/(2-3)) REIF 13,288.80

402 SH116309 4-May-20 73173 SF TO THIRD FLOOR ST01 CW @ (NN-MM)/(2-3) REIF 8,013.43

403 SH116310 4-May-20 73173 SF TO THIRD FLOOR STAIR 02 COREWALL (BB-cc)/(6-7) REIF 8,849.77

404 SH116311 4-May-20 73173 SF TO THIRD FLOOR COLUMN & WALL REIF 7,861.63
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

405 SH116320 4-May-20 27744 SF TO THIRD FLOOR GRID (C-B).(12-13)) REIF 14,593.82

406 SH116323 4-May-20 75789 SF TO THIRD FLOOR COLUMN & WALL REIF 10,282.91

407 SH116324 4-May-20 75789 SF TO THIRD FLOOR COLUMN & WALL REIF 12,383.20

408 SH116325 4-May-20 75789 SF TO THIRD FLOOR ST-04 CW @(NN-MM)/(12-13) REIF 7,909.75

409 SH116312 4-May-20 72406 SF PT SLAB (POUR-A1) ADDL LAYERS REIF 18,954.02

410 SH116313 4-May-20 72406 SECOND FLOOR TRIMMER BAR POUR-A1 REIF 3,963.38

411 SH116314 4-May-20 72406 SF PT SLAB POUR-A1 POUR STRIP, CORNER BAR REIF 2,673.46

412 SH116315 4-May-20 72406 SECOND FLOOR PUNCHING SHEAR DETAILS POUR A1 REIF 1,883.63

413 SH116316 4-May-20 72406 ADDITIONAL REIF (MESH) 19,990.80

414 SH116317 4-May-20 74831 SECOND FLOOR TO THIRD FLOOR LEVEL COLUMN & WALL REIF 17,112.22

415 SH116318 4-May-20 74831 SECOND FLOOR TO THIRD FLOOR LEVEL COLUMN & WALL REIF 5,770.80

416 SH116319 4-May-20 74831 SECOND FLOOR BEAMS POUR-A1REIF 4,496.62

417 SH116408 7-May-20 83067 ADDITIONAL REIF 44,161.92

418 ADJUSTED QTY 1.08

419 SH116409 7-May-20 83067 RAFT POUR8 ADDITIONAL PART A 10,227.06

420 SH116437 7-May-20 66583 RAFT POUR8 ADDITIONAL PART A 50,872.80

421 SH116581 12-May-20 26811 SECOND FLOOR TO THIRD FLOOR LIFT CORE WALL GRID(B-C)/(2-3)) REIF 14,601.65

422 SH116582 12-May-20 26811 SECOND FLOOR TO THIRD FLOOR COLUMN REIF 8,768.81

423 SH116583 12-May-20 26811 SECOND FLOOR TO THIRD FLOOR WALL REIF 1,753.01

424 SH116596 12-May-20 26811 SECOND FLOOR TO THIRD FLOOR STAIR 07 CORE WALL @(B-C)/(6-7) REIF 11,230.96

425 SH116584 12-May-20 75789 LOWER GROUND LEVEL SUMP PIT-08 REIF 20,823.62

426 SH116585 12-May-20 75789 UPSTAND FF ADDITIONAL STRAIGHT BAR 25,436.40

427 SH116597 12-May-20 75789 TOWER CRANE FOUNDATION TC-03 (7100X7100) REIF 10,293.00

428 SH116631 13-May-20 75789 LGF~GF COLUMN POUR05 REIF 23,605.88

428 SH116638 13-May-20 75789 LGF~GF COLUMN POUR06 REIF 22,300.16

429 SH116641 13-May-20 75789 TOWER CRANE FOUNDATION TC-03 (7100X7100) REIF 214.30

429 SH116653 14-May-20 33987 LGF-GF COLUMN (POUR 5) REIF 34,862.18

430 SH116654 14-May-20 89211 LGF-GF COLUMN (POUR 6) REIF 26,823.92


PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

430 SH116655 14-May-20 89211 LGF-GF SWIMMING POOL WALL (POUR 5) REIF 18,666.18

431 SH116673 16-May-20 91740 LOWER GROUND LEVEL GREASE TRAP PIT POUR 6 REIF 3,623.56

431 SH116674 16-May-20 91740 LOWER GROUND LEVEL GREASE TRAP PIT POUR06 REIF 2,750.36

432 ADJUSTED QTY 1.34

432 SH116675 16-May-20 91740 ADDITIONAL REIF 40,130.88

433 SH116707 17-May-20 69118 SLAB MESH THIRD FLOOR 34,983.90

434 SH116708 17-May-20 37729 SLAB MESH THIRD FLOOR 34,983.90

435 SH116721 17-May-20 26811 LOWER GROUND RAFT SLAB B2 LAYER (POUR 05) REIF 40,212.09

436 SH116722 17-May-20 26811 LOWER GROUN RAFT SLAB BOT(B4) ADDL LAYER (POUR 05) REIF 12,654.03

437 SH116723 17-May-20 75789 LOWER GROUND RAFT SLAB B1 LAYER POUR 05 REIF 39,229.27

438 SH116724 17-May-20 75789 LOER GROUND RAFT SLAB BOT (B3&B5) ADDL LAYER POUR 05 REIF 13,849.03

439 SH116738 17-May-20 72882 LOWER GROUND RAFT SLAB B3 ADD'L LAYER (POUR-06) REINF 4,827.32

440 SH116740 17-May-20 72882 LOWER GROUND RAFT SLAB B1 LAYER POUR 06 REIF 32,368.03

441 SH116706 17-May-20 25283 THIRD FLOOR SLB MESH 34,983.90

442 SH116726 17-May-20 78044 LOWER GROUND RAFT SLAB T2 LAYER (POUR05) REIF 41,358.21

443 SH116749 18-May-20 39312 LOWER GROUND RAFT SLAB B4 & T4 ADDL LAYERS (POUR 06) REIF 6,607.38

444 SH116750 18-May-20 39312 LOWER GROUND RAFT SLAB T1 LAYER (POUR06) REIF 28,867.68

445 SH116781 19-May-20 25283 LOWER GROUND RAFT SLAB B2 LAYER (POUR 06) REIF 13,103.90

446 SH116782 19-May-20 69118 LOWER GROUND RAFT SLAB TOP (T3 & T4)ADDL LAYER (POUR 05) REIF 14,953.07

447 SH116783 19-May-20 69118 LOWER GROUND RAFT SLAB T1 LAYER (POUR 05) REIF 37,311.89

448 SH116784 19-May-20 25283 LOWER GROUND RAFT SLAB T2 LAYER (POUR 06) REIF 27,214.10

449 SH116828 20-May-20 17035 GF-FIRST FLOOR COLUMN & WALL REIF 6,969.39

450 SH116829 20-May-20 17035 GF-FIRST FLOOR COLUMN REIF 1,658.36

451 SH116830 20-May-20 17035 GF-FIRST FLOOR COLUMN REIF 7,461.27

452 SH116831 20-May-20 17035 GF-FIRST FLOOR COLUMN & WALL REIF 6,532.24

453 SH116832 20-May-20 17035 GF-FIRST FLOOR STAIR 08 CORE WALL @ (N-M)/(2-3) POUR 04 REIF 17,742.61

454 SH116837 20-May-20 72406 GF PT SLAB ADDL LAYER POUR A2 REIF 15,406.31

455 SH116833 20-May-20 72406 GF PT SLAB PUNCHING SHEAR (POUR-A2)REIF 1,766.83


PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

456 SH116834 20-May-20 72406 GF PT SLAB PUNCHING SHEAR (POUR-A2)REIF 3,028.88

457 SH116835 20-May-20 72406 GF PT SLAB TRIMMER BAR POUR A2 REIF 4,093.50

458 SH116836 20-May-20 72406 GF PT SLAB POUR STRIP POUR A2 REIF 5,243.37

459 SH116924 27-May-20 91799 LOWER GROUND RAFT SLAB B1 LAYER POUR 4 REIF 5,917.96

460 SH116925 27-May-20 91799 3F~4F COREWALL @ ((CC-BB)/(2-3))REIF 13,004.96

461 SH116926 27-May-20 91799 3F~4F STAIR-02 COREWALL (BB-CC)/(6-7) REIF 8,676.69

462 SH116927 27-May-20 26811 3F~ 4F ST-01 CW @(NN-MM)/(2-3) REIF 7,824.94

463 SH116928 27-May-20 26811 3F~ 4F COLUMN & WALL REIF 8,661.98

464 SH116929 27-May-20 26811 3F~ 4F COLUMN & WALL REIF 8,150.79

465 SH116930 27-May-20 26811 3F~ 4F COLUMN & WALL REIF 5,529.05

466 SH116998 28-May-20 89211 3F BEAMS POUR C1 REIF 1,466.96

467 SH116999 28-May-20 89211 3F PT SLAB POUR STRIP BAR & TRIMMER BAR C1 REIF 14,465.32

468 SH117000 28-May-20 89211 3F PT SLAB POUR STRIP BAR & TRIMMER BAR C1 REIF 8,165.08

469 SH117001 28-May-20 89211 3F PUNCHING SHEAR POUR C1 REIF 1,957.33

470 SH117002 28-May-20 73173 3F AREA PT BEAMS (POUR B1) REIF 1,123.77

471 SH117003 28-May-20 73173 3F~PT SLAB ADDL LAYERS POUR B1 REIF 13,183.62

472 SH117004 28-May-20 73173 3F PT SLAB POURB STRIP BAR & TRIMMER BAR (P-B1) REIF 8,578.00

473 SH117005 28-May-20 73173 3F PT SLAB PUNCHING SHEAR POUR B1 REIF 1,891.35

474 SH117042 30-May-20 72160 ADDITIONAL REIF 23,635.87

475 SH117043 30-May-20 33987 PUNCHING SHAER DETAILS POUR D1 REIF 1,622.07
3F PT SLAB POUR D1 POUR STRIP, CORNER BAR, LIVE & DEAD END & PAN
476 SH117044 30-May-20 33987 2,756.03
BOX REIF
477 SH117045 30-May-20 33987 3F SLAB TRIMMER BAR POUR D1 REIF 3,765.65

478 SH117046 30-May-20 33987 3F PT SLAB POUR D1 ADDL LAYERS REIF 17,008.57

479 SH117047 30-May-20 33987 3F BEAMS POUR D1 REIF 3,858.25

480 SH117125 31-May-20 37729 THIRD FLOOR SLAB PUNCHING SHEAR POUR B2 REIF 2,040.00

481 SH117126 31-May-20 37729 THIRD FLOOR TRIMMER BAR POUR B2 REIF 8,697.36

482 SH117127 31-May-20 37729 THIRD FLOOR PT SLAB POUR B2 ADDL LAYERS REIF 17,083.18

483 SH117128 31-May-20 37729 THIRD FLOOR BEAMS POUR B2 REIF 4,221.70
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

484 SH117172 2-Jun-20 32084 THIRD FLOOR BEAMS POUR C2 REIF 3,918.98

485 SH117173 2-Jun-20 32084 THIRD FLOOR PT SLAB ADDL LAYER POUR C2 REIF 16,719.98

486 SH117174 2-Jun-20 32084 THIRD FLOOR PT SLAB TRIMMER BAR POUR C2 REIF 8,459.22

487 SH117175 2-Jun-20 32084 THIRD FLOOR PUNCHING SHEAR POUR C2 REIF 1,812.57

488 SH117176 2-Jun-20 33987 THIRD FLOOR BEAMS POUR D2 REIF 1,378.23

489 SH117177 2-Jun-20 33987 THIRD FLOOR PT SLAB POUR D2 ADDL LAYERS REIF 13,539.40

490 SH117178 2-Jun-20 33987 THIRD FLOOR PT SLAB TRIMMER BAR POUR D2 REIF 4,062.01

491 SH117179 2-Jun-20 33987 THIRD FLOOR POUR D2 PT SLAB CORNER, TENDON, POUR STRIP REIF 2,507.84

492 SH117180 2-Jun-20 33987 THIRD FLOOR PUNCHING SHEAR DETAILS POUR D2 REIF 1,971.35

493 SH117181 2-Jun-20 61004 3F~4F COLUMN & WALL REIF 23,769.38

494 SH117182 2-Jun-20 61004 3F~4F ST-05 CW REIF 9,407.36

495 SH117183 2-Jun-20 72882 LGF COLUMN STARTER POUR 05 REIF 19,836.80

496 SH117184 2-Jun-20 72882 3F~4F ST-04 CW @(NN-MM)/(12-13) REIF 7,734.23

497 SH117185 2-Jun-20 72882 3F~4F STAIR 03 COREWALL (BB-CC)/(8/9) REIF 8,540.39

498 SH117186 2-Jun-20 74831 3F~4F COLUMN & WALL REIF 23,025.23

499 SH117187 2-Jun-20 74831 3F~4F COREWALL @(CC-BB)/(12-13) REIF 13,008.52

500 SH117258 3-Jun-20 71166 3F~4F COREWALL @(B-C)/(8-9) REIF 10,972.49

501 SH117266 3-Jun-20 71166 3F~4F COREWALL @(C-B)/(12-13)) REIF 14,282.94

502 SH117289 3-Jun-20 91799 SWIMMINGPOOL ADDITIONAL BARS 28,163.97

503 SH117314 4-Jun-20 42080 GF PT SLAB PUNCHING SHEAR (POUR-C3) REIF 2,039.11

504 SH117315 4-Jun-20 42080 GF PT SLAB PUNCHING SHEAR (POUR-C3) REIF 1,512.34

505 SH117316 4-Jun-20 42080 GF PT SLAB PUNCHING SHEAR (POUR-C3) REIF 2,892.32

506 SH117317 4-Jun-20 42080 GF UPSTAND WALL REIF 6,084.00

507 SH117318 4-Jun-20 42080 GF PT SLAB (POUR-C3) POUR STRIPS REIF 5,314.55

508 0.46

509 SH117319 4-Jun-20 42080 GF SLAB ADDITIONAL LAYER (POUR-C3)REIF 21,346.67

509 SH117407 6-Jun-20 42080 GF SLAB ADDITIONAL Y DIRECTION POUR D3 REIF 24,039.900

510 SH117442 7-Jun-20 42080 GF SLAB ADDITIONAL Y DIRECTION POUR D3 REIF 15,810.15
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

511 SH117479 7-Jun-20 16624 GF SLAB ADDITIONAL Y DIRECTION POUR A3 REIF 15,655.51

512 SH117480 7-Jun-20 16624 GF SLAB ADDITIONAL X DIRECTION POUR A3 REIF 10,742.18

513 SH117472 7-Jun-20 74831 GF POUR B3 SLAB TOP ADDITIONAL LAYER Y-DIRECTION REIF 18,809.94

514 SH117473 7-Jun-20 74831 GF POUR B3 UPSTAND WALL REIF 9,811.91

515 SH117474 7-Jun-20 74831 GF PT SLAB POUR B3 POUR STRIPS REIF 6,443.33

516 SH117475 7-Jun-20 74831 GF PT SLAB POUR B3 UPSTAND WALL REIF 7,140.21

517 SH117476 7-Jun-20 74831 GF PT SLAB PUNCHING SHEAR POUR B3 REIF 1,881.21

518 SH117477 7-Jun-20 74831 GF PT SLAB PUNCHING SHEAR POUR B3 REIF 2,500.80

519 SH117509 8-Jun-20 32084 GF PT SLAB ADDITIONAL X-DIRECTION REIF 7,260.61

520 SH117510 8-Jun-20 32084 GF POUR STRIP BOT BAR & TRIMMER BAR (P-D3) REIF 3,999.29

521 SH117511 8-Jun-20 32084 GF POUR TOP BAR & DEAD, LIVE END, PAN BOX(P-D3) REIF 2,906.50

522 SH117513 8-Jun-20 32084 GF PT SLAB PUNCHING SHEAR POUR D3 REIF 2,813.30

523 SH117514 8-Jun-20 32084 GF PT SLAB PUNCHING SHEAR POUR D3 REIF 1,342.13

524 SH117515 8-Jun-20 32084 GF PT SLAB PUNCHING SHEAR POUR D3 REIF 1,612.80

525 SH117516 8-Jun-20 72882 ADDITIONAL REIF 38,318.50

526 SH117539 8-Jun-20 32027 FOURTH FLOOR SLAB MESH 34,983.90

527 SH117503 8-Jun-20 69118 GF POUR STRIP BOT BAR & TRIMMER BAR (P-D3) REIF 5,214.72

528 SH117504 8-Jun-20 69118 GF POUR STRIP TOP BAR & DEAD END, PAN BOX (P-A3) REIF 2,783.90

529 SH117505 8-Jun-20 69118 GF POUR A3 UPSTAND WALL REIF 10,933.49

530 SH117506 8-Jun-20 69118 PUNCHING SHEAR REIFPSTAND WALL REIF 4,305.57

531 SH117507 8-Jun-20 69118 GF PT SLAB PUNCHING SHEAR POUR A3 REIF 1,728.30

532 SH117508 8-Jun-20 69118 GF PT SLAB POUR A3 PUNCHING SHAER REIF 304.17

533 SH117517 8-Jun-20 42080 PART E & F MESH REIFORCEMENT 34,983.90

534 SH117518 8-Jun-20 78044 PART E & F MESH REIFORCEMENT 51,084.86

535 SH117594 8-Jun-20 47878 FOURTH FLOOR SLAB MESH B1 34,983.90

536 SH117519 8-Jun-20 25283 GROUND FLOOR SLAB CHAIR REIF 14,565.51

537 SH117550 9-Jun-20 27744 GF SWIMMING POOL SLAB LAYERS POUR 05 REIF 30,477.50

538 SH117562 9-Jun-20 91799 4TH FLOOR BEAMS PART C POUR C1 REIF 1,446.57
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

539 SH117563 9-Jun-20 91799 4TH FLOOR PT SLAB ADDL LAYER POUR C1 REIF 14,851.82

540 SH117564 9-Jun-20 91799 4TH FLOOR PT SLAB POUR STRIP BAR & TRIMMER BAR (P-C1) REIF 8,576.40

541 SH117565 9-Jun-20 91799 4TH FLOOR PUNCHING SHEAR (POUR C1) PART C REIF 1,977.50

542 SH117617 10-Jun-20 25283 4TH FLOOR PT SLAB PUNCHING SHEAR POUR B1 REIF 1,902.95

543 SH117618 10-Jun-20 25283 4TH FLOOR PT SLAB POUR STRIP BAR & TRIMMER BAR (P-B1) REIF 8,656.77

544 SH117619 10-Jun-20 25283 4TH FLOOR PT SLAB ADDL LAYER POUR B1 REIF 13,459.26

545 SH117620 10-Jun-20 25283 4TH FLOOR PT SLAB BEAMS POUR B1 REIF 1,101.54

546 SH117621 10-Jun-20 72160 4TH-5TH FLOOR COLUMN & WALL- PART-B 7,419.50

547 SH117622 10-Jun-20 72160 4TH-5TH FLOOR COLUMN-PART-B 10,388.36

548 SH117623 10-Jun-20 72160 4TH-5TH FLOOR CW ST-01 - PART-B 6,548.88

549 SH117624 10-Jun-20 72160 4TH-5TH FLOOR CW ST-02 - PART-B 7,301.84

550 SH117625 10-Jun-20 72160 4TH-5TH FLOOR CW - PART-B 10,957.50

551 SH117626 10-Jun-20 89211 4TH-5TH FLOOR CW-ST-04 - PART-C 6,475.76

552 SH117627 10-Jun-20 89211 4TH-5TH FLOOR CW-ST-03 - PART-C 7,237.73

553 SH117628 10-Jun-20 89211 4TH-5TH FLOOR CW - PART-C 10,965.32

554 SH117629 10-Jun-20 89211 4TH-5TH FLOOR CW & WALL - PART-C 8,562.19

555 SH117630 10-Jun-20 89211 4TH-5TH FLOOR COLUMN - PART-C 9,834.92

556 SH117687 11-Jun-20 72406 FOURTH FLOOR SLAB MESH-PART-D 34,983.90

557 SH117708 11-Jun-20 47878 4TH-5TH FLOOR STAIR-06 COREWALL- PART-D 7,450.35

558 SH117709 11-Jun-20 47878 4TH-5TH FLOOR STAIR-05 COREWALL- PART-D 6,367.28

559 SH117710 11-Jun-20 47878 4TH-5TH FLOOR COLUMN & WALL- PART-D 19,829.31

560 SH117711 11-Jun-20 47878 4TH-5TH FLOOR COREWALL- PART-D 12,002.46

561 SH117712 11-Jun-20 37729 4F PUNCHING SHEAR DETAILS PART-D (POUR-D1) REIF 1,628.14

562 SH117713 11-Jun-20 37729 4FSLAB PART-D (POUR-D1) POUR STRIP, CORNER BAR & PAN REIF 2,813.38

563 SH117714 11-Jun-20 37729 4F PT SLAB TRIMMER BAR PART-D (POUR-D1) REIF 4,640.77

564 SH117715 11-Jun-20 37729 4F PT SLAB PART D POUR D1 ADDL LAYERS REIF 17,936.92

565 SH117716 11-Jun-20 37729 4F BEAMS POUR D1 REIF 4,437.36

566 SH117717 11-Jun-20 27744 4F FLOOR PT SLAB PUNCHING SHEAR POUR B2 PART-B REIF 2,042.58
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

567 SH117718 11-Jun-20 27744 4F FLOOR PT SLAB TRIMMER BAR REIF DETAILS POUR B2 PART B REIF 8,426.30

568 SH117719 11-Jun-20 27744 4F FLOOR PT SLAB PART B POUR B2 ADDL LAYERS REIF 17,842.73

569 SH117720 11-Jun-20 27744 4F FLOOR BEAMS PART-B POUR-B2 REIF 4,229.31

570 SH117721 11-Jun-20 73173 4F FLOOR PUNCHING SHEAR DETAILS PART-D POUR-D2 REIF 1,990.71

570 SH117722 11-Jun-20 73173 4F FLOOR PART D POUR D2 PT SLAB CORNER BAR, TENDON, POUR STRIP 2,586.44

571 SH117723 11-Jun-20 73173 4F PT SLAB TRIMMER BAR PART-D (POUR-D2) REIF 6,340.86

571 SH117724 11-Jun-20 73173 4F PT SLAB PART D POUR D2 ADDL LAYERS REIF 13,890.86

571 SH117725 11-Jun-20 73173 4F BEAMS POUR D2 REIF 1,355.06

572 SH117749 13-Jun-20 66583 4F BEAMS POUR C2 REIF 4,454.50

572 SH117750 13-Jun-20 66583 4F PT SLAB PART C POUR C2 ADDL LAYERS REIF 18,055.06

573 SH117751 13-Jun-20 66583 4F PT SLAB TRIMMER BAR PART-C (POUR-C2) REIF 8,069.86

573 SH117752 13-Jun-20 66583 4F FLOOR PUNCHING SHEAR DETAILS PART-C POUR-C2 REIF 1,855.33

573 SH117777 14-Jun-20 33987 FIFTH FLOOR SLAB MESH REIF 32,984.82

574 SH117805 14-Jun-20 89211 FIFTH TO SIXTH FLOOR COREWALL PART B @ (CC-BB)/(2-3) REIF 10,965.32

574 SH117806 14-Jun-20 89211 FIFTH TO SIXTH FLOOR STAIR 02 COREWALL PART B @ (BB-CC)/(6-7) REIF 7,301.84
FIFTH TO SIXTH FLOOR STAIR 01 COREWALL PART B @ (NN-MM)/(2-3)
574 SH117807 14-Jun-20 89211 6,548.88
REIF
575 SH117808 14-Jun-20 89211 FIFTH TO SIXTH FLOOR COLUMN PART B REIF 10,393.99

575 SH117809 14-Jun-20 89211 FIFTH TO SIXTH FLOOR COLUMN & WALL REIF 7,419.50

576 SH117778 14-Jun-20 32027 GROUND FLOOR A2 POUR 08 MESH REIF 34,056.58

577 SH117810 14-Jun-20 37729 FIFTH FLOOR PT SLAB PUNCHING SHAER POUR B1 PART B REIF 1,902.95

578 SH117811 14-Jun-20 37729 FIFTH FLOOR PT SLAB POUR STRIP BAR & TRIMMER BAR P-B1 REIF 8,772.65

579 SH117812 14-Jun-20 37729 FIFTH FLOOR PT SLAB ADDL LAYERS POUR B1 REIF 13,381.85

580 SH117813 14-Jun-20 37729 FIFTH FLOOR PT BEAMS POUR B1 REIF 1,101.54

581 SH117824 15-Jun-20 99250 GROUND LEVEL POUR B3 UPSTAND WALL REIF 1,921.01

582 SH117825 15-Jun-20 99250 GROUND FLOOR PT SLAB PART B POUR-B3 POUR STRIP REIF 1,353.67

583 SH117826 15-Jun-20 99250 GROUND LEVEL POUR A3 UPSTAND WALL REIF 1,380.66

584 SH117827 15-Jun-20 99250 POUR STRIP BOT BAR & TRIMMER BAR (P-A3) REIF 3,308.46

585 SH117828 15-Jun-20 99250 FIFTH FLOOR SLAB MESH REIF 32,984.82
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

586 SH117856 15-Jun-20 75789 FIFTH FLOOR BEAMS PART C POUR C1 REIF 1,446.57

587 SH117857 15-Jun-20 75789 FIFTH FLOOR POUR STRIP BAR & TRIMMER BAR P-C1 REIF 8,576.40

588 SH117858 15-Jun-20 75789 FIFTH FLOOR PUNCHING SHEAR POUR C1 REIF 1,977.50

589 SH117863 15-Jun-20 75789 FIFTH FLOOR PT SLAB ADDL LAYER POUR C1 REIF 14,851.82

590 SH117888 16-Jun-20 47878 FIFTH TO SIXTH FLOOR ST04 CW @(NN-MM)(12-13) REIF 6,483.07

591 SH117886 16-Jun-20 47878 FIFTH TO SIXTH FLOOR ST03 CW @(BB-CC)(8-9) REIF 7,237.73

592 SH117885 16-Jun-20 47878 FIFTH TO SIXTH FLOOR COREWALL PART C @(CC-BB)(12-13) REIF 10,965.32

593 SH117884 16-Jun-20 47878 FIFTH TO SIXTH FLOOR COLUMN & WALL REIF 8,562.19

594 SH117883 16-Jun-20 47878 FIFTH TO SIXTH FLOOR COLUMN REIF 9,834.92

595 SH117944 17-Jun-20 34422 FIFTH FLOOR PT SLAB PUNCHING SHEAR (POUR B2) REIF 2,042.58

596 SH117945 17-Jun-20 34422 FIFTH FLOOR PT SLAB TRIMMER BAR REIF POUR B2 8,561.83

597 SH117946 17-Jun-20 34422 FIFTH FLOOR PT SLAB ADDL LAYER REIF POUR B2 17,843.04

598 SH117947 17-Jun-20 34422 FIFTH FLOOR BEAMS POUR B2 REIF 4,229.31

599 SH117975 18-Jun-20 71166 FIFTH FLOOR BEAMS POUR C2 REIF 4,454.50

600 SH117976 18-Jun-20 71166 FIFTH FLOOR PT SLAB ADDLY LAYER POUR C2 REIF 18,055.06

601 SH117977 18-Jun-20 71166 FIFTH FLOOR PT SLAB TRIMMER BAR REIF POUR C2 8,069.86

602 SH117978 18-Jun-20 71166 FIFTH FLOOR PT SLAB PUNCHING SHEAR (POUR C2) REIF 1,855.33

603 SH117997 18-Jun-20 71166 5TH FLOOR TO ROOF ADDITIONAL (PARAPET) 42,392.21

604 SH117990 18-Jun-20 72160 THIRD FLOOR BEAMS POUR A1 4,474.66

605 SH117991 18-Jun-20 72160 THIRD FLOOR PT SLAB PART-A (POUR A1) ADDL LAYERS REIF 19,231.12

606 SH117992 18-Jun-20 72160 3F TRIMMER BAR PART A POUR A1 REIF 5,087.20

607 SH117993 18-Jun-20 72160 3F PT SLAB PART A POUR A1 POUR STRIP, CORNER BAR REIF 2,757.51

608 SH117994 18-Jun-20 72160 3F PUNCHING SHEAR DETAILS PART A POUR A1 1,892.71

609 SH117996 18-Jun-20 72160 3F ADDITIONAL MESH POUR REIF 15,992.64

610 SH118151 23-Jun-20 25283 PART F GF SLAB ADDL & CHAIRS PART A3 & B3 33,365.93

611 SH118152 23-Jun-20 89265 ADDITIONAL-PART B-PARAPET,PAN BOX OPENING REIF 24,192.00

612 SH118153 23-Jun-20 89265 6F PART B AREA PT BEAMS POUR B1 REIF 1,101.75

613 SH118154 23-Jun-20 89265 6F PT SLAB ADDL LAYERS POUR B1 PART B 13,381.11
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

614 SH118155 23-Jun-20 89265 6F PT SLAB POUR STRIP BAR & TRIMMER BAR (P-B1) REIF 8,766.61

615 SH118156 23-Jun-20 89265 6F PT SLAB PUNCHING SHEAR POUR B1 PART B REIF 1,902.95

616 SH118174 24-Jun-20 72160 6F~7F COREWALL PART B @ CC-BB/2-3 REIF 10,957.50

617 SH118175 24-Jun-20 72160 6F~7F STAIR 02 COREWALL PART B BB-CC/6-7 REIF 7,169.44

618 SH118176 24-Jun-20 72160 6F~7F STAIR 01 CW PART B @ NN-MM/2-3 REIF 6,440.20

619 SH118177 24-Jun-20 72160 6F~7F COLUMN PART B REIF 12,127.86

620 SH118178 24-Jun-20 72160 6F~7F COLUMN & WALL PART B REIF 7,652.39

621 SH118179 24-Jun-20 27744 SIXTH FLOOR BEAMS PART B POUR B2 REIF 4,229.31

622 SH118180 24-Jun-20 27744 6TH FLOOR PT SLAB PART B POUR B2 ADDL LAYER REIF 17,843.04

623 SH118181 24-Jun-20 27744 6TH FLOOR PT SLAB PART B POUR B2 TRIMMER BAR DETAILS REIF 8,491.83

624 SH118182 24-Jun-20 27744 6TH FLOOR PT SLAB PUNCHING SHEAR POUR B2 PART B REIF 2,042.58

625 SH118192 24-Jun-20 17035 ADDITIONAL PART D PARAPET WORKS REIF 24,192.00

626 SH118193 24-Jun-20 17035 5TH FLOOR PT SLAB PART D POUR D1 ADDL LAYERS REIF 17,936.92

627 SH118211 25-Jun-20 33987 5TH FLOOR BEAMS POUR D2 REIF 1,355.06

628 SH118212 25-Jun-20 33987 FIFTH FLOOR PT SLAB PART D POUR D2 ADDL LAYERS REIF 13,890.86

629 SH118213 25-Jun-20 33987 FIFTH FLOOR PT SLAB TRIMMER BAR PART D POUR D2 REIF 6,340.86
FIFTH FLOOR PT SLAB CORNER BAR, TENDON, POUR STRIP BAR PART D
630 SH118214 25-Jun-20 33987 2,586.44
POUR D2 REIF
631 SH118215 25-Jun-20 33987 FIFTH FLOOR PUNCHING SHEAR DETAILS PART D POUR D2 REIF 1,990.71

632 SH118216 25-Jun-20 88436 FIFTH FLOOR BEAMS POUR D1 REIF 4,437.36

633 SH118217 25-Jun-20 88436 5TH FLOOR PT SLAB TRIMMER BAR PART D POUR D1 REIF 4,640.77

634 SH118218 25-Jun-20 88436 5TH FLOOR PT SLAB POUR STRIP, CORNER BAR PART D POUR D1 REIF 2,813.38

635 SH118219 25-Jun-20 88436 5TH FLOOR PUNCHING SHEAR DETAILS PART D POUR D1 REIF 1,628.14

636 SH118222 25-Jun-20 73173 3F~4F STAIR-07 @(B-C)/(6-7) PART A REIF 10,878.32

637 SH118223 25-Jun-20 73173 3F~4F LIFT CW PART A GRID (B-C)/(2-3) REIF 14,282.94

638 SH118226 25-Jun-20 88436 PART D1 FIFTH FLOOR SLAB MESH REIF 32,984.82

639 SH118230 25-Jun-20 73173 3F~4F COLUMN & WALL REIF 10,270.55

640 SH118224 25-Jun-20 89821 5TH TO 6TH FLOOR STAIR 06 COREWALL (B-C)(8-9) REIF 7,450.35

641 SH118225 25-Jun-20 89821 5TH TO 6TH FLOOR ST-05 CW REIF 6,367.28
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

642 SH117512 8-Jun-20 32084 GF POUR D3 UPSTAND WALL REIF 17,713.74

643 SH118259 27-Jun-20 72406 6TH TO 7TH FLOOR COREWALL @GRID(CC-BB)/(12-13) REIF 10,965.32

644 SH118260 27-Jun-20 72406 6TH TO 7TH FLOOR ST-03 CW (BB-CC)/(8-9) REIF 7,107.31

645 SH118261 27-Jun-20 72406 6TH TO 7TH FLOOR ST-04 CW (NN-MM)/(12-13) REIF 6,374.39

646 SH118262 27-Jun-20 72406 6TH TO 7TH FLOOR COLUMN REIF 7,684.82

647 SH118263 27-Jun-20 72406 6TH TO 7TH FLOOR COLUMN & WALL REIF 7,019.24

648 SH118264 27-Jun-20 37729 SIXTH FLOOR BEAMS POUR C1 REIF 1,307.01

649 SH118265 27-Jun-20 37729 SIXTH FLOOR PT SLAB ADDL LAYER REIF 14,251.00

650 SH118266 27-Jun-20 37729 SIXTH FLOOR PT SLAB POUR STRIP, TRIMMER BAR REIF 6,650.56

651 SH118267 27-Jun-20 37729 SIXTH FLOOR PUNCHING SHEAR POUR C1 REIF 1,438.00

652 SH118522 6-Jul-20 73173 UPSTAND PARAPET & LAP ADDITIONAL REINF 10,111.40

653 SH118523 6-Jul-20 73173 SIXTH TO SEVENTH FLOOR COLUMN & WALL (PART-C) REINF 3,022.58

654 SH118524 6-Jul-20 73173 SIXTH FLOOR TO SEVENTH FLOOR COLUMN (PART-C) REINF 2,698.28

655 SH118525 6-Jul-20 73173 6F BEAMS PART-C (POUR-C2) REINF 4,258.37

656 SH118526 6-Jul-20 73173 6F PT SLAB ADDL LAYER PART-C (POUR-C2) REINF 17,536.72

657 SH118527 6-Jul-20 73173 6F PT SLAB TRIMMER BAR (POUR-C2) (PART-C) REINF 6,882.46

658 SH118528 6-Jul-20 73173 6F PUNCHING SHEARS (POUR-C2) (PART-C) REINF 1,342.35

659 SH118559 6-Jul-20 69118 RAFT F & STAIRCASE ADDITIONAL 50,359.20

660 SH117995 18-Jun-20 72160 3F ADDITIONAL MESH POUR A1 REIF 15,992.64

661 SH118220 25-Jun-20 89821 5TH TO 6TH FLOOR PART D GRID(C-B)/(12-13) REIF 12,010.28

662 SH118221 25-Jun-20 89821 5TH TO 6TH FLOOR COLUMN & WALL REIF 19,829.31

663 SH118728 11-Jul-20 33987 LANDSCAPE RAFT PART-F (A3 PORTION) ADDITIONAL 18,103.10

664 SH118729 12-Jul-20 16624 4TH FLOOR PART-A (POUR-A1) MESH 14,993.10

665 SH118731 12-Jul-20 16624 4TH FLOOR PT SLAB PART-A(POUR-A1) ADD'L LAYERS REINF 19,231.12

666 SH118730 12-Jul-20 16624 4TH FLOOR BEAMS (POUR-A1) REINF 4,474.66

667 SH118732 12-Jul-20 16624 4TH FLOOR PT SLAB TRIMMER BAR PART-A (POUR-A1) REINF 5,047.48

668 SH118733 12-Jul-20 16624 4TH FLOOR PT SLAB PART-A (POUR-A1) POUR STRIB, CORNER BAR REINF 2,757.51

669 SH118734 12-Jul-20 16624 4TH FLOOR PUNCHING SHEAR DETAILS (PART-A) (POUR-A1) REINF 1,823.66
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

670 SH118735 11-Jul-20 33987 FOURTH TO FIFTH AND FLOOR COLUMN AND WALL (PART-A) REINF 8,944.00

671 SH118736 11-Jul-20 33987 4TH TO 5TH FLOOR LIFT CW PART-A GRID (B-C) /(2-3) REINF 12,002.46

672 SH118737 11-Jul-20 33987 4TH TO 5TH FLOOR STAIR -7 CW @ (B-C) /(6-7) (PART-A) REINF 7,394.08

673 SH118759 13-Jul-20 99250 6F-7F COLUMN & WALL (PART-D) REINF 19,857.22

674 SH118760 13-Jul-20 99250 6F-7F LIFT CORE WALL (PART-D) (GRID(C-B)/(12-13) REINF 12,002.46

675 SH118761 13-Jul-20 99250 6F-7F ST-05 CW (PART-D) REINF 6,345.92

676 SH118762 13-Jul-20 99250 6F-7F STAIR -06 CW (PART-D) (B-C) (8-9) REINF 7,450.35

677 SH118764 12-Jul-20 91799 6TH FLOOR BEAMS (POUR-D2) REINF 1,306.95

678 SH118765 12-Jul-20 91799 6TH FLOOR PT SLAB PART-D (POUR-D2) ADD'L LAYERS REINF 13,890.86

679 SH118766 12-Jul-20 91799 6TH FLOOR PT SLAB TRIMMER BAR PART-D (POUR-D2) REINF 6,340.86

680 SH118767 12-Jul-20 91799 6TH FLOOR PART-D (POUR-D2) PT SLAB CORNER BAR, TENDOON REINF 2,586.44

681 SH118768 12-Jul-20 91799 6TH FLOOR PUNCHING SHEARS DETAILS (PART-D)(POUR-D2) REINF 1,990.71

682 SH118769 12-Jul-20 69118 6F BEAMS (POUR-D1) REINF 4,437.36

683 SH118770 12-Jul-20 69118 6F PT SLAB PART-D (POUR-D1) ADD'L LAYERS REINF 17,936.92

684 SH118771 12-Jul-20 69118 6F PT SLAB TRIMMER BAR PART-D (POUR-D1) REINF 4,640.77

685 SH118772 12-Jul-20 69118 6F PT SLAB PART-D (POUR-D1) POUR STRIB,CORNER ,BAR ,LIVE REINF 2,813.38

686 SH118773 12-Jul-20 69118 6F PUNCHING SHEARS DETAILS (PART-D) (POUR-D1) REINF 1,628.14

687 SH118774 12-Jul-20 69118 6F (PART-D) (POUR-D1) MESH 19,990.80

688 SH118828 14-Jul-20 50859 SEVENTH FLOOR PART-B AREA PT BEAMS (POUR-B1) REINF 1,101.54

689 SH118829 14-Jul-20 50859 7TH FLOOR PT SLAB ADDL LAYERS (POUR-B1) (PART-B) REINF 9,725.75

690 SH118830 14-Jul-20 50859 7F PT SLAB POUR STRIP BAR & TRIMMER BAR (P-B1) REINF 8,449.91

691 SH118831 14-Jul-20 50859 7TH FLOOR PT SLAB PUNCHING SHEAR (POUR-B1) (PART-B) REINF 1,296.40

692 SH118832 14-Jul-20 89211 7TH FLOOR BEAMS (PART-C) (POUR-C1) REINF 1,428.23

693 SH118833 14-Jul-20 89211 7TH FLOOR PT SLAB ADD'L PART-C (POUR-C1) REINF 10,942.46

694 SH118834 14-Jul-20 89211 7TH FLR SLAB POUR STRIP BAR & TRIMMER BAR (P-C1) REINF 7,519.33

695 SH118835 14-Jul-20 89211 7TH FLOOR PUNCHING SHEARS (POUR-C1) (PART-C) REINF 1,106.07

696 SH118836 14-Jul-20 89211 SEVENTH FLOOR C1 POUR-BLOCK C MESH REINF 23,988.96

697 SH118837 14-Jul-20 90859 SEVENTH FLOOR B1 POUR-BLOCK B MESH REINF 23,988.96
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

698 SH118858 15-Jul-20 34422 SEVENTH FLOOR BEAMS PART-B(POUR-B2)REINF 4,125.82

699 SH118859 15-Jul-20 34422 7TH FLOOR PT SLAB PART-B (POUR-B2) ADD'L LAYER REINF 13,603.30

700 SH118860 15-Jul-20 34422 7TH FLOOR PT SLAB TRIMMER BAR REINF(POUR-B2)(PART-B) 7,366.44

701 SH118861 15-Jul-20 34422 7TH FLOOR PT SLAB PUNCHING SHEAR (POUR-B2) (PART-B) REINF 1,444.64

702 SH118997 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR BEAM REIF 2,531.12

703 SH118998 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR BEAM REIF 1,471.03

704 SH118999 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR SLAB REIF 12,147.34

705 SH119000 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR SLAB REIF 14,309.40

706 SH119001 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR UPSTANSD REIF 711.50

707 SH119002 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR UPSTANSD REIF 11,753.64

708 SH119054 20-Jul-20 76469 1F~2F STAIR 08 COREWALL @(N-M)/(2-3) (PART A) REIF 11,079.06

709 SH119055 20-Jul-20 76469 1F~2FCOLUMN (PART A) REIF 9,710.73

710 SH119056 20-Jul-20 76469 1F~2FCOLUMN & WALL (PART A) REIF 5,097.61

711 SH119057 20-Jul-20 42080 7TH FLOOR BEAMS (POUR-D1) REINF 4,309.77

712 SH119058 20-Jul-20 42080 7TH FLOOR D1 BLOCK D MESH REIF 23,988.96

713 SH119059 20-Jul-20 42080 7TH FLOORPUNCHING SHEAR DETAILS PART D POUR D1 1,103.01

7TH FLOOR PT SLAB PART D POUR D1 POUR STRIP, CORNER BAR LIVE
714 SH119060 20-Jul-20 42080 2,432.32
END

715 SH119061 20-Jul-20 42080 7TH FLOOR PT SLAB TRIMMER BAR REINF(POUR-D1)(PART-D) 3,990.19

716 SH119062 20-Jul-20 42080 7TH FLOOR PT SLAB REINF(POUR-D1)(PART-D) ADDL LAYERS REIF 13,759.60

717 SH119140 21-Jul-20 72406 5F~FLOOR BEAMS POUR A1 REIF 4,085.64

718 SH119141 21-Jul-20 72406 5F PT SLAB PART A (POUR 1) ADD L LAYERS REIF 16,694.19

719 SH119142 21-Jul-20 72406 5F PT SLAB TRIMMERBAR PART A(POUR A1) REIF 4,414.73
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)
5F PT SLAB POUR STRIP,CORNER BAR, LIVE & DEAD END PART A(POUR
720 SH119143 21-Jul-20 72406 2,177.19
A1) REIF

721 SH119144 21-Jul-20 72406 5F PUNCHING SHEAR DETAILS PART A POUR A1 REIF 1,314.79

722 SH119147 21-Jul-20 72406 5F MESH POUR A1 REIF STRAIGHT BAR 13,993.56

723 SH119153 21-Jul-20 72160 7TH FLOOR TO ROOF ST01 CW PART B @ NN-MM/2-3 REIF 4,512.61

724 SH119125 21-Jul-20 75789 7F ROOF CORE WALL PART C @ BRID (CC-BB)/(12-13) REIF 11,769.50

725 SH119126 21-Jul-20 75789 7F LOWER ROOF ST-04 CW (PART C) @ (NN-MM) /(12-13) REIF 4,436.02

726 SH119127 21-Jul-20 75789 7F~ROOF STAIR 03 COREWALL PART CREIF 5,168.13

727 SH119128 21-Jul-20 75789 7F~ROOF COLUMN & WALL REIF 2,185.78

728 SH119129 21-Jul-20 75789 7F~ROOF COLUMN REIF 7,376.50

729 SH119130 21-Jul-20 75789 7F~ROOF COLUMN & WALL REIF 7,361.99

730 SH119132 21-Jul-20 75789 7F~ROOF COLUMN REIF 7,034.88

731 SH119152 21-Jul-20 72160 7TH FLOOR TO ROOF COREWALL PART B @ ((CC-BB)/(2-3) REIF 12,046.86

732 SH119154 21-Jul-20 72160 7TH FLOOR TO ROOF ST02 CW PART B @ NN-MM/2-3 REIF 5,220.92

733 SH119155 21-Jul-20 72160 7TH FLOOR TO ROOF COLUMN & WALL PART BREIF 4,803.03

734 SH119156 21-Jul-20 72160 7TH FLOOR TO ROOF COLUMN PART B REIF 7,216.72

735 SH119157 21-Jul-20 72160 7TH FLOOR TO ROOF COLUMN PART B REIF 5,480.20

736 SH119158 21-Jul-20 72160 7TH FLOOR TO ROOF COLUMN PART B REIF 7,116.40

737 SH119366 27-Jul-20 26811 PART A UPSTAND & STAIRCASE REIF STRAIGHT BAR 30,082.08

738 SH119367 27-Jul-20 26811 7TH FLOOR BEAMS POUR D2 REIF 1,291.86

739 SH119368 27-Jul-20 26811 7TH FLOOR PT SLAB PART D ADDL LAYERS POUR D2 REIF 9,401.23

740 SH119369 27-Jul-20 26811 7TH FLOOR PT SLAB TRIMMER BAR PART D POUR D2 REIF 4,556.64

7TH FLOOR PT SLAB POUR D2, CORNER BAR, TENDON, POUR STRIP
741 SH119370 27-Jul-20 26811 2,008.86
TRIMMER BAR PART D POUR D2 REIF
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

742 SH119371 27-Jul-20 26811 7TH FLOOR PT SLAB PUNCHING SHEAR PART D POUR D2 REIF 1,355.91

743 SH119372 27-Jul-20 76469 5F~6F COLUMN & WALL PART A REIF 8,944.00

744 SH119373 27-Jul-20 76469 5F~6F LIFT CW PART A GRID(B-C)/(2-3) REIF 11,366.08

745 SH119374 27-Jul-20 76469 5F~6F STAIR 07 CW @(B-C)/(6-7) REIF 6,714.14

746 SH119411 28-Jul-20 32076 PART A LANDSCAPE GROUND FLOOR SLAB STRAIGHT BAR 19,990.80

747 SH119412 28-Jul-20 32076 PART C 7 TH FLOOR SLAB C2 POUR REIF STRAIGHT BAR 20,065.44

748 SH119438 29-Jul-20 26811 7TH FLOOR LIFT COREWALL PART D REIF 12,236.76

749 SH119439 29-Jul-20 26811 7TH FLOOR ROOF FLOOR ST-05 CW PART D@ (N-M)/(12-13) REIF 5,220.84

750 SH119441 29-Jul-20 26811 7F~RF COLUMN & WALL PART-D REIF 6,790.04

751 SH119442 29-Jul-20 26811 7F~RF COLUMN PART-D REIF 8,842.95

752 SH119443 29-Jul-20 26811 7F~RF COLUMN & WALL PART-D REIF 7,030.05

753 SH119444 29-Jul-20 26811 7F~RF STAIR 06 CW PART-D REIF 6,035.37

754 SH119507 4-Aug-20 89211 PART A3 GROUND FLOOR SLAB & PARAPPET REINF(STRAIGHT BAR) 40,066.56

755 SH119551 5-Aug-20 72406 SECOND FLOOR BEAMS PART-A (POUR-A2) REINF 1,294.65

756 SH119552 5-Aug-20 72406 SF PT SLAB PART-A (POUR-A2) ADD'L LAYERS REINF 10,472.75

757 SH119553 5-Aug-20 72406 SECOND FLOOR SLAB TRIMMER BAR PART-A (POUR-A2) REINF 6,007.70

SF PART-A (POUR-A2) PT SLAB CORNER BAR,TENDON ,POUR STRIB BAR


758 SH119554 5-Aug-20 72406 2,465.52
REINF

759 SH119555 5-Aug-20 72406 SECOND FLOOR PUNCHING SHEAR DETAILS (PART-A) (POUR-A2) REINF 1,450.14

760 SH119561 5-Aug-20 72406 PART A2 SECOND FLOOR MESH REINF STRAIGHT BAR 9,995.40

761 SH119602 8-Aug-20 89211 ROOF FLOOR PT SLAB BEAMS PART-B (POUR-B2) REINF 1,424.15

762 SH119603 8-Aug-20 89211 ROOF FLOOR PT SLAB BEAMS PART-B (POUR-B2) REINF 2,520.94

763 SH119604 8-Aug-20 89211 ROOF FLOOR PT SLAB ADDL LAYER PART-B (POUR-B2) REINF 16,317.16
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

764 SH119605 8-Aug-20 89211 RF FLR PT SLAB STRIP BOTTOM BAR & TRIMMER BAR PART-B (POUR-B2) 2,982.55

RF FLR PT SLAB POUR STRIP TOP BAR & PUNCHING SHEAR PART-B (POUR-
765 SH119606 8-Aug-20 89211 2,159.02
B2)

766 SH119608 8-Aug-20 89211 PART B2 ROOF FLOOR MESH REINF STRAIGHT BAR 21,989.88

767 SH119618 8-Aug-20 69118 ROOF FLOOR PT SLAB BEAMS PART-C (POUR-C2) REINF 2,069.32

768 SH119619 8-Aug-20 69118 ROOF FLOOR PT SLAB BEAMS PART-C (POUR-C2) REINF 2,744.46

769 SH119620 8-Aug-20 69118 ROOF FLOOR PT SLAB ADDL LAYER PART-C (POUR-C2) REINF 15,649.16

RF PT SLAB POUR STRIP BOT BAR & TRIMMER BAR PART-C (POUR -C2)
770 SH119621 8-Aug-20 69118 3,450.89
REINF

771 SH119622 8-Aug-20 69118 RF PT SLAB POUR STRIP TOP BAR & PUNCHING SHER PART-C (POUR-C2) 2,019.05

772 SH119623 8-Aug-20 69118 POUR C2 ROOF FLOOR MESH REINF STRAIGHT BAR 21,989.88

773 SH119630 9-Aug-20 75789 ROOF PT SLAB BEAMS PART-B (POUR-B1) REINF 2,977.66

774 SH119631 9-Aug-20 75789 ROOF PT SLAB ADDL LAYERS (POUR-B1) (PART-B) REINF 13,699.35

RF PT SLAB POUR STRIP BOTTOM BAR & TRIMMER BAR PART-B (POUR-B1)
775 SH119632 9-Aug-20 75789 1,224.20
REINF

776 SH119633 9-Aug-20 75789 RF PT SLAB POUR STRIP TOP BAR & PS PART-B (POUR-B1) REINF 1,691.09

777 SH119634 9-Aug-20 75789 ROOF FLOOR BEAMS PART-C (POUR-C1) REINF 3,831.10

778 SH119635 9-Aug-20 75789 ROOF FLOOR PT SLAB ADDL LAYERS (POUR-C1) ( PART -C) REINF 14,156.61

RF FLR PT SLAB POUR STRIP BOTTOM BAR & TRIMMER BAR PART-C
779 SH119636 9-Aug-20 75789 2,951.34
(POUR-C1)
RF FLR PT SLAB POUR STRIP TOP BAR & PUNCHING SHEAR PART-C
780 SH119637 9-Aug-20 75789 1,670.88
(POUR-C1)

781 SH119760 9-Aug-20 25283 6F BEAMS POUR A1 REIF 4,158.39

782 SH119761 9-Aug-20 25283 6F PT SLAB PART A POUR A1 ADDL LAYERS REIF 17,757.69

783 SH119762 9-Aug-20 25283 6F PT SLAB PART A POUR A1 POUR STRIP, CORNER BAR REIF 2,001.72

784 SH119763 9-Aug-20 25283 6 F PUNCHING SHEAR DETAILS PART A POUR A1 1,303.96

785 SH119738 11-Aug-20 91740 2F-3F STAIR 8 CORE WALL @ (N-M)/(2-3) PART A REIF 9,873.01
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

786 SH119739 11-Aug-20 91740 2F~3F COLUMN PART A REIF 8,260.80

787 SH119740 11-Aug-20 91740 2F~3F WALL PART A REIF 3,208.28

788 SH119741 11-Aug-20 91740 RF UPSTAND & PARAPET PART B (POUR B1) REIF 11,210.21

789 SH119742 11-Aug-20 91740 RF UPSTAND & PARAPET PART C (POUR C1) REIF 11,219.84

790 SH119743 11-Aug-20 37729 6F~7F COLUMN & WALL PART A REIF 8,944.00

791 SH119744 11-Aug-20 37729 6F~7F CW PART A GRID(B-C)/(2-3) REIF 11,366.08

792 SH119745 11-Aug-20 37729 6F~7F STAIR 7 CW @ (B-C)/(9-7) PART A REIF 6,714.14

793 SH119750 12-Aug-20 47878 ROOF FLOOR UPSTAND & PARAPET PART B POUR B2 RIF 13,680.87

794 SH119751 12-Aug-20 47878 RF FLR PT UPSTAND & PARAPET PART C POUR C2 REIF 14,516.81

795 SH119809 13-Aug-20 83069 LANDSCAPE UPSTAND & STAIRCASE STRAIGHT BARS 36,128.64

796 SH119939 17-Aug-20 74831 ROOF FLOOR BEAMS PART-D (POUR-D1) REINF 3,768.57

797 SH119940 17-Aug-20 74831 ROOF FLOOR PT SLAB ADDL LAYER POUR D1 PART D REIF 13,119.06

RF PT SLAB POUR STRIP BOTTOM BAR & TRIMMER BAR PART-D (POUR-D1)
798 SH119941 17-Aug-20 74831 1,937.54
REINF

799 SH119942 17-Aug-20 74831 RF FLOOR PT SLAB POUR STRIP TOP BAR & PUNCHING SHEAR PART D 1,689.20

800 SH119943 17-Aug-20 74831 PART D1 ROOF SLAB MESH REIF 19,990.80

801 SH119944 17-Aug-20 37729 ROOF FLOOR PT SLAB BEAMS PART D POUR D2 2,033.50

802 SH119945 17-Aug-20 37729 ROOF FLOOR PT SLAB BEAMS PART D POUR D2 3,034.70

803 SH119946 17-Aug-20 37729 ROOF FLOOR PT SLAB ADDL LAYERS PART D POUR D2 13,926.79

804 SH119947 17-Aug-20 37729 RF PT SLAB POUR STRIP BOTOM BAR & TRIMMER BAR PART D POUR D2 2,782.94

RF PT SLAB POUR STRIP BOTOM BAR & PUNCHING SHEAR PART D POUR
805 SH119948 17-Aug-20 37729 2,214.46
D2

806 SH119975 17-Aug-20 37729 ROOF FLOOR UPSTAND & PARAPET PART D POUR D1 RIF 10,543.21

807 SH119976 17-Aug-20 32027 ROOF FLOOR UPSTAND & PARAPET PART D POUR D2 REIF 14,529.93
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

808 SH120037 20-Aug-20 78044 ROOF FLOOR ADDITIONAL STRAIGHT BAR 32,022.96

809 SH120061 20-Aug-20 33987 7TH FLOOR BEAMS POUR A1 REIF 4,198.20

810 SH120062 20-Aug-20 33987 7TH FLOOR PT SLAB PART A POUR A1 ADDL LAYERS REIF 14,686.13

811 SH120063 20-Aug-20 33987 7TH FLOOR PT SLAB TRIMMER BAR PART A POUR A1 REIF 4,372.16

7TH FLOOR PT SLAB PART A POUR A1, POUR STRIP, CORNER BAR, LIVE
812 SH120064 20-Aug-20 33987 2,438.37
&DEAD REIF

813 SH120065 20-Aug-20 33987 7TH FLOOR PUNCHING SHEAR DETAILS PART A POUR A1 1,303.96

814 SH120066 20-Aug-20 33987 7TH FLOOR MESH STRAIGHT BAR 9,995.40

815 SH120067 20-Aug-20 32084 3RD TO 4TH FLOOR STAIR 8 COREWALL @(N-M)/(2-3) PART AREIF 9,260.38

816 SH120068 20-Aug-20 32084 3RD TO 4TH FLOOR COLUMN PART AREIF 8,260.80

817 SH120069 20-Aug-20 32084 3RD TO 4TH FLOOR WALL PART AREIF 3,208.28

818 SH120070 20-Aug-20 32084 3RD FLOOR BEAMS POUR 2 1,294.65

819 SH120071 20-Aug-20 32084 3RD FLOOR PT SLAB PART A POUR A2 ADDL LAYERS REIF 10,465.21

820 SH120072 20-Aug-20 32084 3RD FLOOR PT SLAB PART A POUR A2 TRIMMER BAR REIF 5,586.76

3RD FLOOR PT SLAB PART A POUR A2 CORNER BAR,TENDON,POUR STRIP


821 SH120073 20-Aug-20 32084 2,277.01
REIF

822 SH120074 20-Aug-20 32084 3RD FLOOR PT SLAB PART A POUR A2 PUNCHING SHEAR REIF 1,303.96

823 SH120075 20-Aug-20 32084 3RD FLOOR MESH STRAIGHT BAR 7,996.32

824 SH120278 29-Aug-20 76469 LANDSCAPE AREA ADDITIONAL REINF 20,155.20

825 SH120279 29-Aug-20 76469 ADDITIONAL REINF 10,048.80

826 SH120280 30-Aug-20 16624 7F-ROOF LIFT CW PART-A GRID (B-C)/(2-3) REINF 14,884.11

827 SH120281 30-Aug-20 16624 7F- LOWER ROOF STAIR -7 CW (PART-A) REINF 7,238.35

828 SH120282 30-Aug-20 16624 7F-ROOF COLUMN & WALL (PART-A) REINF 1,888.12

829 SH120283 30-Aug-20 16624 7F-ROOF COLUMN & WALL (PART-A) REINF 2,463.50
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

830 SH120284 30-Aug-20 16624 7F - ROOF COLUMN (PART-A) REINF 3,944.70

831 SH120285 30-Aug-20 16624 7F- ROOF COLUMN & WALL (PART-A) REINF 5,111.32

832 SH1202468 6-Sep-20 32027 ROOF FLOOR PT SLAB BEAMS PART A POUR A1 REIF 2,159.10

833 SH1202469 6-Sep-20 32027 ROOF FLOOR PT SLAB BEAMS PART A POUR A1 REIF 3,186.54

834 SH1202470 6-Sep-20 32027 ROOF FLOOR PT SLAB ADDL LAYER PART A POUR A1 REIF 14,370.48

ROOF FLOOR PT SLAB POR STRIP BOTTOM & TRIMMER PART A POUR A1
835 SH1202471 6-Sep-20 32027 4,357.64
REF

836 SH1202472 6-Sep-20 32027 ROOF FLOOR PT SLAB POR STRIP TOP & PS PART A POUR A1 REF 2,338.19

837 SH1202473 6-Sep-20 32027 PART A POUR A1 ADDITIONAL STRAIGHT BAR 12,994.02

838 SH120617 9-Sep-20 72160 ADDITIONAL STRAIGHT BAR 46,205.18

839 SH120698 12-Sep-20 37729 4TH FLOOR BEAMS POUR A2 REIF 1,294.65

840 SH120699 12-Sep-20 37729 4TH FLOOR PT SLAB PART A POUR A2 ADDL LAYER REIF 10,490.13

4TH FLOOR PART A POUR A2 PT SLAB CORNER BAR, TENDON, POUR STRIP
841 SH120701 12-Sep-20 37729 1,264.21
BAR

842 SH120700 12-Sep-20 37729 4TH FLOOR PT SLAB TRIMMER BAR PART A POUR A2 REIF 4,877.77

843 SH120703 12-Sep-20 37729 4TH FLOOR PUNCHING SHEAR DETAILS (PART-A) (POUR-A2) REINF 1,495.45

844 SH120704 12-Sep-20 37729 4TH FLOOR SLAB PART A2 ADDITIONAL STRAIGHT BAR 9,995.40

845 SH120734 12-Sep-20 66583 ROOF FLOOR UPSTAND AND PARAPET PART A POUR A2 REIF 17,096.88

846 SH120735 12-Sep-20 66583 PARTY HALL & GYM VERTICAL ADDITIONAL STRAIGHT BAR 8,139.65

847 SH120857 12-Sep-20 66583 4TH TO 5TH FLOOR COLUMN & WALL PART A REIF 10,007.51

848 SH120858 12-Sep-20 66583 4TH TO 5TH FLOOR STAIR-8 CW @ (N-M)/(2-3) PART A REIF 5,920.50

849 SH120859 12-Sep-20 66583 5TH FLOOR BEAMS POUR A2 REIF 1,294.65

850 SH120860 12-Sep-20 66583 5TH FLOOR PT SLAB PART A POUR A2 ADDL LAYER REIF 10,776.46

851 SH120860 12-Sep-20 66583 5TH FLOOR PT SLAB PART A POUR A2 ADDL LAYER REIF 10,776.46
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

852 SH120861 12-Sep-20 66583 5TH FLOOR PT SLAB TRIMMER BAR PART A POUR A2 REIF 6,062.92

5TH FLOOR PART A POUR A2 PT SLAB CORNER BAR, TENDON, POUR STRIP
853 SH120862 12-Sep-20 66583 1,813.79
DETAILS

854 SH120863 12-Sep-20 66583 5F PUNCHING SHEAR DETAILS PART A POUR A2 REIF 1,495.45

855 SH120864 12-Sep-20 66583 5F SLAB PART A2 MESH REIF 9,995.40

GROSS TOTAL 13,457,917.15