RAB PERTADES 513 JUTA

NILAI RAB PENAMBAHAN ITEM ALAT


No Nama Barang Volume Harga (Rp) No. Item Qty Harga
1 Tangki 6 KL + Stick 2 Set 130.000.000,00 1 Spill Containment 2 Unit 10.000.000,00
2 Sistem Keamanan APAR 15.000.000,00 2 Tank Calibration + Air + Metrologi Cost 1 Set 8.000.000,00
3 Sistem Grounding 10.000.000,00 3 Paket Jasa Inspeksi Teknis 1 Paket 25.000.000,00
4 Rambu-rambu 1 Unit 6.500.000,00 4 Pressure Vent Valve 2 Unit 6.000.000,00
5 Sensor Tangki 1 Unit 18.000.000,00 5 Emergency Valve 2 Unit 6.000.000,00
6 Biaya Pengiriman Tangki 2 Unit 30.000.000,00 6 Hydrotest 2 Unit 8.000.000,00
7 Dispenser Digital Gear Pump 7 Break Away 4 Unit 3.000.000,00
8 Selang Nozle + Nozle OPW Japan 4 Unit 135.000.000,00 8 Gate Away 4 Unit 3.000.000,00
9 Telemonitor GSM VMS 1 Unit 5.250.000,00 TOTAL 69.000.000,00
10 Hydrotest + Gelas Ukur 5.000.000,00
11 Genset 1 Unit 5.000.000,00 TOTAL NILAI RAB + PENAMBAHAN ITEM ALAT 513.000.000,00
12 Modem + Printer 1 Unit 19.750.000,00
13 Android 1 Unit 7.500.000,00
14 Biaya Pengiriman Dispenser 10.000.000,00
15 Biaya Instalasi Dispenser 10.000.000,00
16 Biaya Training Operator & Manajemen 10.000.000,00
17 Biaya Asuransi 1.000.000,00
18 Biaya Survei 3.000.000,00
19 Biaya Project Manager 3.000.000,00
20 Biaya Commissioning & Uji Bejana Tera 20.000.000,00
TOTAL 444.000.000,00