BILL OF QUANTITY

MEP WORK

RUMAH SAKIT IBU ANAK


CENDANA PREMIER
UBUD GIANYAR BALI
15-Nov-19
REKAPITULASI
BILL OF QUANTITY ( BOQ ) MEP

PROYEK : PEMBANGUNAN RUMAH SAKIT IBU DAN ANAK


LOKASI : MAS, UBUD, GIANYAR BALI
PEMILIK PROYEK : DR. ANAK AGUNG GEDE PUTRA DANANJAYA, M.BIOMED, SP.B

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp.)
1 TOTAL ELECTRICAL Rp -
2 TOTAL ELECTRONIC Rp -
3 TOTAL PEKERJAAN PEMADAM KEBAKARAN Rp -
4 TOTAL TATA UDARA Rp -
5 TOTAL PLUMBING Rp -

TOTAL Rp -

REK MEP/Page 3
REKAPITULASI
BILL OF QUANTITY ( BOQ ) MEP

PROYEK : PEMBANGUNAN RUMAH SAKIT IBU DAN ANAK


LOKASI : MAS, UBUD, GIANYAR BALI
PEMILIK PROYEK : DR. ANAK AGUNG GEDE PUTRA DANANJAYA, M.BIOMED, SP.B

HARGA SATUAN JUMLAH HARGA


JUMLAH HARGA
NO URAIAN PEKERJAAN SAT MATERIAL MATERIAL
VOLUME BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
I. PEKERJAAN ELECTRICAL
A Pekerjaan Panel Listrik
1 PP R Pertemuan 2 1.00 Unit - - - -
2 PP Office 1.00 Unit - - - -
3 PP Irna Vip 10.00 Unit - - - -
4 PP Irna kelas 2 3.00 Unit - - - -
5 PP Irna kelas 3 2.00 Unit - - - -
6 PP Irna Presidential 4.00 Unit - - - -
7 PP Irna Eksekutif 6.00 Unit - - - -

Sub Total - - -

B ELECTRICAL FEEDER CABLES.


SDP LT 2 ~ PP R Pertemuan 2 ; NYY 4 x 4 mm2 +
1
BC 6 mm2
41.69 Meter - - - -
SDP LT 2 ~ PP Office ; NYY 4 x 16 mm2 + BC 10
2
mm2
38.83 Meter - - - -
3 SDP LT 3 ~ PP Irna Vip. 8 ; NYY 3 x 4 mm2 26.40 Meter - - - -
4 SDP LT 3 ~ PP Irna Vip. 9 ; NYY 3 x 4 mm2 30.80 Meter - - - -
5 SDP LT 3 ~ PP Irna Vip. 10 ; NYY 3 x 4 mm2 34.10 Meter - - - -
6 SDP LT 3 ~ PP Irna Vip. 11 ; NYY 3 x 4 mm2 38.06 Meter - - - -
7 SDP LT 3 ~ PP Irna Vip. 12 ; NYY 3 x 4 mm2 41.80 Meter - - - -
8 SDP LT 3 ~ PP Irna Vip. 13 ; NYY 3 x 4 mm2 46.42 Meter - - - -
9 SDP LT 3 ~ PP Irna Vip. 14 ; NYY 3 x 4 mm2 49.83 Meter - - - -
10 SDP LT 3 ~ PP Irna Vip. 15 ; NYY 3 x 4 mm2 54.34 Meter - - - -
11 SDP LT 3 ~ PP Irna Vip. 16 ; NYY 3 x 4 mm2 55.22 Meter - - - -
12 SDP LT 3 ~ PP Irna Vip. 17 ; NYY 3 x 4 mm2 50.71 Meter - - - -
13 SDP LT 3 ~ PP Irna Kls 2. 3 ; NYY 3 x 4 mm2 39.38 Meter - - - -
14 SDP LT 3 ~ PP Irna Kls 2. 4 ; NYY 3 x 4 mm2 42.79 Meter - - - -
15 SDP LT 3 ~ PP Irna Kls 2. 5 ; NYY 3 x 4 mm2 47.30 Meter - - - -
16 SDP LT 3 ~ PP Irna Kls 3. 3 ; NYY 3 x 4 mm2 30.80 Meter - - - -
17 SDP LT 3 ~ PP Irna Kls 3. 4 ; NYY 3 x 4 mm2 35.42 Meter - - - -
SDP LT 4 ~ PP Irna Presidential 1 ; NYY 3 x 6
18
mm2
25.41 Meter - - - -
SDP LT 4 ~ PP Irna Presidential 2 ; NYY 3 x 6
19
mm2
31.24 Meter - - - -

ELECTRICAL/Page 4
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT MATERIAL MATERIAL
VOLUME BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
SDP LT 4 ~ PP Irna Presidential 3 ; NYY 3 x 6
20
mm2
41.25 Meter - - - -
SDP LT 4 ~ PP Irna Presidential 4 ; NYY 3 x 6
21
mm2
47.08 Meter - - - -

22 SDP LT 4 ~ PP Irna Eksekutif 1 ; NYY 3 x 4 mm2 29.81 Meter - - - -

23 SDP LT 4 ~ PP Irna Eksekutif 2 ; NYY 3 x 4 mm2 34.32 Meter - - - -

24 SDP LT 4 ~ PP Irna Eksekutif 3 ; NYY 3 x 4 mm2 37.73 Meter - - - -

25 SDP LT 4 ~ PP Irna Eksekutif 4 ; NYY 3 x 4 mm2 42.24 Meter - - - -

26 SDP LT 4 ~ PP Irna Eksekutif 5 ; NYY 3 x 4 mm2 45.65 Meter - - - -

27 SDP LT 4 ~ PP Irna Eksekutif 6 ; NYY 3 x 4 mm2 50.16 Meter - - - -

Sub Total - - - -

C Lampu, Stop Kontak & Kabel Instalasi

C1 Lantai 1
Lighting cable installation. NYM 3x2.5 mm2 in HIC
1
Clipsal 20 mm.
10.00 Titik - - - -
Fan cable installation. NYM 3x2.5 mm2 in HIC
2
Clipsal 20 mm.
1.00 Titik - - - -
3 Down Light Dia 5 " LED 12W 1.00 Bh - - - -
4 TKO 2 x LED 18 Watt 8.00 Bh - - - -
5 Wall Light 12 w 1.00 Bh - - - -
6 Single Switch 1.00 Bh - - - -
7 Double Switch 1.00 Bh - - - -

Sub Total - - - -

C2 Lantai 2
Lighting cable installation. NYM 3x2.5 mm2 in HIC
1
Clipsal 20 mm.
113.00 Titik - - - -
Power outlet cable installation. NYM 3x2.5 mm2 in
2
HIC Clipsal 20 mm.
61.00 Titik - - - -
AC cable installation. NYM 3x2.5 mm2 in HIC
3
Clipsal 20 mm.
17.00 Titik - - - -
Fan cable installation. NYM 3x2.5 mm2 in HIC
4
Clipsal 20 mm.
3.00 Titik - - - -
5 Down Light Dia 5 " LED 12W 97.00 Bh - - - -
6 Down Light Dia 5 " LED 12W c/w Batteray 11.00 Bh - - - -
7 Strip Light LED 48.00 Meter - - - -
8 Exit Lamp 8 Watt c/w Batteray 1.00 Bh - - - -

ELECTRICAL/Page 5
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT MATERIAL MATERIAL
VOLUME BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
9 Wall Light 12 w 1.00 Bh - - - -
10 Single Switch 13.00 Bh - - - -
11 Double Switch 8.00 Bh - - - -
12 Power Outlet 1 Phase , Wall type 61.00 Bh - - - -
13 Power Outlet 1 Phase , Untuk AC 17.00 Bh - - - -

Sub Total - - - -

C3 Lantai 3
Lighting cable installation. NYM 3x2.5 mm2 in HIC
1
Clipsal 20 mm.
193.00 Titik - - - -
Power outlet cable installation. NYM 3x2.5 mm2 in
2
HIC Clipsal 20 mm.
169.00 Titik - - - -
AC cable installation. NYM 3x2.5 mm2 in HIC
3
Clipsal 20 mm.
25.00 Titik - - - -
Fan cable installation. NYM 3x2.5 mm2 in HIC
4
Clipsal 20 mm.
15.00 Titik - - - -
5 Down Light Dia 5 " LED 12W 187.00 Bh - - - -
6 Down Light Dia 5 " LED 12W c/w Batteray 5.00 Bh - - - -
7 Wall Light 12 w 1.00 Bh - - - -
8 Single Switch 17.00 Bh - - - -
9 Double Switch 10.00 Bh - - - -
10 Power Outlet 1 Phase , Wall type 169.00 Bh - - - -
11 Power Outlet 1 Phase , Untuk AC 25.00 Bh - - - -

Sub Total - - - -

C4 Lantai 4
Lighting cable installation. NYM 3x2.5 mm2 in HIC
1
Clipsal 20 mm.
151.00 Titik - - - -
Power outlet cable installation. NYM 3x2.5 mm2 in
2
HIC Clipsal 20 mm.
105.00 Titik - - - -

ELECTRICAL/Page 6
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT MATERIAL MATERIAL
VOLUME BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
AC cable installation. NYM 3x2.5 mm2 in HIC
3
Clipsal 20 mm.
17.00 Titik - - - -
Fan cable installation. NYM 3x2.5 mm2 in HIC
4
Clipsal 20 mm.
21.00 Titik - - - -
5 Down Light Dia 5 " LED 12W 143.00 Bh - - - -
6 Down Light Dia 5 " LED 12W c/w Batteray 6.00 Bh - - - -
7 Strip Light LED 10.00 Meter - - - -
8 Wall Light 12 w 1.00 Bh - - - -
9 Single Switch 14.00 Bh - - - -
10 Double Switch 8.00 Bh - - - -
11 Power Outlet 1 Phase , Wall type 105.00 Bh - - - -
12 Power Outlet 1 Phase , Untuk AC 17.00 Bh - - - -

Sub Total - - - -

C5 Lantai Roof
Lighting cable installation. NYM 3x2.5 mm2 in HIC
1
Clipsal 20 mm.
33.00 Titik - - - -
2 Down Light Dia 5 " LED 12W 33.00 Bh - - - -
3 Double Switch 1.00 Bh - - - -

Sub Total - - - -

E KABEL TRAY

E1 Lantai 2 - - - -
1 Kabel Tray dim. 500 x 100 mm - Meter - - - -
2 Kabel Tray dim. 400 x 100 mm 37.38 Meter - - - -
3 Support Material 1.00 Lot - - - -
- - - -
E2 Lantai 3 - - - -
1 Kabel Tray dim. 500 x 100 mm - Meter - - - -
2 Kabel Tray dim. 400 x 100 mm 37.38 Meter - - - -
3 Support Material 1.00 Lot - - - -
- - - -
E3 Lantai 4 - - - -
1 Kabel Tray dim. 500 x 100 mm - Meter - - - -
2 Kabel Tray dim. 400 x 100 mm 37.38 Meter - - - -
3 Support Material 1.00 Lot - - - -

Sub Total - - - -

1 TOTAL ELECTRICAL - - - -

ELECTRICAL/Page 7
REKAPITULASI
BILL OF QUANTITY ( BOQ ) MEP

PROYEK : PEMBANGUNAN RUMAH SAKIT IBU DAN ANAK


LOKASI : MAS, UBUD, GIANYAR BALI
PEMILIK PROYEK : DR. ANAK AGUNG GEDE PUTRA DANANJAYA, M.BIOMED, SP.B

HARGA SATUAN JUMLAH HARGA


JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
II. PEKERJAAN ELECTRONIC
A Pekerjaan TV

A1 Kabel Feeder
Distribution MATV Cable, Coaxial RJ 11 in HIC c/w
support material
1 - Dari TB TV Lantai 3 ~ Splitter Lantai 3 49.50 Meter - - - -
2 - Dari TB TV Lantai 4 ~ Splitter Lantai 4 46.20 Meter - - - -

A2 Instalasi Kabel TV
A2.1 Lantai 2 - - - -
1 Instalasi kabel TV + HIC, Dari splitter Ke Outlet TV 3.00 Titik - - -
2 Televisi Socket Outlet, Wall type 3.00 Bh - - - -

A2.2 Lantai 3
1 Instalasi kabel TV + HIC, Dari splitter Ke Outlet TV 15.00 Titik - - - -
2 Televisi Socket Outlet, Wall type 15.00 Bh - - - -

A2.3 Lantai 4
1 Instalasi kabel TV + HIC, Dari splitter Ke Outlet TV 14.00 Titik - - - -
2 Televisi Socket Outlet, Wall type 14.00 Bh - - - -

Sub Total - - - -

B Pekerjaan Telepon
B1 Instalasi Kabel TLP
B1.1 Lantai 2
1 Cable Installation ITC 2 x 2 x 0,6 Sqmm 36.00 Titik - - - -
2 Telephone Socket Outlet Wall type 36.00 Unit - - - -
3 Single Line Telephone handset Analog standar 30.00 Unit - - - -
4 Single Line Telephone handset Digital 6.00 Unit - - - -

B1.2 Lantai 3

ELECTRONIC/Page 8
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
1 Cable Installation ITC 2 x 2 x 0,6 Sqmm 16.00 Titik - - - -
2 Telephone Socket Outlet Wall type 16.00 Unit - - - -
3 Single Line Telephone handset Analog standar 16.00 Unit - - - -

B1.3 Lantai 4
1 Cable Installation ITC 2 x 2 x 0,6 Sqmm 11.00 Titik - - - -
2 Telephone Socket Outlet Wall type 11.00 Unit - - - -
3 Single Line Telephone handset Analog standar 11.00 Unit - - - -

Sub Total - - - -

C Pekerjaan Internet

C1 Instalasi Kabel Data (Internet)

C3.1 Lantai 1
1 Wiring Management 1.00 Lot - - - -
2 Wi fi installation cable , UTP Cat 6 in HIC 3.00 Titik - - - -
3 Wall Outlet Data installation cable , UTP Cat 6 in HIC 14.00 Titik - - - -
4 Access Point 3.00 Unit - - - -
5 Wall Outlet Data 14.00 Unit - - - -

C3.2 Lantai 2
1 Wiring Management 1.00 Lot - - - -
2 Wi fi installation cable , UTP Cat 6 in HIC 2.00 Titik - - - -
3 Wall Outlet Data installation cable , UTP Cat 6 in HIC 37.00 Titik - - - -
4 Access Point 2.00 Unit - - - -
5 Wall Outlet Data 37.00 Unit - - - -

C3.3 Lantai 3
1 Wiring Management 1.00 Lot - - - -
2 Wi fi installation cable , UTP Cat 6 in HIC 1.00 Titik - - - -
3 Access Point 1.00 Unit - - - -

C3.4 Lantai 4
1 Wiring Management 1.00 Lot - - - -
2 Wi fi installation cable , UTP Cat 6 in HIC 1.00 Titik - - - -
3 Wall Outlet Data installation cable , UTP Cat 6 in HIC 2.00 Titik - - - -
4 Access Point 1.00 Unit - - - -

ELECTRONIC/Page 9
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
5 Wall Outlet Data 2.00 Unit - - - -

Sub Total - - - -

D Pekerjaan Fire Alarm


D1 Instalasi Kabel Fire Alarm
D1.1 Lantai 1
Instalasi Alarm Detector Cable NYA 2x1.5 Sqmm in
1 17.00 Titik - - - -
HIC
Insyalasi break glass, Alarm Bell & Alarm Lamp Cable,
2 1.00 Titik - - - -
NYA 2x1.5 Sqmm in HIC
3 Smoke Detector 1.00 Bh - - - -
4 Heat Detector 16.00 Bh - - - -
5 Manual break glass Push Button 1.00 Bh - - - -
6 Alarm Bell 1.00 Bh - - - -
7 Alarm Indicator Lamp 1.00 Bh - - - -
8 End of Line 1.00 Bh - - - -

D1.2 Lantai 2
Instalasi Alarm Detector Cable NYA 2x1.5 Sqmm in
1 24.00 Titik - - - -
HIC
Insyalasi break glass, Alarm Bell & Alarm Lamp Cable,
2 1.00 Titik - - - -
NYA 2x1.5 Sqmm in HIC
3 Smoke Detector 24.00 Bh - - - -
4 Manual break glass Push Button 1.00 Bh - - - -
5 Alarm Bell 1.00 Bh - - - -
6 Alarm Indicator Lamp 1.00 Bh - - - -
7 End of Line 3.00 Bh - - - -

D1.3 Lantai 3
Instalasi Alarm Detector Cable NYA 2x1.5 Sqmm in
1 23.00 Titik - - - -
HIC
Insyalasi break glass, Alarm Bell & Alarm Lamp Cable,
2 1.00 Titik - - - -
NYA 2x1.5 Sqmm in HIC
3 Smoke Detector 22.00 Bh - - - -
4 Heat Detector 1.00 Bh - - - -
5 Manual break glass Push Button 1.00 Bh - - - -
6 Alarm Bell 1.00 Bh - - - -
7 Alarm Indicator Lamp 1.00 Bh - - - -
8 End of Line 3.00 Bh - - - -

ELECTRONIC/Page 10
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA

D1.4 Lantai 4
Instalasi Alarm Detector Cable NYA 2x1.5 Sqmm in
1 27.00 Titik - - - -
HIC
Insyalasi break glass, Alarm Bell & Alarm Lamp Cable,
2 1.00 Titik - - - -
NYA 2x1.5 Sqmm in HIC
3 Smoke Detector 27.00 Bh - - - -
4 Manual break glass Push Button 1.00 Bh - - - -
5 Alarm Bell 1.00 Bh - - - -
6 Alarm Indicator Lamp 1.00 Bh - - - -
7 End of Line 3.00 Bh - - - -

D1.5 Lantai 4
Instalasi Alarm Detector Cable NYA 2x1.5 Sqmm in
1 10.00 Titik - - - -
HIC
2 Smoke Detector 10.00 Bh - - - -
3 End of Line 1.00 Bh - - - -

Sub Total - - - -

E Pekerjaan Tata Suara


E1 Instalasi Kabel Tata Suara
E1.1 Lantai 1
Instalasi Horn Speaker Cable NYMHY 2 x1.5 Sqmm in
1 4.00 Titik - - - -
HIC
2 Horn Speaker Area parkir 4.00 Bh - - - -

E1.2 Lantai 2
Instalasi Ceiling Speaker Cable NYMHY 2 x1.5 Sqmm
2 18.00 Titik - - - -
in HIC
3 Ceiling Speaker 3 w 18.00 Bh - - - -

E1.3 Lantai 3
Instalasi Ceiling Speaker Cable NYMHY 2 x1.5 Sqmm
1 19.00 Titik - - - -
in HIC
2 Ceiling Speaker 3 w 19.00 Bh - - - -

E1.4 Lantai 4

ELECTRONIC/Page 11
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
Instalasi Ceiling Speaker Cable NYMHY 2 x1.5 Sqmm
1 24.00 Titik - - - -
in HIC
2 Ceiling Speaker 3 w 24.00 Bh - - - -

Sub Total - - - -

F Pekerjaan CCTV
F1 Instalasi Kabel CCTV
E1.1 Lantai 1
1 CCTV Installation Cabel cable UTP Cat 6 in HIC 5.00 Titik - - - -
2 Outdoor Camera 2 MP HD IR 5.00 Unit - - - -

F1.2 Lantai 2
1 CCTV Installation Cabel cable UTP Cat 6 in HIC 5.00 Titik - - - -
2 Indoor Dome Camera 2 MP HD IR 5.00 Unit - - - -

F1.3 Lantai 3
1 CCTV Installation Cabel cable UTP Cat 6 in HIC 2.00 Titik - - - -
2 Indoor Dome Camera 2 MP HD IR 2.00 Unit - - - -

F1.4 Lantai 4
3 CCTV Installation Cabel cable UTP Cat 6 in HIC 2.00 Titik - - - -
4 Indoor Dome Camera 2 MP HD IR 2.00 Unit - - - -

Sub Total - - - -

G Pekerjaan Nurse Call


G1 Lantai 3
1 Instalasi cable nurse call Irna Kelas 1 10.00 Lot - - - -
2 Instalasi cable nurse call Irna Kelas 2 3.00 Lot - - - -
3 Instalasi cable nurse call Irna Kelas 3 2.00 Lot - - - -
4 Call Reset Button 15.00 bh - - - -
5 Corridor Call Light 20.00 bh - - - -
6 Bathroom Pull Cord, Moisture Resistence 15.00 bh - - - -
7 Ceiling Speaker 10.00 bh - - - -
8 Metal Jack + Bedside Call Switch + Mic 10.00 bh - - - -
9 Metal Jack + Bedside Call Switch + Mic + Speaker 12.00 bh - - - -

G2 Lantai 4

ELECTRONIC/Page 12
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
1 Instalasi cable nurse call Presidential 4.00 Lot - - - -
2 Instalasi cable nurse call Eksekutif 6.00 Lot - - - -
3 Call Reset Button 10.00 bh - - - -
4 Corridor Call Light 10.00 bh - - - -
5 Bathroom Pull Cord, Moisture Resistence 10.00 bh - - - -
6 Ceiling Speaker 10.00 bh - - - -
7 Metal Jack + Bedside Call Switch + Mic 10.00 bh - - - -

Sub Total - - - -

H KABEL TRAY

H1 Lantai 1
1 Kabel Tray dim. 300 x 100 mm 37.38 Meter - - - -
2 Support Material 1.00 Lot - - - -

H2 Lantai 2
1 Kabel Tray dim. 300 x 100 mm 37.38 Meter - - - -
2 Support Material 1.00 Lot - - - -

H3 Lantai 3
1 Kabel Tray dim. 300 x 100 mm 37.38 Meter - - - -
2 Support Material 1.00 Lot - - - -
-
Sub Total - - - -

2 TOTAL ELECTRONIC - - - -

ELECTRONIC/Page 13
REKAPITULASI
BILL OF QUANTITY ( BOQ ) MEP

PROYEK : PEMBANGUNAN RUMAH SAKIT IBU DAN ANAK

LOKASI : MAS, UBUD, GIANYAR BALI


PEMILIK PROYEK : DR. ANAK AGUNG GEDE PUTRA DANANJAYA, M.BIOMED, SP.B

HARGA SATUAN JUMLAH HARGA


JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
III. PEKERJAAN PEMADAM KEBAKARAN
A Pekerjaan Instalasi Hydrant
A1 Pekerjaan Instalasi Hydrant Lantai 2
1 Pemipaan BSP Sch.40
2 dia. 100 mm 30.80 Meter - - - -
3 dia. 65 mm 1.00 Meter - - - -
4 Fitting 1.00 Lot - - - -
Indoor Hydrant Box (IHB) Type B, 750x1250x180, lengkap
5 dengan : Landing Valve, Hose Valve, Hose Nozzle, Hose 1.00 Unit - - - -
Rack dan Accessories
6 Fire Extinguisher ABC Powder, 5 kg Unit - - - -

A2 Pekerjaan Instalasi Hydrant Lantai 3


Pemipaan BSP Sch.40
1 dia. 65 mm 35.20 Meter - - - -
2 Fitting 1.00 Lot - - - -
Indoor Hydrant Box (IHB) Type B, 750x1250x180, lengkap
3 dengan : Landing Valve, Hose Valve, Hose Nozzle, Hose 1.00 Unit - - - -
Rack dan Accessories
4 Fire Extinguisher ABC Powder, 5 kg 1.00 Unit - - - -

A3 Pekerjaan Instalasi Hydrant Lantai 4


Pemipaan BSP Sch.40
1 dia. 65 mm 33.00 Meter - - - -
2 Fitting 1.00 Lot - - - -
Indoor Hydrant Box (IHB) Type B, 750x1250x180, lengkap
3 dengan : Landing Valve, Hose Valve, Hose Nozzle, Hose 1.00 Unit - - - -
Rack dan Accessories
4 Fire Extinguisher ABC Powder, 5 kg 1.00 Unit - - - -

Sub Total - - - -

C Pekerjaan Instalasi Springkler


C1 Pekerjaan Instalasi Springkler Lantai 1
Pemipaan BSP Sch.40
1 dia. 50 mm 5.50 Meter - - - -
2 dia. 50 mm drain 18.70 Meter - - - -

HYDRANT/Page 14
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
3 dia. 32 mm 8.80 Meter - - - -
4 dia. 25 mm 94.60 Meter - - - -
5 Fitting 1.00 Lot - - - -
6 Pendent Sprinkler 1.00 Bh - - - -
7 Uprite Sprinkler 19.00 Bh - - - -

C2 Pekerjaan Instalasi Springkler Lantai 2


Pemipaan BSP Sch.40
1 dia. 65 mm 14.30 Meter - - - -
1 dia. 50 mm 11.00 Meter - - - -
2 dia. 50 mm drain 8.80 Meter - - - -
3 dia. 32 mm 30.80 Meter - - - -
4 dia. 25 mm 188.10 Meter - - - -
5 Fitting 1.00 Lot - - - -
6 Pendent Sprinkler 42.00 Bh - - - -
7 Uprite Sprinkler - Bh - - - -

C3 Pekerjaan Instalasi Springkler Lantai 3


Pemipaan BSP Sch.40
1 dia. 65 mm 8.80 Meter - - - -
2 dia. 50 mm 20.90 Meter - - - -
3 dia. 40 mm 11.00 Meter - - - -
4 dia. 32 mm 33.00 Meter - - - -
5 dia. 25 mm 192.50 Meter - - - -
6 Fitting 1.00 Lot - - - -
7 Pendent Sprinkler 47.00 Bh - - - -

C4 Pekerjaan Instalasi Springkler Lantai 4


Pemipaan BSP Sch.40
1 dia. 65 mm 8.80 Meter - - - -
2 dia. 50 mm 20.90 Meter - - - -
3 dia. 40 mm 11.00 Meter - - - -
4 dia. 32 mm 33.00 Meter - - - -
5 dia. 25 mm 237.60 Meter - - - -
6 Fitting 1.00 Lot - - - -
7 Pendent Sprinkler 53.00 Bh - - - -

C5 Pekerjaan Instalasi Springkler Roof Top


Pemipaan BSP Sch.40
1 dia. 50 mm 20.90 Meter - - - -
2 dia. 32 mm 5.50 Meter - - - -
3 dia. 25 mm 60.50 Meter - - - -
4 Fitting 1.00 Lot - - - -
5 Pendent Sprinkler 15.00 Bh - - - -

HYDRANT/Page 15
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA

Sub Total - - - -

3 TOTAL PEKERJAAN PEMADAM KEBAKARAN Rp - Rp - Rp - Rp -

HYDRANT/Page 16
REKAPITULASI
BILL OF QUANTITY ( BOQ ) MEP

PROYEK : PEMBANGUNAN RUMAH SAKIT IBU DAN ANAK


LOKASI : MAS, UBUD, GIANYAR BALI

PEMILIK PROYEK : DR. ANAK AGUNG GEDE PUTRA DANANJAYA, M.BIOMED, SP.B

HARGA SATUAN JUMLAH HARGA


JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH TOTAL
UTAMA BAHAN UPAH UTAMA
I. PEKERJAAN TATA UDARA

A PEKERJAAN AC
A1 Equipment Lantai 1
Indoor & Outdoor Unit AC complete with absorber
vibration mounting, hanger, support dan
accessories
1 AC Tipe Wall Mounted 3/4 PK Unit - - - -
2 AC Tipe Wall Mounted 1 PK Unit - - - -
3 AC Tipe Wall Mounted 1,5 PK Unit - - - -
4 AC Tipe Wall Mounted 2 PK Unit - - - -
5 AC Tipe Ceeling Casset 2 PK Unit - - - -
6 AC Tipe Ceeling Concealed 1,5 PK Unit - - -

A1.2 Pekerjaan Pipa Refrigerant


Pipa Refrigerant lengkap dengan Insulation dan
- - - -
1 kabel dari indoor ke outdoor, AC 3/4 PK Unit
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
2 kabel dari indoor ke outdoor, AC 1 PK Meter
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
3 kabel dari indoor ke outdoor, AC 1,5 PK Meter
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
4 kabel dari indoor ke outdoor, AC 2 PK Meter
-
A1.3 Pekerjaan Pipa Drain - - - -
Pipa Drain lengkap dengan Insulation, PVC AW
33.00 - - - -
1 Dia 20mm2 Meter
Pipa Drain lengkap dengan Insulation, PVC AW
- - - -
2 Dia 25mm2 66.00 Meter
Pipa Drain lengkap dengan Insulation, PVC AW
- - - -
3 Dia 40mm2 6.60 Meter
Pipa Drain lengkap dengan Insulation, PVC AW
- - - -
4 Dia 50mm2 30.80 Meter

B1 Equipment Lantai 2

AC/Page 17
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH TOTAL
UTAMA BAHAN UPAH UTAMA
Indoor & Outdoor Unit AC complete with absorber
vibration mounting, hanger, support dan
accessories
1 AC Tipe Wall Mounted 1/2 PK 2.00 Unit - - - -
2 AC Tipe Wall Mounted 3/4 PK 5.00 Unit - - - -
3 AC Tipe Wall Mounted 1 PK 2.00 Unit - - - -
4 AC Tipe Wall Mounted 2 PK 9.00 Unit - - - -

B1.2 Pekerjaan Pipa Refrigerant


Pipa Refrigerant lengkap dengan Insulation dan
- - - -
1 kabel dari indoor ke outdoor, AC 1/2 PK 26.40 Meter
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
2 kabel dari indoor ke outdoor, AC 3/4 PK 66.00 Meter
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
3 kabel dari indoor ke outdoor, AC 1 PK 26.40 Meter
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
4 kabel dari indoor ke outdoor, AC 2 PK 118.80 Meter

B1.3 Pekerjaan Pipa Drain


Pipa Drain lengkap dengan Insulation, PVC AW
- - - -
1 Dia 20mm2 110.00 Meter
Pipa Drain lengkap dengan Insulation, PVC AW
- - - -
2 Dia 40mm2 38.50 Meter

B1.4 Pekerjaan Ducting & Grill


Duct AC, PU, support hanger and bolt Ukuran 600
- - - -
1 x 300mm 7.70 Meter
Duct AC, PU, support hanger and bolt Ukuran 500
- - - -
2 x 250mm Meter
Duct AC, PU, support hanger and bolt Ukuran 400
- - - -
3 x 300mm 11.00 Meter
Duct AC, PU, support hanger and bolt Ukuran 250
- - - -
4 x 250mm 17.60 Meter
5 Plenum Box AC 2 PK Unit - - - -
6 Plenum Box AC 3 PK 2.00 Unit - - - -
7 Plenum Box AC 4 PK - Unit - - - -
8 Return Grill 400x400mm Unit - - - -
9 Return Grill 400x600mm Unit - - - -
10 Return Grill 400x800mm 1.00 Unit - - - -
11 Suplly Air Defuser 300x300mm 6.00 Unit - - - -

C1 Equipment Lantai 3

AC/Page 18
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH TOTAL
UTAMA BAHAN UPAH UTAMA
Indoor & Outdoor Unit AC complete with absorber
vibration mounting, hanger, support dan
accessories
1 AC Tipe Wall Mounted 1,5 PK 15.00 Unit - - - -
2 AC Tipe Ceeling Concealed 3 PK 1.00 Unit - - - -

C1.2 Pekerjaan Pipa Refrigerant


Pipa Refrigerant lengkap dengan Insulation dan
- - - -
1 kabel dari indoor ke outdoor, AC 1,5 PK 198.00 Meter
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
2 kabel dari indoor ke outdoor, AC 3 PK 13.20 Meter

C1.3 Pekerjaan Pipa Drain


Pipa Drain lengkap dengan Insulation, PVC AW
104.50 - - - -
1 Dia 20mm2 Meter
Pipa Drain lengkap dengan Insulation, PVC AW
- - - -
2 Dia 25mm2 4.40 Meter
Pipa Drain lengkap dengan Insulation, PVC AW
- - - -
3 Dia 40mm2 30.80 Meter

C1.4 Pekerjaan Ducting & Grill


Duct AC, PU, support hanger and bolt Ukuran 600
- - - -
1 x 300mm 7.70 Meter
Duct AC, PU, support hanger and bolt Ukuran 400
- - - -
2 x 300mm 11.00 Meter
Duct AC, PU, support hanger and bolt Ukuran 250
- - - -
3 x 250mm 17.60 Meter
4 Plenum Box AC 4 PK 2.00 Unit - - - -
5 Return Grill 400x800mm 1.00 Unit - - - -
6 Suplly Air Defuser 300x300mm 6.00 Unit - - - -

D1 Equipment Lantai 4
Indoor & Outdoor Unit AC complete with absorber
vibration mounting, hanger, support dan
accessories
1 AC Tipe Wall Mounted 1/2 PK 5.00 Unit - - - -
2 AC Tipe Wall Mounted 3/4 PK 1.00 Unit - - - -
2 AC Tipe Wall Mounted 1 PK - Unit - - - -
3 AC Tipe Wall Mounted 1,5 PK 14.00 Unit - - - -
4 AC Tipe Ceeling Concealed 3 PK 1.00 Unit - - - -

D1.2 Pekerjaan Pipa Refrigerant


Pipa Refrigerant lengkap dengan Insulation dan
- - - -
1 kabel dari indoor ke outdoor, AC 1/2 PK 13.20 Unit

AC/Page 19
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH TOTAL
UTAMA BAHAN UPAH UTAMA
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
2 kabel dari indoor ke outdoor, AC 1 PK 13.20 Meter
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
3 kabel dari indoor ke outdoor, AC 1,5 PK 184.80 Meter
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
4 kabel dari indoor ke outdoor, AC 3 PK 13.20 Meter

D1.3 Pekerjaan Pipa Drain


Pipa Drain lengkap dengan Insulation, PVC AW
110.00 - - - -
1 Dia 20mm2 Meter
Pipa Drain lengkap dengan Insulation, PVC AW
- - - -
2 Dia 40mm2 23.10 Meter

D1.4 Pekerjaan Ducting & Grill


Duct AC, PU, support hanger and bolt Ukuran 600
- - - -
1 x 300mm 7.70 Meter
Duct AC, PU, support hanger and bolt Ukuran 400
- - - -
2 x 300mm 11.00 Meter
3 Plenum Box AC 2 PK 14.30 Unit - - - -
4 Return Grill 400x400mm 1.00 Unit - - - -
5 Suplly Air Defuser 300x300mm 1.00 Unit - - - -

E1 Equipment Ruang OK
Indoor & Outdoor Unit AC complete with absorber
vibration mounting, hanger, support dan
accessories
1 AHU 180000 Btu/h 2.00 Unit - - - -

Sub Total - - - -

B PEKERJAAN EXHAUS FAN


B1 Lantai 2
1 Exhaust Fan Tipe Ceiling 100 CMH 8.00 Unit - - - -
2 Exhaust Fan Tipe Ceiling 180 CMH 9.00 Unit - - - -
Exhaust Ducting, support hanger and bolt PVC AW
74.80 - - - -
3 Dia 4" Meter
4 Grill 150 x 150mm 10.00 Unit - - - -
5 Grill 1000 x 150mm 1.00 Unit - - - -

B2 Lantai 3
1 Exhaust Fan Tipe Ceiling 100 CMH 15.00 Unit - - - -
2 Exhaust Fan Tipe Ceiling 180 CMH 16.00 Unit - - - -

AC/Page 20
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH TOTAL
UTAMA BAHAN UPAH UTAMA
Exhaust Ducting, support hanger and bolt PVC AW
187.00 - - - -
3 Dia 4" Meter
4 Grill 400 x 150mm 2.00 Unit - - - -
5 Grill 800 x 150mm 7.00 Unit - - - -

B4 Lantai 4
1 Exhaust Fan Tipe Ceiling 100 CMH 15.00 Unit - - - -
2 Exhaust Fan Tipe Ceiling 180 CMH 17.00 Unit - - - -
Exhaust Ducting, support hanger and bolt PVC AW
- - - -
3 Dia 4" 243.10 Meter
4 Grill 150 x 150mm 2.00 Unit - - - -
4 Grill 400 x 150mm 2.00 Unit - - - -
5 Grill 600 x 150mm 1.00 Unit - - - -
6 Grill 800 x 150mm 6.00 Unit - - - -

Sub Total - - - -

4 TOTAL TATA UDARA Rp - Rp - Rp - Rp -

AC/Page 21
REKAPITULASI
BILL OF QUANTITY ( BOQ ) MEP

PROYEK : PEMBANGUNAN RUMAH SAKIT IBU DAN ANAK

LOKASI : MAS, UBUD, GIANYAR BALI


PEMILIK PROYEK : DR. ANAK AGUNG GEDE PUTRA DANANJAYA, M.BIOMED, SP.B

HARGA SATUAN JUMLAH HARGA


JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH HARGA TOTAL
UTAMA UTAMA
I. PEKERJAAN PLUMBING

A Pekerjaan Air Bersih


A1 Pemipaan Lantai 2
Pipa PPR PN.10
1 Ø 32mm (1") 25.52 Meter - - - -
2 Ø 25mm (3/4") 4.73 Meter - - - -
3 Ø 20mm (1/2") 39.60 Meter - - - -
4 Gate valve Ø1" 1.00 Bh - - - -
5 Fitting & support 1.00 Lot - - - -

A2 Pemipaan Lantai 3
Pipa PPR PN.10
1 Ø 50mm (1,5") 21.78 Meter - - - -
2 Ø 32mm (1") 8.14 Meter - - - -
3 Ø 25mm (3/4") 37.29 Meter - - - -
4 Ø 20mm (1/2") 310.20 Meter - - - -
5 Gate valve Ø3/4" 14.00 Bh - - - -
6 Fitting & support 1.00 Lot - - - -

A3 Pemipaan Lantai 4
Pipa PPR PN.10
1 Ø 50mm (1,5") 21.78 Meter - - - -
2 Ø 32mm (1") 8.14 Meter - - - -
3 Ø 25mm (3/4") 22.00 Meter - - - -
4 Ø 20mm (1/2") 224.40 Meter - - - -
5 Gate valve Ø3/4" 10.00 Bh - - - -
6 Fitting & support 1.00 Lot - - - -

Sub Total - - - -

B Pekerjaan Air Panas


B1 Pemipaan Lantai 3
Pipa PPR PN.20
1 Ø 32mm (1") 59.84 Meter - - - -
2 Ø 25mm (3/4") 37.29 Meter - - - -

PLUMBING/Page 22
HARGA SATUAN JUMLAH HARGA
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH HARGA TOTAL
UTAMA UTAMA
3 Ø 20mm (1/2") 198.00 Meter - - - -
4 Gate valve Ø3/4" 14.00 Bh - - - -
5 Fitting & support 1.00 Lot - - - -

B2 Pemipaan Lantai 4
Pipa PPR PN.20
1 Ø 32mm (1") 59.84 Meter - - - -
2 Ø 25mm (3/4") 22.00 Meter - - - -
3 Ø 20mm (1/2") 158.40 Meter - - - -
4 Gate valve Ø3/4" 10.00 Bh - - - -
5 Fitting & support 1.00 Lot - - - -

Sub Total - - - -

C Pekerjaan Air Kotor


C1 Pemipaan Lantai 1
Pipa PVC AW
1 Dia 4" 63.80 Meter - - - -
2 Fitting & support 1.00 Lot - - - -

C2 Pemipaan Lantai 2
Pipa PVC AW
1 Dia 4" 94.60 Meter - - - -
2 Dia 3" 22.77 Meter - - - -
3 Dia 2" 16.83 Meter - - - -
4 Dia 1.5" 6.27 Meter - - - -
5 Fitting & support 1.00 Lot - - - -
6 FWG 2.00 Unit - - - -
7 PVC CO 4" 1.00 Bh - - - -
8 PVC CO 3" 1.00 Bh - - - -

C3 Pemipaan Lantai 3
Pipa PVC AW
1 Dia 4" 101.75 Meter - - - -
2 Dia 3" 47.96 Meter - - - -
3 Dia 2" 64.35 Meter - - - -
4 Dia 1.5" 52.80 Meter - - - -
5 Fitting & support 1.00 Lot - - - -
6 FWG 15.00 Unit - - - -
7 PVC CO 4" 1.00 Bh - - - -
8 PVC CO 3" 1.00 Bh - - - -

C4 Pemipaan Lantai 4

PLUMBING/Page 23
HARGA SATUAN JUMLAH HARGA
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH HARGA TOTAL
UTAMA UTAMA
Pipa PVC AW
1 Dia 4" 94.60 Meter - - - -
2 Dia 3" 22.00 Meter - -
3 Dia 2" 67.65 Meter - - - -
4 Dia 1.5" 39.60 Meter - - - -
5 Fitting & support 1.00 Lot - - - -
6 FWG 10.00 Unit - - - -

Sub Total - - - -

D PEKERJAAN PIPA VENT


D1 Pipa Vent Lantai 2
Pipa PVC AW
1 Dia 2" 15.40 Meter - - - -
2 Dia 1" 31.90 Meter - - - -
3 Fitting & support 1.00 Lot - - - -
4 Vent Cap 2.00 Unit - - - -

D2 Pipa Vent Lantai 3


Pipa PVC AW
1 Dia 2" 18.7 Meter - - - -
2 Dia 1" 181.28 Meter - - - -
3 Fitting & support 1 Lot - - - -
4 Vent Cap 8 Unit - - - -

D3 Pipa Vent Lantai 4


Pipa PVC AW
1 Dia 2" 15.40 Meter - - - -
2 Dia 1" 139.70 Meter - - - -
3 Fitting & support 1.00 Lot - - - -
4 Vent Cap 7.00 Unit - - - -

Sub Total - - - -

E PEKERJAAN PIPA AIR HUJAN


E1 Lantai 1
Pipa PVC AW
1 Dia 4" 66.00 Meter - - - -
2 Fitting & support 1.00 Lot - - - -

E2 Lantai 2
Pipa PVC AW
1 Dia 4" 39.60 Meter - - - -

PLUMBING/Page 24
HARGA SATUAN JUMLAH HARGA
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH HARGA TOTAL
UTAMA UTAMA
2 Dia 2" 6.60 Meter - - - -
3 Fitting & support 1.00 Lot - - - -
4 Floor Drain 2.00 Unit - - - -

E3 Lantai 3
Pipa PVC AW
1 Dia 4" 39.60 Meter - - - -
2 Dia 2" 6.60 Meter - - - -
3 Fitting & support 1.00 Lot - - - -
4 Floor Drain 2.00 Unit - - - -

E4 Lantai 4
Pipa PVC AW
1 Dia 4" 39.60 Meter - - - -
2 Dia 2" 6.60 Meter - - - -
3 Fitting & support 1.00 Lot - - - -
4 Floor Drain 2.00 Unit - - - -

E5 Lantai Atap
Pipa PVC AW
1 Dia 4" 29.70 Meter - - - -
2 Fitting & support 1.00 Lot - - - -
3 Roof Drain 4" 9.00 Unit - - - -

Sub Total - - - -

G Pekerjaan Gas Medis


G1 Pipa Gas Medis Lantai 3
Pipa Tembaga Tipe L
1 Dia 20 mm 66.00 Meter - - - -
2 Dia 15 mm 206.80 Meter - - - -
3 Dia 9,5 mm 290.40 Meter - - - -
4 Fitting & support 1.00 Lot - - - -
5 Tap Gas 02 22.00 bh - - - -
6 Tap Vacum 22.00 bh - - - -

G2 Pipa Gas Medis Lantai 4


Pipa Tembaga Tipe L
1 Dia 20 mm 66.00 Meter - - - -
2 Dia 15 mm 157.30 Meter - - - -
3 Dia 9,5 mm 145.20 Meter - - - -
4 Fitting & support 1.00 Lot - - - -
5 Tap Gas 02 10.00 bh - - - -

PLUMBING/Page 25
HARGA SATUAN JUMLAH HARGA
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH HARGA TOTAL
UTAMA UTAMA
6 Tap Vacum 10.00 bh - - - -

Sub Total - - - -

5 TOTAL PLUMBING - - - -

PLUMBING/Page 26