MEP WORK
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp.)
1 TOTAL ELECTRICAL Rp -
2 TOTAL ELECTRONIC Rp -
3 TOTAL PEKERJAAN PEMADAM KEBAKARAN Rp -
4 TOTAL TATA UDARA Rp -
5 TOTAL PLUMBING Rp -
TOTAL Rp -
REK MEP/Page 3
REKAPITULASI
BILL OF QUANTITY ( BOQ ) MEP
Sub Total - - -
ELECTRICAL/Page 4
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT MATERIAL MATERIAL
VOLUME BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
SDP LT 4 ~ PP Irna Presidential 3 ; NYY 3 x 6
20
mm2
41.25 Meter - - - -
SDP LT 4 ~ PP Irna Presidential 4 ; NYY 3 x 6
21
mm2
47.08 Meter - - - -
Sub Total - - - -
C1 Lantai 1
Lighting cable installation. NYM 3x2.5 mm2 in HIC
1
Clipsal 20 mm.
10.00 Titik - - - -
Fan cable installation. NYM 3x2.5 mm2 in HIC
2
Clipsal 20 mm.
1.00 Titik - - - -
3 Down Light Dia 5 " LED 12W 1.00 Bh - - - -
4 TKO 2 x LED 18 Watt 8.00 Bh - - - -
5 Wall Light 12 w 1.00 Bh - - - -
6 Single Switch 1.00 Bh - - - -
7 Double Switch 1.00 Bh - - - -
Sub Total - - - -
C2 Lantai 2
Lighting cable installation. NYM 3x2.5 mm2 in HIC
1
Clipsal 20 mm.
113.00 Titik - - - -
Power outlet cable installation. NYM 3x2.5 mm2 in
2
HIC Clipsal 20 mm.
61.00 Titik - - - -
AC cable installation. NYM 3x2.5 mm2 in HIC
3
Clipsal 20 mm.
17.00 Titik - - - -
Fan cable installation. NYM 3x2.5 mm2 in HIC
4
Clipsal 20 mm.
3.00 Titik - - - -
5 Down Light Dia 5 " LED 12W 97.00 Bh - - - -
6 Down Light Dia 5 " LED 12W c/w Batteray 11.00 Bh - - - -
7 Strip Light LED 48.00 Meter - - - -
8 Exit Lamp 8 Watt c/w Batteray 1.00 Bh - - - -
ELECTRICAL/Page 5
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT MATERIAL MATERIAL
VOLUME BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
9 Wall Light 12 w 1.00 Bh - - - -
10 Single Switch 13.00 Bh - - - -
11 Double Switch 8.00 Bh - - - -
12 Power Outlet 1 Phase , Wall type 61.00 Bh - - - -
13 Power Outlet 1 Phase , Untuk AC 17.00 Bh - - - -
Sub Total - - - -
C3 Lantai 3
Lighting cable installation. NYM 3x2.5 mm2 in HIC
1
Clipsal 20 mm.
193.00 Titik - - - -
Power outlet cable installation. NYM 3x2.5 mm2 in
2
HIC Clipsal 20 mm.
169.00 Titik - - - -
AC cable installation. NYM 3x2.5 mm2 in HIC
3
Clipsal 20 mm.
25.00 Titik - - - -
Fan cable installation. NYM 3x2.5 mm2 in HIC
4
Clipsal 20 mm.
15.00 Titik - - - -
5 Down Light Dia 5 " LED 12W 187.00 Bh - - - -
6 Down Light Dia 5 " LED 12W c/w Batteray 5.00 Bh - - - -
7 Wall Light 12 w 1.00 Bh - - - -
8 Single Switch 17.00 Bh - - - -
9 Double Switch 10.00 Bh - - - -
10 Power Outlet 1 Phase , Wall type 169.00 Bh - - - -
11 Power Outlet 1 Phase , Untuk AC 25.00 Bh - - - -
Sub Total - - - -
C4 Lantai 4
Lighting cable installation. NYM 3x2.5 mm2 in HIC
1
Clipsal 20 mm.
151.00 Titik - - - -
Power outlet cable installation. NYM 3x2.5 mm2 in
2
HIC Clipsal 20 mm.
105.00 Titik - - - -
ELECTRICAL/Page 6
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT MATERIAL MATERIAL
VOLUME BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
AC cable installation. NYM 3x2.5 mm2 in HIC
3
Clipsal 20 mm.
17.00 Titik - - - -
Fan cable installation. NYM 3x2.5 mm2 in HIC
4
Clipsal 20 mm.
21.00 Titik - - - -
5 Down Light Dia 5 " LED 12W 143.00 Bh - - - -
6 Down Light Dia 5 " LED 12W c/w Batteray 6.00 Bh - - - -
7 Strip Light LED 10.00 Meter - - - -
8 Wall Light 12 w 1.00 Bh - - - -
9 Single Switch 14.00 Bh - - - -
10 Double Switch 8.00 Bh - - - -
11 Power Outlet 1 Phase , Wall type 105.00 Bh - - - -
12 Power Outlet 1 Phase , Untuk AC 17.00 Bh - - - -
Sub Total - - - -
C5 Lantai Roof
Lighting cable installation. NYM 3x2.5 mm2 in HIC
1
Clipsal 20 mm.
33.00 Titik - - - -
2 Down Light Dia 5 " LED 12W 33.00 Bh - - - -
3 Double Switch 1.00 Bh - - - -
Sub Total - - - -
E KABEL TRAY
E1 Lantai 2 - - - -
1 Kabel Tray dim. 500 x 100 mm - Meter - - - -
2 Kabel Tray dim. 400 x 100 mm 37.38 Meter - - - -
3 Support Material 1.00 Lot - - - -
- - - -
E2 Lantai 3 - - - -
1 Kabel Tray dim. 500 x 100 mm - Meter - - - -
2 Kabel Tray dim. 400 x 100 mm 37.38 Meter - - - -
3 Support Material 1.00 Lot - - - -
- - - -
E3 Lantai 4 - - - -
1 Kabel Tray dim. 500 x 100 mm - Meter - - - -
2 Kabel Tray dim. 400 x 100 mm 37.38 Meter - - - -
3 Support Material 1.00 Lot - - - -
Sub Total - - - -
1 TOTAL ELECTRICAL - - - -
ELECTRICAL/Page 7
REKAPITULASI
BILL OF QUANTITY ( BOQ ) MEP
A1 Kabel Feeder
Distribution MATV Cable, Coaxial RJ 11 in HIC c/w
support material
1 - Dari TB TV Lantai 3 ~ Splitter Lantai 3 49.50 Meter - - - -
2 - Dari TB TV Lantai 4 ~ Splitter Lantai 4 46.20 Meter - - - -
A2 Instalasi Kabel TV
A2.1 Lantai 2 - - - -
1 Instalasi kabel TV + HIC, Dari splitter Ke Outlet TV 3.00 Titik - - -
2 Televisi Socket Outlet, Wall type 3.00 Bh - - - -
A2.2 Lantai 3
1 Instalasi kabel TV + HIC, Dari splitter Ke Outlet TV 15.00 Titik - - - -
2 Televisi Socket Outlet, Wall type 15.00 Bh - - - -
A2.3 Lantai 4
1 Instalasi kabel TV + HIC, Dari splitter Ke Outlet TV 14.00 Titik - - - -
2 Televisi Socket Outlet, Wall type 14.00 Bh - - - -
Sub Total - - - -
B Pekerjaan Telepon
B1 Instalasi Kabel TLP
B1.1 Lantai 2
1 Cable Installation ITC 2 x 2 x 0,6 Sqmm 36.00 Titik - - - -
2 Telephone Socket Outlet Wall type 36.00 Unit - - - -
3 Single Line Telephone handset Analog standar 30.00 Unit - - - -
4 Single Line Telephone handset Digital 6.00 Unit - - - -
B1.2 Lantai 3
ELECTRONIC/Page 8
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
1 Cable Installation ITC 2 x 2 x 0,6 Sqmm 16.00 Titik - - - -
2 Telephone Socket Outlet Wall type 16.00 Unit - - - -
3 Single Line Telephone handset Analog standar 16.00 Unit - - - -
B1.3 Lantai 4
1 Cable Installation ITC 2 x 2 x 0,6 Sqmm 11.00 Titik - - - -
2 Telephone Socket Outlet Wall type 11.00 Unit - - - -
3 Single Line Telephone handset Analog standar 11.00 Unit - - - -
Sub Total - - - -
C Pekerjaan Internet
C3.1 Lantai 1
1 Wiring Management 1.00 Lot - - - -
2 Wi fi installation cable , UTP Cat 6 in HIC 3.00 Titik - - - -
3 Wall Outlet Data installation cable , UTP Cat 6 in HIC 14.00 Titik - - - -
4 Access Point 3.00 Unit - - - -
5 Wall Outlet Data 14.00 Unit - - - -
C3.2 Lantai 2
1 Wiring Management 1.00 Lot - - - -
2 Wi fi installation cable , UTP Cat 6 in HIC 2.00 Titik - - - -
3 Wall Outlet Data installation cable , UTP Cat 6 in HIC 37.00 Titik - - - -
4 Access Point 2.00 Unit - - - -
5 Wall Outlet Data 37.00 Unit - - - -
C3.3 Lantai 3
1 Wiring Management 1.00 Lot - - - -
2 Wi fi installation cable , UTP Cat 6 in HIC 1.00 Titik - - - -
3 Access Point 1.00 Unit - - - -
C3.4 Lantai 4
1 Wiring Management 1.00 Lot - - - -
2 Wi fi installation cable , UTP Cat 6 in HIC 1.00 Titik - - - -
3 Wall Outlet Data installation cable , UTP Cat 6 in HIC 2.00 Titik - - - -
4 Access Point 1.00 Unit - - - -
ELECTRONIC/Page 9
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
5 Wall Outlet Data 2.00 Unit - - - -
Sub Total - - - -
D1.2 Lantai 2
Instalasi Alarm Detector Cable NYA 2x1.5 Sqmm in
1 24.00 Titik - - - -
HIC
Insyalasi break glass, Alarm Bell & Alarm Lamp Cable,
2 1.00 Titik - - - -
NYA 2x1.5 Sqmm in HIC
3 Smoke Detector 24.00 Bh - - - -
4 Manual break glass Push Button 1.00 Bh - - - -
5 Alarm Bell 1.00 Bh - - - -
6 Alarm Indicator Lamp 1.00 Bh - - - -
7 End of Line 3.00 Bh - - - -
D1.3 Lantai 3
Instalasi Alarm Detector Cable NYA 2x1.5 Sqmm in
1 23.00 Titik - - - -
HIC
Insyalasi break glass, Alarm Bell & Alarm Lamp Cable,
2 1.00 Titik - - - -
NYA 2x1.5 Sqmm in HIC
3 Smoke Detector 22.00 Bh - - - -
4 Heat Detector 1.00 Bh - - - -
5 Manual break glass Push Button 1.00 Bh - - - -
6 Alarm Bell 1.00 Bh - - - -
7 Alarm Indicator Lamp 1.00 Bh - - - -
8 End of Line 3.00 Bh - - - -
ELECTRONIC/Page 10
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
D1.4 Lantai 4
Instalasi Alarm Detector Cable NYA 2x1.5 Sqmm in
1 27.00 Titik - - - -
HIC
Insyalasi break glass, Alarm Bell & Alarm Lamp Cable,
2 1.00 Titik - - - -
NYA 2x1.5 Sqmm in HIC
3 Smoke Detector 27.00 Bh - - - -
4 Manual break glass Push Button 1.00 Bh - - - -
5 Alarm Bell 1.00 Bh - - - -
6 Alarm Indicator Lamp 1.00 Bh - - - -
7 End of Line 3.00 Bh - - - -
D1.5 Lantai 4
Instalasi Alarm Detector Cable NYA 2x1.5 Sqmm in
1 10.00 Titik - - - -
HIC
2 Smoke Detector 10.00 Bh - - - -
3 End of Line 1.00 Bh - - - -
Sub Total - - - -
E1.2 Lantai 2
Instalasi Ceiling Speaker Cable NYMHY 2 x1.5 Sqmm
2 18.00 Titik - - - -
in HIC
3 Ceiling Speaker 3 w 18.00 Bh - - - -
E1.3 Lantai 3
Instalasi Ceiling Speaker Cable NYMHY 2 x1.5 Sqmm
1 19.00 Titik - - - -
in HIC
2 Ceiling Speaker 3 w 19.00 Bh - - - -
E1.4 Lantai 4
ELECTRONIC/Page 11
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
Instalasi Ceiling Speaker Cable NYMHY 2 x1.5 Sqmm
1 24.00 Titik - - - -
in HIC
2 Ceiling Speaker 3 w 24.00 Bh - - - -
Sub Total - - - -
F Pekerjaan CCTV
F1 Instalasi Kabel CCTV
E1.1 Lantai 1
1 CCTV Installation Cabel cable UTP Cat 6 in HIC 5.00 Titik - - - -
2 Outdoor Camera 2 MP HD IR 5.00 Unit - - - -
F1.2 Lantai 2
1 CCTV Installation Cabel cable UTP Cat 6 in HIC 5.00 Titik - - - -
2 Indoor Dome Camera 2 MP HD IR 5.00 Unit - - - -
F1.3 Lantai 3
1 CCTV Installation Cabel cable UTP Cat 6 in HIC 2.00 Titik - - - -
2 Indoor Dome Camera 2 MP HD IR 2.00 Unit - - - -
F1.4 Lantai 4
3 CCTV Installation Cabel cable UTP Cat 6 in HIC 2.00 Titik - - - -
4 Indoor Dome Camera 2 MP HD IR 2.00 Unit - - - -
Sub Total - - - -
G2 Lantai 4
ELECTRONIC/Page 12
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
1 Instalasi cable nurse call Presidential 4.00 Lot - - - -
2 Instalasi cable nurse call Eksekutif 6.00 Lot - - - -
3 Call Reset Button 10.00 bh - - - -
4 Corridor Call Light 10.00 bh - - - -
5 Bathroom Pull Cord, Moisture Resistence 10.00 bh - - - -
6 Ceiling Speaker 10.00 bh - - - -
7 Metal Jack + Bedside Call Switch + Mic 10.00 bh - - - -
Sub Total - - - -
H KABEL TRAY
H1 Lantai 1
1 Kabel Tray dim. 300 x 100 mm 37.38 Meter - - - -
2 Support Material 1.00 Lot - - - -
H2 Lantai 2
1 Kabel Tray dim. 300 x 100 mm 37.38 Meter - - - -
2 Support Material 1.00 Lot - - - -
H3 Lantai 3
1 Kabel Tray dim. 300 x 100 mm 37.38 Meter - - - -
2 Support Material 1.00 Lot - - - -
-
Sub Total - - - -
2 TOTAL ELECTRONIC - - - -
ELECTRONIC/Page 13
REKAPITULASI
BILL OF QUANTITY ( BOQ ) MEP
Sub Total - - - -
HYDRANT/Page 14
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
3 dia. 32 mm 8.80 Meter - - - -
4 dia. 25 mm 94.60 Meter - - - -
5 Fitting 1.00 Lot - - - -
6 Pendent Sprinkler 1.00 Bh - - - -
7 Uprite Sprinkler 19.00 Bh - - - -
HYDRANT/Page 15
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH TOTAL
UTAMA UTAMA
Sub Total - - - -
HYDRANT/Page 16
REKAPITULASI
BILL OF QUANTITY ( BOQ ) MEP
PEMILIK PROYEK : DR. ANAK AGUNG GEDE PUTRA DANANJAYA, M.BIOMED, SP.B
A PEKERJAAN AC
A1 Equipment Lantai 1
Indoor & Outdoor Unit AC complete with absorber
vibration mounting, hanger, support dan
accessories
1 AC Tipe Wall Mounted 3/4 PK Unit - - - -
2 AC Tipe Wall Mounted 1 PK Unit - - - -
3 AC Tipe Wall Mounted 1,5 PK Unit - - - -
4 AC Tipe Wall Mounted 2 PK Unit - - - -
5 AC Tipe Ceeling Casset 2 PK Unit - - - -
6 AC Tipe Ceeling Concealed 1,5 PK Unit - - -
B1 Equipment Lantai 2
AC/Page 17
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH TOTAL
UTAMA BAHAN UPAH UTAMA
Indoor & Outdoor Unit AC complete with absorber
vibration mounting, hanger, support dan
accessories
1 AC Tipe Wall Mounted 1/2 PK 2.00 Unit - - - -
2 AC Tipe Wall Mounted 3/4 PK 5.00 Unit - - - -
3 AC Tipe Wall Mounted 1 PK 2.00 Unit - - - -
4 AC Tipe Wall Mounted 2 PK 9.00 Unit - - - -
C1 Equipment Lantai 3
AC/Page 18
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH TOTAL
UTAMA BAHAN UPAH UTAMA
Indoor & Outdoor Unit AC complete with absorber
vibration mounting, hanger, support dan
accessories
1 AC Tipe Wall Mounted 1,5 PK 15.00 Unit - - - -
2 AC Tipe Ceeling Concealed 3 PK 1.00 Unit - - - -
D1 Equipment Lantai 4
Indoor & Outdoor Unit AC complete with absorber
vibration mounting, hanger, support dan
accessories
1 AC Tipe Wall Mounted 1/2 PK 5.00 Unit - - - -
2 AC Tipe Wall Mounted 3/4 PK 1.00 Unit - - - -
2 AC Tipe Wall Mounted 1 PK - Unit - - - -
3 AC Tipe Wall Mounted 1,5 PK 14.00 Unit - - - -
4 AC Tipe Ceeling Concealed 3 PK 1.00 Unit - - - -
AC/Page 19
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH TOTAL
UTAMA BAHAN UPAH UTAMA
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
2 kabel dari indoor ke outdoor, AC 1 PK 13.20 Meter
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
3 kabel dari indoor ke outdoor, AC 1,5 PK 184.80 Meter
Pipa Refrigerant lengkap dengan Insulation dan
- - - -
4 kabel dari indoor ke outdoor, AC 3 PK 13.20 Meter
E1 Equipment Ruang OK
Indoor & Outdoor Unit AC complete with absorber
vibration mounting, hanger, support dan
accessories
1 AHU 180000 Btu/h 2.00 Unit - - - -
Sub Total - - - -
B2 Lantai 3
1 Exhaust Fan Tipe Ceiling 100 CMH 15.00 Unit - - - -
2 Exhaust Fan Tipe Ceiling 180 CMH 16.00 Unit - - - -
AC/Page 20
HARGA SATUAN JUMLAH HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH TOTAL
UTAMA BAHAN UPAH UTAMA
Exhaust Ducting, support hanger and bolt PVC AW
187.00 - - - -
3 Dia 4" Meter
4 Grill 400 x 150mm 2.00 Unit - - - -
5 Grill 800 x 150mm 7.00 Unit - - - -
B4 Lantai 4
1 Exhaust Fan Tipe Ceiling 100 CMH 15.00 Unit - - - -
2 Exhaust Fan Tipe Ceiling 180 CMH 17.00 Unit - - - -
Exhaust Ducting, support hanger and bolt PVC AW
- - - -
3 Dia 4" 243.10 Meter
4 Grill 150 x 150mm 2.00 Unit - - - -
4 Grill 400 x 150mm 2.00 Unit - - - -
5 Grill 600 x 150mm 1.00 Unit - - - -
6 Grill 800 x 150mm 6.00 Unit - - - -
Sub Total - - - -
AC/Page 21
REKAPITULASI
BILL OF QUANTITY ( BOQ ) MEP
A2 Pemipaan Lantai 3
Pipa PPR PN.10
1 Ø 50mm (1,5") 21.78 Meter - - - -
2 Ø 32mm (1") 8.14 Meter - - - -
3 Ø 25mm (3/4") 37.29 Meter - - - -
4 Ø 20mm (1/2") 310.20 Meter - - - -
5 Gate valve Ø3/4" 14.00 Bh - - - -
6 Fitting & support 1.00 Lot - - - -
A3 Pemipaan Lantai 4
Pipa PPR PN.10
1 Ø 50mm (1,5") 21.78 Meter - - - -
2 Ø 32mm (1") 8.14 Meter - - - -
3 Ø 25mm (3/4") 22.00 Meter - - - -
4 Ø 20mm (1/2") 224.40 Meter - - - -
5 Gate valve Ø3/4" 10.00 Bh - - - -
6 Fitting & support 1.00 Lot - - - -
Sub Total - - - -
PLUMBING/Page 22
HARGA SATUAN JUMLAH HARGA
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH HARGA TOTAL
UTAMA UTAMA
3 Ø 20mm (1/2") 198.00 Meter - - - -
4 Gate valve Ø3/4" 14.00 Bh - - - -
5 Fitting & support 1.00 Lot - - - -
B2 Pemipaan Lantai 4
Pipa PPR PN.20
1 Ø 32mm (1") 59.84 Meter - - - -
2 Ø 25mm (3/4") 22.00 Meter - - - -
3 Ø 20mm (1/2") 158.40 Meter - - - -
4 Gate valve Ø3/4" 10.00 Bh - - - -
5 Fitting & support 1.00 Lot - - - -
Sub Total - - - -
C2 Pemipaan Lantai 2
Pipa PVC AW
1 Dia 4" 94.60 Meter - - - -
2 Dia 3" 22.77 Meter - - - -
3 Dia 2" 16.83 Meter - - - -
4 Dia 1.5" 6.27 Meter - - - -
5 Fitting & support 1.00 Lot - - - -
6 FWG 2.00 Unit - - - -
7 PVC CO 4" 1.00 Bh - - - -
8 PVC CO 3" 1.00 Bh - - - -
C3 Pemipaan Lantai 3
Pipa PVC AW
1 Dia 4" 101.75 Meter - - - -
2 Dia 3" 47.96 Meter - - - -
3 Dia 2" 64.35 Meter - - - -
4 Dia 1.5" 52.80 Meter - - - -
5 Fitting & support 1.00 Lot - - - -
6 FWG 15.00 Unit - - - -
7 PVC CO 4" 1.00 Bh - - - -
8 PVC CO 3" 1.00 Bh - - - -
C4 Pemipaan Lantai 4
PLUMBING/Page 23
HARGA SATUAN JUMLAH HARGA
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH HARGA TOTAL
UTAMA UTAMA
Pipa PVC AW
1 Dia 4" 94.60 Meter - - - -
2 Dia 3" 22.00 Meter - -
3 Dia 2" 67.65 Meter - - - -
4 Dia 1.5" 39.60 Meter - - - -
5 Fitting & support 1.00 Lot - - - -
6 FWG 10.00 Unit - - - -
Sub Total - - - -
Sub Total - - - -
E2 Lantai 2
Pipa PVC AW
1 Dia 4" 39.60 Meter - - - -
PLUMBING/Page 24
HARGA SATUAN JUMLAH HARGA
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH HARGA TOTAL
UTAMA UTAMA
2 Dia 2" 6.60 Meter - - - -
3 Fitting & support 1.00 Lot - - - -
4 Floor Drain 2.00 Unit - - - -
E3 Lantai 3
Pipa PVC AW
1 Dia 4" 39.60 Meter - - - -
2 Dia 2" 6.60 Meter - - - -
3 Fitting & support 1.00 Lot - - - -
4 Floor Drain 2.00 Unit - - - -
E4 Lantai 4
Pipa PVC AW
1 Dia 4" 39.60 Meter - - - -
2 Dia 2" 6.60 Meter - - - -
3 Fitting & support 1.00 Lot - - - -
4 Floor Drain 2.00 Unit - - - -
E5 Lantai Atap
Pipa PVC AW
1 Dia 4" 29.70 Meter - - - -
2 Fitting & support 1.00 Lot - - - -
3 Roof Drain 4" 9.00 Unit - - - -
Sub Total - - - -
PLUMBING/Page 25
HARGA SATUAN JUMLAH HARGA
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL MATERIAL
BAHAN UPAH BAHAN UPAH HARGA TOTAL
UTAMA UTAMA
6 Tap Vacum 10.00 bh - - - -
Sub Total - - - -
5 TOTAL PLUMBING - - - -
PLUMBING/Page 26