PRODUCTION FLOW
IS 36-PORT
DATA HAULING 1 – 10 JULY 2023
DATE BAS/BP/MIP/107 IS 36 Grand Total DATE CC UC Grand Total
1-Jul-23 26.188,69 34.406,71 60.595,40 1-Jul-23 35.887,15 24.708,25 60.595,40
2-Jul-23 29.277,11 29.956,78 59.233,89 2-Jul-23 27.627,47 31.606,42 59.233,89
3-Jul-23 30.504,62 26.618,46 57.123,08 3-Jul-23 23.972,89 33.150,19 57.123,08 HAULING
4-Jul-23 33.500,18 29.540,53 63.040,71 HAULING IN 4-Jul-23 34.763,78 28.276,93 63.040,71
IN PORT
PORT BASE
5-Jul-23 32.772,78 30.802,90 63.575,68 5-Jul-23 36.908,84 26.666,84 63.575,68
6-Jul-23 30.021,99 36.037,77 66.059,76 6-Jul-23 38.364,78 27.694,98 66.059,76 BASE ON
7-Jul-23 26.053,78 30.062,47 56.116,25 ON IS107 / 7-Jul-23 33.838,06 22.278,19 56.116,25
UC / CC
8-Jul-23 27.284,52 29.376,25 56.660,77 8-Jul-23 28.404,89 28.255,88 56.660,77
9-Jul-23 30.909,77 27.185,30 58.095,07 IS36 9-Jul-23 28.888,68 29.206,39 58.095,07
10-Jul-23 29.422,10 27.719,77 57.141,87 10-Jul-23 27.893,75 29.248,12 57.141,87
Grand Total 295.935,54 301.706,94 597.642,48 Grand Total 316.550,29 281.092,19 597.642,48
UC
DATE Grand Total
107 36
1-Jul-23
2-Jul-23
9.815,22
14.796,87
14.893,03
16.809,55
24.708,25
31.606,42 CAPACITY CRUSHER PORT 24.000 TON / DAY
3-Jul-23 19.691,78 13.458,41 33.150,19 HAULING
4-Jul-23 14.439,72 13.837,21 28.276,93
UC IS 36/107
FROM 1 – 10 JULY, RATE IN UNCRUCH PER
5-Jul-23 13.518,71 13.148,13 26.666,84
6-Jul-23 11.174,12 16.520,86 27.694,98 TO PORT
7-Jul-23
8-Jul-23
7.366,90
11.962,98
14.911,29
16.292,90
22.278,19
28.255,88
DAY OVER THAN CAPACITY CRUSHER PORT
9-Jul-23 15.492,15 13.714,24 29.206,39
10-Jul-23 16.545,12 12.703,00 29.248,12
Grand Total 134.803,57 146.288,62 281.092,19
DATA CAPACITY DBT AND ST
CAPACITY
DBT / ST POPULASI PA 85% RITASE TONASE GRAND TOTAL
SUM 15 12,75 5 125 7968,75
BATARA 13 11,05 5 130 7182,50 MORE THAN ENOUGH
KBU 14 11,90 5 130 7735,00 SUPPLY CRUSHER PORT
ST KBS 20 17,00 5 75 6375,00